Attachment_1_F.1_52.211-10.pdf

PDF 12 KB Posted

Attached to
NGWSP Block 9 through 11 Federal contract opportunity
Solicitation number
R17PS00812
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP Block 9 through 11, newest first.
File Type Posted
Attachment_5_Test_Pit_Photos.pdf PDF
Attachment_6_Block_9-11_Q&A's.docx DOCX document
Attachment_4_Drill_Hole_Photos.pdf PDF
SF-30_R17PS00812_Amendment_5.pdf PDF
Attachment_3_REVISED_Drawings.pdf PDF
Attachment_2_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_Schedule_B.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_5_Block_9-11_Q&A's_7-28-2017.docx DOCX document
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.pdf PDF
Attachment_4_REVISED_Drawings.pdf PDF
SF_30.pdf PDF
Attachment_4_REVISED_Drawings.pdf PDF
Attachment_3_REVISED_Specifications.pdf PDF
SF-30_Amendment_000003.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
SF-30_Amendment_2.pdf PDF
Attachment_6_Block_9-11_Site_Tour_Q&A's.docx DOCX document
Attachment_3_L.15_WBR_1452.236-86.pdf PDF
Attachment_2_I.26_WBR_1452.232-81_AltIII.pdf PDF
Attachment_5_Block_9_-_11_SITE_TOUR_AGENDA.pdf PDF
Attachment_4_Sign-in_sheet.pdf PDF
Tab_13_SF-30_AMD_000001.pdf PDF
Attachment_3_Geology_Drawings_And_Logs.pdf PDF
Attachment_4_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_6_Past_Performance_Questionnaire.pdf PDF
Attachment_5_Wage_Rate_Requirements_(Construction)_Wage_Determinations.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_7_Site_Visit_Location_Maps.pdf PDF
R17PS00812.pdf PDF
Tab_09_Synopsis_(1).docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK

APR 1984

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives:

1) Notice to Proceed for non-site work under this contract,

2) Notice to Proceed for site work on Reach 10 (Station 10003+58.44 to Station 10050+57 and the

Temporary 6-Inch Construction Water Line), and Reach 11 (Station 11058+00 to Station 11279+80), which is anticipated to be issued no later than January 29, 2018, and

3) Notice to Proceed for site work on Reach 9 (Station 90000+00 to Station 91220+00), which is anticipated to be issued no later than June 25, 2018.

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 910 calendar days after the contractor receives the initial non-site work Notice to Proceed issued in accordance with (a)(1) above. The time stated for completion shall include final cleanup of the premises.

File details come from the government source that posted it. Updated .