Attachment_1_REVISED_R17PS00812_Schedule_B.pdf

PDF 146 KB Posted

Attached to
NGWSP Block 9 through 11 Federal contract opportunity
Solicitation number
R17PS00812
Issued by
Department of the Interior Bureau of Reclamation

About this file

Revised Schedule B

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP Block 9 through 11, newest first.
File Type Posted
Attachment_5_Test_Pit_Photos.pdf PDF
Attachment_6_Block_9-11_Q&A's.docx DOCX document
Attachment_4_Drill_Hole_Photos.pdf PDF
SF-30_R17PS00812_Amendment_5.pdf PDF
Attachment_3_REVISED_Drawings.pdf PDF
Attachment_2_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_Schedule_B.docx DOCX document
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_5_Block_9-11_Q&A's_7-28-2017.docx DOCX document
Attachment_4_REVISED_Drawings.pdf PDF
SF_30.pdf PDF
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_4_REVISED_Drawings.pdf PDF
SF-30_Amendment_000003.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_2_I.26_WBR_1452.232-81_AltIII.pdf PDF
SF-30_Amendment_2.pdf PDF
Attachment_6_Block_9-11_Site_Tour_Q&A's.docx DOCX document
Attachment_3_L.15_WBR_1452.236-86.pdf PDF
Attachment_1_F.1_52.211-10.pdf PDF
Attachment_5_Block_9_-_11_SITE_TOUR_AGENDA.pdf PDF
Attachment_4_Sign-in_sheet.pdf PDF
Tab_13_SF-30_AMD_000001.pdf PDF
Attachment_6_Past_Performance_Questionnaire.pdf PDF
Attachment_5_Wage_Rate_Requirements_(Construction)_Wage_Determinations.pdf PDF
Attachment_3_Geology_Drawings_And_Logs.pdf PDF
Attachment_4_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_1_Specifications.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_7_Site_Visit_Location_Maps.pdf PDF
R17PS00812.pdf PDF
Tab_09_Synopsis_(1).docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e | 1 R17PS00812 NGWSP Block 9 through 11

CONTINUATION OF

SECTION B - SUPPLIES OR SERVICES AND PRICE

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the Price Schedules 1, 2 and 3, but no offer will be considered for award on only part of the Price Schedules.

(1) Offerors shall complete Price Schedules 1, 2 and 3. Offers for less than the total of Price Schedules 1, 2 and 3 will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated based on the total of Price Schedules 1, 2 and 3.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedules are estimated quantities for comparison of offers only and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1 of Price Schedules 1, 2 and 3.

(e) Definitions:

(1) CLIN - Contract Line Item Number.

PRICE SCHEDULE 1 (Reach 9)

CLIN Section Supplies or Services Quantity and Unit Unit Price Amount

1 WBR

1452.232.81 Mobilization and Preparatory Work For the lump sum of $

2 01 31 30 Contract Document Management System For the lump sum of $

3 01 56 15 Utility Crossing Investigation For the lump sum of $

4 02 82 20 Pipe Removal and Disposal of Asbestos Containing Materials

10,000 lin. ft. $ $

P a g e | 2

Unit Unit Price Amount

5 26 42 10 Cathodic Protection and Corrosion Monitoring Systems

For the lump sum of $

6 31 02 10 Water for Dust Abatement 11,500 MGal $ $

7 31 02 30 Dust Palliative For the lump sum of $

8 31 11 00 Clearing and Grubbing For the lump sum of $

9 31 14 10 Stripping, Stockpiling and Placement

For the lump sum of $

9A 31 23 22 Mobilization of Trench Box For the lump sum of $

9B 31 23 22 Use of Trench Box 1,400 lin. ft. $ $

10 31 23 22 Excavation for Pipe Trenches 310,000 yd3 $ $

11 31 23 22 Rock Excavation for Pipe Trenches 29,000 yd3 $ $

12 31 23 22 Embedment in Pipe Trenches 28,800 yd3 $ $

13 31 23 22 Backfill for Pipe Trenches 203,000yd3 $ $

14 32 15 10 Gravel Surfacing 3,460 ton $ $

15 32 91 60 Erosion Control Blanket 11,500 yd2 $ $

16 33 05 21 Bored Road Crossing Gas Plant Road

90 lin. ft. $ $

17 33 05 21 Bored Gas Line Crossings 285 lin. ft. $ $

18 33 11 10 Line Pipe 42B100 1,500 lin. ft. $ $

19 33 11 10 Line Pipe 42B125 3,830 lin. ft. $ $

20 33 11 10 Line Pipe 42C125 170 lin. ft. $ $

21 33 11 10 Line Pipe 42B150 2,700 lin. ft. $ $

P a g e | 3

Unit Unit Price Amount

22 33 11 10 Line Pipe 42B175 3,600 lin. ft. $ $

23 33 11 10 Line Pipe 42D175 400 lin. ft. $ $

24 33 11 10 Line Pipe 42B200 2,300 lin. ft. $ $

25 33 11 10 Line Pipe 42B225 2,500 lin. ft. $ $

26 33 11 10 Line Pipe 42B250 8,000 lin. ft. $ $

27 33 11 10 Line Pipe 42B275 5,700 lin. ft. $ $

28 33 11 10 Line Pipe 42B300 3,400 lin. ft. $ $

29 33 11 10 Line Pipe 48B300 1,300 lin. ft. $ $

30 33 11 10 Line Pipe 48B325 13,980 lin. ft. $ $

31 33 11 10 Line Pipe 48C325 220 lin. ft. $ $

32 33 11 10 Line Pipe 48B350 2,700 lin. ft. $ $

33 33 11 10 Line Pipe 48B375 12,843 lin. ft. $ $

34 33 11 10 Line Pipe 48C375 1,250 lin. ft. $ $

35 33 11 10 Line Pipe 48B400 6,765 lin. ft. $ $

36 33 11 10 Line Pipe 48K400 241 lin. ft. $ $

37 33 11 10 Line Pipe 48B425 300 lin. ft. $ $

38 33 11 10 Line Pipe 48C425 200 lin. ft. $ $

39 33 11 10 Line Pipe 48K425 100 lin. ft. $ $

P a g e | 4

Unit Unit Price Amount

40 33 11 10 Line Pipe 48B450 3,000 lin. ft. $ $

41 33 11 10 Line Pipe 48D450 200 lin. ft. $ $

42 33 11 10 Line Pipe 48B475 3,360 lin. ft. $ $

43 33 11 10 Line Pipe 48C475 100 lin. ft. $ $

44 33 11 10 Line Pipe 48D475 420 lin. ft. $ $

45 33 11 10 Line Pipe 48K475 120 lin. ft. $ $

46 33 11 10 Line Pipe 48B500 17,738 lin. ft. $ $

47 33 11 10 Line Pipe 48C500 1,300 lin. ft. $ $

48 33 11 10 Line Pipe 48D500 480 lin. ft. $ $

49 33 11 10 Line Pipe 48K500 120 lin. ft. $ $

50 33 11 10 Line Pipe 48B525 2,400 lin. ft. $ $

51 33 11 10 Line Pipe 48D525 210 lin. ft. $ $

52 33 11 10 Line Pipe 48K525 50 lin. ft. $ $

53 33 11 10 Line Pipe 48B550 1,000 lin. ft. $ $

54 33 11 10 Line Pipe 48B575 2,760 lin. ft. $ $

55 33 11 10 Line Pipe 48C575 400 lin. ft. $ $

56 33 11 10 Line Pipe 48B600 2,600 lin. ft. $ $

57 33 11 10 Line Pipe 48D600 440 lin. ft. $ $

P a g e | 5

Unit Unit Price Amount

58 33 11 10 Line Pipe 48K600 100 lin. ft. $ $

59 33 11 10 Line Pipe 48B625 5,172 lin. ft. $ $

60 33 11 10 Line Pipe 48C625 200 lin. ft. $ $

61 33 11 10 Line Pipe 48B650 4,200 lin. ft. $ $

62 33 11 10 Line Pipe 48C650 300 lin. ft. $ $

63 33 11 10 Line Pipe 48D650 955 lin. ft. $ $

64 33 11 10 Filling and Testing Pipe For the lump sum of $

65 33 11 10 Repair Kits For the lump sum of $

66 33 22 15 42-Inch Sectionalizing Valve Assemblies – Class 150

7 ea. $ $

67 33 22 15 48-Inch Sectionalizing Valve Assemblies – Class 150

2 ea. $ $

68 33 22 15 48-Inch Sectionalizing Valve Assemblies – Class 250

12 ea. $ $

69 33 22 15 48-Inch Sectionalizing Valve Assemblies – Class 350

3 ea. $ $

70 33 22 15 Six Inch Diameter Air Valve Assemblies – 150 lb

3 ea. $ $

71 33 22 15 Six Inch Diameter Air Valve Assemblies – 300 lb

13 ea. $ $

72 33 22 15 Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb

10 ea. $ $

73 33 22 15 Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb

28 ea. $ $

74 33 22 15 Six Inch Diameter Blowoff Assemblies – 300 lb

9 ea. $ $

75 33 22 15 Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb

12 ea. $ $

P a g e | 6

Unit Unit Price Amount

76 33 22 15 Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb

25 ea. $ $

77 33 22 15 24-Inch Buried Manhole Assemblies

– 150 lb

12 ea. $ $

78 33 22 15 24-Inch Buried Manhole Assemblies

– 300 lb

3 ea. $ $

79 35 42 35 Wash Crossing 90023+26 For the lump sum of $

80 35 42 35 Wash Crossing 90077+09 For the lump sum of $

81 35 42 35 Wash Crossings 90095+94 and 90097+40

For the lump sum of $

82 35 42 35 Wash Crossing 90106+05 For the lump sum of $

83 35 42 35 Wash Crossing 90124+68 For the lump sum of $

84 35 42 35 Wash Crossing 90163+39 For the lump sum of $

85 35 42 35 Wash Crossing 90261+28 For the lump sum of $

86 35 42 35 Wash Crossing 90283+24 For the lump sum of $

87 35 42 35 Wash Crossing 90298+25 For the lump sum of $

88 35 42 35 Wash Crossing 90376+25 For the lump sum of $

89 35 42 35 Wash Crossing 90389+71 For the lump sum of $

90 35 42 35 Wash Crossing 90401+39 For the lump sum of $

91 35 42 35 Wash Crossing 90465+63 For the lump sum of $

92 35 42 35 Wash Crossing 90579+06 For the lump sum of $

93 35 42 35 Wash Crossing 90609+15 For the lump sum of $

P a g e | 7

Unit Unit Price Amount

94 35 42 35 Wash Crossing 90628+16 For the lump sum of $

95 35 42 35 Wash Crossing 90833+35 For the lump sum of $

96 35 42 35 Wash Crossing 91186+26 For the lump sum of $

TOTAL FOR PRICE SCHEDULE 1 (Reach 9) $______________

PRICE SCHEDULE 2 (Reach 10)

Unit Unit Price Amount

1 WBR

1452.232.81 Mobilization and Preparatory Work For the lump sum of $

2 01 56 15 Utility Crossing Investigation For the lump sum of $

3 26 42 10 Cathodic Protection and Corrosion Monitoring Systems

For the lump sum of $

4 31 02 10 Water for Dust Abatement 450 MGal $ $

5 31 02 30 Dust Palliative For the lump sum of $

6 31 11 00 Clearing and Grubbing For the lump sum of $

7 31 14 10 Stripping, Stockpiling and Placement

For the lump sum of $

7A 31 23 22 Mobilization of Trench Box For the lump sum of $

7B 31 23 22 Use of Trench Box 200 lin. ft. $ $

8 31 23 22 Excavation for Pipe Trenches 11,800 yd3 $ $

P a g e | 8

PRICE SCHEDULE 2 (Reach 10)

Unit Unit Price Amount

9 31 23 22 Rock Excavation for Pipe Trenches 1,500 yd3 $ $

10 31 23 22 Embedment in Pipe Trenches 1,000 yd3 $ $

11 31 23 22 Backfill for Pipe Trenches 8,800 yd3 $ $

12 33 11 10 Line Pipe 42B50 657 lin. ft. $ $

13 33 11 10 Line Pipe 42B75 1,000 lin. ft. $ $

14 33 11 10 Line Pipe 42C75 500 lin. ft. $ $

15 33 11 10 Line Pipe 42D75 200 lin. ft. $ $

16 33 11 10 Line Pipe 42B100 2,342 lin. ft. $ $

17 33 11 10 Temporary Construction Line For the lump sum of $

18 33 11 10 Filling and Testing Pipe For the lump sum of $

19 33 11 10 Repair Kits For the lump sum of $

20 33 22 15 Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb

2 ea. $ $

21 33 22 15 Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb

1 ea. $ $

22 33 22 15 24-Inch Buried Manhole Assemblies – 150 lb

1 ea. $ $

TOTAL FOR PRICE SCHEDULE 2 (Reach 10) $______________

P a g e | 9

PRICE SCHEDULE 3 (Reach 11)

Unit Unit Price Amount

1 WBR

1452.232.81 Mobilization and Preparatory Work For the lump sum of $

2 01 56 15 Utility Crossing Investigation For the lump sum of $

3 26 42 10 Cathodic Protection and Corrosion Monitoring Systems

For the lump sum of $

4 31 02 10 Water for Dust Abatement 2,100 MGal $ $

5 31 02 30 Dust Palliative For the lump sum of $

6 31 11 00 Clearing and Grubbing For the lump sum of $

7 31 14 10 Stripping, Stockpiling and Placement

For the lump sum of $

7A 31 23 22 Mobilization of Trench Box For the lump sum of $

7B 31 23 22 Use of Trench Box 400 lin. ft. $ $

8 31 23 22 Excavation for Pipe Trenches 49,200 yd3 $ $

9 31 23 22 Rock Excavation for Pipe Trenches 3,200 yd3 $ $

10 31 23 22 Embedment in Pipe Trenches 4,750 yd3 $ $

11 31 23 22 Backfill for Pipe Trenches 32,000 yd3 $ $

12 32 15 10 Gravel Surfacing 510 tons $ $

13 32 91 60 Erosion Control Blanket 1,000 yd2 $ $

14 33 05 21 Bored Road Crossing; BIA Road 9 450 lin. ft. $ $

15 33 11 10 Line Pipe 42B475 1,780 lin. ft. $ $

16 33 11 10 Line Pipe 42B500 700 lin. ft. $ $

P a g e | 10

PRICE SCHEDULE 3 (Reach 11)

Unit Unit Price Amount

17 33 11 10 Line Pipe 42B525 2,100 lin. ft. $ $

18 33 11 10 Line Pipe 42B550 1,100 lin. ft. $ $

19 33 11 10 Line Pipe 42B575 4,300 lin. ft. $ $

20 33 11 10 Line Pipe 42B600 2,500 lin. ft. $ $

21 33 11 10 Line Pipe 42K600 200 lin. ft. $ $

22 33 11 10 Line Pipe 42B625 2,300 lin. ft. $ $

23 33 11 10 Line Pipe 42B650 6,200 lin. ft. $ $

24 33 11 10 Line Pipe 42B675 600 lin. ft. $ $

25 33 11 10 Line Pipe 42B700 400 lin. ft. $ $

26 33 11 10 Filling and Testing Pipe For the lump sum of $

27 33 11 10 Repair Kits For the lump sum of $

28 33 22 15 42-Inch Sectionalizing Valve Assemblies – Class 350

2 ea. $ $

29 33 22 15 Six Inch Diameter Air Valve Assemblies – 300 lb

2 ea. $ $

30 33 22 15 Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb

5 ea. $ $

31 33 22 15 Six Inch Diameter Blowoff Assemblies – 300 lb

2 ea. $ $

32 33 22 15 Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb

4 ea. $ $

33 33 22 15 24-Inch Buried Manhole Assemblies

6 ea. $ $

34 35 42 35 Wash Crossing 11167+00 For the lump sum of $

TOTAL FOR PRICE SCHEDULE 3 (Reach 11) $______________

P a g e | 11

TOTAL FOR PRICE SCHEDULES 1, 2 and 3 $______________________

END OF SUPPLIES OR SERVICES AND PRICES

File details come from the government source that posted it. Updated .