Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- NGWSP Block 9 through 11 Federal contract opportunity
- Solicitation number
- R17PS00812
About this file
Attachment 2
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICE SCHEDULE 1 (Reach 9) | |||||
| CLIN | Section | Supplies or Services | Quantity and Unit | Unit Price | Amount |
| 1 | WBR 1452.232.81 | Mobilization and Preparatory Work | For the lump sum of | $ | |
| 2 | 01 31 30 | Contract Document Management System | For the lump sum of | $ | |
| 3 | 01 56 15 | Utility Crossing Investigation | For the lump sum of | $ | |
| 4 | 02 82 20 | Pipe Removal and Disposal of Asbestos Containing Materials | 10,000 lin. ft. | $ | $ |
| 5 | 26 42 10 | Cathodic Protection and Corrosion Monitoring Systems | For the lump sum of | $ | |
| 6 | 31 02 10 | Water for Dust Abatement | 11,500 MGal | $ | $ |
| 7 | 31 02 30 | Dust Palliative | For the lump sum of | $ | |
| 8 | 31 11 00 | Clearing and Grubbing | For the lump sum of | $ | |
| 9 | 31 14 10 | Stripping, Stockpiling and Placement | For the lump sum of | $ | |
| 10 | 31 23 22 | Excavation for Pipe Trenches | 310,000 yd3 | $ | $ |
| 11 | 31 23 22 | Rock Excavation for Pipe Trenches | 29,000 yd3 | $ | $ |
| 12 | 31 23 22 | Embedment in Pipe Trenches | 28,800 yd3 | $ | $ |
| 13 | 31 23 22 | Backfill for Pipe Trenches | 203,000yd3 | $ | $ |
| 14 | 32 15 10 | Gravel Surfacing | 3,460 ton | $ | $ |
| 15 | 32 91 60 | Erosion Control Blanket | 11,500 yd2 | $ | $ |
| 16 | 33 05 21 | Bored Road Crossing Gas Plant Road | 90 lin. ft. | $ | $ |
| 17 | 33 05 21 | Bored Gas Line Crossings | 285 lin. ft. | $ | $ |
| 18 | 33 11 10 | Line Pipe 42B100 | 1,500 lin. ft. | $ | $ |
| 19 | 33 11 10 | Line Pipe 42B125 | 3,830 lin. ft. | $ | $ |
| 20 | 33 11 10 | Line Pipe 42C125 | 170 lin. ft. | $ | $ |
| 21 | 33 11 10 | Line Pipe 42B150 | 2,700 lin. ft. | $ | $ |
| 22 | 33 11 10 | Line Pipe 42B175 | 3,600 lin. ft. | $ | $ |
| 23 | 33 11 10 | Line Pipe 42D175 | 400 lin. ft. | $ | $ |
| 24 | 33 11 10 | Line Pipe 42B200 | 2,300 lin. ft. | $ | $ |
| 25 | 33 11 10 | Line Pipe 42B225 | 2,500 lin. ft. | $ | $ |
| 26 | 33 11 10 | Line Pipe 42B250 | 8,000 lin. ft. | $ | $ |
| 27 | 33 11 10 | Line Pipe 42B275 | 5,700 lin. ft. | $ | $ |
| 28 | 33 11 10 | Line Pipe 42B300 | 3,400 lin. ft. | $ | $ |
| 29 | 33 11 10 | Line Pipe 48B300 | 1,300 lin. ft. | $ | $ |
| 30 | 33 11 10 | Line Pipe 48B325 | 13,980 lin. ft. | $ | $ |
| 31 | 33 11 10 | Line Pipe 48C325 | 220 lin. ft. | $ | $ |
| 32 | 33 11 10 | Line Pipe 48B350 | 2,700 lin. ft. | $ | $ |
| 33 | 33 11 10 | Line Pipe 48B375 | 12,843 lin. ft. | $ | $ |
| 34 | 33 11 10 | Line Pipe 48C375 | 1,250 lin. ft. | $ | $ |
| 35 | 33 11 10 | Line Pipe 48B400 | 6,765 lin. ft. | $ | $ |
| 36 | 33 11 10 | Line Pipe 48K400 | 241 lin. ft. | $ | $ |
| 37 | 33 11 10 | Line Pipe 48B425 | 300 lin. ft. | $ | $ |
| 38 | 33 11 10 | Line Pipe 48C425 | 200 lin. ft. | $ | $ |
| 39 | 33 11 10 | Line Pipe 48K425 | 100 lin. ft. | $ | $ |
| 40 | 33 11 10 | Line Pipe 48B450 | 3,000 lin. ft. | $ | $ |
| 41 | 33 11 10 | Line Pipe 48D450 | 200 lin. ft. | $ | $ |
| 42 | 33 11 10 | Line Pipe 48B475 | 3,360 lin. ft. | $ | $ |
| 43 | 33 11 10 | Line Pipe 48C475 | 100 lin. ft. | $ | $ |
| 44 | 33 11 10 | Line Pipe 48D475 | 420 lin. ft. | $ | $ |
| 45 | 33 11 10 | Line Pipe 48K475 | 120 lin. ft. | $ | $ |
| 46 | 33 11 10 | Line Pipe 48B500 | 17,738 lin. ft. | $ | $ |
| 47 | 33 11 10 | Line Pipe 48C500 | 1,300 lin. ft. | $ | $ |
| 48 | 33 11 10 | Line Pipe 48D500 | 480 lin. ft. | $ | $ |
| 49 | 33 11 10 | Line Pipe 48K500 | 120 lin. ft. | $ | $ |
| 50 | 33 11 10 | Line Pipe 48B525 | 2,400 lin. ft. | $ | $ |
| 51 | 33 11 10 | Line Pipe 48D525 | 210 lin. ft. | $ | $ |
| 52 | 33 11 10 | Line Pipe 48K525 | 50 lin. ft. | $ | $ |
| 53 | 33 11 10 | Line Pipe 48B550 | 1,000 lin. ft. | $ | $ |
| 54 | 33 11 10 | Line Pipe 48B575 | 2,760 lin. ft. | $ | $ |
| 55 | 33 11 10 | Line Pipe 48C575 | 400 lin. ft. | $ | $ |
| 56 | 33 11 10 | Line Pipe 48B600 | 2,600 lin. ft. | $ | $ |
| 57 | 33 11 10 | Line Pipe 48D600 | 440 lin. ft. | $ | $ |
| 58 | 33 11 10 | Line Pipe 48K600 | 100 lin. ft. | $ | $ |
| 59 | 33 11 10 | Line Pipe 48B625 | 5,172 lin. ft. | $ | $ |
| 60 | 33 11 10 | Line Pipe 48C625 | 200 lin. ft. | $ | $ |
| 61 | 33 11 10 | Line Pipe 48B650 | 4,200 lin. ft. | $ | $ |
| 62 | 33 11 10 | Line Pipe 48C650 | 300 lin. ft. | $ | $ |
| 63 | 33 11 10 | Line Pipe 48D650 | 955 lin. ft. | $ | $ |
| 64 | 33 11 10 | Filling and Testing Pipe | For the lump sum of | $ | |
| 65 | 33 11 10 | Repair Kits | For the lump sum of | $ | |
| 66 | 33 22 15 | 42-Inch Sectionalizing Valve Assemblies – Class 150 | 7 ea. | $ | $ |
| 67 | 33 22 15 | 48-Inch Sectionalizing Valve Assemblies – Class 150 | 2 ea. | $ | $ |
| 68 | 33 22 15 | 48-Inch Sectionalizing Valve Assemblies – Class 250 | 12 ea. | $ | $ |
| 69 | 33 22 15 | 48-Inch Sectionalizing Valve Assemblies – Class 350 | 3 ea. | $ | $ |
| 70 | 33 22 15 | Six Inch Diameter Air Valve Assemblies – 150 lb | 3 ea. | $ | $ |
| 71 | 33 22 15 | Six Inch Diameter Air Valve Assemblies – 300 lb | 13 ea. | $ | $ |
| 72 | 33 22 15 | Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb | 10 ea. | $ | $ |
| 73 | 33 22 15 | Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb | 28 ea. | $ | $ |
| 74 | 33 22 15 | Six Inch Diameter Blowoff Assemblies – 300 lb | 9 ea. | $ | $ |
| 75 | 33 22 15 | Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb | 12 ea. | $ | $ |
| 76 | 33 22 15 | Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb | 25 ea. | $ | $ |
| 77 | 33 22 15 | 24-Inch Buried Manhole Assemblies – 150 lb | 12 ea. | $ | $ |
| 78 | 33 22 15 | 24-Inch Buried Manhole Assemblies – 300 lb | 3 ea. | $ | $ |
| 79 | 35 42 35 | Wash Crossing 90023+26 | For the lump sum of | $ | |
| 80 | 35 42 35 | Wash Crossing 90077+09 | For the lump sum of | $ | |
| 81 | 35 42 35 | Wash Crossings 90095+94 and 90097+40 | For the lump sum of | $ | |
| 82 | 35 42 35 | Wash Crossing 90106+05 | For the lump sum of | $ | |
| 83 | 35 42 35 | Wash Crossing 90124+68 | For the lump sum of | $ | |
| 84 | 35 42 35 | Wash Crossing 90163+39 | For the lump sum of | $ | |
| 85 | 35 42 35 | Wash Crossing 90261+28 | For the lump sum of | $ | |
| 86 | 35 42 35 | Wash Crossing 90283+24 | For the lump sum of | $ | |
| 87 | 35 42 35 | Wash Crossing 90298+25 | For the lump sum of | $ | |
| 88 | 35 42 35 | Wash Crossing 90376+25 | For the lump sum of | $ | |
| 89 | 35 42 35 | Wash Crossing 90389+71 | For the lump sum of | $ | |
| 90 | 35 42 35 | Wash Crossing 90401+39 | For the lump sum of | $ | |
| 91 | 35 42 35 | Wash Crossing 90465+63 | For the lump sum of | $ | |
| 92 | 35 42 35 | Wash Crossing 90579+06 | For the lump sum of | $ | |
| 93 | 35 42 35 | Wash Crossing 90609+15 | For the lump sum of | $ | |
| 94 | 35 42 35 | Wash Crossing 90628+16 | For the lump sum of | $ | |
| 95 | 35 42 35 | Wash Crossing 90833+35 | For the lump sum of | $ | |
| 96 | 35 42 35 | Wash Crossing 91186+26 | For the lump sum of | $ | |
| TOTAL FOR PRICE SCHEDULE 1 (Reach 9) $______________ | |||||
| PRICE SCHEDULE 2 (Reach 10) | |||||
| CLIN | Section | Supplies or Services | Quantity and Unit | Unit Price | Amount |
| 1 | WBR 1452.232.81 | Mobilization and Preparatory Work | For the lump sum of | $ | |
| 2 | 01 56 15 | Utility Crossing Investigation | For the lump sum of | $ | |
| 3 | 26 42 10 | Cathodic Protection and Corrosion Monitoring Systems | For the lump sum of | $ | |
| 4 | 31 02 10 | Water for Dust Abatement | 450 MGal | $ | $ |
| 5 | 31 02 30 | Dust Palliative | For the lump sum of | $ | |
| 6 | 31 11 00 | Clearing and Grubbing | For the lump sum of | $ | |
| 7 | 31 14 10 | Stripping, Stockpiling and Placement | For the lump sum of | $ | |
| 8 | 31 23 22 | Excavation for Pipe Trenches | 11,800 yd3 | $ | $ |
| 9 | 31 23 22 | Rock Excavation for Pipe Trenches | 1,500 yd3 | $ | $ |
| 10 | 31 23 22 | Embedment in Pipe Trenches | 1,000 yd3 | $ | $ |
| 11 | 31 23 22 | Backfill for Pipe Trenches | 8,800 yd3 | $ | $ |
| 12 | 33 11 10 | Line Pipe 42B50 | 657 lin. ft. | $ | $ |
| 13 | 33 11 10 | Line Pipe 42B75 | 1,000 lin. ft. | $ | $ |
| 14 | 33 11 10 | Line Pipe 42C75 | 500 lin. ft. | $ | $ |
| 15 | 33 11 10 | Line Pipe 42D75 | 200 lin. ft. | $ | $ |
| 16 | 33 11 10 | Line Pipe 42B100 | 2,342 lin. ft. | $ | $ |
| 17 | 33 11 10 | Temporary Construction Line | For the lump sum of | $ | |
| 18 | 33 11 10 | Filling and Testing Pipe | For the lump sum of | $ | |
| 19 | 33 11 10 | Repair Kits | For the lump sum of | $ | |
| 20 | 33 22 15 | Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb | 2 ea. | $ | $ |
| 21 | 33 22 15 | Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb | 1 ea. | $ | $ |
| 22 | 33 22 15 | 24-Inch Buried Manhole Assemblies – 150 lb | 1 ea. | $ | $ |
| TOTAL FOR PRICE SCHEDULE 2 (Reach 10) $______________ |
| PRICE SCHEDULE 3 (Reach 11) | |||||
| CLIN | Section | Supplies or Services | Quantity and Unit | Unit Price | Amount |
| 1 | WBR 1452.232.81 | Mobilization and Preparatory Work | For the lump sum of | $ | |
| 2 | 01 56 15 | Utility Crossing Investigation | For the lump sum of | $ | |
| 3 | 26 42 10 | Cathodic Protection and Corrosion Monitoring Systems | For the lump sum of | $ | |
| 4 | 31 02 10 | Water for Dust Abatement | 2,100 MGal | $ | $ |
| 5 | 31 02 30 | Dust Palliative | For the lump sum of | $ | |
| 6 | 31 11 00 | Clearing and Grubbing | For the lump sum of | $ | |
| 7 | 31 14 10 | Stripping, Stockpiling and Placement | For the lump sum of | $ | |
| 8 | 31 23 22 | Excavation for Pipe Trenches | 49,200 yd3 | $ | $ |
| 9 | 31 23 22 | Rock Excavation for Pipe Trenches | 3,200 yd3 | $ | $ |
| 10 | 31 23 22 | Embedment in Pipe Trenches | 4,750 yd3 | $ | $ |
| 11 | 31 23 22 | Backfill for Pipe Trenches | 32,000 yd3 | $ | $ |
| 12 | 32 15 10 | Gravel Surfacing | 510 tons | $ | $ |
| 13 | 32 91 60 | Erosion Control Blanket | 1,000 yd2 | $ | $ |
| 14 | 33 05 21 | Bored Road Crossing; BIA Road 9 | 450 lin. ft. | $ | $ |
| 15 | 33 11 10 | Line Pipe 42B475 | 1,780 lin. ft. | $ | $ |
| 16 | 33 11 10 | Line Pipe 42B500 | 700 lin. ft. | $ | $ |
| 17 | 33 11 10 | Line Pipe 42B525 | 2,100 lin. ft. | $ | $ |
| 18 | 33 11 10 | Line Pipe 42B550 | 1,100 lin. ft. | $ | $ |
| 19 | 33 11 10 | Line Pipe 42B575 | 4,300 lin. ft. | $ | $ |
| 20 | 33 11 10 | Line Pipe 42B600 | 2,500 lin. ft. | $ | $ |
| 21 | 33 11 10 | Line Pipe 42K600 | 200 lin. ft. | $ | $ |
| 22 | 33 11 10 | Line Pipe 42B625 | 2,300 lin. ft. | $ | $ |
| 23 | 33 11 10 | Line Pipe 42B650 | 6,200 lin. ft. | $ | $ |
| 24 | 33 11 10 | Line Pipe 42B675 | 600 lin. ft. | $ | $ |
| 25 | 33 11 10 | Line Pipe 42B700 | 400 lin. ft. | $ | $ |
| 26 | 33 11 10 | Filling and Testing Pipe | For the lump sum of | $ | |
| 27 | 33 11 10 | Repair Kits | For the lump sum of | $ | |
| 28 | 33 22 15 | 42-Inch Sectionalizing Valve Assemblies – Class 350 | 2 ea. | $ | $ |
| 29 | 33 22 15 | Six Inch Diameter Air Valve Assemblies – 300 lb | 2 ea. | $ | $ |
| 30 | 33 22 15 | Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb | 5 ea. | $ | $ |
| 31 | 33 22 15 | Six Inch Diameter Blowoff Assemblies – 300 lb | 2 ea. | $ | $ |
| 32 | 33 22 15 | Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb | 4 ea. | $ | $ |
| 33 | 33 22 15 | 24-Inch Buried Manhole Assemblies | 6 ea. | $ | $ |
| 34 | 35 42 35 | Wash Crossing 11167+00 | For the lump sum of | $ | |
| TOTAL FOR PRICE SCHEDULE 3 (Reach 11) $______________ | |||||
| TOTAL FOR PRICE SCHEDULES 1, 2 and 3 $______________________ |
File details come from the government source that posted it. Updated .