Attachment_1_REVISED_R17PS00812_Schedule_B.docx

DOCX document 56 KB Posted

Attached to
NGWSP Block 9 through 11 Federal contract opportunity
Solicitation number
R17PS00812
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP Block 9 through 11, newest first.
File Type Posted
Attachment_4_Drill_Hole_Photos.pdf PDF
SF-30_R17PS00812_Amendment_5.pdf PDF
Attachment_3_REVISED_Drawings.pdf PDF
Attachment_2_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_Schedule_B.docx DOCX document
Attachment_5_Test_Pit_Photos.pdf PDF
Attachment_6_Block_9-11_Q&A's.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_4_REVISED_Drawings.pdf PDF
SF_30.pdf PDF
Attachment_5_Block_9-11_Q&A's_7-28-2017.docx DOCX document
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.pdf PDF
SF-30_Amendment_000003.pdf PDF
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_4_REVISED_Drawings.pdf PDF
Attachment_3_REVISED_Specifications.pdf PDF
SF-30_Amendment_2.pdf PDF
Attachment_5_Block_9_-_11_SITE_TOUR_AGENDA.pdf PDF
Attachment_4_Sign-in_sheet.pdf PDF
Attachment_6_Block_9-11_Site_Tour_Q&A's.docx DOCX document
Attachment_3_L.15_WBR_1452.236-86.pdf PDF
Attachment_1_F.1_52.211-10.pdf PDF
Attachment_2_I.26_WBR_1452.232-81_AltIII.pdf PDF
Tab_13_SF-30_AMD_000001.pdf PDF
Attachment_3_Geology_Drawings_And_Logs.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_7_Site_Visit_Location_Maps.pdf PDF
R17PS00812.pdf PDF
Attachment_4_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_6_Past_Performance_Questionnaire.pdf PDF
Attachment_5_Wage_Rate_Requirements_(Construction)_Wage_Determinations.pdf PDF
Tab_09_Synopsis_(1).docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 10 R17PS00812 NGWSP Block 9 through 11

CONTINUATION OF

SECTION B - SUPPLIES OR SERVICES AND PRICE

PRICE SCHEDULES

Offers will be considered for award on the Price Schedules 1, 2 and 3, but no offer will be considered for award on only part of the Price Schedules.

Offerors shall complete Price Schedules 1, 2 and 3. Offers for less than the total of Price Schedules 1, 2 and 3 will be considered nonresponsive and will not be evaluated for award.

Offers will be evaluated based on the total of Price Schedules 1, 2 and 3.

Offers are subject to the terms and conditions of this solicitation.

Quantities in the Price Schedules are estimated quantities for comparison of offers only and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1 of Price Schedules 1, 2 and 3.

Definitions:

CLIN - Contract Line Item Number.

PRICE SCHEDULE 1 (Reach 9)

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
1
WBR 1452.232.81
Mobilization and Preparatory Work
For the lump sum of
$
2
01 31 30
Contract Document Management System
For the lump sum of
$
3
01 56 15
Utility Crossing Investigation
For the lump sum of
$
4
02 82 20
Pipe Removal and Disposal of Asbestos Containing Materials
10,000 lin. ft.
$
$
5
26 42 10
Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of
$
6
31 02 10
Water for Dust Abatement
11,500 MGal
$
$
7
31 02 30
Dust Palliative
For the lump sum of
$
8
31 11 00
Clearing and Grubbing
For the lump sum of
$
9
31 14 10
Stripping, Stockpiling and Placement
For the lump sum of
$
10
31 23 22
Excavation for Pipe Trenches
310,000 yd3
$
$
11
31 23 22
Rock Excavation for Pipe Trenches
29,000 yd3
$
$
12
31 23 22
Embedment in Pipe Trenches
28,800 yd3
$
$
13
31 23 22
Backfill for Pipe Trenches
203,000yd3
$
$
14
32 15 10
Gravel Surfacing
3,460 ton
$
$
15
32 91 60
Erosion Control Blanket
11,500 yd2
$
$
16
33 05 21
Bored Road Crossing

Gas Plant Road

90 lin. ft.
$
$
17
33 05 21
Bored Gas Line Crossings
285 lin. ft.
$
$
18
33 11 10
Line Pipe 42B100
1,500 lin. ft.
$
$
19
33 11 10
Line Pipe 42B125
3,830 lin. ft.
$
$
20
33 11 10
Line Pipe 42C125
170 lin. ft.
$
$
21
33 11 10
Line Pipe 42B150
2,700 lin. ft.
$
$
22
33 11 10
Line Pipe 42B175
3,600 lin. ft.
$
$
23
33 11 10
Line Pipe 42D175
400 lin. ft.
$
$
24
33 11 10
Line Pipe 42B200
2,300 lin. ft.
$
$
25
33 11 10
Line Pipe 42B225
2,500 lin. ft.
$
$
26
33 11 10
Line Pipe 42B250
8,000 lin. ft.
$
$
27
33 11 10
Line Pipe 42B275
5,700 lin. ft.
$
$
28
33 11 10
Line Pipe 42B300
3,400 lin. ft.
$
$
29
33 11 10
Line Pipe 48B300
1,300 lin. ft.
$
$
30
33 11 10
Line Pipe 48B325
13,980 lin. ft.
$
$
31
33 11 10
Line Pipe 48C325
220 lin. ft.
$
$
32
33 11 10
Line Pipe 48B350
2,700 lin. ft.
$
$
33
33 11 10
Line Pipe 48B375
12,843 lin. ft.
$
$
34
33 11 10
Line Pipe 48C375
1,250 lin. ft.
$
$
35
33 11 10
Line Pipe 48B400
6,765 lin. ft.
$
$
36
33 11 10
Line Pipe 48K400
241 lin. ft.
$
$
37
33 11 10
Line Pipe 48B425
300 lin. ft.
$
$
38
33 11 10
Line Pipe 48C425
200 lin. ft.
$
$
39
33 11 10
Line Pipe 48K425
100 lin. ft.
$
$
40
33 11 10
Line Pipe 48B450
3,000 lin. ft.
$
$
41
33 11 10
Line Pipe 48D450
200 lin. ft.
$
$
42
33 11 10
Line Pipe 48B475
3,360 lin. ft.
$
$
43
33 11 10
Line Pipe 48C475
100 lin. ft.
$
$
44
33 11 10
Line Pipe 48D475
420 lin. ft.
$
$
45
33 11 10
Line Pipe 48K475
120 lin. ft.
$
$
46
33 11 10
Line Pipe 48B500
17,738 lin. ft.
$
$
47
33 11 10
Line Pipe 48C500
1,300 lin. ft.
$
$
48
33 11 10
Line Pipe 48D500
480 lin. ft.
$
$
49
33 11 10
Line Pipe 48K500
120 lin. ft.
$
$
50
33 11 10
Line Pipe 48B525
2,400 lin. ft.
$
$
51
33 11 10
Line Pipe 48D525
210 lin. ft.
$
$
52
33 11 10
Line Pipe 48K525
50 lin. ft.
$
$
53
33 11 10
Line Pipe 48B550
1,000 lin. ft.
$
$
54
33 11 10
Line Pipe 48B575
2,760 lin. ft.
$
$
55
33 11 10
Line Pipe 48C575
400 lin. ft.
$
$
56
33 11 10
Line Pipe 48B600
2,600 lin. ft.
$
$
57
33 11 10
Line Pipe 48D600
440 lin. ft.
$
$
58
33 11 10
Line Pipe 48K600
100 lin. ft.
$
$
59
33 11 10
Line Pipe 48B625
5,172 lin. ft.
$
$
60
33 11 10
Line Pipe 48C625
200 lin. ft.
$
$
61
33 11 10
Line Pipe 48B650
4,200 lin. ft.
$
$
62
33 11 10
Line Pipe 48C650
300 lin. ft.
$
$
63
33 11 10
Line Pipe 48D650
955 lin. ft.
$
$
64
33 11 10
Filling and Testing Pipe
For the lump sum of
$
65
33 11 10
Repair Kits
For the lump sum of
$
66
33 22 15
42-Inch Sectionalizing Valve Assemblies – Class 150
7 ea.
$
$
67
33 22 15
48-Inch Sectionalizing Valve Assemblies – Class 150
2 ea.
$
$
68
33 22 15
48-Inch Sectionalizing Valve Assemblies – Class 250
12 ea.
$
$
69
33 22 15
48-Inch Sectionalizing Valve Assemblies – Class 350
3 ea.
$
$
70
33 22 15
Six Inch Diameter Air Valve Assemblies – 150 lb
3 ea.
$
$
71
33 22 15
Six Inch Diameter Air Valve Assemblies – 300 lb
13 ea.
$
$
72
33 22 15
Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb
10 ea.
$
$
73
33 22 15
Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb
28 ea.
$
$
74
33 22 15
Six Inch Diameter Blowoff Assemblies – 300 lb
9 ea.
$
$
75
33 22 15
Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb
12 ea.
$
$
76
33 22 15
Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb
25 ea.
$
$
77
33 22 15
24-Inch Buried Manhole Assemblies – 150 lb
12 ea.
$
$
78
33 22 15
24-Inch Buried Manhole Assemblies – 300 lb
3 ea.
$
$
79
35 42 35
Wash Crossing 90023+26
For the lump sum of
$
80
35 42 35
Wash Crossing 90077+09
For the lump sum of
$
81
35 42 35
Wash Crossings 90095+94 and 90097+40
For the lump sum of
$
82
35 42 35
Wash Crossing 90106+05
For the lump sum of
$
83
35 42 35
Wash Crossing 90124+68
For the lump sum of
$
84
35 42 35
Wash Crossing 90163+39
For the lump sum of
$
85
35 42 35
Wash Crossing 90261+28
For the lump sum of
$
86
35 42 35
Wash Crossing 90283+24
For the lump sum of
$
87
35 42 35
Wash Crossing 90298+25
For the lump sum of
$
88
35 42 35
Wash Crossing 90376+25
For the lump sum of
$
89
35 42 35
Wash Crossing 90389+71
For the lump sum of
$
90
35 42 35
Wash Crossing 90401+39
For the lump sum of
$
91
35 42 35
Wash Crossing 90465+63
For the lump sum of
$
92
35 42 35
Wash Crossing 90579+06
For the lump sum of
$
93
35 42 35
Wash Crossing 90609+15
For the lump sum of
$
94
35 42 35
Wash Crossing 90628+16
For the lump sum of
$
95
35 42 35
Wash Crossing 90833+35
For the lump sum of
$
96
35 42 35
Wash Crossing 91186+26
For the lump sum of
$

TOTAL FOR PRICE SCHEDULE 1 (Reach 9) $______________

PRICE SCHEDULE 2 (Reach 10)

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
1
WBR 1452.232.81
Mobilization and Preparatory Work
For the lump sum of
$
2
01 56 15
Utility Crossing Investigation
For the lump sum of
$
3
26 42 10
Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of
$
4
31 02 10
Water for Dust Abatement
450 MGal
$
$
5
31 02 30
Dust Palliative
For the lump sum of
$
6
31 11 00
Clearing and Grubbing
For the lump sum of
$
7
31 14 10
Stripping, Stockpiling and Placement
For the lump sum of
$
8
31 23 22
Excavation for Pipe Trenches
11,800 yd3
$
$
9
31 23 22
Rock Excavation for Pipe Trenches
1,500 yd3
$
$
10
31 23 22
Embedment in Pipe Trenches
1,000 yd3
$
$
11
31 23 22
Backfill for Pipe Trenches
8,800 yd3
$
$
12
33 11 10
Line Pipe 42B50
657 lin. ft.
$
$
13
33 11 10
Line Pipe 42B75
1,000 lin. ft.
$
$
14
33 11 10
Line Pipe 42C75
500 lin. ft.
$
$
15
33 11 10
Line Pipe 42D75
200 lin. ft.
$
$
16
33 11 10
Line Pipe 42B100
2,342 lin. ft.
$
$
17
33 11 10
Temporary Construction Line
For the lump sum of
$
18
33 11 10
Filling and Testing Pipe
For the lump sum of
$
19
33 11 10
Repair Kits
For the lump sum of
$
20
33 22 15
Six Inch Diameter Air Valve with Manhole Assemblies – 150 lb
2 ea.
$
$
21
33 22 15
Six Inch Diameter Blowoff with Manhole Assemblies – 150 lb
1 ea.
$
$
22
33 22 15
24-Inch Buried Manhole Assemblies – 150 lb
1 ea.
$
$

TOTAL FOR PRICE SCHEDULE 2 (Reach 10) $______________

PRICE SCHEDULE 3 (Reach 11)

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
1
WBR 1452.232.81
Mobilization and Preparatory Work
For the lump sum of
$
2
01 56 15
Utility Crossing Investigation
For the lump sum of
$
3
26 42 10
Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of
$
4
31 02 10
Water for Dust Abatement
2,100 MGal
$
$
5
31 02 30
Dust Palliative
For the lump sum of
$
6
31 11 00
Clearing and Grubbing
For the lump sum of
$
7
31 14 10
Stripping, Stockpiling and Placement
For the lump sum of
$
8
31 23 22
Excavation for Pipe Trenches
49,200 yd3
$
$
9
31 23 22
Rock Excavation for Pipe Trenches
3,200 yd3
$
$
10
31 23 22
Embedment in Pipe Trenches
4,750 yd3
$
$
11
31 23 22
Backfill for Pipe Trenches
32,000 yd3
$
$
12
32 15 10
Gravel Surfacing
510 tons
$
$
13
32 91 60
Erosion Control Blanket
1,000 yd2
$
$
14
33 05 21
Bored Road Crossing; BIA Road 9
450 lin. ft.
$
$
15
33 11 10
Line Pipe 42B475
1,780 lin. ft.
$
$
16
33 11 10
Line Pipe 42B500
700 lin. ft.
$
$
17
33 11 10
Line Pipe 42B525
2,100 lin. ft.
$
$
18
33 11 10
Line Pipe 42B550
1,100 lin. ft.
$
$
19
33 11 10
Line Pipe 42B575
4,300 lin. ft.
$
$
20
33 11 10
Line Pipe 42B600
2,500 lin. ft.
$
$
21
33 11 10
Line Pipe 42K600
200 lin. ft.
$
$
22
33 11 10
Line Pipe 42B625
2,300 lin. ft.
$
$
23
33 11 10
Line Pipe 42B650
6,200 lin. ft.
$
$
24
33 11 10
Line Pipe 42B675
600 lin. ft.
$
$
25
33 11 10
Line Pipe 42B700
400 lin. ft.
$
$
26
33 11 10
Filling and Testing Pipe
For the lump sum of
$
27
33 11 10
Repair Kits
For the lump sum of
$
28
33 22 15
42-Inch Sectionalizing Valve Assemblies – Class 350
2 ea.
$
$
29
33 22 15
Six Inch Diameter Air Valve Assemblies – 300 lb
2 ea.
$
$
30
33 22 15
Six Inch Diameter Air Valve with Manhole Assemblies – 300 lb
5 ea.
$
$
31
33 22 15
Six Inch Diameter Blowoff Assemblies – 300 lb
2 ea.
$
$
32
33 22 15
Six Inch Diameter Blowoff with Manhole Assemblies – 300 lb
4 ea.
$
$
33
33 22 15
24-Inch Buried Manhole Assemblies
6 ea.
$
$
34
35 42 35
Wash Crossing 11167+00
For the lump sum of
$

TOTAL FOR PRICE SCHEDULE 3 (Reach 11) $______________

TOTAL FOR PRICE SCHEDULES 1, 2 and 3 $______________________