About this file

Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP Block 9 through 11, newest first.
File Type Posted
Attachment_4_Drill_Hole_Photos.pdf PDF
SF-30_R17PS00812_Amendment_5.pdf PDF
Attachment_3_REVISED_Drawings.pdf PDF
Attachment_2_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_Schedule_B.docx DOCX document
Attachment_5_Test_Pit_Photos.pdf PDF
Attachment_6_Block_9-11_Q&A's.docx DOCX document
Attachment_4_REVISED_Drawings.pdf PDF
SF_30.pdf PDF
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.pdf PDF
Attachment_5_Block_9-11_Q&A's_7-28-2017.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
SF-30_Amendment_000003.pdf PDF
Attachment_1_REVISED_R17PS00812_Schedule_B.docx DOCX document
Attachment_2_REVISED_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_3_REVISED_Specifications.pdf PDF
Attachment_4_REVISED_Drawings.pdf PDF
Attachment_4_Sign-in_sheet.pdf PDF
Attachment_2_I.26_WBR_1452.232-81_AltIII.pdf PDF
Attachment_6_Block_9-11_Site_Tour_Q&A's.docx DOCX document
Attachment_3_L.15_WBR_1452.236-86.pdf PDF
Attachment_1_F.1_52.211-10.pdf PDF
SF-30_Amendment_2.pdf PDF
Tab_13_SF-30_AMD_000001.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_7_Site_Visit_Location_Maps.pdf PDF
R17PS00812.pdf PDF
Attachment_6_Past_Performance_Questionnaire.pdf PDF
Attachment_5_Wage_Rate_Requirements_(Construction)_Wage_Determinations.pdf PDF
Attachment_4_Continuation_of_Section_B_in_excel.xlsx XLSX spreadsheet
Attachment_3_Geology_Drawings_And_Logs.pdf PDF
Tab_09_Synopsis_(1).docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-BID CONFERENCE/ SITE TOUR AGENDA

NAVAJO-GALLUP WATER SUPPLY PROJECT ~ Block 9 - 11

SOLICITATION NO. R17PS00812

July 13, 2017

8:00 A.M.

Twin Lakes Chapter House, Twin Lakes New Mexico, Hwy 491

1. Introduction

a. This job is considered heavy construction.

b. Negotiated (RFP). (See Sections L & M / Address all items required in your bids)

c. Submittal requirements: (See Section 01 31 30, Contract Document Management System and Section 01 33 00, Submittals)

d. All applicable Federal, State, Tribal and Local Taxes shall be paid by the contractor.

e. Land/ROW Access: Limited Access, need to stay on ROW due to environmental and cultural resources in area.

Lands Included in the project site are Navajo Tribal Trust.

2. Construction Considerations: Approximately 28 Miles of Pipeline Installation, Valves and Blowoffs, Jack and

Bore Crossings, Gas Line crossings, Wash Crossings.

3. Environmental Requirements: Navajo Nation Lands, Permitting, SWPPP, Dewatering, 404, NOI, Nationwide 12 permit, wetlands area, Biological Monitors. (See Specification Sections 01 57 20 through 01 57 60)

4. Cultural Requirements: Ground Disturbing Activities, Archeological Site Monitors. (See Section 01 57 90)

5. Safety Requirements

a. Reclamation Safety and Health Standards (RSHS) http://www.usbr.gov/ssle/safety/RSHS-all.pdf

6. No verbal questions will be taken. See the attached Questions form. All written questions will be collected at the end of the site tour. Formal response will be provided via an amendment. Written questions should be submitted to Monica Burgio at mburgio@usbr.gov and Walter Shaw at wshaw@usbr.gov by 12:00 p.m., Friday, July 21, 2017.

http://www.usbr.gov/ssle/safety/RSHS-all.pdf mailto:mburgio@usbr.gov mailto:wshaw@usbr.gov