Questions and Responses 2.pdf
PDF 19 KB Posted
- Solicitation number
- RFP-15449
- Issued by
- Wakulla County, Clewiston City, Florida
About this file
Questions and Responses 2
This document contains a Questions and Responses file related to the Florida Department of Transportation (FDOT) District Three's Request for Proposal for the District 3 Midway Operations Center Supplemental Crew contract. The file provides clarifications and answers to inquiries submitted by prospective bidders regarding the solicitation requirements, evaluation criteria, and contract specifications. Technical proposals are due April 9, 2026 at 10:00 AM via email to D3.Purch@dot.state.fl.us, with public opening scheduled for 11:00 AM the same day at 1074 Highway 90 East, Chipley, FL 32428. Price proposals will be opened separately on April 23, 2026, and the selection meeting is scheduled for May 4, 2026. The contract term is anticipated to begin July 1, 2026 and continue through June 30, 2027, with renewal options for up to three additional years contingent upon satisfactory performance and fund availability. No pre-proposal conference will be held for this procurement.
The bid pricing structure requires submission of hourly rates for crew members and equipment based on estimated annual hours, with a fixed $10,000 equipment contingency included as a non-bid line item and a total contract budgetary ceiling of $500,000. Contractors must provide a performance bond in the full amount of the proposal and carry general liability insurance with combined bodily injury limits of at least $200,000 per person and $300,000 each occurrence, plus property damage insurance of at least $200,000 per occurrence. All proposers must be registered in MyFloridaMarketPlace, comply with E-Verify requirements, and submit certifications regarding scrutinized companies lists. Evaluation will be based on a 70-point technical score and a 30-point price score, with award to the responsive and responsible vendor achieving the highest cumulative score. Monthly payments will be made upon submission of invoices with supporting documentation subject to a one percent MyFloridaMarketPlace transaction fee.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
JARED W. PERDUE, P.E.
SECRETARY
www.fdot.gov
M E M O R A N D U M
Date: 3/31/2026 To: All Proposers RE: Questions and Answers 2 Proposal ID: DOT-RFP-26-3016-CS Description: Midway Operations Center Supplemental Crew
1. What is the anticipated usage for the concrete mixer?
Response: The concrete mixer will be used for a small miscellaneous concrete repair (sidewalk, ditch pavement, knee wall, etc.) that does not require a full load of concrete to be ordered.
2. Section 10. Payment subsection c. and Bid Price Proposal. Equipment Cost item.
Please confirm the full bid rate per crew for the Equipment cost item will be paid each month per crew regardless of actual use of each specific piece of the required equipment per crew.
Response: The full bid rate per crew for the Equipment cost item to provide equipment in accordance with Section ‘7.0 Contractor Provided Equipment (Per Crew)’ will be paid each month per crew regardless of actual use of each specific piece of the required equipment per crew.
3. Please confirm that when the Equip Operator position is requested, it is assumed to be in addition to the 1 Crew Leader and 4 Maintenance Worker positions (not swapped with).
Response: When the Equipment Operator position is requested by the Department it will be in addition to the 1 Crew Leader and 4 Maintenance Worker positions.
4. Please confirm that when the Equip. Operator position is requested, it will be for planned work, and that ample lead time (at least one week) will be made available to the vendor to have the position join the crew.
Response: When the Equipment Operator position is requested, it will be for planned work and at least one-week advance notice will be provided to the Vendor in order to have the Equipment Operator position join the crew.
5. Please consider removing the CDL requirement from the Crew Leader position. It is assumed that most of the workdays will not require a CDL driver, especially Class A. Should the work requested by FDOT require a CDL driver, the vendor will make one available, preferably through the Equipment Operator position. Class B CDL should be sufficient for any CDL requirement that may be requested of the crew and equipment operator.
Response: Contract CDL requirements have been updated per Addendum No. 1 to be posted.