Questions and Responses 2.pdf
PDF 19 KB Posted
- Solicitation number
- RFP-15449
- Issued by
- Wakulla County, Clewiston City, Florida
About this file
This document is a Questions and Responses memorandum from the Florida Department of Transportation (FDOT) District Three addressing clarifications regarding the Midway Operations Center Supplemental Crew Request for Proposal (DOT-RFP-26-3016-CS). The solicitation establishes a contract for staffing and equipment to provide routine maintenance services on roadways in Leon and Gadsden Counties, with crews reporting to the Midway Operations Center at 17 Commerce Blvd, Midway, FL 32343. A minimum of one crew is required, consisting of one crew leader, four maintenance workers, and one equipment operator. Technical proposals are limited to eight pages and are due April 9, 2026 at 10:00 AM via email to D3.Purch@dot.state.fl.us, with public opening of technical proposals at 11:00 AM on the same date at 1074 Highway 90 East, Chipley, FL 32428. Price proposals will be opened separately on April 23, 2026, and the selection meeting is scheduled for May 4, 2026. The contract term is anticipated to begin July 1, 2026 and continue through June 30, 2027, with renewal options for up to three additional years contingent upon satisfactory performance and fund availability.
The questions and responses address several contractual clarifications: the concrete mixer will be used for miscellaneous small concrete repairs; the full bid rate for equipment will be paid monthly per crew regardless of actual equipment utilization; the Equipment Operator position is in addition to the base crew positions, not a replacement; Equipment Operator requests will be for planned work with at least one-week advance notice; and CDL requirements for the Crew Leader position have been updated per Addendum No. 1. The contract structure requires hourly rates for crew members and equipment based on estimated annual hours, with a fixed $10,000 equipment contingency as a non-bid line item. The total contract budgetary ceiling is $500,000, and award will be based on cumulative evaluation scores combining 70 points for technical merit and 30 points for pricing. Monthly payments will be made upon invoice submission with supporting documentation of man-hours and costs, subject to a one percent MyFloridaMarketPlace transaction fee.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
JARED W. PERDUE, P.E.
SECRETARY
www.fdot.gov
M E M O R A N D U M
Date: 3/31/2026 To: All Proposers RE: Questions and Answers 2 Proposal ID: DOT-RFP-26-3016-CS Description: Midway Operations Center Supplemental Crew
1. What is the anticipated usage for the concrete mixer?
Response: The concrete mixer will be used for a small miscellaneous concrete repair (sidewalk, ditch pavement, knee wall, etc.) that does not require a full load of concrete to be ordered.
2. Section 10. Payment subsection c. and Bid Price Proposal. Equipment Cost item.
Please confirm the full bid rate per crew for the Equipment cost item will be paid each month per crew regardless of actual use of each specific piece of the required equipment per crew.
Response: The full bid rate per crew for the Equipment cost item to provide equipment in accordance with Section ‘7.0 Contractor Provided Equipment (Per Crew)’ will be paid each month per crew regardless of actual use of each specific piece of the required equipment per crew.
3. Please confirm that when the Equip Operator position is requested, it is assumed to be in addition to the 1 Crew Leader and 4 Maintenance Worker positions (not swapped with).
Response: When the Equipment Operator position is requested by the Department it will be in addition to the 1 Crew Leader and 4 Maintenance Worker positions.
4. Please confirm that when the Equip. Operator position is requested, it will be for planned work, and that ample lead time (at least one week) will be made available to the vendor to have the position join the crew.
Response: When the Equipment Operator position is requested, it will be for planned work and at least one-week advance notice will be provided to the Vendor in order to have the Equipment Operator position join the crew.
5. Please consider removing the CDL requirement from the Crew Leader position. It is assumed that most of the workdays will not require a CDL driver, especially Class A. Should the work requested by FDOT require a CDL driver, the vendor will make one available, preferably through the Equipment Operator position. Class B CDL should be sufficient for any CDL requirement that may be requested of the crew and equipment operator.
Response: Contract CDL requirements have been updated per Addendum No. 1 to be posted.
File details come from the government source that posted it. Updated .