PRICE PROPOSAL FORM - Cleveland.docx
DOCX document 24 KB Posted
- Attached to
- REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR, CLEVELAND OH (NMACC III POOL 2 PHASE 2)
- Solicitation number
- 70Z04724RPCNI0001
About this file
This document contains a price proposal form for a federal contract solicitation to rehabilitate a waterfront in Cleveland, Ohio. The form requests pricing for a base item and option item to design and construct improvements to infrastructure including a new bulkhead, fender system, concrete cap, cutter utility shore ties for telecom, electrical, water and sewer systems, repair of a float pier and marine fuel distribution system, installation of new sanitary sewer lines, and site work such as pavement patching and utility work. The base item and option item each request separate pricing for design and construction, with a total price requested. Offerors must agree to a 120 day acceptance period for their proposal.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE PROPOSAL FORM
PROJECT 5092184
TASK ORDER ANNOUNCEMENT #70Z04724RPCNI0001:
Base Item 0001: Provide all services and materials necessary to design and construct in accordance with RFP specifications and drawings to complete the design and build the project. The scope includes new waterfront infrastructure, site work, utility work, temporary facilities, demolition, etc. Work includes a new bulkhead, tieback/anchors, fender system, concrete cap, cutter utility shore ties (telecom, electrical, water, & sewer), etc. Repair the float pier and marine fuel distribution system and bilge water tank. Install news sanitary sewer lines to prevent freezing and sloped for positive flow. Site work includes pavement patching, utility work, lighting, striping, etc.
| Design | $ |
| Construction | $ |
| Total | $ |
Option Item 0001: Provide all services and materials necessary to design and construct in accordance with RFP specifications and drawings to complete the design and build project. The scope includes installing new Portland concrete pavement, striping, signage, and parking stop blocks in the main parking lot and along the waterfront. Demolish the existing pavement. The contractor shall perform the work in accordance with this specification and as shown on the enclosed drawing sheets.
| Design | $ |
| Construction | $ |
| Total | $ |
TOTAL PRICE
(Base Line Item 0001 + Option Item 0001): $
The TOTAL BASE AND OPTION ITEMS shall be deemed to include all costs required for the specified work to be completed in accordance with the plans and specifications.
Proposal Acceptance Period: The contractor’s proposal must indicate that it is valid for 120 calendar days from the Government’s receipt of offer.
File details come from the government source that posted it. Updated .