Attachment V - Existing Fuel Distribution System.pdf

PDF 2 MB Posted

Attached to
REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR, CLEVELAND OH (NMACC III POOL 2 PHASE 2)
Solicitation number
70Z04724RPCNI0001
Issued by

About this file

This document includes an attachment to a federal solicitation and related federal contract opportunity. The attachment provides photos and descriptions of work required to rehabilitate the fuel distribution system at the US Coast Guard Marine Safety Unit in Cleveland Harbor, Ohio. The work includes replacing pump controllers, filters, pumps and associated equipment for the diesel and gasoline systems. It also requires removing and replacing bilge water float gauges, fittings, valves and painting of the diesel fuel tank. The related solicitation is available only to offerors who were successful under the NMACC III Pool 2 Phase 1 contract. The solicitation seeks to rehabilitate the waterfront at the same location, including a new bulkhead, fender system, pier repairs, utility upgrades and site work. The agency is the US Coast Guard, with responses due as outlined in the full solicitation distributed via DoDSafe to eligible Pool 2 Phase 2 offerors.

View the file

Other files

File Type Posted
General Decision IL20240018 01.05.2024.pdf PDF
Amendment 011.pdf PDF
OH20240001 04.05.2024.pdf PDF
Amendment 010.pdf PDF
OH20240074 04.05.2024.pdf PDF
Amendment 009.pdf PDF
2024-01-30-5092184-RFP-Drawings.pdf PDF
Amendment 008.pdf PDF
Updated Price Proposal Form.pdf PDF
Amendment 007.pdf PDF
2024-01-23-5092184-RFP-Drawings.pdf PDF
01801_TEMPORARY_FACILITIES.pdf PDF
Attachment X - Photos of USACE Facility Plumbing.pdf PDF
CAD Files.zip ZIP file
Attachment Q NEPA CATEX Document updated.pdf PDF
Amendment 006.pdf PDF
Attachment W - AMI Reconnect Instructions.pdf PDF
Attachment U - SILC-CSTO New Building Design and Construction.pdf PDF
Amendment 005.pdf PDF
IL20230018 07.14.2023 Heavy.pdf PDF
Amendment 004.pdf PDF
OH2023007 09.01.2023 Building.pdf PDF
OH20230001 09.01.2023 Heavy.pdf PDF
Amendment 003.pdf PDF
Amendment 002.pdf PDF
Cleveland12.jpg JPG image
Amendment 0001 Site Visit.pdf PDF
RFI Submittal Form.xlsx XLSX spreadsheet
70Z04724RPCNI0001.pdf PDF
PRICE PROPOSAL FORM - Cleveland.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rehabilitate Waterfront at MSU Cleveland Harbor Project Number: 09-5092184 USCG MSU Cleveland Harbor, OH

Attachment V Existing Fuel Distribution Photos

Photo 1 – Diesel and Gas Pump Controller, Alarm Enclosure, and Override Enclosure

Description of Work - Replace Diesel and Gas Pump Controller Enclosure. Replace alarm Enclosure.

Replace Override switch and Emergency Stop Enclosure. Provide all new galvanized mounting hardware.

All Enclosures sizes shall match existing (Type: NEMA 4X Stainless steel enclosure). Provide all new feeder wires and conduit.

Photo 2 - Fuel Control Buttons (Diesel and Gas)

Description of Work - Replace Pump Controls, Buttons, indicating lights, and mounting stand. Provide all new feeder wire and conduit. Provide all new galvanized mounting hardware.

Photo 3 - Fuel Filters

Description of Work – Replace gasoline and diesel filters. See Photo 3 for the basis of design.

Photo 4 - Gas Pump Data

Description of Work – Remove and replace gasoline pump to include motor controller, disconnects, and all appurtenances complete. Provide new feeder and conduit. See photo for basis of design.

Photo 5 – Diesel Fuel Pump

Description of Work - Remove and replace diesel fuel pump to include motor controller, disconnects, and all appurtenances complete. Provide new feeder and conduit. See photo for basis of design.

Photo 6 - Bilge Water Float Gauge

Description of Work – Remove and replace (2) float gages on the bilge water tank. See photo for basis of design.

Photo 7 - Replace rubber boot.

Description of Work – Remove existing rubber boot. Replace fitting, seal, and leak test.

Photo 8 - Replace all rusted fittings.

Description of Work – Remove and replace existing rusted fittings and hose.

Photo 9 – Repaint diesel tank

Description of Work – Remove all surface rust and repaint entire diesel fuel tank (white). Remove and replace all grounding lines.

Photo 10 - Replace emergency valves (Diesel and Gasoline)

Description of Work – Remove and replace shear valves on both diesel and gasoline systems.

File details come from the government source that posted it. Updated .