- REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR, CLEVELAND OH (NMACC III POOL 2 PHASE 2)
- Solicitation number
- 70Z04724RPCNI0001
About this file
This document contains pre-proposal inquiries and responses related to a solicitation for rehabilitation work at the U.S. Coast Guard waterfront maritime support unit in Cleveland Harbor, Ohio. The solicitation is for a small business set-aside under the National Multiple Award Construction Contract III Pool 2 vehicle. Responses to contractor questions provide clarification on required insurance and bonding, the availability of schematic drawings and work descriptions, the preferred format for a critical path schedule highlighting long lead procurement items, and the inclusion of applicable wage determinations. An organized site visit will be scheduled after release of the task order announcement via amendment. Proposals are due by the time and date specified in the solicitation as amended.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC Ill) POOL 2 SMALL BUSINESS EAST -
REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR
This amendment incorporates the missing Wage Determination. See Attachment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Facilities Design & Construction Center 5505 Robin Hood Rd, STE K Norfolk, VA 23513
9A. AMENDMENT OF SOLICITATION NUMBER
70204724RPCNI0001
12/13/2023
9B. DATED (SEE ITEM 11)
11/14/2023
1 3
RFI No.
Date
Submitted Pg Section Paragraph QUESTION GOVERNMENT RESPONSE
POSTED ON
AMEND NO.
1 11/29/2023 70Z04724RPCNI0001
On November 20th we received document titled "70Z04724RPCNI0001", Attachments A through T, and a price proposal form, which were downloaded from the DoD SAFE service. However, we are not seeing a specific schematic drawing/layout of proposed work specific to this project provided. Are there plans to release schematic drawings &/or a specific narrative of work for this project, and it will be released at some point before time of bid?
There was a total of 25 files as part of the DoDSafe Drop-off. Files named 02- 5092184_Combined-Spec.pdf and 01-5092184_Combined-Drawings.pdf are the files you need to download.
2 21/1/23 70Z04724RPCNI0001
there isn’t a time/ date for the site visit set up yet. It states:
"(b) One organized site visit will be scheduled after the release of the Task Order announcement via amendment. Although the site visit IS NOT mandatory, it is highly encouraged that you have your team and any major subcontractors attend the meeting.
No other site visits will be allowed."
Just so we can start planning, do you know when the site visit will be held?
Information for the site visit will be posted via a future amendment
3 12/8/2023
6 of 20 Insurance/Bonds
This section states, "Please review Section H.2 of the contract for insurance requirements, Section I of the contract for bonding requirements and Section L.7 of the Solicitation for Bid Guarantee required for this task order."
Section H, I and Section L do not appear to be included in any of the documents. Can the government provide these sections or guidance as to what these requirements are?
Please refer to the main SB solicitation 70Z04723RNMACCSB.
4 12/9/2023
Factor 5 Technical Solution, Subfactor 5.2
- Subcontractor and Construction Materials Procurement Strategy
Subfactor 5.2, c)
The RFP states, "Provide a critical path schedule highlighting long lead items and methods of working long lead items into the construction plan to minimize delays."
Is a schedule actually required or is this just in narrative format
See amendment language
5 12/10/2023
Factor 5 Technical Solution, Subfactor 5.2
- Subcontractor and Construction Materials Procurement Strategy
Subfactor 5.2, c)
What format (excel, P6, etc.) does the government want if a schedule is required?
PDF format will suffice.
6 12/11/2023
Factor 5 Technical Solution, Subfactor 5.2
- Subcontractor and Construction Materials Procurement Strategy
Subfactor 5.2, c)
If schedule is required, can it be 11"x17" and does it count toward the page count?
11"x17" will suffice, and does not count towards page count.
7 12/12/2023 5 I Wage Determination not found on Sam.gov See amendment language 003 8 12/13/2023 5 I Marine Wage Determination not found See amendment language 004
PRE-PROPOSAL INQUIRY/REQUEST FOR INFORMATION
REFERENCE
| 70Z04724RPCI0002 Amendment 002.pdf |
| Continuation Page |
| Base Hono Map Pre-Bid Site Visit |