Amendment 002.pdf

PDF 2 MB Posted

Attached to
REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR, CLEVELAND OH (NMACC III POOL 2 PHASE 2)
Solicitation number
70Z04724RPCNI0001
Issued by

About this file

This document provides an amendment to a solicitation for rehabilitation work on a waterfront maritime security unit for the United States Coast Guard in Cleveland Harbor, Cleveland, Ohio. The solicitation is being conducted under the National Multiple Award Construction Contract Pool 2 Small Business East contract vehicle.

The amendment revises the response requirements for subfactor 5.2(c) of the technical solution, changes the site visit details, and provides an attachment with the site visit log and answers to vendor questions. Offerors must acknowledge receipt of the amendment by the specified date and time to have their proposals considered. The rehabilitation work includes utility coordination according to specification section 01110, paragraph 1.10. A critical path schedule for long lead items is required but may be in PDF format and will not count toward the page limit. A pre-bid site visit will be scheduled after solicitation release via future amendment.

View the file

Other files

File Type Posted
General Decision IL20240018 01.05.2024.pdf PDF
Amendment 011.pdf PDF
OH20240001 04.05.2024.pdf PDF
Amendment 010.pdf PDF
OH20240074 04.05.2024.pdf PDF
Amendment 009.pdf PDF
2024-01-30-5092184-RFP-Drawings.pdf PDF
Amendment 008.pdf PDF
Updated Price Proposal Form.pdf PDF
Amendment 007.pdf PDF
2024-01-23-5092184-RFP-Drawings.pdf PDF
01801_TEMPORARY_FACILITIES.pdf PDF
Attachment X - Photos of USACE Facility Plumbing.pdf PDF
CAD Files.zip ZIP file
Attachment Q NEPA CATEX Document updated.pdf PDF
Amendment 006.pdf PDF
Attachment W - AMI Reconnect Instructions.pdf PDF
Attachment U - SILC-CSTO New Building Design and Construction.pdf PDF
Attachment V - Existing Fuel Distribution System.pdf PDF
Amendment 005.pdf PDF
IL20230018 07.14.2023 Heavy.pdf PDF
Amendment 004.pdf PDF
OH2023007 09.01.2023 Building.pdf PDF
OH20230001 09.01.2023 Heavy.pdf PDF
Amendment 003.pdf PDF
Cleveland12.jpg JPG image
Amendment 0001 Site Visit.pdf PDF
RFI Submittal Form.xlsx XLSX spreadsheet
70Z04724RPCNI0001.pdf PDF
PRICE PROPOSAL FORM - Cleveland.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC Ill) POOL 2 SMALL BUSINESS EAST -

REHABILITATE WATERFRONT MSU USCG CLEVELAND HARBOR

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Facilities Design & Construction Center 5505 Robin Hood Rd, STE K Norfolk, VA 23513

9A. AMENDMENT OF SOLICITATION NUMBER

70204724RPCNI0001

12/12/2023

9B. DATED (SEE ITEM 11)

11/14/2023

1 3

This amendment is issued to provide revisions to the Solicitation, Non-Price Subfactor 5.2 (c) and insert amendment attachments.

I) SUBFACTOR 5.2 c)- Subcontractor and Construction Materials Procurement Strategy

DELETE: Provide a critical path schedule highlighting long lead items and methods of working long lead items into the construction plan to minimize delays. This includes utility coordination, see RFP section 01110 paragraph 1.10.

REPLACE WITH: Provide a critical path schedule highlighting long lead items and methods of working long lead items into the construction plan to minimize delays. This includes utility coordination, see RFP section 01110 paragraph 1.10. Critical Path Schedule does not count towards page count.

II) AMENDMENT ATTACHMENTS:

a. Site Visit Log

b. Questions and Answers

END OF AMENDMENT

11/29/2023 70Z04724RPCNI0001

On Novemeber 20th we received document titled "70Z04724RPCNI0001", Attachments A through T, and a price proposal form, which were downloaded from the DoD SAFE service. However, we are not seeing a specific schematic drawing/layout of proposed work specific to this project provided. Are there plans to release schematic drawings &/or a specific narrative of work for this project, and it will be released at some point before time of bid?

There was a total of 25 files as part of the DoDSafe Drop-off. Files named 02- 5092184_Combined-Spec.pdf and 01-5092184_Combined-Drawings.pdf are the files you need to download.

21/1/23 70Z04724RPCNI0001

there isn’t a time/ date for the site visit set up yet. It states:

"(b) One organized site visit will be scheduled after the release of the Task Order announcement via amendment. Although the site visit IS NOT mandatory, it is highly encouraged that you have your team and any major subcontractors attend the meeting. No other site visits will be allowed."

Just so we can start planning, do you know when the site visit will be held?

Information for the site visit will be posted via a future amendment

12/8/2023

6 of 20 Insurance/Bonds

This section states, "Please review Section H.2 of the contract for insurance requirements, Section I of the contract for bonding requirements and Section L.7 of the Solicitation for Bid Guarantee required for this task order."

Section H, I and Section L do not appear to be included in any of the documents. Can the government provide these sections or guidance as to what these requirements are?

Please refer to the main SB solictation 70Z04723RNMACCSB.

12/9/2023

Factor 5 Technical Solution, Subfactor 5.2 - Subcontractor and Construction Materials Procurement Strategy

Subfactor 5.2, c)

The RFP states, "Provide a critical path schedule highlighting long lead items and methods of working long lead items into the construction plan to minimize delays."

Is a schedule actually required or is this just in narrative format

See amendment language

12/10/2023

Factor 5 Technical Solution, Subfactor 5.2 - Subcontractor and Construction Materials Procurement Strategy

Subfactor 5.2, c)

What format (excel, P6, etc) does the government want if a schedule is required?

PDF format will suffice.

12/11/2023

Factor 5 Technical Solution, Subfactor 5.2 - Subcontractor and Construction Materials Procurement Strategy

Subfactor 5.2, c)

If schedule is required, can it be 11"x17" and does it count toward the page count?

11"x17" will suffice, and does not count towards page count.

70Z04724RPCI0002 Amendment 002.pdf
Continuation Page
Base Hono Map Pre-Bid Site Visit

File details come from the government source that posted it. Updated .