Price Breakdown Worksheet.pdf

PDF 66 KB Posted

Attached to
Z2DA--36C25726R0043 | 594A4-22-221 Renovate Halls and Walls DOM
Solicitation number
36C25726R0043
Issued by

About this file

This document is a Price Breakdown Worksheet template for construction project cost estimation. The worksheet provides a comprehensive categorization of construction work divisions, including 33 distinct divisions ranging from General Requirements (Division 01) to Utilities (Division 33). The template is designed to break down project costs into three primary categories: Material, Labor, and Equipment, with columns for each division to input specific costs. Additional rows at the bottom of the worksheet allow for calculating subtotal costs, general liability/insurance, overhead and profit, bonding costs, and the total project cost. This template serves as a detailed financial tracking and estimating tool for construction project managers and contractors to comprehensively document and analyze project expenses across multiple construction work categories.

View the file

Other files

File Type Posted
14. B 24 ELECT DETAILS.docx DOCX document
Micro Air Asbestos Test Report 2009.pdf PDF
12. B 24 LIGHTING FIXTURES NOTES.docx DOCX document
11. B24 C WING POWER PLAN 2ND FL.docx DOCX document
6. PANELBOARDS NORM EMERG 2.docx DOCX document
5. PANELBAORDS NORM EMERG.docx DOCX document
copy SOW_Rev 2 02_09_2026.pdf PDF
10. B24 C WING POWER PLAN 1ST FL.docx DOCX document
9. B24 LIGHTING C WING 2ND FL.docx DOCX document
8. B24 LIGHTING C WING 1ST FL.docx DOCX document
7. PANELBOARD NOR EMERG 3.docx DOCX document
4. PANELS BOARDS EMERG.docx DOCX document
1. PANELBOARDS.docx DOCX document
RFI Questions and Answers_02-09-2026.pdf PDF
36C25726R0043 0003.docx DOCX document
13. B24 DRAWING INDEX V2.docx DOCX document
3. PANELBOARDS NORMAL.docx DOCX document
2. TYPICAL BEDROOM PANELS.docx DOCX document
36C25726R0043 0002.docx DOCX document
12__ Ceramic Tile.pdf PDF
36C25726R0043 0001.docx DOCX document
18__RFI 65 Question_Palladium Doors.pdf PDF
15__Specification Haze Tile-5T037.pdf PDF
Site Visit Sign In Sheet_ Repair Halls and Walls Dm.pdf PDF
17__ B24 ACM Report Summary.pdf PDF
16__Water Fountain.pdf PDF
14__Pinnacle Rubber Wall Base.pdf PDF
11__Armstrong Flooring-Biome Montaine Uluru 1.pdf PDF
9__B24-B-WING -Build Back Plans 1.pdf PDF
Statement of Work_Rev1_ 01-23-2026.pdf PDF
36C25726R0043_1 Conformed Solicitation.pdf PDF
13__ Forge Planning Guide.pdf PDF
10__Drawing 24 AF102 Corrected.pdf PDF
1__Consolidated asbuilt 1-8.docx DOCX document
01-23-26 FINAL RFI QAs 36C25726R0043 594A4-22-221 Renovate Halls and Walls DOM.pdf PDF
36C25726R0043_1.docx DOCX document
Drawing_ 24-GC100.pdf PDF
Specs_ BONHAM RENOVATE HALLS WALLS FLOORS DOMICILIARY.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL LABOR EQUIPMENT TOTAL

DIVISION 01: GENERAL REQUIREMENTS

DIVISION 02: EXISTING CONDITIONS

DIVISION 03: CONCRETE

DIVISION 04: MASONRY

DIVISION 05: METALS

DIVISION 06: WOOD, PLASTICS & COMPOSITES

DIVISION 07: THERMAL & MOISTURE PROTECTION

DIVISION 08: OPENINGS

DIVISION 09: FINISHES

DIVISION 10: SPECIALTIES

DIVISION 11: EQUIPMENT

DIVISION 12: FURNISHINGS

DIVISION 13: SPECIAL CONSTRUCTION

DIVISION 14: CONVEYING EQUIPMENT

DIVISION 21: FIRE SUPPRESSION

DIVISION 22: PLUMBING

DIVISION 23: HVAC

DIVISION 25: INTEGRATED AUTOMATION

DIVISION 26: ELECTRICAL

DIVISION 27: COMMUNICATIONS

DIVISION 28: ELECTRONIC SAFETY AND SECURITY

DIVISION 31: EARTHWORK

DIVISION 32: EXTERIOR IMPROVEMENTS

DIVISION 33: UTILITIES

SUBTOTAL COST:

GENERAL LIABILITY / INSURANCE:

OVERHEAD & PROFIT:

BOND:

PROJECT TOTAL COST:

File details come from the government source that posted it. Updated .