This document is a Request for Proposal (RFP) for a construction services project at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. The Department of Veterans Affairs Network Contracting Office is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) to renovate and upgrade approximately 61,500 gross square feet of domiciliary hallways and patient rooms in Building #24. The project scope includes installing new finishes for floors, walls, door jamb finishes, corner/wall guards, handrails, windowsills, window treatments, communication boards, and interior lighting. Specific requirements include removing certain rooms from the scope, performing ceiling and wall lighting upgrades, replacing windowsills, and rebuilding walls damaged by water.

The solicitation (Solicitation Number 36C25726R0043) is set aside exclusively for SDVOSBs under NAICS code 236220 with a size standard of $45.0M. The project is valued between $1,000,000 and $5,000,000, with a 180-calendar day performance period after Notice to Proceed. Key dates include a mandatory site visit on January 6, 2026, Request for Information due by January 13, 2026, and proposal submissions due by January 27, 2026 at 2:00 PM CDT. Offerors must submit a Bid Guarantee and demonstrate the ability to obtain Performance and Payment Bonds. The evaluation will consider technical acceptability, past performance, and price, with past performance weighted more significantly than price.

View the file

Other files

File Type Posted
10. B24 C WING POWER PLAN 1ST FL.docx DOCX document
9. B24 LIGHTING C WING 2ND FL.docx DOCX document
8. B24 LIGHTING C WING 1ST FL.docx DOCX document
7. PANELBOARD NOR EMERG 3.docx DOCX document
4. PANELS BOARDS EMERG.docx DOCX document
1. PANELBOARDS.docx DOCX document
RFI Questions and Answers_02-09-2026.pdf PDF
36C25726R0043 0003.docx DOCX document
14. B 24 ELECT DETAILS.docx DOCX document
Micro Air Asbestos Test Report 2009.pdf PDF
13. B24 DRAWING INDEX V2.docx DOCX document
3. PANELBOARDS NORMAL.docx DOCX document
2. TYPICAL BEDROOM PANELS.docx DOCX document
12. B 24 LIGHTING FIXTURES NOTES.docx DOCX document
11. B24 C WING POWER PLAN 2ND FL.docx DOCX document
6. PANELBOARDS NORM EMERG 2.docx DOCX document
5. PANELBAORDS NORM EMERG.docx DOCX document
copy SOW_Rev 2 02_09_2026.pdf PDF
36C25726R0043 0002.docx DOCX document
17__ B24 ACM Report Summary.pdf PDF
16__Water Fountain.pdf PDF
14__Pinnacle Rubber Wall Base.pdf PDF
11__Armstrong Flooring-Biome Montaine Uluru 1.pdf PDF
9__B24-B-WING -Build Back Plans 1.pdf PDF
Statement of Work_Rev1_ 01-23-2026.pdf PDF
36C25726R0043_1 Conformed Solicitation.pdf PDF
12__ Ceramic Tile.pdf PDF
36C25726R0043 0001.docx DOCX document
13__ Forge Planning Guide.pdf PDF
10__Drawing 24 AF102 Corrected.pdf PDF
1__Consolidated asbuilt 1-8.docx DOCX document
01-23-26 FINAL RFI QAs 36C25726R0043 594A4-22-221 Renovate Halls and Walls DOM.pdf PDF
18__RFI 65 Question_Palladium Doors.pdf PDF
15__Specification Haze Tile-5T037.pdf PDF
Site Visit Sign In Sheet_ Repair Halls and Walls Dm.pdf PDF
Price Breakdown Worksheet.pdf PDF
Drawing_ 24-GC100.pdf PDF
Specs_ BONHAM RENOVATE HALLS WALLS FLOORS DOMICILIARY.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25726R0043

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25726R0043 X 12-1 -2025 549A4-22-221 36C257 Department of Veterans Affairs Network Contracting Office -17 1901 Veterans Memorial Dr., Bldg. 171 Temple TX 76504 Department of Veterans Affairs Network Contracting Office- 17 1901 Veterans Memorial Dr., Bldg. 171 Temple TX 76504 Cassandra King cassandra.king@va.gov Acquisition Title: 549A4-22-221, Renovate Halls, Walls, and Floors DOM

The VA North Texas Healthcare System has a requirement for construction services to renovate and upgrade finishes for Domiciliary hallways and patient rooms (approximately 61,500 GSF) including floors, walls, door jamb finishes, corner/ wall guards, handrails, windowsills, window treatments (shades), communication boards, and associated interior lighting. The work is to be performed at the Sam Rayburn Memorial Veterans Center located at 1201 East 9th Street, Bonham, Texas 75418-4059. The contractor shall perform installation for all materials and components. The contractor shall provide all labor, material, equipment, supervision, for construction services. All work shall be performed in accordance with the statement of work. All work must comply with federal, state and local codes and regulations.

Period of Performance: 180 calendar days after issuance of the Notice to Proceed. This includes material purchase.

This is a "competitive" set aside for 100% Service-Disabled Veteran Owned Small Business (SDVOSB).

This solicitation is being issued as a Request for Proposal(RFP).

The applicable NAICS is 236220-Commercial and Institutional Building Construction, with a Size Standard of $45.0M.

The magnitude of this construction project is between $1,000,000 and $5,000,000.

Site Visit: An organized site visit is scheduled for January 06, 202 at 09:00 AM (CDT), at Sam Rayburn Memorial Veterans Center, 1201 East 9th Street, Bonham, Texas 75418-4059. Attendees shall meet up in Bldg. 9 (Conference Room).

The site visit point of contact is Felix B. Sanmiguel, felix.sammiguel@va.gov, (903) 583-6494.

Potential offerors are urged and expected to inspect the site where services are to be performed.

RFI Due Date: Requests for Information shall be in (MS Word) and submitted electronically via email to Cassandra King, cassandra.king@va.gov and Horacio Fernandez, horacio.fernandez@va.gov, no later than January 13, 2026, at 2:00 PM (CDT).

RFP Due Date: Proposals shall be submitted electronically via email to Cassandra King, cassandra.king@va.gov and Horacio Fernandez, horacio.fernandez@va.gov, no later than January 27, 2026 at 2:00 PM (CDT).

All Offerors shall submit a Bid Guarantee with their proposal. The awardee must be able to obtain and provide the necessary level of Performance and Payment Bonds.

X X 52.211-10 X zero

2:00 PM

CST

01-27-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

(877) 353-9791

(512) 460-5540 Horacio Fernandez

VA-VHA-RPOW-2026-0001

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE5
ITEM INFORMATION5
A.4 – PROPOSAL PREPARATION INSTRUCTIONS6
A.5 - OFFEROR’S SELF PERFORMED CALCULATIONS15
A.6 - V.T.C.A. Tax Code §151.31116
A.7 – STATEMENT OF WORK17
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS26
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS26
2.1 52.216-1 TYPE OF CONTRACT (APR 1984) (DEVIATION NOV 2025)26
2.2 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)27
2.3 52.228-1 BID GUARANTEE (SEP 1996)28
2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)28
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)29
2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)29
2.7 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)30
2.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)30
REPRESENTATIONS AND CERTIFICATIONS31
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025)31
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) (DEVIATION NOV 2025)32
3.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION DATE)34
3.4 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)36
3.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)38
3.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020) (DEVIATION SEP 2025)42
GENERAL CONDITIONS44
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)44
4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025)44
4.3 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)45
4.4 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020) (DEVIATION DATE)45
4.5 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)46
4.6 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) (DEVIATION DATE)56
4.7 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (AUG 2018)59
4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)60
4.9 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)61
4.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) (DEVIATION DATE)61
4.11 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014)66
4.12 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)67
4.13 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025)77
4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)78
4.15 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)79
4.16 52.252-4 ALTERATIONS IN CONTRACT (APR 1984)79
4.17 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)79
4.18 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)79
4.19 SUPPLEMENTAL INSURANCE REQUIREMENTS79
4.20 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) (DEVIATION DATE)81
4.21 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)83
4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)86
4.23 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)86

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

1.00

JB

Construction services to renovate and upgrade finishes for Domiciliary hallways and patient rooms (approximately 61,500 GSF) including floors, walls, door jamb finishes, corner/wall guards, handrails, windowsills, window treatments (shades), communication boards, and associated interior lighting. The contractor shall perform installation for all materials and components. The contractor shall provide all labor, material, equipment, supervision, for construction services. All work shall be performed in accordance with the statement of work. All work must comply with federal, state and local codes and regulations.

1.00

JB

Cost of Payment and Performance Bonds.

GRAND TOTAL

A.4 – PROPOSAL PREPARATION INSTRUCTIONS

1. Introduction: These instructions prescribe the format of proposals along with the development and presentation of the proposal data. These instructions are designed to ensure the proper submission of information necessary to provide for comprehensive evaluation of proposals. Offerors shall carefully review this section prior to commencing proposal preparation and take the necessary measures to ensure that the information submitted is factual, accurate, and complete.

2. Notice: For a proposal to be considered, offerors must strictly comply with all instructions outlined in this solicitation. Furthermore, all solicitation amendments (if any) must be acknowledged in accordance with FAR Clause 52.215-1- Instructions to Offerors. Failure to furnish proposals that comply with all instructions and include complete copies of required documents, at the predetermined due date for submission, shall result in elimination from consideration for award.

3. Submission instructions: Offers must be submitted by email to Contract Specialist at cassandra.king@va.gov and Contracting Officer, Horacio Fernandez at horacio.fernandez@va.gov. Offers must be submitted on or before the due date and time [SF 1442, Block 13a].

a. Proposals must be submitted in four volumes.

1) Technical Acceptability-Vol. I

2) Past Performance-Vol. II

3) Price-Vol. III

4) Solicitation, Offer, & Award Documents-Vol. IV

b. Offerors may submit their proposals in one to four emails.

c. Volumes I through IV must be submitted as separate PDFs.

d. Each volume must be submitted as attachments to their submission email(s).

e. The email subject line shall include the Solicitation Number, project title, company name and volume. Each email must clearly indicate how many total emails the Offeror will be sending.

Example 1: (1 email with Volumes I through IV, each volume attached separately):

[36C25726R0043, Renovate Halls and Walls DOM, Company Name, Email 1 of 1, Volume I - IV]

Example 2: (4 separate emails with each volume attached separately to its corresponding email)

[36C25726R0043, Renovate Halls and Walls DOM, Company Name, Email 1 of 4, Volume I]

4. A. Format Instructions: Proposals must be clearly indexed and logically assembled. Each volume must have a clear title at the top of the first page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date, and solicitation number in the header and/or footer.

Proposal page limitations are applicable to this procurement. The table below indicates the maximum page count for each volume:

Volume Number
Factor
File Name
Page Limitations
Volume I
Technical Acceptability
Tech.pdf
5
Volume II
Past Performance
Past Perf.pdf
40 pages
Volume III
Price Evaluation
Price.pdf
Complete A.3, Price/Cost Schedule for Project Pricing
Volume IV
Solicitation, Amendments, Offer, Award Documents, Certifications and Representations
Solicitation-Offer-Certs- Reps.pdf
None

If the Offeror submits annexes, documentation, attachments, or the like, such will count against the Offeror’s page limitations unless otherwise indicated in this solicitation. The page count will be determined by counting the pages in the order they come up in the print layout view. Pages in violation of these instructions, including those that exceed the total page limit for a particular volume, will not be evaluated. Proposals must be in at least 12-point font and have at least 1” margins.

If an offeror includes a table of contents or a glossary of terms or abbreviations, those pages will not be included in the page count of that volume. However, substantive information included on table of contents or glossary pages will not be considered.

B. Content Instructions: Information must be confined to the appropriate volume. The Offeror shall confine submissions to essential matters sufficient to define the proposal and provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal. All proprietary information shall be clearly and properly marked.

C. Volume Specific Submittal Instructions:

1. Volume I – Technical Acceptability: Provide proof of Experience Modification Rating (EMR). Each Offeror shall provide their current EMR, or verifiable equivalent, from their insurance company or from their state, based on the offeror’s state of incorporation’s EMR requirements. The Government will consider the most recent timeframe corresponding to the Offeror’s insurance coverage period. If an offeror submits an EMR older than 12 months, using a three-year average at the time of proposal submittal, that offer shall be deemed unacceptable and cause the offeror to be removed from competition. An EMR less than or equal to 1.00 will be considered technically acceptable. If the NCCI cannot issue an EMR because the Offeror lacks insurance history, the Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Offeror a Unity Rating of 1.0.

2. Volume II – Past Performance

Past Performance Project History: Offerors are encouraged to submit information relating to up to three projects it has completed or is in the process of completing. If submitting such information, offerors must provide detailed summary of these projects, including:

a) Owner Government Agency/Company who awarded contract

b) Location (physical address)

c) Project Name

d) Project Description (Details of construction renovation requirements, challenges, and solutions)

e) Project Cost and Cost Control Measures (original and final contract costs, contract mods, cost containment measures, value engineering, etc.)

f) Project Performance Period (Initial/Actual, schedule impacts and efficiencies)

g) Owner POC (Name, Title, Telephone Number, Email)

h) Subcontractors (Roles, Responsibilities, Percent of work)

i) A narrative description detailing the project scope related to piping and drainage work. Additionally, indicate whether the project site was a healthcare facility. The narrative must also address the complexity and magnitude of the project, any challenges faced and how the offeror responded to those challenges, whether the project stayed on schedule, whether any unforeseen site conditions were encountered, any other unusual factors, and the degree of success obtained. Offerors are encouraged to include supporting documents such as photographs that support the narrative.

3. Volume III – Price: Complete Price/Cost Schedule

a) Complete the price offer schedule in section A.3

b) Price shall be addressed using the attached price breakdown worksheet, which is included in (Attachment- Price Breakdown Worksheet).

c) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.

NOTE: Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73(d)(3).

4. Volume IV - Solicitation, Offer, & Award Documents

a) Certifications and Representations. An authorized official of the offeror shall sign SF 1442 and all certifications requiring original signature. Volume IV must contain the following:

1) Solicitation Section A – Standard Form SF 1442 and Acknowledgement of Amendments, if any.

2) Any proposed exceptions to solicitation terms and conditions. Any Offeror-imposed terms and conditions which deviate from the Government’s material terms and conditions established by the Solicitation, may render the Offeror’s proposal Unacceptable and thus ineligible for award.

3) Signed 852.219-75, VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.

4) Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating parties to the joint venture:

a) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and

b) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.

SOLICITATION, AMENDMENTS, OFFER, AWARD DOCUMENTS, CERTIFICATIONS

AND REPRESENTATIONS.

1. Standard Form (SF) 1442 Solicitation, Offer, and Award:

All blocks under section "OFFER" on page 2 of SF 1442 (Item 14 through 20C) shall be completed. Offerors shall be solely responsible for monitoring Government's website SAM.gov for amendments to this solicitation, if any, and acknowledge them in accordance with the requirements stipulated in this solicitation and amendments.

2. Duly executed Bid Bond /Guarantee:

Offerors shall use form SF24 Bid Bond. Bid bonds that are found noncompliant with bid guarantee requirements may result in the rejection of the offer. See clause 52.228-1 Bid Guarantee for additional information on the compliance with bid guarantee requirements.

3. SDVOSB Certification:

Offerors are required to be SDVOSB certified with the Small Business Administration (SBA). Offerors must register their businesses at MySBA Certifications, https://certifications.sba.gov/. Verification of the offerors’ SDVOSB certification will be conducted using SBA Small Business Search, https://search.certifications.sba.gov/.

Offerors must have an active registration in the System for Award Management (SAM), including completed and annually validated representations and certifications.

Verification of offerors active SDVOSB registration will be conducted using SAM.gov.

4. Acknowledgement of All Amendments:

The Offeror must acknowledge and agree to all amendments by either 1.) completing block 19 of the SF 1442, or 2.) returning the signed amendment form(s) with the submission.

5. Bid Guarantee:

The Offeror must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on SF 24.

6. Representations & Certifications:

To be eligible for award, offerors must have an active System for Award Management (SAM) registration when submitting their proposal and at the time of award, validate their annual representations and certifications via SAM.gov (https://sam.gov). Offerors must complete and sign FAR clause 52.219-28(h) if they are a small business that does not have representations and certifications (reps and certs) in SAM.

7. Information Regarding Responsibility Matters:

The Offeror must provide its response to FAR 52.209-7 (b).

9. Violation of Arms Control Treaties or Agreements:

The Offeror must provide its response to FAR 52.209-13(b) Certification.

10. Limitations on Subcontracting—Certificate of Compliance for Services and Construction:

To be eligible for award for an SDVOSB set-aside contract for services and construction, VAAR 852.219-75, Limitations on Subcontracting (LOS) requires certification to be completed, signed, and returned with the offeror’s proposal. The completed and signed forms will become part of the official award documentation.

a) VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION

(JAN 2023) (DEVIATION).

b) Self-Performed Work Calculation Worksheet.

11. Notice to SB Joint Venture/Mentor Protegee:

Any Offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the Offeror ineligible for award.

12. Superintendent Work:

The awardee will be required to always provide a superintendent on the project in accordance with FAR Clause 52.236-6. The Superintendent is considered a key position and SHALL NOT be subcontracted and must work directly for the prime contractor.

The Government will strictly enforce all the proposal submission requirements outlined in the solicitation. Failure to comply with these requirements will result in an Offeror's proposal being rejected as being incomplete or non-conforming to solicitation requirements.

It is solely the responsibility of offerors to ensure the Government receives proposal before or on the exact due date and time set forth in this solicitation. Offerors shall provide confirmation of the bid bond delivery via email to Contract Specialist, cassandra.king@va.gov, and Contracting Officer, Horacio Fernandez, horacio.fernandez@va.gov prior to the closing date and time.

Deadline for all inquiries for this solicitation is listed on SF1442. Government’s responses to inquiries will be issued in the form of Amendment(s) to be posted on the same website where this solicitation is posted: www.SAM.gov. All interested offerors, including those submitting inquiries, are required to monitor the above website for any posted amendments and acknowledge them in accordance with the instructions provided in the amendments as well as in this solicitation.

EVALUATION FACTORS FOR AWARD:

1. Source Selection Process Overview. All proposals shall be subject to evaluation by a team of Government personnel. Proposals will be evaluated strictly in accordance with their written content. Subjective judgment by the government is implicit in the evaluation process.

a. The Government will first review proposals to determine whether they are complete and comply with the instructions set forth in this solicitation. The Government will eliminate all proposals that were submitted late and not subject to an applicable exception, fail to comply with all instructions, or are incomplete.

Offerors are to be and will be verified at Small Business Administration (SBA), MySBA Certifications, https://certifications.sba.gov/ as a SDVOSB under NAICS Code: 236220– Commercial and Institutional Building Construction.

The Government will then determine whether remaining offerors are able to meet the following bonding requirements. Each offeror must demonstrate its ability to obtain bonding for a minimum amount of the offeror’s proposed price. The offeror shall demonstrate all bonding comes from the Bureau of the Fiscal Service (BFS), Surety Bonds, List of Certified Companies found at https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html.

A complete proposal is one that includes all required information and documentation, including any applicable representations, forms, or clauses requiring information or signatures from offerors. Proposals which merely restate a requirement or state that a requirement will be met, without providing supporting rationale, will be deemed incomplete and not considered.

b. Next, the Government will evaluate each remaining offeror’s Volume I Technical Capability. The Government will eliminate any proposals that are not technically acceptable.

c. The Government will then conduct a tradeoff process with all remaining offerors. The Government will consider Volume II Past Performance and Volume III Price in this tradeoff process. In using this source selection process, the Government intends to make award based on which offeror provides the best value to the Government considering and comparing the past performance and price of each remaining offeror. Past Performance is significantly more important than price in this process. The Government may thus choose not to make award to the offer with the highest past performance rating or the lowest priced offeror. In the interest of efficiency, the Government reserves the right to conduct the evaluation in the most effective manner. The Government intends to rate and then rank each offeror before deciding which offeror presents sufficient value to merit award. The Government reserves the right to not make award to an offeror who does not present sufficient value considering past performance and price.

d. The Government intends to make award without discussions, but it reserves the right to conduct discussions if doing so would be in the best interest of the Government. Initial proposals should contain offeror’s best offer. The Government may request clarifications, as described in FAR 15.306(a).

e. A contract will be awarded to the offeror who presents the best value to the Government considering Past Performance and Price.

2. Evaluation Factors

a. FACTOR 1- Technical Acceptability: Experience Modification Rating (EMR)

i. The Offeror shall provide their current EMR. Any EMR older than 12 months, at the time of proposal submittal shall be deemed unacceptable and cause the offeror to be removed from competition. An EMR less than or equal to 1.00 is considered Technically Acceptable.

ii. The Offeror shall provide their EMR or verifiable equivalent, from their insurance company or from their state, based off the offeror’s state of incorporation’s EMR requirements. The EMR, or equivalent, shall be newer than 12 months, at time of proposal receipt. It is understood that EMRs may have a future forecasted start date due to how the company who generates EMRs assigns EMRs. As such, EMRs provided with a future start date will be deemed acceptable, if an EMR is not more than three months from the date of solicitation close date. A letter that states there isn’t enough work experience to have EMR will automatically constitute a numbered rating of “1.0”. Any stated equivalents shall be explained thoroughly to the Government. A lack of sufficient detail may deem this Factor as “Unacceptable”.

iii. Any Offeror who receives a rating of Unacceptable as part of the technical acceptability review will be eliminated from consideration for award.

b. FACTOR 2 - Past Performance

i. The Government will assess the relative risks associated with an Offeror's likelihood of success in fulfilling the solicitation's requirements as indicated by that Offeror's record of past performance. In this context, “Offeror” refers to the proposed prime contractor. A joint venture will be assessed on the combined performance of each or as a team of the joint venture offerors.

ii. The Government will conduct a performance risk assessment based on the quality, relevancy, and recency of the Offeror's past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. Offerors are cautioned that the Government will review available past performance data available in the Contractor Performance Assessment Reporting System (CPARS). The Government reserves the right to consider past performance information from any available source and may contact customers other than those identified by the Offeror when evaluating past performance. Since the Government may not necessarily interview all the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of any data provided. Offerors are reminded that the burden of proving low performance risk rests with the Offerors per FAR 15.305(a)(2)(iv), “in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.”

c. FACTOR 3 - Price. The Government will evaluate offers by adding the total of all line-item prices. The Total Evaluated Price will be that sum. The Government will evaluate the total proposed price of all Offerors who are not eliminated before the tradeoff process stage as an indicator of the value the Offeror will provide on project. The Government will also evaluate the Total Evaluated Price to determine whether proposals are fair and reasonable.

Page 1 of Page 1 of

A.5 - OFFEROR’S SELF PERFORMED CALCULATIONS

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Cost of Materials $ __________

c) Total excluding materials (a-b) $ __________

d) Amount projected to be paid to non-VetCert listed SDVOSBs: $ __________ (not including materials)

e) Offeror’s percentage of estimated non-VetCert work (d/c X 100 = %) __________%

f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________% A/E-Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SBA SDVOSBs.

General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SBA SDVOSBs.

Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified SBA SDVOSBs.

A.6 - V.T.C.A. Tax Code §151.311 Offerors are hereby notified that in accordance with V.T.C.A., Tax Code §151.311, the purchase of tangible personal property for use in the performance of a contract for an organization exempted under Section 151.309 or 151.310 of this code is exempt if the tangible personal property is incorporated into realty in the performance of the contract. Additionally, the purchase of tangible personal property, other than machinery or equipment and its accessories and repair and replacement parts, for use in the performance of a contract for an improvement to realty for an organization exempted under Section 151.309 or 151.310 of the code is exempt if the tangible personal property is necessary and essential for the performance of the contract and completely consumed on the job. The VA is an exempt organization.

Therefore, the contractor’s purchase of such building and construction materials within the State of Texas to be incorporated into the real property belonging to the U.S. Department of Veterans Affairs (VA) or completely used in the performance of the contract is subject to exemption from Texas Sales and Use taxes under the code. To take advantage of the tax exemption the successful offeror under this solicitation must complete a Texas Sales and Use Tax Exemption Certificate when it purchases construction materials for this contract.

Notwithstanding FAR 52.229-3, all proposals received in response to this solicitation are presumed to reflect this tax exemption and therefore should not include Texas’ Sales or Use Taxes on sales of materials for incorporation into VA real estate under this contract or used in the performance of this contract.

The successful offeror is responsible for obtaining the certificate, as it is specific to the state of Texas, and not the VA.

A.7 – STATEMENT OF WORK

STATEMENT OF WORK

Renovate Halls, Walls, and Floors DOM

PROJECT # 549A4-22-221

1. SCOPE: This project provides primarily architectural upgrades to the Domiciliary walls and floors in hallways and patient rooms located in Building #24, Sam Rayburn Memorial Veterans Center, 1201 E. 9th St., Bonham, Texas, 75418.

2. STATEMENT OF WORK: The Contractor shall perform installation for all materials and components.

Work shall include installation, but is not limited to the following:

Renovate and upgrade finishes for Domiciliary hallways and patient rooms (approximately 61,500 GSF) including floors, walls, door jamb finishes, corner/wall guards, handrails, windowsills, window treatments (shades), communication boards, and associated interior lighting.

1. See Design attachments:

Bonham Domiciliary Package Finishes BON B24 – A Wing 1st Floor BON B24 – A Wing 2nd Floor BON B24 – B Wing 1st Floor BON B24 – B Wing 2nd Floor BON B24 – C Wing 1st Floor BON B24 – C Wing 2nd Floor

1. Remove rooms from scope: 1C-143 490SF & bathroom on Sheet I-103; 1B-143 490SF & 1B-143A & bathroom on Sheet I-102; and 2B-143 490SF & 2B-143A & bathroom on Sheet I-105.

1. Remove all work in bathrooms beyond the bathroom doors; bathroom doors are in scope.

1. Include ceiling and wall lighting upgrades.

1. Replace windowsills in patient rooms.

1. Flooring will be removed and replaced.

1. Photorealistic renderings of new design work will be required.

1. Provide detailed phasing plan using limited swing space.

1. Build-back for/repair walls in B Wing (1st and 2nd floors) that were removed during water damage remediation.

3. CONTRACTOR RESPONSIBILITIES: The Contractor shall exercise extreme care to avoid damaging Government property such as buildings, equipment, trees, shrubs, or turf. Any damage to Government property by the Contractor shall be repaired by the Contractor to its original condition at no additional cost to the Government. The contractor shall restore ALL disturbed grounds to existing conditions. The Contractor shall ensure that all materials are new, free from defects, imperfections and asbestos free (NO ASBESTOS CONTAINING MATERIALS SHALL BE USED ON THIS PROJECT).

4. SCHEDULE OF WORK: The Contractor shall notify the Contracting Officer’s Representative (COR) prior to start of work. The Contractor shall schedule work through the COR. The Contractor shall coordinate work with COR NLT 3 days before starting work. Other contractors may be working in the same area performing other work. The contractor shall execute work in a manner so as not to impede other contract work. Period of Performance will be 180days after issue of Notice to proceed.

5. HOURS OF WORK: The normal hours of work are 07:30 to 16:15 (4:15) Monday through Friday. Work shall be performed during normal working hours. Work to be performed in other than normal hours shall be approved by the Contracting Officer’s Representative.

6. WORKMANSHIP: All work under this contract shall conform to the standards of these specifications. The Contractor, at no additional cost to the Government, shall correct work not meeting these specifications. Work shall be accomplished by personnel skilled in the respective trades.

7. DAILY PROGRESS REPORTS: The Contractor shall provide daily reports no later than 9:00 AM; a progress report of work accomplished the previous day to COR located in Bldg. 9.

8. WORKING CONDITIONS: The buildings and the surrounding site areas will be occupied, and Government operations shall continue at normal, temporary, or restricted basis for the duration of the contract. The Contractor shall take all precautions to ensure that his operations are conducted in a manner so as not to interfere with the normal operation of surrounding areas/facilities. The Contractor shall execute work in a safe manner and shall not subject personnel to unsafe conditions. The Contractor shall provide safety barricades, devices, and equipment to protect personnel and property and repair damage caused by construction operations. Take all precautions to protect the building and its occupants during the construction period

9. SITE VISIT: The Contractor shall visit the site to determine the full extent of the work. Failure to inspect the site will not constitute grounds for a claim after contract award.

10. DISPOSAL: Disposal of materials removed under this contract shall go to an approved disposal site in accordance with all local, state, and federal laws, regulations, and guidelines, and are the Contractor’s sole responsibility. The contractor shall adhere to all OSHA requirements concerning removal, transporting, and disposal of the material.

11. CLEAN-UP: The Contractor shall keep the area neat and tidy and free of debris at the end of each workday.

12. TEMPORARY FACILITIES: Temporary electrical power and water may be provided by the Government at no cost to the Contractor from existing lines and sources located at the building site. The characteristics and source locations may be verified by a visit to the site. The Contractor shall provide ample temporary storage shed space for materials requiring shelter from the weather, and security and safety protection. Storage facilities shall be in the areas of the facility designated by the Contracting Officer’s Representative.

13. SAFETY AND FIRE: All fire and safety rules and regulations are applicable; NFPA and SBCCI dated 1999. The Contractor shall comply with EM385-1-1 dated 1987 for minimum safety requirements.

14. PERMITS: The Contractor shall be responsible for obtaining any licenses and permits and complying with any laws, codes, and regulations applicable to the execution of this work as required Federally and by the State of Texas.

15. WARRANTEE: The contractor shall warrantee work to be free of defects and workmanship for a period of 1 year from date of acceptance.

16. QUALITY ASSURANCE: The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of these specifications.

17. SUBMITTALS: The contractor shall provide with their quote the following information:

ITEMDESCRIPTION
DoorsSubmit manufacturer's descriptive literature for screens and any accessories required to complete the work. Include data and details on screen construction and motorized components.

END OF SECTION

NARA Records Management Language for Contracts (May 2017)

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. VA North Texas Health Care System and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA North Texas Health Care System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA North Texas Health Care System. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA North Texas Health Care System control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VA North Texas Health Care System guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA North Texas Health Care System policy.

8. The Contractor shall not create or maintain any records containing any non-public VA North Texas Health Care System information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The VA North Texas Health Care System owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VA North Texas Health Care System shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

Information Technology Security requirements section

As prescribed in 839.201, insert the following clause:

The contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract.

1. GENERAL

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.

c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.

d. Custom software development and outsourced operations must be located in the U.S.

to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .