Palm Harbor Recreation Center Construction Project - Technical Specifications Summary
This document comprises comprehensive technical specifications for the construction of a 28,000 square foot recreation center in Palm Harbor, Florida, prepared by Pinellas County's Construction Services Department in partnership with design consultant Wannemacher Jensen Architects. The project encompasses detailed construction standards across multiple divisions including general conditions, plumbing, fire protection, HVAC systems, electrical infrastructure, and building finishes. The specifications detail requirements for all mechanical systems including chilled water systems, variable frequency drives, direct digital controls, ductwork installations, terminal units, air distribution devices, and centrifugal fans. The project incorporates extensive piping systems for domestic water, sanitary waste, storm drainage, refrigerant lines, and HVAC applications, with specifications for materials including copper tubing, PVC piping, stainless steel components, and galvanized steel ductwork. The contract term is 425 consecutive calendar days from the Notice to Proceed, with a non-mandatory pre-bid site visit scheduled for October 29, 2025, Step 1 bid submission deadline of November 11, 2025, and Step 2 deadline of November 20, 2025. Liquidated damages are assessed at $487.07 per calendar day for project delays.
The specifications require compliance with numerous industry standards including ASHRAE, NFPA, SMACNA, AMCA, and UL certifications for all equipment and systems. The project mandates a 15% Small Business Enterprise (SBE) participation goal for subcontractors and requires comprehensive documentation including shop drawings, coordination drawings, performance certifications, and manufacturer warranties. Bidders must demonstrate AHRI certification compliance for chillers, AMCA certification for fans, and proper seismic qualification for all equipment. The specifications establish performance requirements for noise control (NC35 maximum in occupied spaces), energy efficiency standards per ASHRAE/IES 90.1, and include detailed requirements for testing, balancing, and commissioning of all systems. Insurance and bonding requirements are specified, with contractors required to provide bonding letters indicating maximum bonding capacity. The project incorporates dual functionality as both a recreational facility and an emergency hurricane shelter designed to American Red Cross standards, necessitating specialized design considerations for structural resilience and operational flexibility in mechanical and electrical systems.
View the file
Other files for this state and local contract opportunity
Show all 50
Palm Harbor Recreation Center Addition has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PALM HARBOR RECREATION CENTER
COVER
PROJECT NUMBER: 24002
000000 - Page 1 of 2
VERSION: 250915 – PERMIT SET
Technical Specifications
1500 16th Street Palm Harbor, Florida 34683
PROJECT # 24002
PERMIT 9/15/2025
VOLUME 2
FOR
Palm Harbor Recreation Center
PREPARED BY
Wannemacher Jensen Architects, Inc.
132 Mirror Lake Dr. N.
Unit 301
St. Petersburg, Florida 33701 727-822-5566
AR94244
COVER
PROJECT NUMBER: 24002
000000 - Page 2 of 2
VERSION: 250915 – PERMIT SET
This page intentionally left blank
TABLE OF CONTENTS Page 1
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT ISSUE
TABLE OF CONTENTS – VOLUME 1
DIVISION 01 - GENERAL CONDITIONS
011000 SUMMARY
012500 SUBSTITUTION PROCEDURES
012600 CONTRACT MODIFICATION PROCEDURES
012900 PAYMENT PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATION
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
014000 QUALITY REQUIREMENTS
014200 REFERENCES
015000 TEMPORARY FACILITIES AND CONTROLS
016000 PRODUCT REQUIREMENTS
017300 EXECUTION
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
033000 CAST-IN-PLACE CONCRETE
033543 POLISHED CONCRETE FLOORS
DIVISION 04 - MASONRY
042300 REINFORCED UNIT MASONRY
DIVISION 05 - METALS
051200 STRUCTURAL STEEL FRAMING
052100 STEEL JOIST FRAMING
053000 METAL DECKING
054000 COLD FORMED METAL FRAMING
055000 METAL FABRICATIONS
055113 METAL PAN STAIRS
057300 DECORATIVE METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
061600 SHEATHING
064116 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071326 SELF-ADHERING SHEET WATERPROOFING
071616 CRYSTALLINE WATERPROOFING
072100 BUILDING INSULATION
072600 UNDERSLAB VAPOR BARRIER
072715 NONBITUMINOUS SELF-ADHERING SHEET AIR BARRIERS
072726 FLUID-APPLIED MEMBRANE AIR BARRIERS
075216 SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING
076200 SHEET METAL FLASHING AND TRIM
077100 ROOF SPECIALTIES
TABLE OF CONTENTS Page 2
077200 ROOF ACCESSORIES
078100 APPLIED FIREPROOFING
078413 PENETRATION FIRESTOPPING
089200 JOINT SEALANTS
079500 EXPANSION CONTROL
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081416 FLUSH WOOD DOORS
083113 ACCESS DOORS AND FRAMES
083323 OVERHEAD COILING DOORS
084213 SECURITY ALUMINUM ENTRANCES
085653 SECURITY WINDOWS
087100 DOOR HARDWARE
087913 KEY STORAGE EQUIPMENT
088000 GLAZING
DIVISION 09 - FINISHES
092116 GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216 NON-STRUCTURAL METAL FRAMING
092400 PORTLAND CEMENT PLASTERING (STUCCO)
092900 GYPSUM BOARD
093000 SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION
093013 CERAMIC TILING
095113 ACOUSTICAL PANEL CEILINGS
096413 PERFORMANCE WOOD FLOORING
096466 WOOD ATHLETIC FLOORING
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT FLOORING
096766 SYNTHETIC ATHLETIC FLOORING
096813 TILE CARPETING
099100 PAINTING
DIVISION 10 - SPECIALTIES
102113 PLASTIC TOILET COMPARTMENTS
102239 FOLDING PANEL PARTITIONS
102600 WALL AND DOOR PROTECTION
102800 TOILET ACCESSORIES
104413 FIRE EXTINGUISHER CABINETS
104416 FIRE EXTINGUISHERS
109050 MISCELLANEOUS SPECIALTIES
DIVISION 11 – EQUIPMENT
114000 FOOD SERVICE EQUIPMENT
116623 GYMNASIUM EQUIPMENT
116643 INTERIOR SCOREBOARDS
116653 GYMNASIUM DIVIDERS
DIVISION 12 - FURNISHINGS
122413 ROLLER WINDOW SHADES
123661 SIMULATED STONE COUNTERTOPS
124813 ENTRNACE FLOOR MATS AND FRAMES
126600 GYMNASIUM BLEACHERS
DIVISION 13 - SPECIAL CONSTRUCTION
TABLE OF CONTENTS Page 3
NOT USED
DIVISION 14 - CONVEYING SYSTEMS
142400 HYDRAULIC ELEVATOR
TABLE OF CONTENTS – VOLUME 2
DIVISION 21 - FIRE PROTECTION
210500 COMMON WORK RESULTS FOR FIRE SUPPRESSION
210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING
210518 ESCUTCHEONS FOR FIR-SUPPRESSION PIPING
210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
211313 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
220500 COMMON WORK RESULTS FOR PLUMBING
220513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
220518 ESCUTCHEONS FOR PLUMBING PIPING
220519 METERS AND GAGES FOR PLUMBING PIPING
220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221119 DOMESTIC WATER PIPING SPECIALTIES
221316 SANITARY WASTE AND VENT PIPING
221319 SANITARY WASTE PIPING SPECIALTIES
221413 STORM DRAINAGE PIPING
221423 STORM DRAINAGE PIPING SPECIALTIES
221429 SUMP PUMPS
223300 ELECTRIC, DOMESTIC WATER HEATERS
224000 PLUMBING FIXTURES
224213 COMMERCIAL WATER CLOSETS, URINALS, AND BIDETS
224213.13 COMMERCIAL WATER CLOSETS
224213.16 COMMERCIAL URINALS
224216.13 COMMERCIAL LAVATORIES
224216.16 COMMERCIAL SINKS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
230100 GENERAL MECHANICAL PROVISIONS
230500 BASIC MECHANICAL MATERIALS & METHODS
230515 INSTRUCTIONS & MAINTENANCE MANUALS
230519 FLOW METERS AND GAGES
230520 PIPING SYSTEMS - FLUSHING AND CLEANING
230521 THERMOMETERS
230523 VALVES, COCKS AND SPECIALTIES - HVAC SYSTEMS
230524 AIR CONTROL EQUIPMENT - HYDRONIC SYSTEMS
230529 HANGERS AND SUPPORTS
230535 ELECTRIC MOTORS, HIGH EFFICIENCY TYPE
230548 VIBRATION ISOLATION EQUIPMENT
230553 IDENTIFICATION FOR HVAC SYSTEMS AND EQUIPMENT
230593 HVAC TESTING AND BALANCING
230700 INSULATION, HVAC
230800 HVAC COMMISSIONING
TABLE OF CONTENTS Page 4
230923 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) CONTROLS
230925 VARIABLE FREQUENCY DRIVES
232113 PIPING SYSTEMS - HVAC WATER
232125 PUMPS - HORIZONTAL BASE MOUNTED END SUCTION
232313 REFRIGERANT PIPE, VALVES AND SPECIALTIES
232500 HVAC WATER TREATMENT
233100 DUCTWORK
233300 DUCT SYSTEM ACCESSORIES
233314 DAMPERS - FIRE, FIRE-SMOKE, AND SMOKE
233617 TERMINAL UNITS - VAV, SINGLE INLET, ELECTRIC COIL
233713 AIR DISTRIBUTION DEVICES
236426 AIR COOLED CHILLERS
237313 AIR HANDLING UNITS, CENTRAL STATION, MODULAR
237314 ROOFTOP MODULAR CHILLED WATER AIR HANDLING UNITS
237500 ENERGY RECOVERY VENTILATORS
238143 AIR CONDITIONING UNITS - DUCTLESS SPLIT SYSTEM
DIVISION 26 - ELECTRICAL
260010 BASIC ELECTRICAL REQUIREMENTS
260500 COMMON WORK RESULTS FOR ELECTRICAL
260519 CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
260553 ELECTRICAL IDENTIFICATION
260800 COMMISSIONING OF ELECTRICAL SYSTEMS
260923 LIGHTING CONTROL DEVICES
262200 LOW-VOLTAGE TRANSFORMERS
262413 SWITCHBOARDS
262416 PANELBOARDS
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
264313 SURGE PROTECTIVE DEVICES
265119 LED INTERIOR LIGHTING
265613 LIGHTING POLES AND STANDARDS
265619 LED EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
270010 TECHNOLOGY GENERAL PROVISIONS
270526 GROUNDING AND BONDING FOR TELECOMMUNICATIONS SYSTEMS
270528 RACEWAYS FOR TECHNOLOGY
271000 STRUCTURED CABLING SYSTEM
274134 BROADBAND DISTRIBUTION SYSTEM
274135 CATV HEADEND
275125 SOUND REINFORCEMENT SYSTEM
275150 EDUCATIONAL INTERCOM AND PROGRAM CLOCK
DIVISION 28 - ELECTRONIC SAFEY AND SECURITY
281000 ELECTRONIC SECURITY SYSTEMS
283111 ADDRESSABLE FIRE ALARM SYSTEM
DIVISION 31 - EARTHWORK
313116 TERMITE CONTROL
TABLE OF CONTENTS Page 5
DIVISION 32 – EXTERIOR IMPROVEMENTS
328400 IRRIGATION
329000 PLANTING
329200 TURF AND GRASS
END OF TABLE OF CONTENTS
TABLE OF CONTENTS Page 6
THIS PAGE INTENTIONALLY LEFT BLANK
COMMON WORK RESULTS FOR FIRE
SUPPRESSION 210500 - Page 1 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
COMMON WORK RESULTS FOR FIRE SUPPRESSION
PART 1 GENERAL
1.1RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Piping materials and installation instructions are common to most piping systems.
2. Mechanical sleeve seals.
3. Sleeves.
4. Escutcheons.
5. Grout.
6. Fire-suppression equipment and piping demolition.
7. Equipment installation requirements common to equipment sections.
8. Painting and finishing.
9. Concrete bases.
10. Supports and anchorages.
1.3 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
F. The following are industry abbreviations for plastic materials:
1. CPVC: Chlorinated polyvinyl chloride plastic.
G. The following are industry abbreviations for rubber materials:
1. EPDM: Ethylene-propylene-diene terpolymer rubber.
2. NBR: Acrylonitrile-butadiene rubber.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Mechanical sleeve seals.
2. Escutcheons.
B. Welding certificates.
1.5 QUALITY ASSURANCE
A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."
SUPPRESSION 210500 - Page 2 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
C. Electrical Characteristics for Fire-Suppression Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.
1.7 COORDINATION
A. Arrange pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for fire-suppression installations.
B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.
C. Coordinate requirements for access panels and doors for fire-suppression items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 08 Section "Access Doors and Frames."
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:
1. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified.
2.2 PIPE, TUBE, AND FITTINGS
A. Refer to individual Division 21 piping Sections for pipe, tube, and fitting materials and joining methods.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.3 JOINING MATERIALS
A. Refer to individual Division 21 piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.
a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.
2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.
C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.
D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
SUPPRESSION 210500 - Page 3 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to
ASTM B 813.
F. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
G. Solvent Cements for Joining CPVC Plastic Piping: ASTM F 493.
2.4 MECHANICAL SLEEVE SEALS
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
1. Manufacturers:
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Metraflex Co.
d. Pipeline Seal and Insulator, Inc
2. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.
3. Pressure Plates: Carbon steel or Stainless steel. Include two for each sealing element.
4. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating or Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.5 SLEEVES
A. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.
B. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
C. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.
1. Underdeck Clamp: Clamping ring with set screws.
D. PVC Pipe: ASTM D 1785, Schedule 40.
E. Molded PE: Reusable, PE, tapered-cup shaped, and smooth-outer surface with nailing flange for attaching to wooden forms.
2.6 PIPING ESCUTCHEONS
A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.
B. One-Piece, Cast-Brass Type: With set screw.
1. Finish: Polished chrome plated.
C. Split-Casting, Cast-Brass Type: With concealed hinge and set screw.
1. Finish: Polished chrome plated.
D. One-Piece, Stamped-Steel Type: With set screw and chrome-plated finish.
E. Split-Plate, Stamped-Steel Type: With concealed hinge, set screw, and chrome-plated finish.
2.7 GROUT
A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout.
1. Characteristics: Post-hardening, volume-adjusting, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.
2. Design Mix: 5000-psi, 28-day compressive strength.
3. Packaging: Premixed and factory packaged.
SUPPRESSION 210500 - Page 4 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
PART 3 EXECUTION
3.1 FIRE-SUPPRESSION DEMOLITION
A. Refer to Division 01 Section "Cutting and Patching" and Division 02 Section "Selective Structure Demolition" for general demolition requirements and procedures.
B. Disconnect, demolish, and remove fire-suppression systems, equipment, and components indicated to be removed.
1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
2. Equipment to Be Removed: Disconnect and cap services and remove equipment.
C. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
3.2 PIPING SYSTEMS - COMMON REQUIREMENTS
A. Install piping according to the following requirements and Division 21 Sections specifying piping systems.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.
D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
F. Install piping to permit valve servicing.
G. Install piping at indicated slopes.
H. Install piping free of sags and bends.
I. Install fittings for changes in direction and branch connections.
J. Install piping to allow application of insulation.
K. Select system components with pressure rating equal to or greater than system operating pressure.
L. Install escutcheons for penetrations of walls, ceilings, and floors according to the following:
1. New Piping:
a. Bare Piping at Wall Ceiling and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.
M. Permanent sleeves are not required for holes formed by removable PE sleeves.
N. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.
2. Install sleeves in new walls and slabs as new walls and slabs are constructed.
3. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:
SUPPRESSION 210500 - Page 5 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
a. PVC or Steel Pipe Sleeves.
b. Stack Sleeve Fittings: For pipes penetrating floors with membrane waterproofing. Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches above finished floor level. Refer to Division 07 Section "Sheet Metal Flashing and Trim" for flashing.
1) Seal space outside of sleeve fittings with grout.
4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint. Refer to Division 07 Section "Joint Sealants" for materials and installation.
O. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Install steel pipe for sleeves smaller than 6 inches in diameter.
2. Install cast-iron "wall pipes" for sleeves 6 inches and larger in diameter.
3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
P. Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
Q. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 07 Section "Penetration Firestopping" for materials.
R. Verify final equipment locations for roughing-in.
S. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
3.3 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 21 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
SUPPRESSION 210500 - Page 6 of 6
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
F. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
G. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
H. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.
2. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.
3.4 PAINTING
A. Painting of fire-suppression systems, equipment, and components is specified in Division 09
Sections "Interior Painting" and "Exterior Painting."
B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.
3.5 CONCRETE BASES
A. Concrete Bases: Shall be coordinated with Division 03
3.6 ERECTION OF METAL SUPPORTS AND ANCHORAGES
A. Refer to Division 05 Section "Metal Fabrications" for structural steel.
B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor fire-suppression materials and equipment.
C. Field Welding: Comply with AWS D1.1.
3.7 GROUTING
A. Mix and install grout for fire-suppression equipment base bearing surfaces, pump and other equipment base plates, and anchors.
B. Clean surfaces that will come into contact with grout.
C. Provide forms as required for placement of grout.
D. Avoid air entrapment during placement of grout.
E. Place grout, completely filling equipment bases.
F. Place grout on concrete bases and provide smooth bearing surface for equipment.
G. Place grout around anchors.
H. Cure placed grout.
END OF SECTION
Identification for Fire Suppression Piping and Equipment 210553 - Page 1 of 2
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
PART 1 GENERAL
1.1SECTION INCLUDES
A. Nameplates.
B. Tags.
C. Stencils.
D. Pipe markers.
E. Ceiling tacks.
1.2 RELATED REQUIREMENTS
A. Section 099123 - Interior Painting: Stencil paint.
1.3 REFERENCE STANDARDS
A. ASME A13.1 - Scheme for the Identification of Piping Systems; 2023.
B. ASTM D709 - Standard Specification for Laminated Thermosetting Materials; 2017.
1.4 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
B. List: Submit list of wording, symbols, letter size, and color coding for mechanical identification.
C. Chart and Schedule: Submit valve chart and schedule, including valve tag number, location, function, and valve manufacturer's name and model number.
D. Product Data: Provide manufacturers catalog literature for each product required.
E. Samples: Submit two labels 6 by 6 inch in size.
F. Manufacturer's Installation Instructions: Indicate special procedures, and installation instructions.
G. Project Record Documents: Record actual locations of tagged valves.
PART 2 PRODUCTS
2.1 IDENTIFICATION APPLICATIONS
A. Automatic Controls: Tags.
B. Control Panels: Nameplates.
C. Instrumentation: Tags.
D. Major Control Components: Nameplates.
E. Piping: Tags.
F. Pumps: Nameplates.
G. Relays: Tags.
H. Small-sized Equipment: Tags.
I. Thermostats: Nameplates.
J. Valves: Nameplates and ceiling tacks where above lay-in ceilings.
2.2 NAMEPLATES
A. Manufacturers:
1. Brimar Industries, Inc: www.pipemarker.com/#sle.
2. Kolbi Pipe Marker Co: www.kolbipipemarkers.com/#sle.
3. Seton Identification Products, a Tricor Direct Company: www.seton.com/#sle.
Identification for Fire Suppression Piping and Equipment 210553 - Page 2 of 2
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
4. Substitutions: See Section 016000 - Product Requirements.
B. Description: Laminated three-layer plastic with engraved letters.
1. Letter Color: White.
2. Letter Height: 1/4 inch.
3. Background Color: Black.
4. Thickness: 1/8 inch.
5. Plastic: Comply with ASTM D709.
2.3 TAGS
A. Manufacturers:
1. Advanced Graphic Engraving, LLC: www.advancedgraphicengraving.com/#sle.
2. Brady Corporation: www.bradycorp.com/#sle.
3. Brimar Industries, Inc: www.pipemarker.com/#sle.
4. Craftmark Pipe Markers: www.craftmarkid.com/#sle.
5. Kolbi Pipe Marker Co: www.kolbipipemarkers.com/#sle.
6. Seton Identification Products, a Tricor Direct Company: www.seton.com/#sle.
7. Substitutions: See Section 016000 - Product Requirements.
B. Plastic Tags: Laminated three-layer plastic with engraved black letters on light contrasting background color. Tag size minimum 1-1/2 inch diameter.
C. Metal Tags: Brass with stamped letters; tag size minimum 1-1/2 inch diameter with smooth edges.
D. Valve Tag Chart: Typewritten letter size list in anodized aluminum frame.
2.4 STENCILS
A. Stencils: With clean cut symbols and letters of following size:
2.5 PIPE MARKERS
2.6 CEILING TACKS
A. Description: Steel with 3/4 inch diameter color coded head.
PART 3 EXECUTION
3.1 PREPARATION
A. Degrease and clean surfaces to receive adhesive for identification materials.
B. Prepare surfaces in accordance with Section 099123 for stencil painting.
3.2 INSTALLATION
A. Install nameplates with corrosive-resistant mechanical fasteners, or adhesive. Apply with sufficient adhesive to ensure permanent adhesion and seal with clear lacquer.
B. Install tags with corrosion resistant chain.
C. Install underground plastic pipe markers 6 to 8 inches below finished grade, directly above buried pipe.
D. Use tags on piping 3/4 inch diameter and smaller.
1. Identify service, flow direction, and pressure.
2. Install in clear view and align with axis of piping.
3. Locate identification not to exceed 20 feet on straight runs including risers and drops, adjacent to each valve and Tee, at each side of penetration of structure or enclosure, and at each obstruction.
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 1 of 9
PROJECT NUMBER: 24002 VERSION: 250915 - PERMIT SET ISSUE
WET-PIPE SPRINKLER SYSTEMS
PART 1 GENERAL
1.1RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Pipes, fittings, and specialties.
2. Fire-protection valves.
3. Fire-department connections.
4. Sprinklers.
B. Related Sections:
1. Division 21 Section "Fire-Suppression Standpipes" for standpipe piping.
2. Division 21 Section "Dry-Pipe Sprinkler Systems" for dry-pipe sprinkler piping.
3. Division 21 Section for fire pumps, pressure-maintenance pumps, and fire-pump controllers.
1.3 DEFINITIONS
A. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure of 175 psig maximum.
1.4 SYSTEM DESCRIPTIONS
A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated.
1.5 PERFORMANCE REQUIREMENTS
A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.
B. Sprinkler system shall be approved by authorities having jurisdiction.
1. Margin of Safety for Available Water Flow and Pressure: 10 P.S.I.
2. Sprinkler Occupancy Hazard Classifications refer to drawings.
1.6 SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
B. Shop Drawings: For wet-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work.
C. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including hydraulic calculation analysis signed and sealed by the qualified professional engineer responsible for their preparation.
D. Coordination Drawings: Sprinkler systems, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:
1. Domestic water piping.
2. Compressed air piping.
3. HVAC hydronic piping.
4. Items penetrating finished ceiling including the following:
a. Lighting fixtures.
b. Air outlets and inlets.
c. Speakers and ceiling mounted fire alarm devices
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 2 of 9
E. Hydraulic Calculations.
F. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.
G. Fire-hydrant flow test report.
H. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and Test Certificate for Aboveground Piping."
I. Field quality-control reports.
J. Operation and Maintenance Data: For sprinkler specialties to include in emergency, operation, and maintenance manuals.
1.7 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Sprinkler Cabinets: Finished, wall-mounted, steel cabinet with hinged cover, and with space for a minimum of six spare sprinklers plus sprinkler wrench. Include number of sprinklers required by NFPA 13 and sprinkler wrench. Include separate cabinet with sprinklers and wrench for each type of sprinkler used on Project.
1.8 QUALITY ASSURANCE
A. Installer Qualifications:
1. Installer's responsibilities include fabricating and installing sprinkler systems and providing working plans per NFPA 13. Base calculations on results of fire-hydrant flow test.
B. Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
D. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:
1. NFPA 13, "Installation of Sprinkler Systems."
2. NFPA 13R, "Installation of Sprinkler Systems in Residential Occupancies up to and
Including Four Stories in Height."
3. NFPA 24, "Installation of Private Fire Service Mains and Their Appurtenances."
1.9 PROJECT CONDITIONS
A. Interruption of Existing Sprinkler Service: Do not interrupt sprinkler service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary sprinkler service according to requirements indicated:
1. Notify Architect and Construction Manager no fewer than two days in advance of proposed interruption of sprinkler service.
2. Do not proceed with interruption of sprinkler service without Architect's and Construction
Manager's written permission.
1.10 COORDINATION
A. Coordinate layout and installation of sprinklers with other construction that penetrates ceilings, including light fixtures, HVAC equipment, and partition assemblies.
1.11 REFERENCE STANDARDS
A. NFPA 13 - Standard for the Installation of Sprinkler Systems; Most Recent Edition Adopted by
Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
PART 2 PRODUCTS
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 3 of 9
2.1 STEEL PIPE AND FITTINGS
A. Standard Weight, Black-Steel Pipe: ASTM A 53/A 53M or ASTM A 135.
B. Piping Schedule shall be: All piping with threaded fittings shall be schedule 40 and all piping with grooved fittings shall be schedule 10.
C. Galvanized- and Black-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.
D. Galvanized and Uncoated, Steel Couplings: ASTM A 865, threaded.
E. Galvanized and Uncoated, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.
F. Grooved-Joint, Steel-Pipe Appurtenances:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Tyco Fire & Building Products LP.
b. Victaulic Company.
c. Anvil Star Piping Inc.
2. Pressure Rating: 175 psig unless otherwise noted.
3. Galvanized and Uncoated, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.
4. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.
2.2 CPVC PIPE AND FITTINGS (FOR RESIDENTIAL APPLICATIONS ONLY)
A. CPVC Fittings: UL listed and/or FM approved, for 175-psig rated pressure at 150 deg F, socket type. Include "LISTED" and "CPVC SPRINKLER FITTING" markings.
1. NPS 3/4 to NPS 1-1/2: ASTM F 438 and UL 1821, Schedule 40, socket type.
2. NPS 2 to NPS 3: ASTM F 439 and UL 1821, Schedule 80, socket type.
3. CPVC-to-Metal Transition Fittings: CPVC, one piece, with dimensions equivalent to pipe;
one end with threaded brass insert, and one socket end.
4. CPVC-to-Metal Transition Unions: CPVC, with dimensions equivalent to pipe; one end with threaded brass insert, and one socket end.
5. Flanges: CPVC, one or two pieces.
2.3 PIPING JOINING MATERIALS
A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick or ASME B16.21, nonmetallic and asbestos free.
1. Class 125, Cast-Iron Flanges and Class 150, Bronze Flat-Face Flanges: Full-face gaskets.
2. Class 250, Cast-Iron Flanges and Class 300, Steel Raised-Face Flanges: Ring-type gaskets.
B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.
C. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing unless otherwise indicated.
D. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
E. Solvent Cements for Joining CPVC Piping and Tubing: ASTM F 493, solvent cement recommended by pipe and fitting manufacturer, and made for joining CPVC sprinkler pipe and fittings. Include cleaner or primer recommended by pipe and fitting manufacturer.
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 4 of 9
1. Use solvent cement that has a VOC content of 490 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
2. Use adhesive primer that has a VOC content of 650 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
F. Plastic, Pipe-Flange Gasket, and Bolts and Nuts: Type and material recommended by piping system manufacturer unless otherwise indicated.
2.4 LISTED FIRE-PROTECTION VALVES
A. General Requirements:
1. Valves shall be UL listed or FM approved.
2. Minimum Pressure Rating for Standard-Pressure Piping: 175 psig.
3. Minimum Pressure Rating for High-Pressure Piping: 300 psig.
B. Ball Valves:
1. Standard: UL 1091 except with ball instead of disc.
2. Valves NPS 1-1/2 and Smaller: Bronze body with threaded ends.
3. Valves NPS 2 and NPS 2-1/2: Bronze body with threaded ends or ductile-iron body with grooved ends.
4. Valves NPS 3: Ductile-iron body with grooved ends.
C. Check Valves:
1. Standard: UL 312.
2. Pressure Rating: 300 psig.
3. Type: Swing check.
4. Body Material: Cast iron.
5. End Connections: Flanged or grooved.
D. Iron Butterfly Valves:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Anvil International, Inc.
b. Kennedy Valve; a division of McWane, Inc.
c. Milwaukee Valve Company.
d. NIBCO INC.
e. Tyco Fire & Building Products LP.
f. Victaulic Company.
2. Standard: UL 1091.
3. Pressure Rating: 175 psig (1200 kPa).
4. Body Material: Cast or ductile iron.
5. Style: Lug or wafer.
6. End Connections: Grooved.
2.5 FIRE-DEPARTMENT CONNECTIONS
A. Fire-Department Connection:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Fire-End & Croker Corporation.
b. Tyco Fire & Building Products LP
c. Potter Roemer
d. Elkhart Brass
2. Standard: UL 405.
3. Type: As indicated on drawings.
4. Pressure Rating: 175 psig minimum.
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 5 of 9
5. Body Material: Corrosion-resistant metal.
6. Inlets: Threads according to NFPA 1963 and matching local fire-department sizes and threads. Include extension pipe nipples, lugged swivel connections, and check devices or clappers.
7. Caps: Lugged type, with gasket and chain.
2.6 SPRINKLERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, but are not limited to, the following:
1. Reliable Automatic Sprinkler Co., Inc.
2. Victaulic Company.
3. Viking Corporation.
B. General Requirements:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating for Residential Sprinklers: 175 psig maximum.
3. Pressure Rating for Automatic Sprinklers: 175 psig minimum.
4. Pressure Rating for High-Pressure Automatic Sprinklers: 300 psig.
5. Refer to drawings for sprinkler types and applicable locations.
2.7 GROUT
A. Standard: ASTM C 1107, Grade B, post hardening and volume adjusting, dry, hydraulic-cement grout.
B. Characteristics: Nonshrink and recommended for interior and exterior applications.
C. Design Mix: 5000-psi, 28-day compressive strength.
D. Packaging: Premixed and factory packaged.
PART 3 EXECUTION
3.1 PREPARATION
A. Perform fire-hydrant flow test according to NFPA 13 and NFPA 291. Use results for system design calculations required in "Quality Assurance" Article.
B. Report test results promptly and in writing.
3.2 SERVICE-ENTRANCE PIPING
A. Connect sprinkler piping to water-service piping for service entrance to building.
B. Install shutoff valve, backflow preventer, pressure gage, drain, and other accessories indicated at connection to water-service piping.
3.3 PIPING INSTALLATION
A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.
1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans.
B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.
C. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.
D. Install unions adjacent to each valve in pipes NPS 2 and smaller.
E. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 6 of 9
F. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.
G. Install sprinkler piping with drains for complete system drainage.
H. Install sprinkler control valves, test assemblies, and drain risers adjacent to standpipes when sprinkler piping is connected to standpipes.
I. Install automatic (ball drip) drain valve at each check valve for fire-department connection, to drain piping between fire-department connection and check valve. Install drain piping to and spill over floor drain or to outside building.
J. Install alarm devices in piping systems.
K. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13. Powder driven inserts are not allowed.
L. Install pressure gages on riser or feed main, at each sprinkler test connection, and at top of each standpipe. Include pressure gages with connection not less than NPS 1/4 and with soft metal seated globe valve, arranged for draining pipe between gage and valve. Install gages to permit removal and install where they will not be subject to freezing.
M. Pressurize and check preaction sprinkler system piping and air-pressure maintenance devices.
N. Fill sprinkler system piping with water.
3.4 JOINT CONSTRUCTION
A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.
B. Install unions adjacent to each valve in pipes NPS 2 and smaller.
C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.
F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.
G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.
H. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article.
1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.
I. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to
AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.
J. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.
K. Plastic-Piping, Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 7 of 9
1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements. Apply primer.
2. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.
3.5 VALVE AND SPECIALTIES INSTALLATION
A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.
B. Install listed fire-protection shutoff valves supervised open, located to control sources of water supply except from fire-department connections. Install permanent identification signs indicating portion of system controlled by each valve.
C. Install check valve in each water-supply connection. Install backflow preventers instead of check valves in potable-water-supply sources.
D. Specialty Valves:
1. General Requirements: Install in vertical position for proper direction of flow, in main supply to system.
2. Alarm Valves: Include bypass check valve and retarding chamber drain-line connection.
3.6 SPRINKLER INSTALLATION
A. Install sprinklers in suspended ceilings in the center of acoustical ceiling panels. Sprinklers may be centered in tile either by hard pipe or with flexible connectors. Connectors shall be UL 2443 listed, Flex Heads Industries or equal.
B. Sprinkler Location: Sprinklers shall be installed no closer than 4 inches to any Ceiling grid or wall.
C. Install dry-type sprinklers with water supply from heated space. Do not install pendant or sidewall, wet-type sprinklers in areas subject to freezing.
3.7 ESCUTCHEON INSTALLATION
A. Install escutcheons for penetration of walls, ceilings, and floors.
B. Escutcheons for Piping:
1. Piping with Fitting or Sleeve Protruding from Wall: deep pattern.
2. Bare Piping at Wall and Floor Penetrations in Finished Spaces: cast brass with polished chrome-plated finish.
3. Bare Piping at Ceiling Penetrations in Finished Spaces cast brass with polished chrome-plated finish.
3.8 SLEEVE INSTALLATION
A. General Requirements: Install sleeves for pipes and tubes passing through penetrations in floors, partitions, roofs, and walls.
B. Sleeves are not required for core-drilled holes.
C. Permanent sleeves are not required for holes formed by removable PE sleeves.
D. Cut sleeves to length for mounting flush with both surfaces unless otherwise indicated.
E. Install sleeves in new partitions, slabs, and walls as they are built.
F. For interior wall penetrations, seal annular space between sleeve and pipe or pipe insulation using joint sealants appropriate for size, depth, and location of joint. Comply with requirements for joint sealants in Division 07 Section "Joint Sealants."
G. For exterior wall penetrations above grade, seal annular space between sleeve and pipe using joint sealants appropriate for size, depth, and location of joint. Comply with requirements for joint sealants in Division 07 Section "Joint Sealants."
H. For exterior wall penetrations below grade, seal annular space between sleeve and pipe using sleeve seals.
WET-PIPE SPRINKLER SYSTEMS 211313 - Page 8 of 9
I. Seal space outside of sleeves in concrete slabs and walls with grout.
J. Install sleeves that are large enough to provide 1/4-inch (6.4-mm) annular clear space between sleeve and pipe or pipe insulation unless otherwise indicated.
K. Install sleeve materials according to the following applications:
1. Sleeves for Piping Passing through Concrete Floor Slabs: Molded PVC.
2. Sleeves for Piping Passing through Concrete Floor Slabs of Mechanical Equipment Areas or Other Wet Areas: Stack sleeve fittings.
a. Extend sleeves 2 inches (50 mm) above finished floor level.
b. For pipes penetrating floors with membrane waterproofing, extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified. Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches (50 mm) above finished floor level. Comply with requirements for flashing in Division 07 Section "Sheet Metal Flashing and Trim."
3. Sleeves for Piping Passing through Gypsum-Board Partitions:
a. PVC-pipe sleeves for pipes smaller than NPS 6 (DN 150).
b. Galvanized-steel-sheet sleeves for pipes NPS 6 (DN 150) and larger.
c. Exception: Sleeves are not required for water-supply tubes and waste pipes for individual plumbing fixtures if escutcheons will cover openings.
4. Sleeves for Piping Passing through Concrete Roof Slabs: Molded PVC.
5. Sleeves for Piping Passing through Exterior Concrete Walls:
a. Galvanized-steel-pipe sleeves for pipes smaller than NPS 6 (DN 150).
b. Cast-iron wall pipe sleeves for pipes NPS 6 (DN 150) and larger.
c. Install sleeves that are large enough to provide 1-inch (25-mm) annular clear space between sleeve and pipe or pipe insulation when sleeve seals are used.
d. All exterior sleeves shall be sealed watertight.
6. Sleeves for Piping Passing through Interior Concrete Walls:
a. PVC-pipe sleeves for pipes smaller than NPS 6 (DN 150).
b. Galvanized-steel-sheet sleeves for pipes NPS 6 (DN 150) and larger.
L. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestop materials and installations in Division 07 Section "Penetration Firestopping."
3.9 IDENTIFICATION
A. Install labeling and pipe markers on equipment and piping according to requirements in
NFPA 13.
B. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Division 26 Section "Identification for Electrical Systems."
3.10 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Leak Test: After installation, charge systems…