Palm_Harbor_Rec_Center_-_Fire_Protection_-_Signed_and_Sealed.pdf
PDF 2 MB Posted
- Attached to
- Palm Harbor Recreation Center Addition State and local contract opportunity
- Solicitation number
- 26-0011-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is a Fire Protection System Design and Specification Set for the Palm Harbor Parks and Recreation Center located at 1500 16th Street, Palm Harbor, Florida 34683, prepared by WJ Architects and VoltAir Inc. The project involves designing a comprehensive fire protection system for a new recreation center building and an existing adjacent building, utilizing a wet pipe automatic sprinkler system compliant with the 2023 Florida Building Code, 2023 Florida Fire Prevention Code, and NFPA-13 (2019 Edition). The system will be designed with different hazard classifications including light hazard for office and support spaces, ordinary hazard group I for freezer/cooler areas, and ordinary hazard group II for kitchen and food preparation zones.
The fire protection design includes a new 6-inch underground fire service connected to an existing city main, with a water flow test conducted on 10/25/24 showing static pressure of 51 PSI and a flow of 1,050 GPM. The system will feature a new fire riser, backflow prevention device, fire department connection, and multiple sprinkler zones with varying density requirements (0.10-0.20 GPM/sq. ft.) and temperature ratings. The project includes provisions for sprinkler coverage, hydraulic calculations, alarm monitoring, and coordination with architectural and structural elements. The system is designed to provide comprehensive fire protection with minimal disruption to existing building operations, with specific attention to routing, sprinkler placement, and compliance with local fire safety standards.
View the file
Other files for this state and local contract opportunity
Show all 50
Palm Harbor Recreation Center Addition has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTESSYMBOL LEGEND - FIRE PROTECTIONFAC 61G15 COMPLIANCE NOTESRESPONSIBILITY OF DELEGATED
ENGINEER OF RECORD IN ASSUMING
THE DESIGN RESPONSIBILITY FOR THE
FIRE PROTECTION SYSTEM FROM THE
ENGINEER OF RECORD
SHEET INDEX
LEGEND - FIRE SPRINKLER
SYMBOL
NOTES:
A. SPRINKLERS SHALL BE ORDINARY TEMPERATURE UNLESS OTHERWISE NOTED.
B. SPRINKLER GUARDS SHALL BE PROVIDED ON ALL SPRINKLERS INSTALLED LOWER THAN 7'-6" ABOVE FINISH FLOOR AND / OR ARE SUBJECT TO DAMAGE.
C. PROVIDE RECESSED, CONCEALED AND SIDEWALL SPRINKLERS WITH ESCUTCHEON IN EXPOSED AREAS.
D. COORDINATE COLOR SELECTIONS WITH ARCHITECT.
E. SPRINKLERS EXPOSED TO EXTERIOR OR CORROSIVE ENVIRONMENTS SHALL HAVE VC250 FINISH.
F. SPRINKLERS IN FREEZER / COOLERS SHALL BE INTERMEDIATE TEMPERATURE.
1/2" 155°F QUICK 5.6 WHITE
SYMBOL DESCRIPTION
CONNECT TO EXISTING
DEMOLISH TO POINT INDICATED
NEW SPRINKLER PIPING
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
EXISTING RECESSED SPRINKLER TO REMAIN
EXISTING UPRIGHT SPRINKLER TO REMAIN
ELBOW, TURNED DOWN
ELBOW, TURNED UP
TEE, TURNED UP
TEE, TURNED DOWN
CAP
FLUSHING CONNECTION
ZONE CONTROL VALVE / FLOW SWITCH / DRAIN RISER
CONTROL VALVE WITH TAMPER SWITCH
CHECK VALVE
FLOW SWITCH
BACKFLOW PREVENTER WITH TAMPER SWITCHES
STANDPIPE WITH FIRE DEPARTMENT VALVE
ROOF MANIFOLD
FIRE DEPARTMENT CONNECTION
POST INDICATOR VALVE WITH TAMPER SWITCH
FIRE VALVE CABINET
KEYNOTE
REVISION REFERENCE
A. FIRE PROTECTION SYSTEM SHALL COMPLY WITH THE CURRENTLY
ADOPTED VERSION OF NFPA, FLORIDA BUILDING CODE AND STATE
FIRE PREVENTION CODE.
B. FINAL INSPECTION AND APPROVAL SHALL BE BY LOCAL FIRE MARSHAL
AND ARCHITECT / ENGINEER.
C. SUBMIT SIGNED AND SEALED SPRINKLER SHOP DRAWINGS AND
MATERIAL SUBMITTALS TO THE ARCHITECT / ENGINEER AND FIRE
MARSHAL PRIOR TO ANY INSTALLATION.
D. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE RESPONSIBILITY
OF THIS CONTRACTOR TO PROVIDE ANY ADDITIONAL OFFSETS, PIPING,
SPRINKLERS AND OTHER COMPONENTS REQUIRED FOR PROPER
INSTALLATION AND COORDINATION WITH OTHER TRADES.
E. INSTALL PIPING IN AREAS WITH EXPOSED STRUCTURE AS HIGH AS
POSSIBLE TO ALLOW THE OWNER MAXIMUM USE OF SPACE. PREP,
PRIME AND PAINT ALL EXPOSED PIPING TO COLOR AS REQUIRED BY
THE ARCHITECT. DO NOT PAINT SPRINKLERS.
F. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING
DESCRIPTIONS AND HEIGHTS.
G. COORDINATE SPRINKLERS WITH ALL DIFFUSERS, SPEAKERS, LIGHTING
FIXTURES AND CEILING SYSTEMS. SPACE SPRINKLERS IN
ACCORDANCE WITH NFPA 13 AND LISTING OF THE SPRINKLER.
H. CENTER SPRINKLER LOCATIONS IN THE TILE AS INDICATED ON THE
DRAWINGS OR IN HARD CEILING AREAS CENTERED BETWEEN LIGHTS.
PROVIDE ARMOVERS OR SWING JOINTS AS REQUIRED.
I. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED
CONSTRUCTION) SHALL BE INSTALLED WITH DEFLECTOR 1" BELOW THE
BOTTOM OF THE BEAM (MAXIMUM 22" BELOW ROOF DECK). EXPOSED
BAR JOISTS THAT HAVE SPRAY ON FIRE-PROOFING THAT MAKES THE
JOIST SOLID SHALL BE TREATED LIKE A BEAM WITH THE SPRINKLERS
1" BELOW THE BOTTOM OF THE FIRE-PROOFING.
J. SLEEVE ALL PIPING PENETRATIONS THROUGH WALLS, CEILING AND
FLOORS. SLEEVE AND / OR FIRE STOP ALL PENETRATIONS THROUGH
RATED WALLS, CEILINGS AND FLOORS WITH U/L LISTED ASSEMBLIES.
FIRE STOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF
THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR
FINAL FINISHES.
K. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON-ACCESSIBLE
CEILINGS AND CHASES.
L. PROVIDE A PERMANENTLY ATTACHED NAME TAG ATTACHED TO THE
RISER STATING THE REQUIRED DESIGN CRITERIA FOR EACH
HYDRAULICALLY DESIGNED SYSTEM.
M. PROVIDE SPRINKLERS UNDER ALL EXPOSED DUCTWORK /
OBSTRUCTIONS OVER 48" WIDE AND SPACE SPRINKLERS AROUND ALL
OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13. SPRINKLERS UNDER
DUCTS ARE NOT INDICATED ON DRAWINGS BUT ARE REQUIRED AND
SHALL BE PROVIDED IN ACCORDANCE WITH NFPA.
N. PROVIDE SPRINKLER GUARDS IN MECHANICAL ROOMS, ELECTRIC
ROOMS, TELEPHONE ROOMS, ELEVATOR ROOMS, ELEVATOR SHAFTS
AND ON ANY SPRINKLERS LESS THAN 7'-6" ABOVE THE FLOOR.
O. IF SYSTEM PRESSURE EXCEEDS 100 PSI, ALL HANGERS ON END
SPRINKLERS IN PENDANT POSITION SHALL BE WITHIN 12" OF END OF
LINE IN ACCORDANCE WITH NFPA 13.
P. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (SERVERS,
COMM, ELEC. PANELS, TRANSFORMERS, ETC.) PRIOR TO ANY
INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL
PANELS UNDER ANY CIRCUMSTANCES.
Q. FIRE DEPARTMENT CONNECTIONS TO SPRINKLER SYSTEMS,
STANDPIPES, YARD HYDRANTS OR ANY OTHER FIRE HOSE
CONNECTION SHALL BE COMPATIBLE WITH THE CONNECTIONS USED
BY THE LOCAL FIRE DEPARTMENT.
APPLICABLE CODES AND STANDARDS:
FLORIDA BUILDING CODE 2023 8th EDITION FLORIDA FIRE PREVENTION CODE 2023 8th EDITION
FLORIDA ADMINISTRATIVE RULE 69A-60.005
NFPA-13, 2019 EDITION
(A) POINT OF SERVICE:
THE POINT OF SERVICE IS 'EXISTING CITY MAIN'.
(B) APPLICABLE NFPA STANDARDS TO BE APPLIED:
SHALL COMPLY WITH NFPA 13 ACCEPTANCE SECTION 25 CHAPTERS
25.1 APPROVAL OF SPRINKLER SYSTEM
25.2 ACCEPTANCE REQUIREMENTS
25.3 CIRCULATING CLOSED LOOP SYSTEM
25.4 INSTRUCTIONS
25.5 HYDRAULIC DESIGN INFORMATION SIGN
25.6 GENERAL INFORMATION SIGN
(C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR AREA:
LIGHT HAZARD: OFFICE AND SUPPORT SPACES
ORDINARY HAZARD GROUP I: FREEZER / COOLER
ORDINARY HAZARD GROUP II: KITCHEN AND FOOD PREP AREAS
(D) DESIGN APPROACH:
LIGHT HAZARD
SYSTEM TYPE: WET PIPED AUTOMATIC SPRINKLER SYSTEM, USING
STEEL SUPPLY PIPING TO NEW STANDARD SPRAY PENDANT, QUICK
RESPONSE, AUTOMATIC FIRE SPRINKLER LOCATIONS.
DENSITY: 0.10 GPM / SQ. FT.
AREA OF OPERATION: 1,500 SQ. FT. MAX.
SPRINKLER TEMPERATURE RATING: 155°F
MAX. COVERAGE PER SPRINKLER: 225 SQ. FT.
A HOSE DEMAND OF 100 GPM WILL BE ADDED FOR LIGHT HAZARD
CALCULATIONS.
ORDINARY HAZARD GROUP I
SYSTEM TYPE: WET PIPED AUTOMATIC SPRINKLER SYSTEM, USING
STEEL SUPPLY PIPING TO NEW STANDARD SPRAY PENDANT, QUICK
RESPONSE, AUTOMATIC FIRE SPRINKLER LOCATIONS.
DENSITY: 0.15 GPM / SQ. FT.
AREA OF OPERATION: 1,500 SQ. FT. MAX.
SPRINKLER TEMPERATURE RATING: 155°F
MAX. COVERAGE PER SPRINKLER: 130 SQ. FT.
A HOSE DEMAND OF 250 GPM WILL BE ADDED FOR ORDINARY HAZARD
CALCULATIONS.
ORDINARY HAZARD GROUP II
SYSTEM TYPE: WET PIPED AUTOMATIC SPRINKLER SYSTEM, USING
STEEL SUPPLY PIPING TO NEW STANDARD SPRAY PENDANT, QUICK
RESPONSE, AUTOMATIC FIRE SPRINKLER LOCATIONS.
DENSITY: 0.20 GPM / SQ. FT.
AREA OF OPERATION: 1,500 SQ. FT. MAX.
SPRINKLER TEMPERATURE RATING: 155°F
MAX. COVERAGE PER SPRINKLER: 130 SQ. FT.
A HOSE DEMAND OF 250 GPM WILL BE ADDED FOR ORDINARY HAZARD
CALCULATIONS.
(E) CHARACTERISTICS OF THE WATER SUPPLY TO BE USED:
THE WATER SUPPLY IS PROVIDED FROM AN EXISTING PUBLIC WATER
PURVEY CIRCULATING MAIN.
(F) FLOW TEST DATA:
REFER TO WATER FLOW TEST DATA SCHEDULE ON THIS SHEET. IF
TEST DATA IS NOT WITHIN 6 MONTHS AT TIME OF REVIEW, PROVIDE
NEW FLOW TEST DATA.
(G) VALVING AND ALARM REQUIREMENTS TO MINIMIZE POTENTIAL FOR
IMPAIRMENTS AND UNRECOGNIZED FLOW OF WATER:
THE FIRE SPRINKLER RISER(S) FOR THIS BUILDING ARE EQUIPPED WITH
A WATER FLOW SWITCH WITH A LOCAL ALARM AND OFF-SITE
MONITORING. BACKFLOW PREVENTION DEVICE SHALL BE PROVIDED
FOR ENTIRE ON SITE SUPPLY LOOP.
(H) MICROBIAL INDUCED CORROSION (MIC):
AS OF THIS DATE, NO SIGNS OF MIC HAVE BEEN OBSERVED OR
DETERMINED TO BE AN ISSUE. THIS FINDING IS ACCEPTABLE TO THE
EOR.
(I) BACKFLOW PREVENTION AND METERING SPECIFICATIONS:
REFER TO CIVIL UTILITY PLAN FOR BACKFLOW AND METERING DETAILS.
(J) QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL YARD AND
INTERIOR FIRE PROTECTION COMPONENTS:
ALL NEW YARD AND INTERIOR FIRE PROTECTION EQUIPMENT SHALL BE
UL LISTED FOR FIRE PROTECTION SERVICE AND FM APPROVED.
SCOPE OF WORK:
NEW BUILDING; PROVIDE A NEW FULLY AUTOMATIC WET SPRINKLER
SYSTEM IN ACCORDANCE WITH NFPA 13 APPLICABLE EDITION. THE NEW
SYSTEM SHALL REMAIN SEPARATE FROM THE EXISTING BUILDING.
EXISTING BUILDING; MAINTAIN AREA WATCH IF ANY OF THE FIRE
PROTECTION SYSTEMS HAVE BEEN DISABLED. THIS BUILDING HAS AN
EXISTING FIRE RISER LOCATED IN THE STORAGE ROOM SERVING THE
EXISTING SPRINKLER SYSTEM.
CONTRACTOR SHALL SUBMIT PIPING SHOP DRAWINGS FOR PERMIT TO THE
FIRE MARSHAL. DRAWINGS SHALL BE 1/8" SCALE PIPING SHOP DRAWINGS
AS PRESCRIBED IN SPECIFICATIONS AND AS REQUIRED BY LOCAL CODES.
SHOP DRAWINGS SHALL INCLUDE SPRINKLER PIPING CUT LENGTHS,
OFFSETS, FITTINGS AND DEVICES, ELEVATIONS, HANGER LOCATIONS,
SPRINKLER HEAD COUNT BY TYPE, ELEVATION SECTIONS, HYDRAULIC
CALCULATIONS AND OTHER INSTALLATION INFORMATION. THIS SHOP
DRAWING MUST BE SIGNED AND SEALED BY THE DELEGATED ENGINEER.
A. THIS NOTE SETS FORTH CLARIFICATION OF THE REQUIREMENT THAT
THE DELEGATED ENGINEER OF RECORD FOR THE FIRE PROTECTION
SYSTEM SHALL CONSIDER THAT ANY CHANGES, DEVIATIONS IN ANY
FORM FROM THE INTENT OF THE ENGINEER OF RECORD'S FIRE
PROTECTION SYSTEM ENGINEERING.
B. FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS ARE INTENDED
TO DESCRIBE THE SCOPE AND INTENT OF THE FIRE PROTECTION
SYSTEM BASED ON INFORMATION THE FIRE PROTECTION SYSTEM
ENGINEER OF RECORD (FPS EOR) HAS AT THE TIME OF THE DESIGN.
SINCE AT THE TIME OF THE DESIGN OF THE FIRE PROTECTION SYSTEM
ENGINEERING DOCUMENTS NOT ALL INFORMATION MAY BE AVAILABLE IN
THE EXACT FORM OR VALUE NEEDED, THE FPS EOR MAY PROVIDE
INFORMATION ON THE FIRE PROTECTION SYSTEM ENGINEERING
DOCUMENTS THAT ARE BASED ON BEST AVAILABLE DATA.
ACCORDINGLY, THE DELEGATED ENGINEER OF RECORD SHOULD
EVALUATE AND, IF NECESSARY, MAKE CHANGES/ADJUSTMENTS TO THE
ROUTING, SIZING, CAPACITIES, AND LOCATIONS OF ALL FIRE
PROTECTION EQUIPMENT, PIPE, SPRINKLERS, RISERS, VALVES, ETC.
WITHIN REASONABLE LIMITS FROM THAT INFORMATION SHOWN IN THE
DESIGN CRITERIA ON THE FPS EOR’S FIRE PROTECTION SYSTEM
ENGINEERING DOCUMENTS (FPS EDS) PROVIDED THE ASSOCIATED
ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND CIVIL DOCUMENTS
THAT RELATE TO THE FIRE PROTECTION SYSTEMS FOR THE PROJECT
ARE COORDINATED WITH SUCH CHANGES/ADJUSTMENTS.
C. ANY SUCH ADJUSTMENTS AND/OR CHANGES WHICH THE DELEGATED
EOR FOR THE FIRE PROTECTION SYSTEM PROPOSES IN ASSUMING
RESPONSIBILITY FROM THE FPS EOR’S DESIGN ARE ACCEPTABLE AND
MAY BE DONE PROVIDED THE DELEGATED EOR’S SYSTEM MEETS THE
FIRE PROTECTION OBJECTIVES CONTAINED IN THE FIRE PROTECTION
SYSTEM ENGINEERING DOCUMENTS AND THAT ANY SUCH CHANGES ARE
NOT AN ADDED COST TO THE CONTRACT.
D. TO THIS END, THE INFORMATION CONTAINED IN THE FIRE PROTECTION
SYSTEM EORS ENGINEERING DOCUMENTS RELATED TO SYSTEM
COMPONENTS AND ROUTING SHOULD BE VERIFIED BY THE FIRE
PROTECTION SYSTEM DELEGATED ENGINEER OF RECORD FOR THE FIRE
PROTECTION SYSTEM LAYOUT DOCUMENTS IN REGARD TO CAPACITIES,
OPERATION, FUNCTION, AND MAINTAINABILITY AND ANY PROVIDED
SYSTEMS, EQUIPMENT, RISER LAYOUT, SPRINKLER LAYOUT AND OTHER
SYSTEM COMPONENTS WHICH ARE PART OF THE FIRE PROTECTION
SYSTEM. THIS VERIFICATION OF THE FIRE PROTECTION SYSTEM
ENGINEERING DOCUMENTS BY THE DELEGATED EOR SHOULD INCLUDE
ANY MODIFICATIONS WHICH MAY BE NEEDED BY THE FIRE PROTECTION
SYSTEM LAYOUT DOCUMENTS IN ORDER TO MEET THE SYSTEM FIRE
PROTECTION OBJECTIVES; SUCH MODIFICATIONS ARE TO BE
PERFORMED AT NO ADDITIONAL COST TO THE CONTRACT.
E. CAPACITIES AND LIMITS (BOTH MAXIMUMS AND MINIMUMS) OF
REQUIREMENTS FOR FLOW, PRESSURE, PHYSICAL SIZE AND POWER OF
EQUIPMENT AND COMPONENTS WHICH ARE OBTAINED, IMPLIED OR
CONCLUDED FROM THE EOR’S ENGINEERING DOCUMENTS ARE TO BE
UNDERSTOOD AS CLOSELY APPROXIMATE PERFORMANCE CONDITIONS
WHICH SHOULD BE CONFIRMED BY THE DELEGATED EOR BEFORE
PROCUREMENT AND/OR INSTALLATION OF THE AFFECTED PORTIONS OF
THE FIRE PROTECTION SYSTEM.
F. THESE CAPACITIES AND LIMITS SCHEDULED OR SHOWN ON THE EOR’S
ENGINEERING DOCUMENTS SHOULD, IF NECESSARY, BE ADJUSTED UP
OR DOWN AT NO COST IF WARRANTED TO PROVIDE THE FINAL
INSTALLED FIRE PROTECTION SYSTEM IN ACCORD WITH CODE
REQUIREMENTS. ACTUAL PRESSURES AND FLOW ENCOUNTERED
THROUGHOUT THE FIRE PROTECTION SYSTEM SHOULD BE VERIFIED BY
THE RESULT OF HYDRAULIC CALCULATIONS PERFORMED BY THE
DELEGATED EOR AND ANY PRESSURE REDUCING VALVES OR OTHER
SUCH DEVICES OR PIPING SYSTEM CONFIGURATION CHANGES SHOULD
BE PROVIDED IN APPROPRIATE LOCATIONS IN THE FIRE PROTECTION
SYSTEM IF NEEDED TO MEET CODE OR OPERATIONAL PERFORMANCE
LIMITS.
WATER FLOW TEST DATA
STATIC: 51
LOCATION: 169 FEET SOUTH OF HYDRANT
RESIDUAL: 45
FLOW: 1050
LOCATION: WEST PROPERTY LINE @ 1550 16TH ST.
DATE: 10/25/24
TIME: 10:03 AM
BY: CITY OF PALM HARBOR
CODE COMPLIANCE
1. TO THE BEST OF OUR KNOWLEDGE, THESE PLANS AND SPECIFICATIONS
ARE COMPLETE AND COMPLY WITH THE 2023 FLORIDA BUILDING CODE -
8th EDITION, 2023 FLORIDA FIRE PREVENTION CODE - 8th EDITION, LOCAL
MUNICIPALITY AMENDMENTS AND THE CODES REFERENCED WITHIN.
ORF. TEMP. RESPONSE K-FAC FINISH MODEL REMARKS ESCUTCHEON MFG. IMAGE
V2708 RECESSED WHITE VICTAULIC
1/2" 155°F QUICK 5.6 BRASS V2704 UPRIGHT ----
1/2" 155°F QUICK 5.6 BRASS V2704 UPRIGHT
W/CAGE
1/2" 155°F QUICK 5.6 VC250 V3506
DRY
PENDANT
CHROME
VICTAULIC
VICTAULIC
VICTAULIC
FDC
FVC
E
E
OR
FDV
PIV
FC
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
N D
O T
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V E
IN
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
S P
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
R
C
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
A
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
H
X
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
G
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
IT
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
L A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y I
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
F
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B lv d.
ui te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 8:
A
M
FP-000
LEGEND - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
6T
H S
T R
E E
T , P
A
LM
H A
R B
O R
F L
PERMIT SET 9-15-25
SHEET NUMBER SHEET NAME
FP-000 LEGEND - FIRE PROTECTION
FP-100 SITE PLAN - FIRE PROTECTION
FP-201 LEVEL 1 - RCP - FIRE PROTECTION
FP-202 LEVEL 2 - RCP - FIRE PROTECTION
FP-203 EXISTING BUILDING - RCP - FIRE PROTECTION
FP-901 DETAILS - FIRE PROTECTION
REV DESCRIPTION DATE
A. ALL UNDERGROUND PIPE ROUTING AND LOCATIONS
INDICATED ON THIS PLAN IS FOR REFERENCE ONLY. SITE
UTILITIES AND CIVIL PLANS SHALL GOVERN IN REGARDS TO
PIPE ROUTING AND LOCATION OF SERVICES.
B. ALL FIRE PROTECTION PIPING MAINS INDICATED ON THIS PLAN
IS INTENDED TO BE ROUTED UNDERGROUND / BELOW GRADE
UNLESS OTHERWISE NOTED.
EXISTING
FIRE RISER
TO REMAIN.
EXISTING BACKFLOW
DEVICE AND FDC TO
REMAIN
PROPOSED NEW BACKFLOW DEVICE
AND FDC TO BE LOCATED, REFER TO
CIVIL PLANS FOR INFORMATION
EXISTING
WATER MAIN
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
GENERAL NOTES
KEY NOTES
KEY PLAN
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 8:
A
M
FP-100
SITE PLAN - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
NUMBER NOTES
1 NEW ESTIMATED 6" INCOMING UNDERGROUND FIRE
SERVICE TERMINATED WITH FLANGED CAP 12" ABOVE
FINISHED FLOOR.
2 ESTIMATED 4" UNDERGROUND FIRE LINE ROUTED TO
REMOTE FDC. REFER TO SITE UTILITIES PLAN FOR PIPE
CONTINUATION.
3 REMOTE FIRE DEPARTMENT CONNECTION INSTALLED BY
SITE UTILITIES CONTRACTOR, SHALL BE LOCATED NO
FURTHER THAN 100'-0 FROM NEAREST SITE FIRE
HYDRANT. REFER TO SITE UTILITIES PLANS FOR EXACT
LOCATION.
4 EXISTING FIRE HYDRANT, REFER TO SITE UTILITY PLANS
FOR EXACT LOCATION OF HYDRANT AND PIPE ROUTING.
5 OUTLINED AREA SHALL BE PROTECTED BY AN AUTOMATIC
WET PIPE SPRINKLER SYSTEM. HAZARD CLASSIFICATION
SHALL BE LIGHT HAZARD UTILIZING A SPRINKLER DENSITY
OF 0.10 GPM PER SQUARE FOOT DENSITY OVER THE
HYDRAULICALLY MOST REMOTE 1500 SQUARE FEET PLUS
A 100 GPM HOSE ALLOWANCE.
0' 15' 30' 60' 120'
SCALE: 1" = 30'-0"
N
1" = 30'-0"
SITE PLAN - FIRE PROTECTION
A. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR TO PROVIDE ANY
ADDITIONAL OFFSETS, PIPING, SPRINKLERS AND OTHER
COMPONENTS REQUIRED FOR PROPER INSTALLATION AND
COORDINATION WITH OTHER TRADES.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
CEILING DESCRIPTIONS AND HEIGHTS.
C. COORDINATE SPRINKLERS WITH ALL DIFFUSERS, SPEAKERS,
LIGHTING FIXTURES, AND OTHER CEILING MOUNTED
SYSTEMS.
D. CENTER SPRINKLER LOCATIONS IN THE TILE AS INDICATED
ON THE DRAWINGS, OR IN HARD CEILING AREAS CENTERED
BETWEEN LIGHTS. PROVIDE ARMOVERS OR SWING JOINTS
AS REQUIRED.
E. SLEEVE ALL PIPING PENETRATIONS THROUGH WALLS,
CEILINGS, AND FLOORS. SLEEVE AND / OR FIRE STOP ALL
PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND
FLOORS WITH U/L LISTED ASSEMBLIES. FIRE STOP
ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF
THE WALL, CEILING, OR FLOOR. SEE ARCHITECTURAL
DRAWINGS FOR FINAL FINISHES.
F. PROVIDE SPRINKLERS UNDER ALL EXPOSED DUCTWORK /
OBSTRUCTIONS OVER 48" WIDE, AND SPACE SPRINKLERS
AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
SPRINKLERS UNDER DUCTS ARE NOT INDICATED ON
DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED IN
ACCORDANCE WITH NFPA.
G. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT
(SERVERS, COMM, ELECT. PANELS, TRANSFORMERS, ETC.)
PRIOR TO ANY INSTALLATION. DO NOT ROUTE ANY PIPING
OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES.
EXISTING ACTIVITY ROOM
KITCHEN
CUSTODIAL
MDF
MEN'S RESTROOM
WOMEN'S RESTROOM
ARTS AND CRAFTS
MULTIPURPOSE ROOM B
MULTIPURPOSE ROOM A
STORAGE
MECH
ELEC
STORAGE
108A
GYM
LOBBY
RECEPTION
101A
CORRIDOR
UPRIGHT SPRINKLER
WITH GUARD BELOW
ELEVATED TRACK.
OPEN TO
ABOVE
MECH
SPRINKLER MAIN
BELOW ELEVATED
TRACK.
EXISTING FIRE RISER TO REMAIN
FOR EXISTING BUILDING
OPEN TO
ABOVE
PIPE UP
PIPE UP
PIPE DN
REFER TO SHEET FP-203 FOR
WORK IN THIS BUILDING.
ELEVATOR
100A
CORRIDOR
MECHANICAL ROOM
OPEN TO
ABOVE
SERVE SPRINKLER
FROM LOBBY 101.
EMERGENCY ELEC. AND
GENERATOR
108B
ELEC
OFFICES
DRY SIDEWALL
SPRINKLER
UNDER LANDING
DRY SIDEWAL
SPRINKLER
UNDER LANDING
UPRIGHT HEAD
UNDER LANDING
CHILLER YARD
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
GENERAL NOTES
KEY NOTES
KEY PLAN
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 8:
A
M
FP-201
LEVEL 1 - RCP - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
NUMBER NOTES
1 ESTIMATED INCOMING 6" UNDERGROUND FIRE MAIN
TERMINATED WITH FLANGED CAP 12" ABOVE FINISHED
FLOOR.
2 NEW FIRE RISER CONNECTED TO INCOMING FIRE SERVICE
FLANGED CAP 12" ABOVE FINISHED FLOOR. REFER TO FIRE
RISER DETAIL #4 ON DWG. FP-901 INDICATING FDC PIPING
AND MULTI-LEVEL SPRINKLER MAINS SERVING LEVEL 1
AND LEVEL 2 WITH FLOW & TAMPER SWITCHES.
3 HORIZONTAL 286°F SIDEWALL SPRINKLER LOCATED 12"
ABOVE ELEVATOR FLOOR.
0' 4' 12' 24' 42'-8"
SCALE: 3/32" = 1'-0"
N
3/32" = 1'-0"
LEVEL 1 - RCP - FIRE PROTECTION
A. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR TO PROVIDE ANY
ADDITIONAL OFFSETS, PIPING, SPRINKLERS AND OTHER
COMPONENTS REQUIRED FOR PROPER INSTALLATION AND
COORDINATION WITH OTHER TRADES.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
CEILING DESCRIPTIONS AND HEIGHTS.
C. COORDINATE SPRINKLERS WITH ALL DIFFUSERS, SPEAKERS,
LIGHTING FIXTURES, AND OTHER CEILING MOUNTED
SYSTEMS.
D. CENTER SPRINKLER LOCATIONS IN THE TILE AS INDICATED
ON THE DRAWINGS, OR IN HARD CEILING AREAS CENTERED
BETWEEN LIGHTS. PROVIDE ARMOVERS OR SWING JOINTS
AS REQUIRED.
E. SLEEVE ALL PIPING PENETRATIONS THROUGH WALLS,
CEILINGS, AND FLOORS. SLEEVE AND / OR FIRE STOP ALL
PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND
FLOORS WITH U/L LISTED ASSEMBLIES. FIRE STOP
ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF
THE WALL, CEILING, OR FLOOR. SEE ARCHITECTURAL
DRAWINGS FOR FINAL FINISHES.
F. PROVIDE SPRINKLERS UNDER ALL EXPOSED DUCTWORK /
OBSTRUCTIONS OVER 48" WIDE, AND SPACE SPRINKLERS
AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
SPRINKLERS UNDER DUCTS ARE NOT INDICATED ON
DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED IN
ACCORDANCE WITH NFPA.
G. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT
(SERVERS, COMM, ELECT. PANELS, TRANSFORMERS, ETC.)
PRIOR TO ANY INSTALLATION. DO NOT ROUTE ANY PIPING
OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES.
OFFICE
OFFICE
CUSTODIAL
A
D A
S T
A F
F R
E S
T R
O O
M
S T
A F
F R
E S
T R
O O
M
MEN'S RESTROOM
WOMEN'S RESTROOM
DANCE STUDIO A
DANCE STUDIO B
CONFERENCE ROOM
MECH
ELEC
STORAGE
ELEVATED TRACK
CORRIDOR
FIRE RISER
SPRINKLER MAIN
BELOW ROOF
OFFICE
PIPE UPPIPE UP
CORRIDOR 201B
CORRIDOR
ELEVATOR
100A
SMALL PROGRAM ROOM
ELEC.
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
GENERAL NOTES
KEY NOTES
KEY PLAN
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 8:
A
M
FP-202
LEVEL 2 - RCP - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
NUMBER NOTES
0' 4' 12' 24' 42'-8"
SCALE: 3/32" = 1'-0"
N
0' 4' 12' 24' 42'-8"
SCALE: 3/32" = 1'-0"
N
3/32" = 1'-0"
LEVEL 2 - RCP - FIRE PROTECTION
A. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR TO PROVIDE ANY
ADDITIONAL OFFSETS, PIPING, SPRINKLERS AND OTHER
COMPONENTS REQUIRED FOR PROPER INSTALLATION AND
COORDINATION WITH OTHER TRADES.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
CEILING DESCRIPTIONS AND HEIGHTS.
C. COORDINATE SPRINKLERS WITH ALL DIFFUSERS, SPEAKERS,
LIGHTING FIXTURES, AND OTHER CEILING MOUNTED
SYSTEMS.
D. CENTER SPRINKLER LOCATIONS IN THE TILE AS INDICATED
ON THE DRAWINGS, OR IN HARD CEILING AREAS CENTERED
BETWEEN LIGHTS. PROVIDE ARMOVERS OR SWING JOINTS
AS REQUIRED.
E. SLEEVE ALL PIPING PENETRATIONS THROUGH WALLS,
CEILINGS, AND FLOORS. SLEEVE AND / OR FIRE STOP ALL
PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND
FLOORS WITH U/L LISTED ASSEMBLIES. FIRE STOP
ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF
THE WALL, CEILING, OR FLOOR. SEE ARCHITECTURAL
DRAWINGS FOR FINAL FINISHES.
F. PROVIDE SPRINKLERS UNDER ALL EXPOSED DUCTWORK /
OBSTRUCTIONS OVER 48" WIDE, AND SPACE SPRINKLERS
AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
SPRINKLERS UNDER DUCTS ARE NOT INDICATED ON
DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED IN
ACCORDANCE WITH NFPA.
G. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT
(SERVERS, COMM, ELECT. PANELS, TRANSFORMERS, ETC.)
PRIOR TO ANY INSTALLATION. DO NOT ROUTE ANY PIPING
OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES.
EXISTING OFFICE
EXISTING ACTIVITY ROOM
EXISTING EXERCISE
EXISTING MECH. ROOM
EXISTING STORAGE
NEW STORAGE
EXISTING FIRE
RISER TO REMAIN.
NEW SPRINKLER LOCATION
FOR EXISTING SYSTEM IN
BUILDING.
EXISTING SYSTEM TO REMAIN
IN HATCHED AREA.
PROTECTION IN THIS
AREA IS TO BE PROVIDED
BY THE NEW SYSTEM
NEW CORRIDOR
NEW STORAGE
FIRE RISER ROOM
EXISTING LOBBY
NEW CORRIDOR
EXISTING CUSTODIAL
EXISTING ELEC.
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
GENERAL NOTES
KEY NOTES
KEY PLAN
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 8:
A
M
FP-203
EXISTING BUILDING -
RCP - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
NUMBER NOTES
0' 4' 12' 24' 42'-8"
SCALE: 3/32" = 1'-0"
N
N.I.C.
3/32" = 1'-0"
EXISTING BUILDING - RCP - FIRE PROTECTION
1" 90° THREADED
ELBOW (TYPICAL)
1" DROP NIPPLE
1" x 1/2" THREADED
REDUCER
SPRINKLER
BRANCH LINE
CONCEALED SPRINKLER
GROOVED MECHANICAL BRANCH
CONNECTION JOINT (EQUAL TO
VICTAULIC STYLE 920)
CEILING
1" DROP NIPPLE
RECESSED / SEMI-RECESSED SPRINKLER
GROOVED MECHANICAL BRANCH
CONNECTION JOINT (EQUAL TO
VICTAULIC STYLE 920)
CEILING
1" 90° THREADED
ELBOW (TYPICAL)
1" X 1/2" THREADED
REDUCER
24" MINIMUM
1. WHEN STANDARD PENDANT SPRINKLERS, RATHER THAN DRY PENDANT SPRINKLERS ARE
INSTALLED ON PRE-ACTION AND DRY-PIPE SYSTEMS, 'RETURN BENDS' ARE REQUIRED PER
NFPA 13.
GENERAL NOTES
GRADE
M
IN
IM
U
M C
O V
E R
P E
R N
F P
A
5'-0"
FINISHED FLOOR
REFER TO CIVIL OR SITE UTILITIES
PLANS FOR PIPE CONTINUATION
GROOVED JOINT X
FLANGE ADAPTER
THRUST BLOCK
(PER NFPA 24)
PIPE
SECTION A-A
PROVIDE MECHANICAL SLEEVE
SEAL, LINK SEAL OR EQUAL.
STAINLESS STEEL
PREFABRICATED
IN-BUILDING RISER
A
A
BUILDING
PERIMETER WALL
STANDARD AWWA C900 GASKETED
COUPLER CONNECTION BELOW GRADE TO
SITE PIPING
PVC SITE PIPING (C900)
1' -0
A
.F .F
1. INCOMING UNDERGROUND PIPING, PROVIDED BY SITE UTILITIES CONTRACTOR, SHALL
TERMINATE 12" ABOVE FINISHED FLOOR WITH BLIND FLANGE AS INDICATED ON DETAIL.
2. PROTECTION OF INCOMING UNDERGROUND PIPING INCLUDING ARCHING OF STRUCTURAL
FOUNDATION WALL AND DEPTH OF PIPE BURY SHALL BE PER NFPA-24.
3. PROVIDE TAMPER SWITCHES AT OS&Y STEMS OF BACKFLOW ASSEMBLY OR CHAIN AND LOCKS
AROUND OS&Y VALVE HANDLES. COORDINATE REQUIREMENT SUPERVISORY CONTROLS WITH
LOCAL AHJ.
4. PROVIDE STAINLESS STEEL IN-BUILDING RISER (EQUAL TO AMES SERIES IBR). PLASTIC PIPE IS
NOT PERMITTED BELOW OR WITHIN 5'-0" OF BUILDING.
5. PROVIDE DI-ELECTRIC FLANGE (AS REQUIRED) SET AT TRANSITION TO SYSTEM RISER PIPING
MATERIAL.
6. PROVIDE CORROSION PROTECTION PER MANUFACTURER'S RECOMMENDATIONS FOR
CORROSIVE SOIL INSTALLATIONS.
GENERAL NOTES
ADJUSTABLE SWIVEL RING
PIPE HANGER (EQUAL TO
ANVIL FIGURE 69) TYPICAL
UL LISTED POWDER
DRIVEN CONCRETE
ANCHOR
TOP BEAM
C-TYPE
CLAMP
3/8" ALL THREAD ROD
FOR PIPE SIZES UP
TO 4" (TYPICAL)
CONCRETE STEEL CENTER BEAM
SPRINKLER
PIPING UP TO
4" (TYPICAL)
STRUCTURAL
STEEL I-BEAM
UL LISTED
CENTER BEAM
CLAMP
HANGER LOCATED
AT END OF
SPRINKLER
BRANCH LINE TO
HAVE ROD TIGHT
TO PIPE TO
PREVENT WATER
HAMMER ACTION
AT LAST
SPRINKLER
(TYPICAL)
TO LEVEL 1 AND LEVEL 2
SYSTEM
DRAIN RISER
PROVIDE VICTAULIC
SERIES 717 CHECK VALVE
TO FDC
VICTAULIC UMC ASSEMBLY
2" MAIN DRAIN
2" MAIN DRAIN.
PENETRATE WALL 8"
A.F.F. AND PROVIDE 45
DEGREE TURN DOWN
AMES IN-BUILDING RISER
0 - 300 PSI GAUGE
VICTAULIC 009H
COUPLING
A. USE 3/8" DIAMETER ROD FOR PIPE DIAMETER SIZE 1" THRU 4".
B. USE 1/2" DIAMETER ROD FOR PIPE DIAMETER SIZE 6" THRU 8".
GENERAL NOTES
C
3" MIN.
3" MIN.
3" MIN.
CB
15'-0" MAX.
12'-0" MAX.
12'-0" MAX.3'-0" MAX.
4'-0" MAX.
5'-0" MAX.
APIPE SIZE
BA
1-1/2" - 8"
1-1/4"
1"
HANGER LOCATION DETAIL
SPRINKLER
STEEL PIPE
STRUCTURE
ADJUSTABLE SWIVEL RING HANGER
(TYPICAL FOR SPRINKLER BRANCH
LINES)
NOTE:
WHERE THE 'A' DISTANCE IS EXCEEDED THE BRANCH PIPING SHALL BE EXTENDED BEYOND
THE END SPRINKLER AND SHALL BE SUPPORTED BY AN ADDITIONAL HANGER.
GROOVED BUTTERFLY FLOOR
CONTROL VALVE W/ TAMPER SWITCH
CHECK VALVE (IN COMBINED
SYSTEMS ONLY)
PRESSURE GAUGE
(0 - 200 PSI) - TYP.
TO SPRINKLER
SYSTEM (SEE PLANS
FOR CONTINUATION)
PLAN VIEW
ELEVATION VIEW
FIRE RISER
FLOW SWITCH
INSPECTOR'S TEST AND
DRAIN VALVE WITH SITE
GLASS (EQUAL TO FPPI
SURE TEST)
BV / TS FSCV
TO DRAIN RISER
SECTIONAL DRAIN
VALVE CONNECTION
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
N . W es ts ho re
B te
T am pa
, F lo rid a
T el : 8
.8
.4
T el
: 8
.8
.9 w w w
.V ol tA irI nc .c om C
O A
P ro je ct
.2
A ut od es k D oc s:
//2
P al m
H ar bo r
R ec re at io n
C en te r/
_P al m H ar bo r R ec C nt r_
M E
P _v
.r vt
9/
/2
:2 9:
A
M
FP-901
DETAILS - FIRE
PROTECTION
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
NTS 6RETURN BEND PIPING ARRANGEMENT
NTS 1INCOMING FIRE RISER W/ IN-BUILDING RISERNTS 4PIPE HANGERS - CONCRETE-STEEL STRUCTURES
NTS 2FIRE RISER DETAILNTS 5HANGAR SPACING FOR BRANCH LINES - STEEL PIPING
NTS 3FLOOR CONTROL VALVE AND TEST MODULE
| FP-000 - LEGEND - FIRE PROTECTION |
| FP-100 - SITE PLAN - FIRE PROTECTION |
| FP-201 - LEVEL 1 - RCP - FIRE PROTECTION |
| FP-202 - LEVEL 2 - RCP - FIRE PROTECTION |
| FP-203 - EXISTING BUILDING - RCP - FIRE PROTECTION |
| FP-901 - DETAILS - FIRE PROTECTION |
| 2025-09-16T11:23:03-0400 | |
| Bryan Zemina |
| 2025-09-16T11:23:15-0400 | |
| Bryan Zemina |
| 2025-09-16T11:23:27-0400 | |
| Bryan Zemina |
| 2025-09-16T11:23:39-0400 | |
| Bryan Zemina |
| 2025-09-16T11:23:51-0400 | |
| Bryan Zemina |
| 2025-09-16T11:24:03-0400 | |
| Bryan Zemina |
File details come from the government source that posted it. Updated .