250915_PERMIT_SET_-_PH_REC_CENTER_-_FOOD_SERVICE.pdf
PDF 14 MB Posted
- Attached to
- Palm Harbor Recreation Center Addition State and local contract opportunity
- Solicitation number
- 26-0011-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document set represents preliminary food service equipment construction documents for the Palm Harbor Parks and Recreation project located in Pinellas County, Florida, at 1500 16th Street. The documents are prepared by WJ Architects and Theodore Barber & Co. Inc. (TBCI) and are marked as a "Preliminary Not for Construction" permit set dated 9-15-25. The project involves the detailed design and specification of a commercial kitchen facility, including comprehensive plans for equipment layout, electrical, plumbing, mechanical systems, ventilation, and special conditions.
The documentation provides extensive technical specifications for various food service equipment, including walk-in coolers and freezers, exhaust hoods, ranges, ovens, refrigeration units, sinks, work tables, and associated utility connections. The equipment schedules detail precise electrical, plumbing, and mechanical requirements for each item, with specifications for voltage, amperage, water connections, waste lines, and ventilation needs. The documents emphasize compliance with local, state, and national building codes, with particular attention to fire safety standards, accessibility requirements, and health code regulations. The plans include detailed diagrams for equipment installation, utility connections, floor penetrations, and special construction considerations to ensure a fully functional and code-compliant commercial kitchen environment.
View the file
Other files for this state and local contract opportunity
Show all 50
Palm Harbor Recreation Center Addition has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
N D
O
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V E
IN
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
S P
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
R
C
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
A
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
X
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
G
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
IT
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
L A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y I
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
F
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
P R
E
LI
M
IN
A R
Y N
O T
F O
R C
O N
S T
R U
C T
IO
N
P a rk
S t.
N
S u it e
S t.
P e te rs b u rg
F lo ri d a
T e l:
.5
.5
F a x:
.5
.5
W e b w w w .T
B C
Id e s ig n .c o m
FS-0.1.1
GENERAL NOTES
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
A4.1
A
A4.1
A
+7'-0"
A.F.F.
A
A
W-2
F
9.01
A 501
A
ROOM
ID-13.4
GENERAL NOTES
GENERAL NOTES
AFF Above Finished Floor
(E) Exsiting
FBO Furnished By Others
FF & E Fixtures Furnishings and Equipment
NIC Not In Contract
(R) Relocate
S/S Stainless Steel
TBCI Theodore Barber & Co. Inc.
U.O.N. Unless Otherwise Noted
(X) Existing to be removed
ABBREVIATIONS
Existing Walls To Remain
New Gypsum Board Stud Wall
Detail Identification Sheet Where Detail Is Drawn
Section Cut Direction Sheet Where Section Is Drawn Section Identification
Detail Reference
Section Reference
Elevation Reference
Work Point/Control Point or Datum
Shaded Side Is Side Considered
Match Line
Revision Reference
Addendum / Bulletin No.
Kitchen/Laundry Equipment Reference
Keynote Reference
Flashing Reference
Wall Type Reference
Louver Reference
Window Reference
Room Number
Door Reference
The Following Symbols May Be Used In The Drawings:
Column References
REFERENCE SYMBOLS
GENERAL PROJECT NOTES
PROJECT SPECIFICATIONS FORM A PART OF THESE GENERAL NOTES.
1. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER
THESE GENERAL NOTES AND THE TYPICAL DETAILS.
2. SEE THE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
SIZE AND LOCATION OF WINDOW AND DOOR OPENINGS.
SIZES AND LOCATIONS OF INTERIOR AND EXTERIOR NONBEARING
PARTITIONS.
SIZES AND LOCATIONS OF CONCRETE CURBS, CONVENIENCE FLOOR
DRAINS, SLOPES, DEPRESSED AREAS, CHANGES IN LEVELS, CHAMFERS,
GROOVES, INSERTS, ETC.
SIZE AND LOCATION OF FLOOR AND ROOF OPENINGS.
FLOOR AND ROOF FINISHES.
STAIR FRAMING AND DETAILS.
DIMENSIONS NOT SHOWN ON THE FOOD SERVICE DRAWINGS.
CEILING ASSEMBLIES AND HEIGHTS.
EXTERIOR WALL ASSEMBLIES.
3. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR THE
FOLLOWING:
PIPES, SLEEVES, HANGERS, TRENCHES, WALL, FLOOR AND ROOF
OPENINGS, DUCT PENETRATIONS, ETC. EXCEPT AS SHOWN OR NOTED.
CONVENIENCE FLOOR SINKS.
ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS.
CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, OR PLUMBING
FIXTURES.
SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR
BOLTS FOR MOUNTS.
BEVERAGE CONDUIT RUNS AND PULL BOXES, UNLESS INCLUDED IN TBCI
FOOD SERVICE DRAWINGS.
4. COORDINATE WITH INTERIOR DESIGN DRAWINGS FOR THE FOLLOWING:
CEILING PATTERNS, MATERIALS, FINISHES, DECORATIVE LIGHT
FIXTURES, LOCATIONS AND ADDITIONAL CEILING INFORMATION.
DIMENSIONS AND ALL INTERIOR WALL ELEVATIONS.
DETAILS OF BOOTHS, BAR, COUNTER AND BUILT-INS.
5. SEE TBCI SPECIFIC FOOD SERVICE DRAWINGS FOR WALL BACKING
INFORMATION, SLAB DEPRESSIONS, BEVERAGE CONDUIT /
REFRIGERATION ROUTING, BULK CO2 FILL BOX, WALL FLASHING, CURB
BASES ETC.
6. SEE TBCI FOOD SERVICE ELECTRICAL DRAWINGS FOR ALL FOOD SERVICE
ELECTRICAL REQUIREMENTS.
7. SEE TBCI FOOD SERVICE PLUMBING DRAWINGS FOR ALL FOOD SERVICE
WATER DRAINS, GAS AND PLUMBING REQUIREMENTS. REFER TO TCI
SPECIAL CONDITIONS PLAN FOR FLOOR SINK ROUGH-IN DIMENSIONS.
8. NOTIFY TBCI FOOD SERVICE CONSULTANT WHEN DRAWINGS BY OTHERS
SHOW OPENINGS, POCKETS, WALLS, ETC. NOT SHOWN ON TBCI FOOD
SERVICE DRAWINGS.
9. KITCHEN EQUIPMENT CONTRACTOR SHALL INVESTIGATE THE SITE DURING
ALL PHASES OF CONSTRUCTION. IF ANY BURIED STRUCTURES,
CESSPOOLS, CISTERNS, FOUNDATIONS, UTILITIES, ETC. ARE FOUND, TBCI
SHALL BE NOTIFIED IMMEDIATELY.
10. KITCHEN EQUIPMENT CONTRACTOR SHOP DRAWINGS SUBMITTED TO TBCI
SHALL CONSIST OF (5) HARD-COPY SETS, AND (1) ELECTRONIC CAD FILE.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL HAVE
INCLUDED IN HIS SCOPE, ALL WORK NECESSARY TO PROPERLY
COORDINATE AND FACILITATE THE INSTALLATION OF ALL FOOD SERVICE
EQUIPMENT BY THE KITCHEN EQUIPMENT CONTRACTOR AND / OR OWNER,
INCLUDING THE INSTALLATION OF ALL RELATED ITEMS REQUIRED. THIS
WORK SHALL INCLUDE ALL NECESSARY CORE DRILLING AND SLEEVES
THROUGH WALLS, CEILINGS, FLOORS, COLUMNS AND BEAMS FOR THE
PASSAGE OF ALL UTILITIES AND REFRIGERATION LINES. THIS WORK
SHALL ALSO INCLUDE ALL EMPTY CONDUITS, ALL EQUIPMENT
PADS/CURBS, ALL PLUMBING AND ELECTRICAL REQUIREMENTS AS
DESCRIBED ON TBCI FOOD SERVICE CONTRACT DOCUMENTS, ALL DUCT
SHAFTS AND WALL BACKING.
3. THE DRAWINGS AND SPECIFICATIONS, AND ALL COPIES THEREOF, ARE
LEGAL INSTRUMENTS OF SERVICE FOR THE USE BY THE OWNER AND
AUTHORIZED REPRESENTATIVES ON THE DESIGNATED PROPERTY ONLY.
OTHER USE, WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE
OWNER, THEODORE BARBER & CO. INC., OR PROJECT ARCHITECT, IS
PROHIBITED.
4. SPECIFICATIONS, DETAILS AND SCHEDULES, WHICH MAY BE BOUND
SEPARATELY AND REFERENCED BY PROJECT NAME, ARE PART OF
THESE CONTRACT DOCUMENTS. DRAWINGS BY CONSULTING
PROFESSIONALS, INCLUDING FOOD SERVICE CONSULTANTS, ARE
SUPPLEMENTARY AND SUBORDINATE TO THE ARCHITECTURAL
DRAWINGS AND ARE PART OF THESE CONTRACT DOCUMENTS AS MAY
BE APPLICABLE.
5. THE KITCHEN EQUIPMENT CONTRACTOR SHALL NOTIFY THE FOOD
SERVICE CONSULTANT IMMEDIATELY OF ANY OMISSIONS OR
DISCREPANCIES BETWEEN THE FOOD SERVICE DRAWINGS,
ARCHITECTURAL DRAWINGS, CONSULTING PROFESSIONALS DRAWINGS,
SPECIFICATIONS OR EXISTING CONDITIONS. SHOULD THERE BE AN
OMISSION OR DISCREPANCY BETWEEN SAID DRAWINGS AND
SPECIFICATIONS, IT SHALL BE BROUGHT TO THE FOOD SERVICE
CONSULTANT'S ATTENTION IN WRITING FOR CLARIFICATION PRIOR TO
BIDDING, EXECUTION OR INSTALLATION OF SAID WORK. IF A CONFLICT
OCCURS BETWEEN THE DESIGN DRAWINGS AND SPECIFICATIONS, THE
MOST STRINGENT SHALL APPLY.
6. ALL WORK SHALL CONFORM TO ALL THE LATEST RULES AND
REGULATIONS OF FEDERAL, STATE AND LOCAL GOVERNMENT AGENCIES
AND JURISDICTIONS HAVING AUTHORITY OF THE PROJECT, INCLUDING
STATE AND FEDERAL ACCESSIBILITY REQUIREMENTS.
7. THE KITCHEN EQUIPMENT CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, ELEVATIONS AND EXISTING CONDITIONS PRIOR TO
STARTING WORK AND REPORT ANY DISCREPANCIES IN WRITING TO THE
FOOD SERVICE CONSULTANT. ANY WORK INSTALLED IN CONFLICT WITH
THE FOOD SERVICE DRAWINGS SHALL BE CORRECTED AT THE KITCHEN
EQUIPMENT CONTRACTOR'S EXPENSE.
8. THE KITCHEN EQUIPMENT CONTRACTOR SHALL OBTAIN ALL
NECESSARY PERMITS AND APPROVALS FOR ALL WORK.
9. THE KITCHEN EQUIPMENT CONTRACTOR SHALL BE RESPONSIBLE FOR
SCHEDULING AND COORDINATING THE WORK FOR ALL UTILITIES AND
SERVICES RELATED TO THIS WORK.
10. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE
CONSIDERED TO BE CONTRACT STANDARDS. QUESTIONS REGARDING
THE SAME, OR THEIR EXACT MEANING, SHALL BE DIRECTED TO THE
FOOD SERVICE CONSULTANT.
11. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE. DO
NOT SCALE DRAWINGS. THE KITCHEN EQUIPMENT CONTRACTOR SHALL,
AT THE MINIMUM, BE RESPONSIBLE FOR THE ACCURATE PLACEMENT
AND CONFIGURATION OF THE EQUIPMENT WITHIN ITS SCOPE ON THE
SITE.
12. ALL WALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD AT METAL
STUD WALLS, OR TO FACE OF MASONRY OR CONCRETE, UNLESS
OTHERWISE NOTED.
13. VERTICAL DIMENSIONS AND CEILING HEIGHT ARE TAKEN FROM
ABOVE FINISH FLOOR UNLESS OTHER WISE NOTED.
17. ALL PIPES, CONDUITS, WIRES AND DUCTS SHALL BE CONCEALED
FROM VIEW UNLESS OTHERWISE NOTED. HIDDEN CONDITIONS:
KITCHEN EQUIPMENT CONTRACTOR TO CONTACT FOOD SERVICE
CONSULTANT IMMEDIATELY UPON UNCOVERING HIDDEN CONDITION.
FOOD SERVICE CONSULTANT TO PROVIDE DIRECTION.
16. KITCHEN EQUIPMENT CONTRACTOR SHALL VERIFY EXACT SIZES AND
LOCATIONS OF ALL ITEMS WITHIN HIS SCOPE, INCLUDING, BUT NOT
LIMITED TO; EQUIPMENT CURBS, BASE STRUCTURES, AS WELL AS
POWER, WATER, DRAIN, GAS INSTALLATIONS AND LOCATIONS. ALL
ITEMS SHALL BE VERIFIED WITH EQUIPMENT MANUFACTURERS BEFORE
PROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE THE FIELD
CONDITIONS OR APPROVED SUBSTITUTIONS SHALL BE MADE WITHOUT
ADDITIONAL CHARGE TO THE OWNER OR TBCI.
15. KITCHEN EQUIPMENT CONTRACTOR SHALL VERIFY LOCATION OF ALL
STIFFENERS, BRACES, BLOCKING, BACKING, HANGERS, BACK-UP PLATES
AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF THE
CASEWORK, FIXTURES AND ALL WALL-MOUNTED OR SUSPENDED
KITCHEN EQUIPMENT, OR MISCELLANEOUS EQUIPMENT OR
FURNISHINGS THAT ARE CONTAINED IN THIS WORK.
14. ALL DOOR SIZES SHOWN IN FOOD SERVICE DOCUMENTATIONS ARE
OPENING SIZES. ALLOWANCE FOR THRESHOLDS, ETC. SHALL BE
DEDUCTED. FRAMES SHALL BE REINFORCED WHERE REQUIRED, FOR
CLOSERS, STOPS AND HARDWARE.
2. THESE DRAWINGS TO BE USED IN CONJUCTION WITH THE FULL SET OF
CONSTRUCTION DOCUMENTS AS APPLICABLE. THE LAST DATED
REVISION VOIDS ALL PREVIOUS FOOD SERVICE CONSTRUCTION
DOCUMENTS CONTAINED IN THIS SET.
1.INFORMATION INDICATED ON THESE PLANS ARE GENERALLY FOR
FOOD SERVICE EQUIPMENT AND ARE INTENDED AS REFERENCE ONLY.
THIS PLAN REPRESENTS A FOOD SERVICE LAYOUT OF CULINARY,
BEVERAGE, SYSTEMS AND RELATED EQUIPMENT FOR THE
CONVENIENCE OF OWNER/OPERATOR, ARCHITECTS, MECHANICAL,
ELECTRICAL, AND PLUMBING ENGINEERS, CONTRACTORS, KITCHEN
EQUIPMENT FABRICATORS, KITCHEN EQUIPMENT CONTRACTORS AND
OTHER RELATED TRADES. THE BASE PLAN HAS BEEN MADE AVAILABLE
FROM INFORMATION PROVIDED BY OTHERS, NOT LIMITED TO
MEASUREMENTS, ELECTRONIC BACKGROUNDS, GRID LINES AND
EXISTING OR PROPOSED BUILDING SYSTEMS, NOT LIMITED TO
(PLUMBING, STRUCTURAL, CONCRETE, DUCTWORK, ELECTRICAL AND
MECHANICAL). GENERAL CONTRACTORS, SUBCONTRACTORS, KITCHEN
EQUIPMENT DEALERS, CONTRACTORS, INSTALLERS, RELATED AND
NON-RELATED CONTRACTORS, ARE RESPONSIBLE FOR SECURING AND
OBTAINING THEIR OWN MEASUREMENTS AND SPECIFIC INFORMATION.
THEODORE BARBER & COMPANY, INC. IS NOT RESPONSIBLE FOR THE
ENGINEERING OR INTEGRATION OF RELATED ENGINEERING AND
DISCIPLINES THROUGHOUT THE FULL SET OF CONSTRUCTION
DOCUMENTS SPECIFIC TO THE FOOD SERVICE EQUIPMENT IN RELATION
TO THE STRUCTURAL, ARCHITECTURAL, MECHANICAL, PLUMBING AND
ELECTRICAL TRADES, UNLESS OTHERWISE SPECIFICALLY PROVIDED
FOR IN THE PLANS AND SPECIFICATIONS.
THEODORE BARBER & COMPANY, INC. ASSUMES NO RESPONSIBILITY
FOR WORK DONE BY ANY AND ALL ARCHITECTS, ENGINEERS,
CONSULTANTS OR CONTRACTORS, OR FOR ANY CHANGES MADE
NECESSARY BY LOCAL, STATE, OR NATIONAL BUILDING CODES,
ORDINANCES, STRUCTURAL CONDITIONS, OR BY THE SUBSTITUTION OR
CHANGES IN EQUIPMENT SHOWN ON THIS PLAN(S). CONTRACTORS ARE
TO MAKE ALLOWANCES FOR INTERNAL AND EXTERNAL FINAL
CONNECTIONS ON THE FOOD SERVICE EQUIPMENT, WASTE PIPING,
VALVES, BACK-FLOW PREVENTION, TRAPS, DRAIN GRATES, FLUID /GAS
REGULATORS, FAUCETS, STEAM TRAPS, STARTING SWITCHES AND
MOTORS, EXCEPT WHERE SPECIFICALLY NOTED IN THE FOOD SERVICE
SPECIFICATIONS, SECTION 11400.
18. THE TBCI FOOD SERVICE CONTRACT DRAWINGS AND
SPECIFICATIONS REPRESENT THE FINISHED DESIGN. THEY DO NOT
INDICATE THE METHOD OF CONSTRUCTION.
19. THE KITCHEN EQUIPMENT CONTRACTOR SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE FOOD SERVICE EQUIPMENT,
WORKING AND ADJACENT SPACES DURING CONSTRUCTION.
20. IT SHALL BE THE RESPONSIBILITY OF THE ARCHITECT, OWNER
AND/OR THE GENERAL CONTRACTOR TO INSURE THAT ALL OF THE
CONSULTANTS AND SUB-CONTRACTORS RECEIVE COPIES OF ANY AND
ALL ADDENDUMS OR CHANGES TO THE CONSTRUCTION DOCUMENTS
OR FIELD CONDITIONS WHICH ARE MADE PRIOR TO AND DURING
CONSTRUCTION.
21. KITCHEN EQUIPMENT CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL GENERAL CLEAN-UP AND DISPOSAL OF ALL TRASH, CARTONS,
CRATES, DEBRIS, ETC. AFTER FINAL INSTALLATION OF ALL FIXTURES
AND EQUIPMENT, UNLESS OTHERWISE NOTED, INCLUDING FINAL
NON-SANITARY CLEANING.
22. ALL BASE BUILDING CONSTRUCTION, MECHANICAL, PLUMBING,
ELECTRICAL, WIRING AND CONDUIT REQUIREMENTS RELATED TO
EQUIPMENT AS INDICATED ON TBCI CONTRACT DOCUMENTS ARE TO BE
PROVIDED BY THE GENERAL CONTRACTOR AND/OR SUB-CONTRACTORS
UNLESS OTHERWISE NOTED.
Room Name
Room Number
Interior Elevation Direction Interior Elevation Number Sheet Where Elevation Is Drawn
North Arrow
Room Identification
Interior Elevation Reference
GENERAL NOTES (cont'd.)
REV DESCRIPTION DATE
ITEM
FIRE/SMOKE DAMPER
VAV TERMINAL (NO FAN)
TEMP CONTROL PANEL
DOOR HOLDING/LATCHING DEVICE EMERGENCY
EMERGENCY
NORMAL
EMERGENCY
POWER SOURCE 20a. CIRCUIT
No. Per
J
J
V
F
D
ABBREVIATIONSELECTRICAL SYMBOLSELECTRICAL REQUIREMENTS FOOD SERVICE ELECTRICAL SYSTEM NOTES
THE FOLLOWING SYMBOLS MAY BE USED IN THE DRAWINGS:
+ Above Finished Floor
A Amp
BP Breaker Panel
C Conduit (with pull cord if otherwise empty)
C.O. Conduit only
CONN Connection
DN+ Down from ceiling to height above Finished Floor
DR Duplex Recptacle
(E) Existing
E.C. Electrical Contractor
FBO Furnished By Others
FF & E Fixtures Furnishings and Equipment
GFCI Ground Fault Circuit Interrupter
GRD/GND Ground
HP Horsepower
JB Junction Box
KW Kilowatt (Watt x 1000)
NIC Not In Contract
PI Plug In
P/W Phase / Wire
(R) Relocate
SR Single Recptacle
U.O.N. Unless Otherwise Noted
V Volts
(X) Existing to be removed
1. THESE DRAWINGS INDICATE ELECTRICAL FEEDS ONLY TO FOOD
SERVICE EQUIPMENT AND SYSTEMS. SEE KITCHEN
DRAWINGS (FS-SERIES) PREPARED BY THE FOOD SERVICE
CONSULTANT FOR EXPLANATIONS OF LOADS, SYMBOLS
MOUNTING HEIGHTS, ETC. - AND FOR ADDITIONAL
ELECTRICAL REQUIREMENTS NOT INDICATED ON THESE
DRAWINGS, INCLUDING:
EXTENSIONS TO EQUIPMENT FROM OUTLET BOXES,
SPECIALTY RECEPTACLES, CORD SETS, MULTIPLE
CONNECTIONS FROM SINGLE OUTLETS, POWER AND
CONTROL INTERCONNECTIONS FROM COMPRESSOR
RACK TO FIELD EQUIPMENT AND MISCELLANEOUS
POWER AND CONTROL INTERCONNECTIONS.
2. SEE OVERALL FOOD SERVICE DRAWINGS FOR DESCRIPTIONS OF
EQUIPMENT AND SYSTEMS.
3. ALL CONDUIT STUB-UPS, AS INDICATED ON THE KITCHEN
EQUIPMENT DRAWINGS, SHALL BE ROUTED BELOW FINISHED
FLOOR, 3
4" MIN, UNLESS OTHERWISE NOTED AS LARGER.
4. ALL RECEPTACLES WITHIN 6FT OF SINKS OR WATER USE AREAS
SHALL BE 'GFCI' TYPE.
5. ALL DEVICE COVER PLATES SHALL BE STAINLESS STEEL.
6. PROVIDE "TAYMAC" #S1/2G SERIES WEATHERPROOF RECESSED
RECEPTACLE COVERS FOR ALL ABOVE COUNTER
RECEPTACLES IN BAR AND SINK AREAS.
7. FINAL CONNECTION TO ALL KITCHEN EQUIPMENT SHALL BE
MADE WITH 'SEAL-TITE' FLEXIBLE CONDUIT.
8. PROVIDE MOISTURE PROOF SEAL OFFS FOR ALL CONDUITS
ENTERING/LEAVING COOLER AND FREEZER BOXES.
ASSEMBLE, INSTALL AND LAMP, LIGHTING FIXTURES AND
WIRING DEVICES PROVIDED WITH COOLERS AND FREEZERS.
PROVIDE COMPLETE INTERNAL CIRCUITING AND
CONNECTIONS.
9. PROVIDE POWER INTERCONNECTION BETWEEN FREEZER FAN
COILS / DEFROST HEATERS AND COMPRESSOR RACKS.
MINIMUM CIRCUITING = 5 #12, 1"C. CONFIRM REQUIREMENTS
PRIOR TO ROUGH-IN.
10. ALL EQUIPMENT LOCATED BELOW EXHAUST HOODS WITHIN
FOOD PREPARATION AREAS SHALL BE SERVED BY
SHUNT-TRIP TYPE CIRCUIT BREAKERS INTERLOCKED WITH
THE HOOD FIRE SUPPRESSION SYSTEM. UPON ACTIVATION
OF THE FIRE SYSTEM, THE SHUNT-TRIP CIRCUIT BREAKERS
SHALL TRIP TO THE 'OFF' POSITION.
11. KITCHEN HOOD EXHAUST FANS AND MAKE-UP AIR UNITS SHALL
BE INTERLOCKED AND THE CONTROL CIRCUITS SHALL BE
ROUTED THROUGH DRY CONTACTS PROVIDED IN THE FIRE
PROTECTION SYSTEM. PROVIDE ADDITIONAL RELAYS AS
REQUIRED.
12. PROVIDE 120V SERVICE AND CONNECTIONS TO GAS SOLENOID
VALVES. INTERCONNECT WITH HOOD CONTROL AND FIRE
SUPPRESSION SYSTEMS.
13. SUPPLEMENTAL TASK LIGHTING: PROVIDE (15) 24" LONG LOCAL
AND UNDERCOUNTER TASK LIGHTS, COMPLETE WITH LAMPS,
INTEGRAL SWITCH, CORD SET AND/OR LOCAL OUTLET AS
REQUIRED. "ALKCO" # SF300 SERIES. LOCATE AS DIRECTED
FOR SUPPLEMENTAL TASK LIGHTING, OR AS REQUIRED TO
PROVIDE 50 FOOT-CANDLE LIGHT LEVELS. RETURN EXCESS
TO OWNER.
14. PROVIDE RACEWAY SYSTEMS FOR REFRIGERATION AND
BEVERAGE SERVICE LINES AS DIRECTED IN FOOD SERVICE
DRAWINGS (ALL LONG-RADIUS SWEEPS). PROVIDE PULL
CANS AND GUTTERS AS REQUIRED. ASSEMBLE ALL
RACEWAY SYSTEM JOINTS WITH SILICONE CAULK, TO
PROVIDE A CONTINUOUS WATERTIGHT ASSEMBLY.
A. GENERAL NOTES:
1. ALL WORK INDICATED ON THE ELECTRICAL ROUGH-IN PLAN MUST
BE COMPLETED BY OTHER THAN THE KITCHEN EQUIPMENT
CONTRACTOR AND MUST COMPLY WITH ALL LOCAL CODES AND
REGULATIONS.
2. A CATALOG OF MANUFACTURERS EQUIPMENT SPECIFICATION
SHEETS IS INCLUDE AS AN INTEGRAL PORTION OF HTIS
SUBMITTAL, WE SUGGEST THEREFORE THAT ALL TRADES
REVIEW THE REQUIREMENTS AS INDICATED REGARDING EACH
MANUFACTURER.
3. CROSS REFERENCE ALL INFORMATION PER ROUGH-IN DRAWINGS
WITH EQUIPMENT SCHEDULE DRAWINGS.
4. THE ELECTRICAL ROUGH-IN PLAN IS PROVIDED FOR INFORMATION
ONLY, IS BASED ON A 60 HERTZ, UNLESS OTHERWISE NOTED.
ELECTRICAL SYSTEM AND IS INTENDED TO SHOW FOOD
SERVICE FIXTURES AND EQUIPMENT OUTLET TYPES,
LOCATIONS, LOADS AND CONNECTION POSITIONS ONLY.
FURNISH ANY ADDITIONAL OUTLETS AS REQUIRED BY LOCAL
CODES OR REQUESTED BY OWNER. REFER TO ARCHITECTURAL
OR ELECTRICAL ENGINEERING PLANS FOR ANY ADDITIONAL
ELECTRICAL REQUIREMENTS.
5. REFER TO APPROVED SHOP DRAWINGS FOR SUPPLEMENTAL
ELECTRICAL CONNECTIONS AND INSTALLATION REQUIREMENTS
FOR THE FOOD SERVICE EQUIPMENT INDICATED ON THIS PLAN.
6. ELECTRICAL REQUIREMENTS FOR EXISTING AND OWNER OR
PURVEYOR PROVIDED EQUIPMENT MUST BE VERIFIED WITH THE
ACTUAL EQUIPMENT SUPPLIED. THESE PLANS ARE MINIMUM
GUIDELINES ONLY AND MUST BE VERIFIED. CONTACT OWNER
OR EQUIPMENT PROVIDER FOR LOCATION OR SPECIFICATIONS
FOR THIS EQUIPMENT.
7. EXPOSED ELECTRICAL SERVICES STUBBED UP OUT OF THE
FLOOR MUST BE PROTECTED AND INSTALLED IN A MANNER
WHICH WILL PREVENT DAMAGE FROM WATER OR IF HIT BY
PORTABLE KITCHEN EQUIPMENT, HEAVILY LOADED CARTS OR
FLOOR CLEANING EQUIPMENT.
8. PRIOR TO THE INSTALLATION OF THE FOOD SERVICE EQUIPMENT,
THE ELECTRICAL CONTRACTOR MUST CONFIRM THAT
ELECTRICAL WIRING HAS BEEN PULLED THROUGH JUNCTION
BOXES.
B. ELECTRICAL CONTRACTORS NOTES:
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
FOR INSTALLING OF THE FOLLOWING, AND FOR MAKING ALL FINAL
CONNECTIONS TO FOOD SERVICE EQUIPMENT AS SHOWN ON THIS
PLAN UNLESS OTHERWISE NOTED.
1. ELECTRICAL CONTRACTORS SHALL FURNISH ALL LABOR AND
MATERIALS TO MAKE ALL FINAL CONNECTIONS AND SHALL
INCLUDE ALL ITEMS REQUIRED BY APPLICABLE LAWS.
2. ELECTRICAL CONTRACTORS TO CROSS REFERENCE ROUGH-IN
DRAWINGS, STAINLESS STEEL FABRICATION, WALK-IN
DRAWINGS, EXHAUST HOOD DRAWINGS AND MILLWORK DETAIL
DRAWINGS.
3. ALL WIRING, WIRING CONDUITS, JUNCTION BOXES, ELECTRICAL
OUTLETS, SWITCHES, COVER PLATES, PLUG MOLDING, ETC. AS
SHOWN ON PLAN AND NOT PROVIDED BY OTHERS. RUN ALL OF
THE ELECTRICAL SERVICE LINES IN WALLS OR CONCEALED
WHEREVER POSSIBLE. ALL EXPOSED SERVICES, COMPONENTS
AND CONNECTIONS TO BE VAPOR TIGHT.
4. ALL DISCONNECTS OR OTHER DEVICES AS REQUIRED BY LOCAL
CODES. DO NOT LOCATE DISCONNECTS OR OTHER DEVICES
(OTHER THAN JUNCTION BOX CONNECTIONS OR CORD AND
PLUG RECEPTACLES) BEHIND COOKING EQUIPMENT OR BELOW
EXHAUST HOOD ASSEMBLIES.
5. ALL SHUNT-TRIP CIRCUIT BREAKERS OR DISCONNECTS FOR FIRE
SUPPRESSION SYSTEM SHUT-OFF OF ALL ELECTRICAL BELOW
AND IN EXHAUST HOODS AND VENTILATORS, INTERWIRED WITH
FIRE SUPPRESSION SYSTEM, AS REQUIRED BY N.F.P.A.
STANDARDS AND ANY LOCAL CODES AND REGULATIONS.
6. ALL RECEPTACLES, OUTLETS AND CORD AND PLUG ASSEMBLIES
TO BE NEMA SIZED, UL APPROVED AND RATED FOR THE
SERVICE INDICATED ON THESE PLANS.
7. WALK-IN COOLER/FREEZER LOCATIONS SHOWN IN THIS PLAN:
A) ALL VAPOR PROOF LIGHT FIXTURES, AS REQUIRED BY
KITCHEN EQUIPMENT CONTRACTOR.
B) ALL DISCONNECTS AND SWITCHES AT BLOWER COILS BY
ELECTRICAL CONTRACTOR.
C) ALL VAPOR PROOF DUPLEX CONVENIENCE OUTLETS AS
INDICATED BY ELECTRICAL CONTRACTOR.
D) ALL INTERCONNECTIONS FOR ELECTRICAL COMPONENTS IN
THE COOLER/FREEZER COMPARTMENTS BY ELECTRICAL
CONTRACTOR, INCLUDING CONTROL WIRING BETWEEN
WALK-IN FREEZER COIL AND REMOTE CONDENSER TO
ACCOMMODATE DEFROST CYCLE TIMER.
E) ALL INTERCONNECTIONS FOR FREEZER EVAPORATORS AND
COMPRESSORS, INCLUDING HEAT TAPE, VERIFY EXACT
WIRE SIZES WITH MANUFACTURERS SPECIFICATIONS, BY
ELECTRICAL CONTRACTOR.
8. ALL WIRING CONDUITS INTO WALK-IN COOLER/FREEZER
COMPARTMENTS FOR THE FOLLOWING BY ELECTRICAL
CONTRACTOR:
A) EACH EVAPORATOR COIL.
B) EACH VAPOR PROOF CEILING LIGHT.
C) EACH PERSONNEL ALARM SWITCH AND LIGHT.
D) EACH HIGH TEMPERATURE WARNING ALARM SYSTEM.
9. ALL PENETRATIONS FOR THE REQUIRED SERVICES MUST BE
MADE THROUGH THE CEILING INSULATION AND ARE REQUIRED
TO BE VAPOR TIGHT. ALL CONDUITS TO RUN ABOVE THE
WALK-IN COMPARTMENTS.
10. ALL COMPRESSOR LOADS SHALL BE SIZED FOR APPROXIMATELY
3500 WATTS PER HORSEPOWER, OR PER NATIONAL ELECTRICAL
CODE. VERIFY REQUIREMENTS WITH MANUFACTURERS NAME
PLATE DATA.
11. ALL WIRING TO AND INTERWIRING BETWEEN THE FOLLOWING:
A) EXHAUST HOOD/VENTILATOR COMPARTMENTS.
B) ELECTRICIAN TO SIZE AND SUPPLY STARTER MOTORS FOR
EXHAUST HOOD FANS.
C) ELECTRICAL SERVICES TO CONTROL PANELS. EXACT
REQUIREMENTS FOR THE NUMBER OF WIRES AND
ELECTRICAL SERVICE MUST BE VERIFIED WITH THE
APPROVED SHOP DRAWINGS AND COMPLY WITH LOCAL
CODES AND REGULATIONS BY ELECTRICAL CONTRATOR.
D) CONTROL WIRING FORM CONTROL PANEL TO EACH HOOD
SECTION FOR DAMPERS, SOLENOIDS AND LIGHTS BY
ELECTRICAL CONTRATOR.
E) CONTROL WIRING FROM CONTROL PANEL TO EXHAUST AND
SUPPLY FANS. THESE FANS SHALL BE ELECTRICALLY
INTERLOCKED BY ELECTRICAL CONTRACTOR.
F) FIRE SYSTEMS CONTROL INTERWIRING BETWEEN FIRE
SUPPRESSION SYSTEMS, CONTROL PANELS AND REMOTE
SHUT-OFFS BY ELECTRICAL CONTRACTOR.
G) CONTROL WIRING FROM CONTROL PANEL TO EACH REMOTE
DETERGENT PUMP AS APPLICABLE BY ELECTRICAL
CONTRACTOR.
12. ALL REQUIRED MATERIALS TO MAKE FINAL CONNECTIONS TO ALL
FOOD SERVICE EQUIPMENT SHOWN ON THIS PLAN BY
ELECTRICALCONTRACTOR.
13. AVOID LOCATING ELECTRICAL PANELS BEHIND FOOD SERVICE
EQUIPMENT. REFER TO EQUIPMENT PLANS FOR THE LOCATIONS
OF EQUIPMENT THAT DOES NOT APPEAR ON THIS ELECTRICAL
ROUGH-IN PLAN
14. AN ISOLATED CIRCUIT WITH A CLEAN EARTH GROUND FOR ALL
OWNER PROVIDE POINT-OF-SALE EQUIPMENT, CREDIT CARD
SCANNERS AND VALIDATION MACHINES. VERIFY ELECTRICAL
REQUIREMENTS WITH THE OWNER AND EQUIPMENT, BY
ELECTRICAL CONTRACTOR.
15. INTERCONNECT WASTE PULPER CONTROL PANEL WITH THE
PULPER, EXTRACTOR AND REMOTE STOP-START STATIONS, AS
PER MANUFACTURERS SPECIFICATIONS, BY ELECTRICAL
CONTRACTOR.
(continued)
ELECTRICAL REQUIREMENTS
1. DEFINITION: THE WORD "PROVIDE" MEANS: FURNISH, INSTALL FEED,
CONNECT WITH ALL ACCESSORIES AND ANCILLARY EQUIPMENT FOR
A COMPLETE OPERATING INSTALLATION BY APPROPRIATE TRADE, AS
NOTED.
2. CODES: WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL
APPLICABLE CODES AND ORDINANCES.
3. COMPLETE INSTALLATION: ELECTRICAL CONTRACTOR TO PROVIDE ALL
LABOR, MATERIALS, EQUIPMENT, TOOLS, ACCESSORIES, ETC.
NECESSARY TO ACCOMPLISH A COMPLETE ELECTRICAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
PERFORMED BY APPLICABLE TRADES.
4. GROUNDING: ELECTRICAL CONTRACTOR TO GROUND ALL EQUIPMENT
AND SYSTEM NEUTRALS IN ACCORDANCE WITH THE CODE. PROVIDE
CODE SIZE EQUIPMENT GROUNDING CONDUCTOR IN ALL FEEDERS
AND BRANCH CIRCUIT RACEWAYS. WHERE ISOLATED GROUNDS ARE
INDICATED, PROVIDE INSULATED CONDUCTOR.
5. CIRCUITING: ELECTRICAL CONTRACTOR SHALL PROVIDE ALL
CIRCUITING IN CONDUIT. EMT WITH STEEL INSULATED THROAT
SET-SCREW FITTINGS MAY BE USED IN DRY INTERIOR LOCATIONS.
PVC WITH WRAPPED RIGID ELBOWS AND RISERS SHALL BE USED IN
CONCRETE AND BELOW GRADE. RGS OR IMC CIRCUITING SHALL BE
CONCEALED. WHERE CONCEALMENT IS IMPRACTICAL, AND WITH
THE SPECIFIC APPROVAL OF THE ENGINEER, SURFACE RACEWAY
AND OUTLETS MAY BE INSTALLED, FINISHED TO MATCH ADJACENT
SURFACES. METAL-CLAD CABLE (TYPE MC) MAY BE USED PER THE
FOLLOWING:
A) LIMITED SINGLE-CIRCUIT, DEAD-END FEEDS IN DRY LOCATIONS,
WITHIN ACCESSIBLE ATTIC SPACES.
B) FLEXIBLE "WHIPS" FROM JUNCTION BOXES TO RECESSED AND
SUSPENDED LIGHTING FIXTURES.
C) CIRCUITING WITHIN CASEWORK AND OTHER "TIGHT"
CONDITIONS.
D) WHERE APPROVED FOR INSTALLATION, TYPE MC CABLE SHALL
BE SUPPORTED VERTICALLY 5' O.C., HORIZONTALLY 3' O.C.,
AND WITHIN 12" OF OUTLET JUNCTION BOXES.
E) PLASTIC BUSHINGS SHALL BE INSTALLED AT ALL TERMINATIONS.
GENERAL ELECTRICAL NOTES
(These notes supplement the master specifications and are related to work surrounding food service.)
8. PERMITS: ELECTRICAL CONTRACTOR SHALL OBTAIN FOR ALL BUILDING
AND WORKING PERMITS AND INSPECTION FEES FOR THIS PROJECT,
AS APPLICABLE TO SPECIFIC TRADE.
9. UTILITY SERVICES: ELECTRICAL CONTRACTOR SHALL PROVIDE
POWERE AND COMMUNICATIONS SYSTEM SERVICES IN
ACCORDANCE WITH THE REQUIREMENTS OF THE SERVING UTILITIES.
PROVIDE EXCAVATION, RACEWAY, STRUCTURE, GROUNDING, ETC.
AS DIRECTED. POWER SERVICES AND DISTRIBUTION SYSTEM AIC
RATING SHALL EXCEED MAXIMUM AVAILABLE FAULT CURRENT
THROUGH UTILITY SERVICE TRANSFORMER. CONTACT SERVIING
UTILITIES AND OBTAIN THEIR REQUIREMENTS PRIOR TO BID.
(UTILITY SERVICE AND LINE EXTENSION CHARGES PAID BY OTHERS).
10. FIRE STOPPING: ELECTRICAL CONTRACTOR SHALL PROVIDE FIRE
STOPPING AT ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES. FIRE
STOP ASSEMBLIES SHALL BE UL LISTED AND APPROVED BY CODE
ENFORCING AUTHORITIES BY APPROPRIATE TRADES.
11. FUSES AND CIRCUIT BREAKERS: FUSES AND CIRCUIT BREAKERS SHALL
BE SIZED PER ACTUAL NAMEPLATE OF EQUIPMENT SERVED.
CIRCUIT BREAKERS SHALL BE RATED FOR THEIR RESPECTIVE
APPLICATION (MOTOR CIRCUIT PROTECTOR, GROUND FAULT
CIRCUIT INTERRUPTER, ARC FAULT CIRCUIT INTERRUPTER, ETC.).
FUSES SHALL BE DUAL-ELEMENT CURRENT-LIMITING, AND SHALL BE
INTERCHANGEABLE BETWEEN FRAME SIZES WITH STANDARD
FACTORY FUSE REDUCERS.
12. EQUIPMENT STANDARDS: ALL MATERIALS AND EQUIPMENT SHALL BE
NEW AND OF THE HIGHEST QUALITY AVAILABLE ("SPECIFICATION
GRADE"). LIGHTING FIXTURES SHALL HAVE ELECTRONIC BALLASTS
AND ACRYLIC LENSES. FOOD SERVICE EQUIPMENT SHALL BE
FACTORY-ASSEMBLED COMMERCIAL-GRADE, CONFIGURED PER
SERVING UTILITY STANDARDS.
13. GUARANTEE: THE ELECTRICAL CONTRACTOR SHALL GUARANTEE THE
COMPLETE ELECTRICAL SYSTEM, AND ALL PORTIONS THEREOF,
SHALL BE GUARANTEED TO BE FREE FROM DEFECTS IN
WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM
DATE OF FINAL ACCEPTANCE. PROMPTLY REMEDY SUCH DEFECTS
AND ANY SUBSEQUENT DAMAGE CAUSED BY THE DEFECTS OR
REPAIR THEREOF AT NO EXPENSE TO THE OWNER. LIGHT BULBS
ARE EXEMPT FROM THIS GUARANTEE, BUT SHALL BE NEW AND
UNUSED AT THE TIME OF FINAL ACCEPTANCE.
14. SUBMITTALS: SUBMIT COPIES AS REQUIRED, OF FACTORY SHOP
DRAWINGS FOR ALL LIGHTING FIXTURES, SWITCHGEAR, PANELS,
MOTOR CONTROL, WIRING DEVICES, ETC. PROPOSED FOR THIS
PROJECT. PROPOSED SUBSTITUTIONS SHALL BE EQUAL OR
SUPERIOR TO SPECIFIED ITEMS IN ALL RESPECTS. DETERMINATION
OF EQUALITY RESTS SOLELY WITH ELECTRICAL ENGINEER.
15. LOCATIONS: INDICATED LOCATIONS OF ALL OUTLETS AND EQUIPMENT
ARE SUBJECT TO CHANGE. SHIFT/RELOCATE/RECONFIGURE ANY
OUTLET, EQUIPMENT OR CONNECTION POINT UP TO 10' AS DIRECTED
BY ELECTRICAL ENGINEER, AT NO ADDED COST.
16. IDENTIFICATION: ELECTRICAL CONTRACTOR SHALL IDENTIFY ALL
EQUIPMENT, SWITCHBOARD CIRCUITS AND ELECTRICALLY-CONNECTED
EQUIPMENT WITH ENGRAVED NAMEPLATES. NAMEPLATES SHALL BE
FASTENED WITH A MINIMUM OF TWO (2) SCREWS. PANEL DIRECTORIES
SHALL BE TYPED.
17. PANELBOARDS: PANELS SHALL HAVE FLUSH MONO-FLAT TRIM, PIANO
HINGED DOORS AND COVER (DOOR IN DOOR) WITH LOCKABLE
MASTER-KEYED FLUSH CATCHES AND BOLT-ON CIRCUIT BREAKERS.
FLUSH MOUNTED PANELS SHALL HAVE EMPTY CONDUITS STUBBED TO
ACCESSIBLE SPACE:
(1) 1" CONDUIT FOR EACH (4) SPARE/SPACE CIRCUITS.
18. TAMPER-PROOF: ALL EQUIPMENT AND CIRCUITING ACCESSIBLE BY THE
PUBLIC SHALL BE DEMONSTRATED TO BE TAMPER-PROOF AND VANDAL
RESISTANT. OPENABLE DEVICES AND EQUIPMENT SHALL BE
PADLOCKABLE.
19. SUPPORTS AND HANGERS: SUPPORT AND ALIGN ALL RACEWAYS, CABINETS,
BOXES, BACK-BOXES, FIXTURES AND EQUIPMENT FROM STRUCTURE.
SECURE ALL SUPPORTING METHODS BY MEANS OF TOGGLE BOLTS IN
HOLLOW MASONRY, EXPANSION BOLTS IN SOLID MASONRY, CONCRETE
PRESET INSERTS OR EXPANSION BOLTS IN CONCRETE, MACHINE
SCREWS OR BOLTS ON METAL SURFACES, AND WOOD SCREWS ON
WOOD CONSTRUCTION. ALL SUPPORTING SYSTEMS AND COMPONENTS
SHALL BE RATED FOR FIVE (5) TIMES THE ACTUAL LOAD.
20. ADDITIONAL SYSTEMS AND EQUIPMENT CONNECTIONS: IN ADDITION TO
EQUIPMENT POWER FEEDERS AND CONNECTIONS INDICATED ON THE
ELECTRICAL DRAWINGS, PROVIDE 120V CONTROL POWER CONNECTIONS
TO SMOKE/FIRE DAMPERS, VAV BOXES, TEMPERATURE CONTROL
PANELS, DOOR-HOLDING/LATCHING DEVICES, ETC., AS INDICATED IN THE
MECHANICAL DRAWINGS AND SPECIFICATIONS.
21. 24-HOUR OPERATION: IF APPLICABLE, CONDUCT WORK TO MINIMIZE
DISRUPTION OF OWNER'S ONGOING 24-HOUR OPERATIONS. PROVIDE
BARRICADES, NOISE ABATEMENT AND DUST CONTAINMENT MEASURES
TO ENSURE THE SAFETY AND COMFORT OF PATRONS, STAFF AND
WORKERS. INTERRUPTIONS OF EXISTING POWER , COMMUNICATIONS
OR FIRE ALARM SYSTEMS SHALL BE MOMENTARY IN NATURE, EACH
SUCH OUTAGE (OR OPERATION WHICH MAY POSE RISK OF AN
ACCIDENTAL OUTAGE) SHALL BE SCHEDULED 48 HOURS IN ADVANCE.
6. WIRING: ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRE IN
COPPER, STRANDED IN SIZES #8 AWG AND LARGER. INSULATION
SHALL BE TYPE THW, THWN OR THHN.
7. EXISTING CONDITIONS: ELECTRICAL AND FOOD SERVICE CONTRACTOR
SHALL VISIT THE SITE TO BECOME FAMILIARIZED WITH ALL EXISTING
AND PROPOSED CONDITIONS WHICH MAY AFFECT THE COURSE OF
HIS WORK PRIOR TO SUBMITTING A BID ON THIS PROJECT. NO
EXTRAS WILL BE ALLOWED FOR FAILURE TO COMPLY WITH THIS
REQUIREMENT.
GENERAL ELECTRICAL NOTES
(continued)
FIRE ALARM CONTROL LOGIC
ELECTRICAL NOTES
Combination Starter & Disconnect:
30 / 3 size '1' , fusible U.O.N.
Single-Phase motor control assembly:
HP-rated switch and power relay-20 / 1 U.O.N.
Pullbox - size and location as required
Junction box - size per NEC requirements
Duplex Convenience Outlet (D.C.O.)
Power Outlet, 1 Phase
Power Outlet installed in equipment (by K.E.C. or manufacturer)
Power Outlet, 3 Phase
Conduit stub-out with final connections to equipment
Floor Outlet, flush or pedestal mounted
Switch
Plug Molding
Refer to indicated note
Single Convenience Outlet (S.C.O.)
Four Plex Convenience Outlet (Q.C.O.)
Incandescent light fixture
Vapor-Proof light fixture
Fluorescent light fixture
Floor Stub Up (terminated conduit)
Telephone Outlet
Data Communication Connection
T H
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
P R
E
LI
M
IN
A R
Y N
O T
F O
R C
O N
S T
R U
C T
IO
N
P a rk
S t.
N
S u it e
S t.
P e te rs b u rg
F lo ri d a
T e l:
.5
.5
F a x:
.5
.5
W e b w w w .T
B C
Id e s ig n .c o m
FS-0.1.2
ELECTRICAL NOTES
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
P R
E
LI
M
IN
A R
Y N
O T
F O
R C
O N
S T
R U
C T
IO
N
P a rk
S t.
N
S u it e
S t.
P e te rs b u rg
F lo ri d a
T e l:
.5
.5
F a x:
.5
.5
W e b w w w .T
B C
Id e s ig n .c o m
FS-0.1.3
PLUMBING NOTES
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
FD
2" FS
2" FS
2" FS
2" FS
PLUMBING NOTES
PLUMBING SYMBOLS
THE FOLLOWING SYMBOLS MAY BE USED IN THE DRAWINGS:
Floor Drain
Floor Sink/No Grate
(with minimum connection size)
(continued)
Plumbing Requirements
A. GENERAL NOTES:
1. ALL WORK INDICATED ON THE PLUMBING ROUGH-IN PLAN MUST BE
COMPLETED BY OTHER THAN THE KITCHEN EQUIPMENT
CONTRACTOR AND MUST COMPLY WITH ALL LOCAL CODES AND
RESTRICTIONS.
2. THE PLUMBING ROUGH-IN PLAN IS INTENDED TO SHOW PIPE SIZES,
ROUGH-IN HEIGHTS AND LOCATIONS AND CONSUMPTION RATES
FOR FOOD SERVICE EQUIPMENT ONLY. ANY ADDITIONAL
PLUMBING REQUIREMENTS ARE THE RESPONSIBILITY OF THE
PLUMBING ENGINEER AND MUST COMPLY WITH ANY APPLICABLE
CODES AND REGULATIONS.
3. REFER TO THE APPROVED SHOP DRAWINGS FOR THE SUPPLEMENTAL
COORDINATION AND INSTALLATION REQUIREMENTS FOR THE
FOOD SERVICE EQUIPMENT INDICATED ON THE PLANS.
4. ALL SERVICES FOR THE EXISTING AND OWNER OR PURVEYOR
PROVIDED EQUIPMENT MUST BE VERIFIED WITH THE EQUIPMENT.
ANY UTILITIES INDICATED ON THE PLANS ARE MINIMUM
GUIDELINES ONLY AND MUST BE VERIFIED WITH THE EQUIPMENT.
CONTACT EQUIPMENT PROVIDER FOR THE LOCATION OF, OR
SPECIFICATIONS FOR, THIS EQUIPMENT.
5. PRIOR TO THE INSTALLATION OF THE FOOD SERVICE EQUIPMENT, THE
KITCHEN EQUIPMENT CONTRACTOR MUST CONFIRM THAT THE
WATER, GAS AND/OR STEAM LINES WERE PREVIOUSLY PRESSURE
TESTED, FLUSHED FREE OF FOREIGN MATTER, VALVED OFF AND
TAGGED WITH THE APPROPRIATE LABELS.
B. PLUMBING CONTRACTOR NOTES:
PLUMBING ENGINEER IS RESPONSIBLE FOR SPECIFYING THE
FOLLOWING. PLUMBING CONTRACTOR IS RESPONSIBLE FOR
PROVIDING AND INSTALLING THE FOLLOWING, AND FOR MAKING ALL
FINAL CONNECTIONS TO THE FOOD SERVICE EQUIPMENT UNLESS
OTHERWISE NOTED.
1. COMPLETE HAND SINK ASSEMBLIES. VERIFY COMPLIANCE WITH
LOCAL CODES AND REGULATIONS.
2. FLOOR TYPE MOP BASIN COMPLETE WITH MIXING VALVE SERVICE
FAUCET, VACUUM BREAKER AND WALL MOUNTED MOP HANGING
RACK. FAUCET TO BE MOUNTED 54" ABOVE FINISHED FLOOR.
3. CONVENIENCE & FLOOR DRAIN LOCATIONS AND SIZING AS
REQUIRED BY LOCAL CODES AND REGULATIONS.
4. HOSE BIBB ASSEMBLY WITH A FAUCET WITH GARDEN HOSE THREAD,
MIXING VALVE AND VACUUM BREAKER WHERE SHOWN ON THESE
FOOD SERVICE PLUMBING ROUGH-IN DRAWINGS.
5. PRESSURE REDUCING OR REGULATING VALVES, FAUCETS AND
WATER INLETS, IN-LINE WATER FILTERS AND VACUUM BREAKERS,
NOT OTHERWISE SUPPLIED TO FOOD SERVICE EQUIPMENT, AS
REQUIRED BY LOCAL CODES AND MANUFACTURERS
SPECIFICATIONS.
6. WASTE LINES, DIRECT AND INDIRECT, SHALL BE A MINIMUM 1" DIA.
REGARDLESS OF CONNECTION SIZE, TO BE PITCHED DOWNWARD
AND TO HAVE ADEQUATE CLEAN-OUT PROVISIONS. INDIRECT
WASTE LINES FROM WALK-IN COOLER/FREEZERS MUST BE
PITCHED 4"/12" MINIMUM WITH AN IN-LINE "P" TRAP OVER FLOOR
SINK. EACH EVAPORATOR IS TO HAVE A SEPARATE DRAIN LINE.
7. AREA DRAINS AND FLOOR SINKS COMPLETE WITH TOP GRATES
INDICATED AND REMOVABLE SEDIMENT BUCKET. FLOOR SINK TOP
TO BE SET FLUSH WITH THE FINISHED FLOOR. VERIFY
COMPLIANCE WITH LOCAL CODES AND REGULATIONS.
8. N/A
9. ALL REQUIRED MATERIALS TO MAKE FINAL CONNECTIONS TO ALL
FOOD SERVICE EQUIPMENT INDICATED ON THESE PLANS.
10. NOTES CONCERNING PLUMBING ROUGH-INS:
A) FURNISH AND INSTALL ALL WATER, WASTE, GAS AND STEAM
LINES AND SIZE SERVICE TO PROVIDE FULL FLOW VOLUME
FOR ALL EQUIPMENT SUPPLIED BY RESPECTIVE MAINS AND
BRANCHES. PROVIDE STOP VALVES AND TAG ROUGH-INS
WITH THE APPROPRIATE IDENTIFYING LABELS. SERVICE
LINES STUBBED OUT OF WALLS, UP FROM FINISHED FLOORS
OR A CONCRETE CURB A MINIMUM OF 2". VENT PIPES MUST
BE CONCEALED IN WALLS OR COLUMN CHASE. USE A
LOOP-VENT OR AIR GAP ASSEMBLY FOR ISLAND FIXTURES.
ALL FLOOR PENETRATIONS MUST BE SEALED WATERTIGHT.
B) WASTE LINES SHOWN ARE DESIGNED TO COMPLY WITH THE
BEST KNOWN AND GENERALLY ACCEPTED HEALTH AND
SANITARY CONDITIONS AND CODES. PLUMB LINES TO
ENSURE NO INTERFERENCE WITH THE INTENDED USE OR
SERVICING OF FOOD SERVICE EQUIPMENT. RUN LINES
BELOW THE EQUIPMENT AT THE HIGHEST POSSIBLE
ELEVATION ABOVE FINISHED FLOOR. NO LINES ARE TO LAY
ON THE FLOOR. VERIFY COMPLIANCE WITH LOCAL CODES
AND REGULATIONS.
C) SUPPLY 140°F HOT WATER TO EQUIPMENT. INSULATE WATER
AND STEAM LINES TO CONFORM WITH THE ACCEPTED
PRACTICE. IT IS RECOMMENDED THAT EXPOSED PIPES AND
FITTINGS ABOVE A WORKING HEIGHT OF 34" BE CHROME
PLATED OR COVERED WITH A STAINLESS STEEL SLEEVE.
D) SIZE FUEL GAS SERVICE LINES TO PROVIDE THE REQUIRED BTU
RATING INDICATED FOR THE EQUIPMENT, AT A LOW
PRESSURE OF APPROXIMATELY 7" TO 9" WATER COLUMN.
INSTALL AUTOMATIC MECHANICAL SHUT-OFF VALVES,
FURNISHED BY FIRE SUPPRESSION SYSTEM CONTRACTOR, IN
GAS SUPPLY LINES TO EQUIPMENT UNDER EXHAUST HOOD
ASSEMBLIES. VERIFY COMPLIANCE WITH LOCAL CODES AND
REGULATIONS
Plumbing Requirements
B. PLUMBING CONTRACTOR NOTES: (CONT'D.)
11. NOTES CONCERNING PLUMBING CONNECTIONS:
A) ALL WATER, GAS AND STEAM SERVICES FOR PORTABLE AND
COUNTER TOP EQUIPMENT MUST BE CONNECTED TO THE
EQUIPMENT WITH COMMERCIAL TYPE FLEXIBLE HOSE AND
QUICK DISCONNECT FITTINGS. HOSES MUST BE COVERED
WITH A FIRE RESISTANT PLASTIC OR POLY COATING. GAS
ASSEMBLIES MUST BE A.G.A. APPROVED FOR COMMERCIAL
KITCHEN EQUIPMENT.
B) WATER TO STEAM PRODUCING EQUIPMENT MUST HAVE A
WATER HARDNESS NO GREATER THAN 2.0 GRAINS AND A PH
LEVEL BETWEEN 7.0 TO 7.5. WATER USED FOR COOLING
WATER TO CONDENSING UNITS OR COMPRESSORS MUST BE
TREATED TO INHIBIT THE FORMATION OF DEPOSITS IN THE
CONDENSING TUBES.
C) STEAM THAT COMES IN DIRECT CONTACT WITH FOOD, FOOD
HOLDING EQUIPMENT OR WAREWASHING EQUIPMENT MUST
BE POTABLE STEAM.
D) INTERPIPE HOT WATER SUPPLY LINES BETWEEN BOOSTER
HEATER AND WAREWASHING EQUIPMENT.
E) INTERPIPE WATER LINES BETWEEN WATER WASH VENTILATOR
ASSEMBLIES AND CONTROL PANELS. REFER TO
MANUFACTURERS SPECIFICATIONS FOR EXACT
REQUIREMENTS.
F) MANIFOLD WASTE AND WASTE CONNECTIONS FOR INDIVIDUAL
SECTIONS OF WATER WASH VENTILATORS TO A MAIN DRAIN
CONNECTION. VERIFY CODE COMPLIANCE.
G) INTERCONNECT WASTE PULPER, EXTRACTOR AND SCRAP
TROUGH AS PER MANUFACTURERS SPECIFICATIONS.
H) INSTALL IN-LINE WATER FILTERS AS FURNISHED BY KITCHEN
EQUIPMENT CONTRACTOR.
C. PLUMBERS NOTES:
1. PLUMBING CONTRACTORS TO OBTAIN ALL NECESSARY PERMITS AND
INSTALLATION IS TO BE IN COMPLETE ACCORDANCE WITH ALL
NATIONAL, STATE AND LOCAL CODES.
2. PLUMBING CONTRACTORS SHALL FURNISH ALL LABOR AND
MATERIALS TO MAKE ALL FINAL CONNECTIONS AND SHALL
INCLUDE ALL ITEMS REQUIRED BY APPLICABLE LAWS.
3. A CATALOG OF MANUFACTURERS EQUIPMENT SPECIFICATION
SHEETS IS INCLUDED AS AN INTEGRAL PORTION OF THIS
SUBMITTAL, WE SUGGEST THEREFORE THAT ALL TRADES REVIEW
THE REQUIREMENTS AS INDICATED REGARDING EACH
MANUFACTURER.
4. CROSS REFERENCE ALL INFORMATION PER ROUGH-IN DRAWINGS
WITH THE EQUIPMENT SCHEDULE DRAWINGS.
5. PLUMBING CONTRACTORS TO CROSS REFERENCE ROUGH-IN
DRAWINGS, STAINLESS STEEL FABRICATION, WALK-IN DRAWINGS,
EXHAUST HOOD DRAWINGS AND MILLWORK DETAIL DRAWINGS.
6. ALL VENT LOCATIONS AND RUNS TO BE LOCATED BY MECHANICAL
ENGINEER.
7. ALL FUNNEL FLOOR DRAINS, FLOOR SINKS AND/OR FLOOR DRAINS
UTILIZED FOR THE DRAINAGE OF FOOD SERVICE EQUIPMENT
SHALL BE SELF-PRIMING.
8. PLUMBING CONTRACTOR TO PROVIDE ALL INDIRECT DRAINS FROM
EQUIPMENT TO FLOOR SINK DRAINS.
9. ALL PLUMBING TO BE INSTALLED AS TO PRECLUDE ANY POSSIBILITY
OF BACK SIPHONAGE.
10. ALL INDIRECT DRAINS ARE TO BE AIR-GAPPED 1" ABOVE FLOOR
DRAINS (OR PER LOCAL CODE).
11. PLUMBING CONTRACTOR TO PROVIDE REQUIRED PRESSURE
REGULATING VALVES FOR HOT WATER LINE TO DISHWASHER
RINSE CONNECTION AND ALL OTHER EQUIPMENT REQUIRING
REGULATORS.
12. PLUMBER IS NOT RESPONSIBLE FOR SUPPLYING FAUCETS UNLESS
SPECIFIED.
13. PLUMBER TO PROVIDE MIXING VALVE AT WATER HEATER SO THAT A
MINIMUM OF 140° WATER IS DELIVERED TO BOOSTER HEATER, OR
AS DESIGNED BY MECHANICAL ENGINEER.
D. ADDITIONAL NOTES:
Floor Sink/Half Grate
(with minimum connection size)
Floor Sink/3 4 Grate
(with minimum connection size)
Floor Sink/Full Grate
(with minimum connection size)
Hot/Cold Water
Rough-in and Connection
Direct Waste
Rough-in and Connection
Indirect Waste
Fuel Gas
Rough-in and Connection
Steam Supply
Rough-in and Connection
Steam Condensate Return
Rough-in and Connection
Hose Bibb, Hot or Cold Water
Hose Bibb, Hot or Cold Water with MIixing Valve and Vacuum Breaker
( + ) Above Finished Floor
CFM Cubic Feet per Minute
CONN Connection
CR Condensate Return
CW Cold Water
DN ( + ) Down from ceiling to height above above finished floor
(E) Existing
FBO Furnished By Others
FD Floor Drain
FF & E Fixtures Furnishings and Equipment
FPM Feet Per Minute
G Gas
GPM Gallons Per Minute
GT Grease Trap
HW 140 degree Hot Water
IW Indirect Waste
MW Mixed Water
MBTUH 1000 BTU/HR
NIC Not In Contract
PD Pressure Drop
P.C. Plumbing Contractor
(R) Relocate
SR Steam Return
SS Steam Supply
TWR Tower Water Return
TWS Tower Water Supply
U.O.N. Unless Otherwise Noted
VC Valve Compartment
W Waste
(X) Existing to be removed
ABBREVIATIONS
E A
R C
H
IT
E C
T 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T A
H E
R P
R O
P E
R T
Y R
IG
H
T S
A R
E H
E R
E B
Y R
E S
E R
V
H E
I D
E A
S
D E
S
IG
N S
P L A
N S
D
R A
W
IN
G S
A
E C
IF
IC
A T
IO
N
S P
R O
D U
C E
D B
Y T
H E
A R
C H
IT
E
C T
T H
E S E
I D
E A
S
D E
S
IG
N S
P L A
N S
D R
A W
IN
G
S
A
E C
IF
IC
A T
IO
N
S S
H A
L L N
O T
B E
R E
P R
O D
U C
E D
N V
E Y
E D
I N
A N
Y M
A N
N E
R N
O R
A S
S
IG
N E
D
Y T
H
IR
D P
A R
T Y
W
IT
H O
U T
F
IR
S T
O B
T A
IN
IN
G T
P R
E S S W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
C H
IT
E
C T
C
O N
S E
N T
I S
H E
R E
B Y
G R
A N
T E
D
V E
R N
M E
N T
A L A
G E
N C
IE
S
T O
R E
P R
O D
U C
E T
N S T
R U
C T
IO
N
D R
A W
IN
G
S I
N C
O M
P L
IA
N C
E W
E S
T A
T E
S T
A T
U T
E S
T O
T H
E B
E S
T O
F T
C H
IT
E
C T
'S O
F E
N G
IN
E
E R
'S K
N O
W L E
D G
E
T
A
N S
A N
D S
P E
C
IF
IC
A
T
IO
N S C
O M
P L Y
W
IT
H T
P L
IC
A B
L E
M
IN
IM
U
M B
U
IL
D
IN
G C
O D
E S A
N D
T
P L
IC
A B
L E
F
IR
E S
A F
E T
Y S
T A
N D
A R
D S
T E
R M
IN
E
D B
Y T
H E
L O
C A
L A
U T
H O
R
IT
Y
C O
R D
A N
C E
W
IT
H C
H A
P T
E R
S
A N
D
E F
L O
R
ID
A S
T A
T U
T E
S
W J
A rc hi te ct s
A R
(7
2-w .w ja rc
.c om
W an ne m ac he r
Je ns en A rc hi te ct s, In c.
Project number
P R
E
LI
M
IN
A R
Y N
O T
F O
R C
O N
S T
R U
C T
IO
N
P a rk
S t.
N
S u it e
S t.
P e te rs b u rg
F lo ri d a
T e l:
.5
.5
F a x:
.5
.5
W e b w w w .T
B C
Id e s ig n .c o m
FS-0.1.4
MECHANICAL NOTES
P A
L M
H A
R B
O R
P A
R K
S A
N D
R E
C R
E A
T
IO
N
P
IN
E
LL
A S
C O
U N
T Y
T H
S T
R E
E T
, P A
L M
H A
R B
O R
F L
PERMIT SET 9-15-25
ABBREVIATIONS
MECHANICAL SYMBOLS
VENTILATION REQUIREMENTS
The Following Symbols May Be Used In The Drawings:
( + ) Above Finished Floor
CFM Cubic Feet per Minute
CONN Connection
DN ( + ) Down from ceiling to height above above finished floor
(E) Existing
FBO Furnished By Others
FF & E Fixtures Furnishings and Equipment
FPM Feet Per Minute
G Gas
NIC Not In Contract
MBTUH 1000 BTU/HR
PD Pressure Drop
(R) Relocate
SR Steam Return
SS Steam Supply
TWR Tower Water Return
TWS Tower Water Supply
U.O.N. Unless Otherwise Noted
(X) Existing to be removed
A. GENERAL NOTES:
1. ALL WORK INDICATED ON THE BUILDING CONDITIONS AND
VENTILATION PLAN MUST BE COMPLETED BY OTHER THAN THE
KITCHEN EQUIPMENT CONTRACTOR AND MUST COMPLY WITH ALL
LOCAL CODES AND RESTRICTIONS.
2. THE BUILDING CONDITIONS AND VENTILATION PLAN IS INTENDED TO
SHOW SPECIAL BUILDING AND VENTILATION REQUIREMENTS FOR
THE FOOD SERVICE EQUIPMENT ONLY. ANY ADDITIONAL BUILDING
CONDITIONS OR VENTILATION REQUIREMENTS ARE THE
RESPONSIBILITY OF THE ARCHITECT OR MECHANICAL ENGINEER
AND MUST COMPLY WITH ANY APPLICABLE CODES AND
REGULATIONS. REFER TO ARCHITECTURAL/ENGINEERING PLANS.
3. REFER TO THE APPROVED SHOP DRAWINGS FOR THE
SUPPLEMENTAL COORDINATION AND INSTALLATION
REQUIREMENTS FOR THE FOOD SERVICE EQUIPMENT INDICATED
ON THE PLANS.
4. REQUIREMENTS INDICATED ON THE PLANS FOR THE EXISTING AND
OWNER OR PURVEYOR PROVIDED EQUIPMENT ARE MINIMUM
GUIDELINES ONLY AND MUST BE VERIFIED WITH THE EQUIPMENT.
FURNISH SERVICES AND MAKE ALL FINAL CONNECTIONS AS
REQUIRED. CONTACT EQUIPMENT PROVIDER FOR THE LOCATION
OF, OR SPECIFICATIONS FOR, THIS EQUIPMENT.
5. PRIOR TO THE INSTALLATION OF THE FOOD SERVICE EQUIPMENT
THE KITCHEN EQUIPMENT CONTRACTOR MUST CONFIRM THAT:
A) THE WALLS, CEILINGS AND FLOORS IN THE KITCHEN, FOOD
PREPARATION, WAREWASHING OR BAR AREAS ARE SMOOTH,
EASILY CLEANABLE NONABSORBENT AND DURABLE. WALLS
AND CEILINGS SHALL BE LIGHT IN COLOR.
B) THE CEILINGS ARE INSTALLED AND FINISHED.
C) THE WALLS ARE INSTALLED AND FINISHED.
D) THE FLOORING HAS BEEN INSTALLED AND WASHED CLEAN.
E) A LOADING DOCK IS AVAILABLE AND TO COORDINATE WITH THE
APPLICABLE TRADESMEN ANY DOOR OR WINDOW OPENINGS
OR PASSAGES FOR THE DELIVERY OF THE FOOD SERVICE
EQUIPMENT.
6. THE MOUNTED HEIGHT FOR THE BOTTOM EDGE OF THE HOODS TO
BE 6'-6" ABOVE THE FINISHED FLOOR OR PER LOCAL CODE
REQUIREMENTS.
B. MECHANICAL CONTRACTOR NOTES
MECHANICAL ENGINEER IS RESPONSIBLE FOR SPECIFYING THE
FOLLOWING. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR
PROVIDING AND THE INSTALLING OF THE FOLLOWING, AND FOR MAKING
FINAL CONNECTIONS TO THE FOOD SERVICE EQUIPMENT UNLESS
OTHERWISE NOTED.
1. THE INSULATION FOR ALL COOKING EQUIPMENT EXHAUST HOODS
AND DUCTS AS REQUIRED BY LOCAL CODES.
2. THE HORIZONTAL DUCTWORK FOR ALL DISH/UTENSIL WASHERS.
ALL DUCTS MUST HAVE WATER TIGHT JOINTS AND BE GRADED
BACK TO THE MACHINE. (DO NOT USE ALUMINUM DUCTS.)
3. BALANCED SUPPLY AND EXHAUST AIR IN KITCHEN AREAS TO
CONTAIN COOKING ODORS AND PROVIDE A COMFORTABLE
WORKING ENVIRONMENT. TEMPER MAKE-UP AIR SUPPLY IN ALL
KITCHEN AREAS, ESPECIALLY SUPPLY AIR THROUGH EXHAUST
HOODS. VERIFY AND COMPLY WITH ALL APPLICABLE CODES.
4. THE DUCT COLLARS ON EXHAUST HOODS MAY BE OVERSIZED TO
INCREASE EFFICIENCY. PROVIDE ALL TRANSITIONS TO DUCTS AS
REQUIRED AND MAKE ALL FINAL CONNECTIONS ON ALL HOODS.
VERIFY AND COMPLY WITH ALL APPLICABLE CODES.
5. ALL EXHAUST HOOD ASSEMBLIES, DUCTING, COMPONENTS, ETC.
SHALL BE UMC TYPE 1 ASSEMBLY, EXCEPT AT WAREWASHING
AREAS OR AS OTHERWISE NOTED. VERIFY THAT VENTILATION
REQUIREMENTS ARE IN COMPLIANCE WITH LOCAL CODES AND
REGULATIONS.
6. SUGGESTED MINIMUM VENTILATION REQUIREMENTS:
A) KITCHEN AREAS: 45 TO 60 AIR CHANGES /HOUR
B) SERVICE AREAS: 45 TO 60 AIR CHANGES/HOUR
C) PREP AREAS: 45 TO 60 AIR CHANGES/HOUR
D) WASHING AREA: 45 TO 60 AIR CHANGES/HOUR
E) STORAGE ROOMS: 3 AIR CHANGES/HOUR
F) OFFICES: 4 AIR CHANGES/HOUR
G) CONDENSING UNITS: 1000 CFM/HP (AIR-COOLED)
200 CFM/HP (WATER-COOLED)
7. PROVIDE DOUBLE-WALLED GAS/VENT FLUE TO THE ATMOSPHERE AS
REQUIRED BY LOCAL CODES. ANY FLUE OF EXCESSIVE LENGTH,
WITH BENDS OR OTHER RESTRICTIONS MUST BE PROVIDED WITH
A BOOSTER EXHAUST FAN INTERWIRED TO OPERATE WITH THE
EQUIPMENT BEING VENTED. BOOSTER FAN SHALL PROVIDE 0" S.P.
AT CONNECTION TO EQUIPMENT.
8. ALL REQUIRED MATERIALS TO MAKE THE FINAL CONNECTIONS TO
ALL KITCHEN EQUIPMENT CONTRACTOR PROVIDED EQUIPMENT.
C. GENERAL CONTRACTOR REQUIREMENTS
THE ARCHITECT IS RESPONSIBLE FOR SPECIFYING THE FOLLOWING: THE
GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
FOLLOWING UNLESS OTHERWISE NOTED.
1. THE IN-WALL REINFORCING OR WALL BACKING FOR ALL WALL
MOUNTED, RECESSED OR SEMI-RECESSED EQUIPMENT OR
CONTROL PANELS.
VENTILATION REQUIREMENTS
Supply Air Diffuser
Mechanical References
Return Air Diffuser
Supply Air Linear Diffuser
GENERAL CONTRACTOR NOTES (CONT'D.)
2. A 4" DEEP DEPRESSION FOR ALL WALK-IN COOLER/FREEZERS, WITH
A SMOOTH AND TRANSIT-LEVEL FINISH. THE EXCESS DEPRESSION
IS TO BE FILLED WITH GROUT. THE FINISHED FLOOR MATERIALS
AND COVED BASES ARE TO BE INSTALLED AFTER THE WALK-IN
PANELS HAVE BEEN SET IN PLACE.
3. A 6" HIGH SOLID CONCRETE PAD WITH TROWEL-SMOOTH AND LEVEL
FINISH.
4. AN EASILY VISIBLE PERMANENT BENCHMARK INDICATING FINISHED
FLOOR LEVEL.
5. ANY FIRE RELATED MATERIALS FOR EXHAUST VENT DUCTS, VENT
STACKS, AND ANY HEAT PRODUCING FOOD SERVICE EQUIPMENT.
VERIFY COMPLIANCE WITH LOCAL CODES AND REGULATIONS.
6. THE COVED BASES AT ALL VERTICAL INTERSECTIONS OF ALL
KITCHEN FLOORS.
7. ALL CONDUITS FOR REFRIGERATION OR DRINK LINES SHALL HAVE A
SMOOTH INTERIOR FINISH, A MINIMUM RADIUS OF 24" AT ALL
BENDS AND A MINIMUM 16" X 18" X 12" DEEP ACCESSIBLE PULL BOX
ON ALL CONDUIT RUNS IN EXCESS OF 95'-0", IN ALL FLOORS OR
CONCEALED SPACES. THE TOTAL OF ALL BENDS BETWEEN PULL
BOXES NOT TO EXCEED 180°. STUB CONDUIT ENDS OUT 2" FROM
WALLS OR 2" ABOVE FINISHED FLOORS. VERIFY COMPLIANCE
WITH ALL LOCAL CODES AND REGULATIONS.
8. ALL HOLES OR SLEEVES THROUGH FLOORS, WALLS AND CEILINGS,
AS REQUIRED FOR THE INSTALLATION OF REFRIGERATION, DRINK,
ELECTRICAL OR PLUMBING LINES AS SHOWN ON THESE PLANS.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
SEALING HOLES AND SLEEVES AFTER INSTALLATION OF THE
LINES.
9. ALL PADS OR CURBS FOR FOOD SERVICE EQUIPMENT AND/OR ROOF
OR SERVICE AREA MOUNTED COMPRESSOR RACKS. VERIFY
COMPLIANCE WITH LOCAL CODES AND REGULATIONS.
10. ALL OPENINGS IN WALLS AS INDICATED ON THESE PLANS FOR ANY
RECESSED OR SEMI-RECESSED CONTROL PANELS.
11. SLOPE ALL FLOORS TO FLOOR SINKS, FLOOR DRAINS OR FLOOR
TROUGHS. VERIFY COMPLIANCE WITH LOCAL CODES.
12. A MINIMUM OF 150 LBS. PER SQUARE FOOT FLOOR LOADING, OR
HIGHER AS REQUIRED BY LOCAL CODES.
13. RECOMMENDED FINISHED CEILING HEIGHTS IN KITCHEN AREAS AND
FOR SPECIFIC FOOD SERVICE EQUIPMENT ARE AS FOLLOWS:
A) KITCHEN AREAS WITH HOODS: 9'-0"
B) COOLER/FREEZER AREAS: 9'-6"
C) GENERAL AREAS: 8'-0"
D) ICE MACHINE AREAS: 9'-0"
ADEQUATE SPACE IS NEEDED ABOVE THE FINISHED CEILINGS FOR
MECHANICAL AND ELECTRICAL WORK, ESPECIALLY FOR EXHAUST
HOOD DUCTING. PLEASE NOTIFY THEODORE BARBER & COMPANY,
INC. IF HEIGHTS ARE LESS THAN RECOMMENDED MINIMUMS.
D. ADDITIONAL NOTES:
1. GENERAL CONTRACTOR TO PROVIDE FLOOR DEPRESSION TO
MATCH OLD FLOOR THROUGH OR 4" DEEP WHICHEVER IS
GREATER AT THIS LOCATION. FILL EXCESS ABANDONED FLOOR
TROUGH AND INSTALL PROVIDE TROUGH PAN. VERIFY
DIMENSIONS WITH THE EXISTING SITE CONDITIONS AND NEW
EQUIPMENT. VERIFY CODE COMPLIANCE AND COORDINATE
INSTALLATION WITH ASSOCIATED TRADES.
(continued)
Floor Depression
(Refer to note C.2)
Masonry Pad
(Refer to note C.3)
Non-combustible Wall Material
(Verify requirements with local codes)
Finished Wall Opening
Wall Backing
(Refer to note C.1)
Supply Duct
Exhaust Duct
Direct Connect Flue
(Verify requirements with local codes)
Air Movement/Heat Removal
(Verify requirements with local codes)
Refer to Indicated Note
CONDITIONS
A. GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIAL
CONDITIONS, AND OTHER RELATED PORTIONS OF DIVISION 1 APPLY
TO THIS SECTION.
REGULATIONS, CODES PERMITS AND INSPECTIONS
A. COMPLY WITH ALL NATIONAL, STATE, COUNTY AND CITY CODES,
ORDINANCES, ETC. HAVING JURISDICTION, INCLUDING RULES AND
REQUIREMENTS OF UTILITY SERVING AGENCIES.
B. INCORPORATE ALL CODES, ORDINANCES, ETC. INTO THE BASE BID
AND INSTALLATION OF THE WORK. NO ADDITIONAL FUNDS WILL BE
ALLOCATED FOR WORK REQUIRED TO CONFORM TO REGULATIONS
AND REQUIREMENTS AND/OR TO OBTAIN APPROVAL OF WORK.
C. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND LICENSES. WHEN
REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND
APPROVED BY LOCAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .