This document is an Engineering Design Report prepared by Vickstrom Engineering Services, Inc. for the Palm Harbor Recreation Center project in Unincorporated Pinellas County, Florida. The project involves demolishing an existing building and constructing a new recreational facility on an 8.59-acre parcel located at the northeast corner of Pennsylvania Avenue and 16th Street. The proposed development will create approximately 0.86 acres of new impervious surface and includes modifications to an existing dry pond to accommodate increased runoff, with drainage inlets collecting site runoff for treatment and attenuation. The engineering report details hydrologic analysis, pond volume calculations, and water quality volume assessments to meet Pinellas County Stormwater Manual requirements for 10-year, 25-year, and 100-year storm events.
The project's stormwater management design focuses on environmental compliance and flood prevention. The proposed pond system will provide water quality treatment meeting Presumptive Criteria and will retain storm runoff without discharge, with a control structure designed to manage water volumes from various storm events. The geotechnical report indicates a seasonal high water elevation of 49.3 ft NAVD, with the pond bottom set eight feet above the seasonal high groundwater elevation. Infiltration rate tests show the soils have a vertical hydraulic conductivity of 29 in/hr, enabling efficient water percolation. The engineering report includes detailed HydroCAD models and MODRET analyses demonstrating the pond's capacity to manage runoff and meet local stormwater regulations.
View the file
Other files for this state and local contract opportunity
Show all 50
Palm Harbor Recreation Center Addition has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Palm Harbor Recreation Center 1500 16th Street
Section 01, Township 28S, Range 15E
Unincorporated Pinellas County, Florida
Engineering Design Report
Prepared By:
Vickstrom Engineering Services, Inc.
April 2025
Unincorporated Pinellas County, Florida
Engineering Design Report
Engineers Certification:
I HEREBY CERTIFY THAT THE ATTACHED CALCULATIONS
HAVE BEEN PERFORMED UNDER MY DIRECT SUPERVISION
Daniel M. Vickstrom, P.E.
State of Florida P.E. No. 46090
PALM HARBOR RECREATION CENTER
TABLE OF CONTENTS
Section 1 Project Location
Section 2 Project Scope
Section 3 Hydrologic Analysis & Pond Volume Calculations
Section 4 Water Quality Volume Check
Appendix o Hydrologic Calculations o Pond Volume Calculation o HydroCAD Models (Input & Output)
10 Year, 24 Hour Existing Conditions Model 10 Year, 24 Hour Proposed Conditions Model 25 Year, 24 Hour Existing Conditions Model 25 Year, 24 Hour Proposed Conditions Model 100 Year, 24 Hour Proposed Conditions Model o MODRET Input and Model o Geotechnical Report
SECTION 1 PROJECT LOCATION
The proposed project involves the demolition of an existing building and the construction of a recreational facility on an occupied parcel in Pinellas County within Section 01, Township 28S, and Range 15E. The site is located on the northeast corner of Pennsylvania Avenue and 16 th Street. See Sheet 1 of the Construction Plans for a location map. The proposed recreational facility with new parking will create approximately 0.86 acres of new impervious surface.
SECTION 2 PROJECT SCOPE
The proposed project involves the demolition of the existing building to the north and the construction of a recreation facility on the 8.59-acre parcel. Additional parking and drive aisles will be added to the existing parking lot as part of this project. Access to the site will remain along 16th street.
The existing dry pond on the south side of the site will be modified to accommodate the increase in impervious area. Drainage inlets will collect runoff from the site and direct it to the pond for treatment and attenuation. The pond system will be designed to provide water quality treatment to meet Presumptive Criteria for Pinellas County per table 6.10.4 of Pinellas County Stormwater Manual, and storm runoff attenuation for the 10 year and 25 year, 24 hour storm events. The 100 year, 24 hour storm event was also analyzed to ensure that the pond will not overtop and no buildings will flood.
See the Construction Plans showing the location of the proposed construction and stormwater pond.
In its current condition, the site is developed. No wetlands currently exist on the site. Therefore, no wetlands will be impacted as part of this project.
Based on the geotechnical report, and site observations, it is estimated that the seasonal high water elevation at the pond will be El 49.3 ft NAVD. The bottom of the pond is set eight feet above the SHGW elevation at El 57.3 ft NAVD.
SECTION 3 HYDROLOGIC ANALYSIS & POND VOLUME CALCULATION
Runoff from the site will be directed to the proposed pond via a piped storm drainage system.
The proposed pond, located at the southern area of the site, will discharge into the County drainage system (ditch) at the southwest corner of the site if the pond overtops.
A control structure is provided within the proposed pond, and is designed to retain the runoff from the 10 year, 25 year and 100 year storms with no discharge. The water quality treatment volume will be retained and percolated into the ground.
Unincorporated Pinellas County, Florida
Engineering Design Report
Engineers Certification:
I HEREBY CERTIFY THAT THE ATTACHED CALCULATIONS
HAVE BEEN PERFORMED UNDER MY DIRECT SUPERVISION
Daniel M. Vickstrom, P.E.
State of Florida P.E. No. 46090
TABLE OF CONTENTS
Section 1 Project Location
Section 2 Project Scope
Section 3 Hydrologic Analysis & Pond Volume Calculations
Section 4 Water Quality Volume Check
Appendix o Hydrologic Calculations o Pond Volume Calculation o HydroCAD Models (Input & Output)
▪ 10 Year, 24 Hour Existing Conditions Model
▪ 10 Year, 24 Hour Proposed Conditions Model
▪ 25 Year, 24 Hour Existing Conditions Model
▪ 25 Year, 24 Hour Proposed Conditions Model
▪ 100 Year, 24 Hour Proposed Conditions Model o MODRET Input and Model o Geotechnical Report
SECTION 1 PROJECT LOCATION
The proposed project involves the demolition of an existing building and the construction of a recreational facility on an occupied parcel in Pinellas County within Section 01, Township 28S, and Range 15E. The site is located on the northeast corner of Pennsylvania Avenue and 16th
Street. See Sheet 1 of the Construction Plans for a location map. The proposed recreational facility with new parking will create approximately 0.86 acres of new impervious surface.
SECTION 2 PROJECT SCOPE
The proposed project involves the demolition of the existing building to the north and the construction of a recreation facility on the 8.59-acre parcel. Additional parking and drive aisles will be added to the existing parking lot as part of this project. Access to the site will remain along 16th street.
The existing dry pond on the south side of the site will be modified to accommodate the increase in impervious area. Drainage inlets will collect runoff from the site and direct it to the pond for treatment and attenuation. The pond system will be designed to provide water quality treatment to meet Presumptive Criteria for Pinellas County per table 6.10.4 of Pinellas County Stormwater
Manual, and storm runoff attenuation for the 10 year and 25 year, 24 hour storm events. The 100 year, 24 hour storm event was also analyzed to ensure that the pond will not overtop and no buildings will flood.
See the Construction Plans showing the location of the proposed construction and stormwater pond.
In its current condition, the site is developed. No wetlands currently exist on the site. Therefore, no wetlands will be impacted as part of this project.
Based on the geotechnical report, and site observations, it is estimated that the seasonal high water elevation at the pond will be El 49.3 ft NAVD. The bottom of the pond is set eight feet above the SHGW elevation at El 57.3 ft NAVD.
SECTION 3 HYDROLOGIC ANALYSIS & POND VOLUME CALCULATION
Runoff from the site will be directed to the proposed pond via a piped storm drainage system.
The proposed pond, located at the southern area of the site, will discharge into the County drainage system (ditch) at the southwest corner of the site if the pond overtops.
A control structure is provided within the proposed pond, and is designed to retain the runoff from the 10 year, 25 year and 100 year storms with no discharge. The water quality treatment volume will be retained and percolated into the ground.
The hydrologic analysis for this project was performed using SCS Methods per TR-55. Values for Runoff Curve Numbers (RCNs) and Times of Concentration (Tc) were computed following TR-55 procedures. For the attenuation routing analysis, the starting elevation in the pond was started at the bottom of the pond, El. 57.3.
An RCN was determined for the existing and proposed conditions. In the natural condition, the site contains mostly Astatula soils, and some Basinger, Holopaw, and Samsula soils which are HSG type A soils. Because the groundwater is shallow in this area, the HSG A soil was used to determined the RCN for the runoff routing modeling and pond routing. This assessment is also supported by the exfiltration rates determined in the Geotechnical report, attached.
The time of concentration was estimated based on a runoff velocity under both existing and post development conditions.
These values were input into the HydroCAD model to create 10 year and 25 year runoff hydrographs for the existing and proposed conditions. The proposed runoff hydrograph was routed through the pond to determine the release rate and verify it will retain the conditions design storms for the 10 year and 25 year storms with no discharge.
The pond will retain both the 10 year and the 25 year storms with 6 inches of freeboard. In addition, the 100 year, 24 hour model was run to demonstrate that the pond will not overtop.
The pond top of bank is El 61.3 ft.
Peak Stages in Pond
10 Yr-24 Hr Elevation 58.9 ft 25 Yr-24 Hr Elevation 59.4 ft 100 Yr-24 Hr Elevation 59.9 ft
Computations for the hydrologic parameters for proposed conditions are contained in the appendix. The calculations for the pond volume and the HydroCAD models are provided in the appendix.
SECTION 4 WATER QUALITY VOLUME CHECK
The water quality volume for the proposed pond is based on the requirement to capture and retain sufficient treatment volume to meet the County’s water quality requirements. To verify the treatment volume, the presumptive criteria in section 6.10.7 was used. Per table 6.10.4, (as shown in the appendix) the retained water quality volume is 1.59” x (Area of site draining to pond = 138,996 S.F.) = 18,417 C.F. Because the pond is a retention facility designed to retain up to and including the 100 year storm, this water quality volume is achieved well below the crest of the weir.
A MODRET model was developed to determine the water quality volume drawdown from the water quality pool level (EL 58.55 ft NAVD) to the pond bottom elevation of El 57.3 ft NAVD.
Based on the DRI test results in geotechnical report, the soils have a Kv of 29 in/hr. The
MODRET model determined that the retained water quality volume will exfiltrate in less than 3 hours. The results are provided in the appendix. Due to there being no outflow from the 100 year storm, a MODRET model was also used to find the volume drawdown. The MODRET model determined that the retained weir level volume will exfiltrate in less than 8 hours. The MODRET analysis is included in the Appendix.
APPENDIX
• Hydrologic Calculations
• Pond Volume Calculation
• HydroCAD Models (Input & Output)
10 Year, 24 Hour Existing Conditions Model
10 Year, 24 Hour Proposed Conditions Model
25 Year, 24 Hour Existing Conditions Model
• MODRET Input and Model
• Geotechnical Report
Hydrologic Calculations
POND DRAINAGE SUMMARY
EX. POND DRAINAGE AREA= 90,213 S.F. ~ 2.07 AC.
EX. IMPERVIOUS
EX. PERVIOUS
TOTAL EX. POND DRAINAGE AREA
50,150 S.F.
40,063 S.F.
90,213 S.F.
PROP. POND DRAINAGE AREA= 138,996 S.F. ~ 3.19 AC.
PROP. IMPERVIOUS 87,539 S.F.
PROP. PERVIOUS 51,457 S.F.
TOTAL PROP. POND DRAINAGE AREA 138,996 S.F.
1.15 AC.
0.92 AC.
2.07 AC.
2.01 AC.
1.18 AC.
3.19 AC.
REQ'D W.Q. VOLUME = 1.59" X 138,996 S.F. = 18,419 C.F.
Pond Volume Calculation
Project: Palm Harbor 3/25/2025 Calc by: FWM
Proposed Pond Volume Calculation
Elevation
NAVD
Elevations Area
Average Area
D Volume (ft³)
Volume
58.00 57.30 13,458
59.00 58.30 15,418 14,438 14,438 14,438
60.00 59.30 17,949 16,684 16,684 31,122
61.00 60.30 19,535 18,742 18,742 49,864
62.00 61.30 21,971 20,753 20,753 70,617
HydroCAD Models (Input & Output)
• 10 Year, 24 Hour Existing Conditions Model
• 10 Year, 24 Hour Proposed Conditions Model
• 25 Year, 24 Hour Existing Conditions Model
• 25 Year, 24 Hour Proposed Conditions Model
• 100 Year, 24 Hour Proposed Conditions Model
10 Year, 24 Hour Existing Conditions Model
Type II FL 24-hr Rainfall=7.50"SWFWMD Palm Harbor Printed 1/22/2025Prepared by {enter your company name here}
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Existing Site
Runoff = 3.27 cfs @ 12.64 hrs, Volume= 0.735 af, Depth= 4.26"
Runoff by SCS TR-20 method, UH=SWFWMD-256, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II FL 24-hr Rainfall=7.50"
Area (sf) CN Description
* 50,150 98 Building and Parking
40,063 39 >75% Grass cover, Good, HSG A 90,213 72 Weighted Average 40,063 44.41% Pervious Area 50,150 55.59% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
30.0 Direct Entry, Type II FL 24-hr Rainfall=7.50"Palm Harbor 10 yr Printed 4/2/2025Prepared by {enter your company name here}
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 2P: Existing Pond
Inflow Area = 2.071 ac, 55.59% Impervious, Inflow Depth = 4.26" Inflow = 3.27 cfs @ 12.64 hrs, Volume= 0.735 af Outflow = 1.08 cfs @ 14.33 hrs, Volume= 0.876 af, Atten= 67%, Lag= 101.1 min Discarded = 1.08 cfs @ 14.33 hrs, Volume= 0.876 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Starting Elev= 58.30' Surf.Area= 12,810 sf Storage= 6,063 cf Peak Elev= 58.62' @ 14.33 hrs Surf.Area= 13,394 sf Storage= 10,301 cf (4,238 cf above start)
Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= (not calculated: outflow precedes inflow)
Volume Invert Avail.Storage Storage Description #1 57.80' 52,501 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
57.80 11,441 0 0
58.30 12,810 6,063 6,063
59.30 14,615 13,713 19,775
60.30 16,311 15,463 35,238
61.30 18,214 17,263 52,501
Device Routing Invert Outlet Devices #1 Primary 60.30' 3.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Discarded 57.80' 2.900 in/hr Exfiltration over Surface area
Conductivity to Groundwater Elevation = 54.00'
Discarded OutFlow Max=1.08 cfs @ 14.33 hrs HW=58.62' (Free Discharge) 2=Exfiltration ( Controls 1.08 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=58.30' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
10 Year, 24 Hour Proposed Conditions Model
Type II FL 24-hr Rainfall=7.50"SWFWMD Palm Harbor
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Proposed Site
Runoff = 5.94 cfs @ 12.62 hrs, Volume= 1.334 af, Depth= 4.93"
Runoff by SCS TR-20 method, UH=SWFWMD-256, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II FL 24-hr Rainfall=7.50"
Area (sf) CN Description
* 93,396 98 Building and Parking
47,985 39 >75% Grass cover, Good, HSG A 141,381 78 Weighted Average 47,985 33.94% Pervious Area 93,396 66.06% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
30.0 Direct Entry, Type II FL 24-hr Rainfall=7.50"Palm Harbor 10 yr Printed 3/26/2025Prepared by {enter your company name here}
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: Proposed Pond
Inflow Area = 3.246 ac, 66.06% Impervious, Inflow Depth = 4.93" Inflow = 5.94 cfs @ 12.62 hrs, Volume= 1.334 af Outflow = 1.31 cfs @ 14.79 hrs, Volume= 1.334 af, Atten= 78%, Lag= 130.3 min Discarded = 1.31 cfs @ 14.79 hrs, Volume= 1.334 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Peak Elev= 58.92' @ 14.79 hrs Surf.Area= 16,977 sf Storage= 24,413 cf
Plug-Flow detention time= 185.4 min calculated for 1.331 af (100% of inflow) Center-of-Mass det. time= 185.2 min ( 1,054.8 - 869.7 )
Volume Invert Avail.Storage Storage Description #1 57.30' 70,617 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
57.30 13,458 0 0
58.30 15,418 14,438 14,438
59.30 17,949 16,684 31,122
60.30 19,535 18,742 49,864
61.30 21,971 20,753 70,617
Device Routing Invert Outlet Devices #1 Primary 60.30' 3.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Discarded 57.30' 2.900 in/hr Exfiltration over Surface area
Conductivity to Groundwater Elevation = 48.00'
Discarded OutFlow Max=1.31 cfs @ 14.79 hrs HW=58.92' (Free Discharge) 2=Exfiltration ( Controls 1.31 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=57.30' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
25 Year, 24 Hour Existing Conditions Model
Type II FL 24-hr Rainfall=9.00"SWFWMD Palm Harbor
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Existing Site
Runoff = 4.29 cfs @ 12.63 hrs, Volume= 0.963 af, Depth= 5.58"
Runoff by SCS TR-20 method, UH=SWFWMD-256, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II FL 24-hr Rainfall=9.00"
Area (sf) CN Description
* 50,150 98 Building and Parking
40,063 39 >75% Grass cover, Good, HSG A 90,213 72 Weighted Average 40,063 44.41% Pervious Area 50,150 55.59% Impervious Area
Tc Length Slope Velocity Capacity Description
Type II FL 24-hr Rainfall=9.00"Palm Harbor 25 yr Printed 4/2/2025Prepared by {enter your company name here}
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 2P: Existing Pond
Inflow Area = 2.071 ac, 55.59% Impervious, Inflow Depth = 5.58" Inflow = 4.29 cfs @ 12.63 hrs, Volume= 0.963 af Outflow = 1.21 cfs @ 14.50 hrs, Volume= 1.105 af, Atten= 72%, Lag= 112.2 min Discarded = 1.21 cfs @ 14.50 hrs, Volume= 1.105 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Starting Elev= 58.30' Surf.Area= 12,810 sf Storage= 6,063 cf Peak Elev= 59.00' @ 14.50 hrs Surf.Area= 14,065 sf Storage= 15,402 cf (9,339 cf above start)
Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 1.1 min ( 877.0 - 875.9 )
Volume Invert Avail.Storage Storage Description #1 57.80' 52,501 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
57.80 11,441 0 0
58.30 12,810 6,063 6,063
59.30 14,615 13,713 19,775
60.30 16,311 15,463 35,238
61.30 18,214 17,263 52,501
Device Routing Invert Outlet Devices #1 Primary 60.30' 3.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Discarded 57.80' 2.900 in/hr Exfiltration over Surface area
Conductivity to Groundwater Elevation = 54.00'
Discarded OutFlow Max=1.21 cfs @ 14.50 hrs HW=59.00' (Free Discharge) 2=Exfiltration ( Controls 1.21 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=58.30' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Type II FL 24-hr Rainfall=9.00"SWFWMD Palm Harbor
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Proposed Site
Runoff = 7.60 cfs @ 12.61 hrs, Volume= 1.710 af, Depth= 6.32"
Runoff by SCS TR-20 method, UH=SWFWMD-256, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II FL 24-hr Rainfall=9.00"
Area (sf) CN Description
* 93,396 98 Building and Parking
47,985 39 >75% Grass cover, Good, HSG A 141,381 78 Weighted Average 47,985 33.94% Pervious Area 93,396 66.06% Impervious Area
Tc Length Slope Velocity Capacity Description
Type II FL 24-hr Rainfall=9.00"Palm Harbor 25 yr
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: Proposed Pond
Inflow Area = 3.246 ac, 66.06% Impervious, Inflow Depth = 6.32" Inflow = 7.60 cfs @ 12.61 hrs, Volume= 1.710 af Outflow = 1.46 cfs @ 14.94 hrs, Volume= 1.710 af, Atten= 81%, Lag= 139.5 min Discarded = 1.46 cfs @ 14.94 hrs, Volume= 1.710 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Peak Elev= 59.44' @ 14.94 hrs Surf.Area= 18,177 sf Storage= 33,717 cf
Plug-Flow detention time= 238.6 min calculated for 1.710 af (100% of inflow) Center-of-Mass det. time= 238.5 min ( 1,100.4 - 861.9 )
Volume Invert Avail.Storage Storage Description #1 57.30' 70,617 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
57.30 13,458 0 0
58.30 15,418 14,438 14,438
59.30 17,949 16,684 31,122
60.30 19,535 18,742 49,864
61.30 21,971 20,753 70,617
Device Routing Invert Outlet Devices #1 Primary 60.30' 3.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Discarded 57.30' 2.900 in/hr Exfiltration over Surface area
Conductivity to Groundwater Elevation = 48.00'
Discarded OutFlow Max=1.46 cfs @ 14.94 hrs HW=59.44' (Free Discharge) 2=Exfiltration ( Controls 1.46 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=57.30' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Type II FL 24-hr Rainfall=12.00"SWFWMD Palm Harbor
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Proposed Site
Runoff = 10.93 cfs @ 12.60 hrs, Volume= 2.481 af, Depth= 9.17"
Runoff by SCS TR-20 method, UH=SWFWMD-256, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II FL 24-hr Rainfall=12.00"
Area (sf) CN Description
* 93,396 98 Building and Parking
47,985 39 >75% Grass cover, Good, HSG A 141,381 78 Weighted Average 47,985 33.94% Pervious Area 93,396 66.06% Impervious Area
Tc Length Slope Velocity Capacity Description
Type II FL 24-hr Rainfall=12.00"Palm Harbor 100 yr
HydroCAD® 10.00-26 s/n 08021 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: Proposed Pond
Inflow Area = 3.191 ac, 62.98% Impervious, Inflow Depth = 8.90" Inflow = 10.46 cfs @ 12.61 hrs, Volume= 2.366 af Outflow = 2.65 cfs @ 14.55 hrs, Volume= 2.366 af, Atten= 75%, Lag= 117.0 min Discarded = 2.65 cfs @ 14.55 hrs, Volume= 2.366 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Peak Elev= 59.96' @ 14.55 hrs Surf.Area= 18,992 sf Storage= 43,273 cf
Plug-Flow detention time= 182.9 min calculated for 2.366 af (100% of inflow) Center-of-Mass det. time= 182.8 min ( 1,037.6 - 854.8 )
Volume Invert Avail.Storage Storage Description #1 57.30' 70,617 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
57.30 13,458 0 0
58.30 15,418 14,438 14,438
59.30 17,949 16,684 31,122
60.30 19,535 18,742 49,864
61.30 21,971 20,753 70,617
Device Routing Invert Outlet Devices #1 Primary 60.30' 3.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Discarded 57.30' 2.900 in/hr Exfiltration over Surface area
Conductivity to Groundwater Elevation = 55.30'
Discarded OutFlow Max=2.65 cfs @ 14.55 hrs HW=59.96' (Free Discharge) 2=Exfiltration ( Controls 2.65 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=57.30' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
Daniel Vickstrom Highlight
MODRET Input and Model
Water Quality Volume
MODRET INPUT WATER QUALITY
Pond Bottom Area = 13,458 s.f.
Volume Between Bottom and Water Quality Elevation = 18,417 s.f.
Pond Length to Width Ratio = 144 / 100 = 1.4
SHW Elevation = 50
Pond Bottom Elevation = 57.3
Control Structure Top (Overflow Elevation) = 58.55
From Geotech Report:
Field Measured Infiltration Rate (KVS) = 29 in/hr = 58 ft/day
KVU = 2/3 (58 ft/day) = 38.67 ft/day
KHS = 1.5 (58 ft/day) = 87 ft/day
Recovery Time = 2 hours
MODRET
SUMMARY OF UNSATURATED & SATURATED INPUT PARAMETERS
PROJECT NAME : Palm Harbor Rec Center
POLLUTION VOLUME RUNOFF DATA USED
UNSATURATED ANALYSIS EXCLUDED
Pond Bottom Area 13,458.00 ft²
Pond Volume between Bottom & DHWL 18,417.00 ft³
Pond Length to Width Ratio (L/W) 1.40
Elevation of Effective Aquifer Base 35.00 ft
Elevation of Seasonal High Groundwater Table 50.00 ft
Elevation of Starting Water Level 57.30 ft
Elevation of Pond Bottom 57.30 ft
Design High Water Level Elevation 58.55 ft
Avg. Effective Storage Coefficient of Soil for Unsaturated Analysis 0.10
Unsaturated Vertical Hydraulic Conductivity 38.67 ft/d
Factor of Safety 2.00
Saturated Horizontal Hydraulic Conductivity 87.00 ft/d
Avg. Effective Storage Coefficient of Soil for Saturated Analysis 0.20
Avg. Effective Storage Coefficient of Pond/Exfiltration Trench 1.00
Hydraulic Control Features:
Top Bottom Left Right
Groundwater Control Features - Y/N N N N N Distance to Edge of Pond 0.00 0.00 0.00 0.00 Elevation of Water Level 0.00 0.00 0.00 0.00
Impervious Barrier - Y/N N N N N Elevation of Barrier Bottom 0.00 0.00 0.00 0.00
Analysis Date: 3/26/2025
TIME - RUNOFF INPUT DATA
PROJECT NAME: PALM HARBOR REC CENTER
STRESS
PERIOD
NUMBER
INCREMENT
OF TIME
(hrs)
VOLUME
OF RUNOFF
(ft³)
Unsat 0.00 0.00
1 1.00 18,417.00
2 1.82 0.00
3 1.82 0.00
4 1.82 0.00
5 1.82 0.00
6 1.82 0.00
7 1.82 0.00
8 1.82 0.00
9 1.82 0.00
10 1.82 0.00
11 1.82 0.00
12 1.82 0.00
13 1.82 0.00
14 1.82 0.00
15 1.82 0.00
16 1.82 0.00
17 1.82 0.00
18 1.82 0.00
19 1.82 0.00
20 1.82 0.00
21 1.82 0.00
22 1.82 0.00
23 1.82 0.00
24 1.82 0.00
25 1.82 0.00
26 1.82 0.00
27 1.82 0.00
28 1.82 0.00
29 1.82 0.00
30 1.82 0.00
SUMMARY OF RESULTS
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
00.00 - 0.00 50.000 0.000 * 0.00000
0.00 50.000 3.56525 3.08310
1.00 57.797 2.60095 0.00 1.72319
2.18 57.300 1.44083 0.00 1.15847
4.64 56.515 1.01966 0.00 0.88085
6.46 56.123 0.79920 0.00 0.71754
8.28 55.804 0.66309 0.00 0.60864
10.10 55.533 0.56931 0.00 0.52998
11.92 55.297 0.49992 0.00 0.46986
13.74 55.088 0.44604 0.00 0.42222
15.56 54.901 0.40281 0.00 0.38341
17.38 54.730 0.36717 0.00 0.35094
19.21 54.574 0.33719 0.00 0.32344
21.03 54.430 0.31159 0.00 0.29974
22.85 54.297 0.28941 0.00
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
0.27907
24.67 54.173 0.27001 0.00
0.26095
26.49 54.056 0.25289 0.00
0.24483
28.31 53.948 0.23766 0.00
0.23050
30.13 53.845 0.22405 0.00
0.21759
31.95 53.748 0.21174 0.00
0.20588
33.77 53.657 0.20054 0.00
0.19520
35.59 53.570 0.19040 0.00
0.18561
37.41 53.487 0.18115 0.00
0.17669
39.23 53.409 0.17258 0.00
0.16846
41.05 53.334 0.16472 0.00
0.16098
42.87 53.262 0.15746 0.00
0.15393
44.69 53.194 0.15069 0.00
0.14745
46.51 53.128 0.14442 0.00
0.14138
48.33 53.065 0.13854 0.00
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
0.13569
50.15 53.005 0.13308 0.00
0.13046
51.97 52.947 0.12797 0.00
0.12547
53.79 52.891 0.12311 0.00
0.12076
55.62 52.837 0.11857 0.00
0.11638
57.44 52.785 0.11431 0.00
0.11225
59.26 52.736 0.11029 0.00
0.10833
61.08 52.687 0.10647 0.00
0.10461
62.90 52.641 0.10286 0.00
0.10111
64.72 52.596 0.09944 0.00
0.09776
66.54 52.552 0.09622 0.00
0.09468
68.36 52.510 0.09314 0.00
0.09161
70.18 52.470 0.09020 0.00
0.08878
72.00 52.430 0.00
Maximum Water Elevation: 57.797 feet @ 1.00 hours Recovery @ 2.180 hours
* Time increment when there is no runoff Maximum Infiltration Rate: 18.080 ft/day
INFILTRATION : PALM HARBOR REC CENTER
Total Volume Infiltrated = 18,417 ft³
Time (hrs)
V o lu m e I n fi lt ra te d ft ³)
18,000
17,500
17,000
16,500
16,000
15,500
15,000
14,500
14,000
13,500
13,000
12,500
12,000
11,500
11,000
10,500
10,000
9,500
9,000
8,500
8,000
7,500
7,000
6,500
6,000
5,500
5,000
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
Max Water Elevation = 57.80 ft
Time (hrs)
W a te r E le v a ti o n ft
57.5
Weir Volume
MODRET INPUT WEIR VOLUME
Pond Bottom Area = 13, 458 s.f.
Volume Between Bottom and Water Quality Elevation = 49, 864 s.f.
Pond Length to Width Ratio = 188 / 145 = 1.4
SHW Elevation = 50
Pond Bottom Elevation = 57.3
Control Structure Top (Overflow Elevation) = 60.3
From Geotech Report:
Field Measured Infiltration Rate (KVS) = 29 in/hr = 58 ft/day
KVU = 2/3 (58 ft/day) = 38.67 ft/day
KHS = 1.5 (58 ft/day) = 87 ft/day
Recovery Time = 7.5 hours
SUMMARY OF UNSATURATED & SATURATED INPUT PARAMETERS
PROJECT NAME : Palm Harbor Rec Center
POLLUTION VOLUME RUNOFF DATA USED
UNSATURATED ANALYSIS EXCLUDED
Pond Bottom Area 13,458.00 ft²
Pond Volume between Bottom & DHWL 49,864.00 ft³
Pond Length to Width Ratio (L/W) 1.40
Elevation of Effective Aquifer Base 35.00 ft
Elevation of Seasonal High Groundwater Table 50.00 ft
Elevation of Starting Water Level 57.30 ft
Elevation of Pond Bottom 57.30 ft
Design High Water Level Elevation 60.30 ft
Avg. Effective Storage Coefficient of Soil for Unsaturated Analysis 0.10
Unsaturated Vertical Hydraulic Conductivity 38.67 ft/d
Factor of Safety 2.00
Saturated Horizontal Hydraulic Conductivity 87.00 ft/d
Avg. Effective Storage Coefficient of Soil for Saturated Analysis 0.20
Avg. Effective Storage Coefficient of Pond/Exfiltration Trench 1.00
Hydraulic Control Features:
Top Bottom Left Right
Groundwater Control Features - Y/N N N N N Distance to Edge of Pond 0.00 0.00 0.00 0.00 Elevation of Water Level 0.00 0.00 0.00 0.00
Impervious Barrier - Y/N N N N N Elevation of Barrier Bottom 0.00 0.00 0.00 0.00
TIME - RUNOFF INPUT DATA
PROJECT NAME: PALM HARBOR REC CENTER
STRESS
PERIOD
NUMBER
INCREMENT
OF TIME
(hrs)
VOLUME
OF RUNOFF
(ft³)
Unsat 0.00 0.00
1 1.00 49,864.00
2 1.82 0.00
3 1.82 0.00
4 1.82 0.00
5 1.82 0.00
6 1.82 0.00
7 1.82 0.00
8 1.82 0.00
9 1.82 0.00
10 1.82 0.00
11 1.82 0.00
12 1.82 0.00
13 1.82 0.00
14 1.82 0.00
15 1.82 0.00
16 1.82 0.00
17 1.82 0.00
18 1.82 0.00
19 1.82 0.00
20 1.82 0.00
21 1.82 0.00
22 1.82 0.00
23 1.82 0.00
24 1.82 0.00
25 1.82 0.00
26 1.82 0.00
27 1.82 0.00
28 1.82 0.00
29 1.82 0.00
30 1.82 0.00
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
00.00 - 0.00 50.000 0.000 * 0.00000
0.00 50.000 4.18985 3.71960
1.00 59.494 3.24934 0.00 2.39325
2.82 58.551 1.96246 0.00 1.53167
4.64 57.947 1.34869 0.00 1.16570
6.46 57.487 1.05789 0.00 0.95008
7.37 57.300 0.87827 0.00 0.80647
10.10 56.795 0.75462 0.00 0.70278
11.92 56.517 0.66327 0.00 0.62376
13.74 56.271 0.59237 0.00 0.56099
15.56 56.050 0.53547 0.00 0.50994
17.38 55.849 0.48864 0.00 0.46733
19.21 55.665 0.44924 0.00 0.43115
21.03 55.495 0.41554 0.00 0.39994
22.85 55.337 0.38640 0.00
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
0.37285
24.67 55.190 0.36089 0.00
0.34893
26.49 55.053 0.33831 0.00
0.32770
28.31 54.923 0.31828 0.00
0.30886
30.13 54.802 0.30034 0.00
0.29181
31.95 54.687 0.28410 0.00
0.27639
33.77 54.578 0.26941 0.00
0.26242
35.59 54.474 0.25605 0.00
0.24967
37.41 54.376 0.24379 0.00
0.23792
39.23 54.282 0.23252 0.00
0.22712
41.05 54.192 0.22218 0.00
0.21724
42.87 54.107 0.21263 0.00
0.20802
44.69 54.025 0.20371 0.00
0.19940
46.51 53.946 0.19536 0.00
0.19132
48.33 53.871 0.18765 0.00
PROJECT NAME : Palm Harbor Rec Center
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (cfs)
AVERAGE
INFILTRATION
RATE (cfs)
CUMULATIVE
OVERFLOW
(ft³)
Analysis Date: 3/26/2025
0.18397
50.15 53.798 0.18044 0.00
0.17692
51.97 53.728 0.17365 0.00
0.17039
53.79 53.661 0.16730 0.00
0.16421
55.62 53.596 0.16129 0.00
0.15838
57.44 53.534 0.15566 0.00
0.15294
59.26 53.474 0.15032 0.00
0.14770
61.08 53.415 0.14524 0.00
0.14278
62.90 53.359 0.14050 0.00
0.13822
64.72 53.305 0.13598 0.00
0.13373
66.54 53.252 0.13167 0.00
0.12960
68.36 53.201 0.12759 0.00
0.12558
70.18 53.151 0.12368 0.00
0.12179
72.00 53.103 0.00
Maximum Water Elevation: 59.494 feet @ 1.00 hours Recovery @ 7.371 hours
* Time increment when there is no runoff Maximum Infiltration Rate: 19.335 ft/day
Total Volume Infiltrated = 49,864 ft³
Time (hrs) 76543210
V o lu m e I n fi lt ra te d ft ³)
48,000
46,000
44,000
42,000
40,000
38,000
36,000
34,000
32,000
30,000
28,000
26,000
24,000
22,000
20,000
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
Max Water Elevation = 59.49 ft
Time (hrs) 76543210
W a te r E le v a ti o n ft
58.5
57.5
Geotechnical Report
| 2025-04-17T15:54:43-0400 | |
| Daniel M Vickstrom |