About this file

Amendment 2 Section J

View the file

Other files

File Type Posted
P15PS01390_Amendment_0005_Q As.pdf PDF
P15PS01390_Amendment_0005.pdf PDF
P15PS01390_Amendment_0004.pdf PDF
2)_GOGA_149952_Contract_Price_Schedule_Blank_-_Amendment_0005.xlsx XLSX spreadsheet
2)_Section_J.pdf PDF
3)_Wage_Determination.pdf PDF
5)_GOGA_149952_Q As_Amend_0003.pdf PDF
4)_Addl_Information_-_Parapet_ _Roofing_Repair_Details.pdf PDF
1)_P15PS01390_Amendment_0003.pdf PDF
9)_Vehicle_Use_on_Alcatraz_SOP.pdf PDF
7)_Alcatraz-CLR-Chapter-4-C_7.pdf PDF
6)_PV_SBS_ _Flashing_Spec__20101122.pdf PDF
11)_GOGA_149952_Q As_Amend_0002.pdf PDF
1)_P15PS01390_Amendment_0002.pdf PDF
10)_Alcatraz_Rodent_Exclusion.pdf PDF
3)_Wage_Determination.pdf PDF
8)_Alcatraz_Island_EIS 1 .pdf PDF
5)_2010-12-13_SCA_HazMat_Report.pdf PDF
4)_2010-06-15_SCA_HazMat_Report.pdf PDF
6)_01_27_00_-_Definition_of_Contract_Line_Items_2B.pdf PDF
2)_GOGA_149952_Contract_Price_Schedule_Blank_-_Amendment_0001.xlsx XLSX spreadsheet
4)_Wage_Rates.pdf PDF
3)_Section_J.pdf PDF
5)_01_27_00_-_Definition_of_Contract_Line_Items_2A.pdf PDF
7)_GOGA_149952 _Pre-Bid_Slides.pdf PDF
9)_Q_and_As _7.23.2015.pdf PDF
8)_Attachment_B_Pre-Bid_Participants.pdf PDF
1)_P15PS01390_Amendment_0001.pdf PDF
3)_GOGA-149952 _2B_Specs.pdf PDF
2)_GOGA-149952 _2A_Specs.pdf PDF
5)_GOGA-149952 _2B_Dwgs.pdf PDF
6)_Wage_Rates_CA29.pdf PDF
4)_GOGA-149952 _2A_Dwgs.pdf PDF
7)_GOGA_149952_Proposal_Submission_Pkg.pdf PDF
7a)_GOGA_149952_Contract_Price_Schedules.xlsx XLSX spreadsheet
1)_GOGA_149952_P15PS01390.pdf PDF
7b)_Small_Business_Participation_Plan.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Document No.

P15PS01390

Document Title

GOGA 149952 Cellhouse (Building 68) Alcatraz Island

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

1. Project Specifications

i. Phase 2A

ii. Phase 2B

2. Drawing number: 641/107116

i. Phase 2A: 74 sheets

ii. Phase 2B: 74 sheets

3. Davis Bacon Wage Rate, General Decision Number: CA150029 07/31/2015 CA29

4. Proposal Submission Package

i. Volume I - Technical

ii. Volume II – Business & Price

iii. Contract Price Schedule (Excel File)

iv. Small Business Participation Plan (Excel File)

5. Additional Documents Requested During Solicitation

i. Summary Report: Bulk Asbestos, Lead-Based Pant and Hazardous Materials Survey Alcatraz Cellhouse -- SCA Environmental, Inc. June 15, 2010

ii. Summary Report: Bulk Asbestos, Lead-Based Pant and Hazardous Materials Survey Alcatraz Cellhouse – Citadel Level -- SCA Environmental, Inc. December 13, 2010

iii. Specification Section 075216 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING – GOGA 150682 Alcatraz Roofing Photovoltaic Project

iv. Alcatraz Island Historic Vegetation, Cultural Landscape Report Figure 4 - 10

v. Alcatraz Island Historic Preservation and Safety Construction Program – Final Environmental

Impact Statement – October 2001

vi. Golden Gate National Recreation Area Standard Operating Procedures Vehicle Use on Alcatraz

vii. Alcatraz Rodent Exclusion

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS