| CONTRACT PRICE SCHEDULE - BASE (PHASE 2A) |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2A: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| BASE (PHASE 2A) | | | | |
| 1 | General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| 2 | Type F Concrete Patch - With Anodes | 1137 | S.F. | $0.00 | $0.00 |
| 3 | Type F Concrete Patch - No Anodes | 106 | S.F. | | $0.00 |
| 4 | Type FT Concrete Patch - With Anodes | 2 | S.F. | | $0.00 |
| 5 | Type FT Concrete Patch - No Anodes | 66 | S.F. | | $0.00 |
| 6 | Type E Concrete Patch - With Anodes | 255 | L.F. | | $0.00 |
| 7 | Type E Concrete Patch - No Anodes | 199 | L.F. | | $0.00 |
| 8 | Type T Concrete Patch | 66 | S.F. | | $0.00 |
| 9 | Type W Concrete Patch - Exterior - With Anodes | 5 | L.F. | | $0.00 |
| 10 | Type W Concrete Patch - Exterior - No Anodes | 561 | L.F. | | $0.00 |
| 11 | Type Ws Concrete Patch | 113 | L.F. | | $0.00 |
| 12 | Type P Concrete Patch | 303 | S.F. | | $0.00 |
| 13 | Type FF Concrete Patch | 90 | S.F. | | $0.00 |
| 14 | Type O Concrete Patch | 48 | L.F. | | $0.00 |
| 15 | Type Cb Concrete Patch | 10 | L.F. | | $0.00 |
| 16 | Type Ci Crack Repair - Epoxy Injection | 45 | L.F. | | $0.00 |
| 17 | Type Cp Crack Repair - Rout & Point | 10 | L.F. | | $0.00 |
| 18 | Type AI Patch - Remove Abandoned Insert | 554 | EA | | $0.00 |
| 19 | Type W Concrete Patch - Interior | 15 | L.F. | | $0.00 |
| 20 | Type W Concrete Patch – Through Wall | 33 | L.F. | | $0.00 |
| 21 | Type F Concrete Patch - Interior | 31 | S.F. | | $0.00 |
| 22 | Type E Concrete Patch - Interior | 109 | L.F. | | $0.00 |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 22) ------------------------------------ | | | | Base Price | $ - 0 |
| 23 | PHASE 2A - OPTION 1 | See Separate Breakdown | | | $0 |
| 24 | PHASE 2A - OPTION 2 | See Separate Breakdown | | | $0 |
| 25 | PHASE 2A - OPTION 3 | See Separate Breakdown | | | $0 |
| 26 | PHASE 2A - OPTION 4 | See Separate Breakdown | | | $0 |
| 27 | PHASE 2B - OPTION | See Separate Breakdown | | | $0 |
| 28 | PHASE 2B - OPTION 1 | See Separate Breakdown | | | $0 |
| 29 | PHASE 2B - OPTION 2 | See Separate Breakdown | | | $0 |
| 30 | PHASE 2B - OPTION 3 | See Separate Breakdown | | | $0 |
| 31 | PHASE 2B - OPTION 4 | See Separate Breakdown | | | $0 |
| 32 | PHASE 2B - OPTION 5 | See Separate Breakdown | | | $0 |
| 33 | PHASE 2B - OPTION 6 | See Separate Breakdown | | | $0 |
| 34 | PHASE 2B - OPTION 7 | See Separate Breakdown | | | $0 |
TOTAL BASE PRICE Plus Options ------------------------------------ $ - 0
CLIN 23-2A Option 1
| CONTRACT PRICE SCHEDULE - CLIN #23 BREAKDOWN |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2A: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 23 | CLIN #23 BREAKDOWN | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 311 | S.F. | $0.00 | $0.00 |
| Type F Concrete Patch - No Anodes | 69 | S.F. | $0.00 | $0.00 |
| Type FT Concrete Patch - No Anodes | 10 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 95 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 184 | L.F. | $0.00 | $0.00 |
| Type T Concrete Patch | 67 | S.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 64 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 21 | L.F. | $0.00 | $0.00 |
| Type FF Concrete Patch | 39 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 91 | L.F. | $0.00 | $0.00 |
| Type Cb Concrete Patch | 6 | L.F. | $0.00 | $0.00 |
| Type Ci Crack Repair - Epoxy Injection | 81 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 123 | EA | $0.00 | $0.00 |
| Type F Concrete Patch - Interior | 28 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 12 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #23 - PHASE 2A OPTION 1 | | | | | $ - 0 |
CLIN 24-2A Option 2
| CONTRACT PRICE SCHEDULE - CLIN #24 - PHASE 2A OPTION 2 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2A: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 24 | CLIN #24 - PHASE 2A OPTION 2 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 65 | S.F. | $0.00 | $0.00 |
| Type F Concrete Patch - No Anodes | 33 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 66 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 14 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 130 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 34 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 8 | L.F. | $0.00 | $0.00 |
| Type Ci Crack Repair - Epoxy Injection | 6 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 25 | EA | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 11 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #24 - PHASE 2A OPTION 2 ------------------------------------ | | | | | $ - 0 |
CLIN 25-2A Option 3
| CONTRACT PRICE SCHEDULE - CLIN #25 - PHASE 2A OPTION 3 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2A: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 25 | CLIN #25 - PHASE 2A OPTION 3 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 5 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 16 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - With Anodes | 17 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 8 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 35 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 18 | L.F. | $0.00 | $0.00 |
| Type Ci Crack Repair - Epoxy Injection | 11 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 57 | EA | $0.00 | $0.00 |
| TOTAL CLIN #25 Option 3 PRICE ------------------------------------ | | | | | $ - 0 |
CLIN 26-2A Option 4
| CONTRACT PRICE SCHEDULE - CLIN #26 - PHASE 2A OPTION 4 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2A: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 26 | CLIN #26 - PHASE 2A OPTION 4 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 68 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 13 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - With Anodes | 39 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 41 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 89 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 5 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 28 | EA | $0.00 | $0.00 |
| TOTAL CLIN #26 - Option 4 PRICE ------------------------------------ | | | | | $ - 0 |
CLIN 27-2B OPTION
| CONTRACT PRICE SCHEDULE - CLIN #27 - PHASE 2B OPTION |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 27 | CLIN #27 - PHASE 2B OPTION | | | | | | 1.1 | 1.2 | 1.3 | 1.4 | 1.5 | 1.6 | 1.7 | 1.8 | 1.9 | 1.10 | 1.11 | 1.12 | 1.13 | 1.14 | 1.15 | 1.16 | 1.17 | 1.18 | 1.19 | 1.20 | 1.21 | 1.22 | 1.23 | 1.24 | 1.25 | 1.26 |
| General Work Items | 1 | Lump Sum | $0.00 | $0 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type F Concrete Patch - With Anodes | 388 | S.F. | $0.00 | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type F Concrete Patch - No Anodes | 69 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type FT Concrete Patch - With Anodes | 2 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type FT Concrete Patch - No Anodes | 29 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type E Concrete Patch - With Anodes | 525 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type E Concrete Patch - No Anodes | 1 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type T Concrete Patch | 128 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type W Concrete Patch - Exterior - With Anodes | 18 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type W Concrete Patch - Exterior - No Anodes | 457 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type Ws Concrete Patch | 43 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type P Concrete Patch | 47 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type FF Concrete Patch | 45 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type O Concrete Patch | 98 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type Cb Concrete Patch | 49 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type Ci Crack Repair - Epoxy Injection | 51 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type Cp Crack Repair - Rout & Point | 10 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type AI Patch - Remove Abandoned Insert | 23 | EA | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type W Concrete Patch – Through Wall | 28 | L.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type F Concrete Patch - Interior | 5 | S.F. | | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type E Concrete Patch - Interior | 64 | L.F. | | $0.00 | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | |
| TOTAL CLIN #27 - PHASE 2B BASE ------------------------------------ | | | | | $0.00 | $0.00 | | | | | | | | | | | | | | | | | | | | | | | | | | |
CLIN 28 - PHASE 2B OPTION 1
| CONTRACT PRICE SCHEDULE - CLIN #28 - PHASE 2B OPTION 1 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 28 | CLIN #28 - PHASE 2B OPTION 1 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 33 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 27 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 48 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 20 | L.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 28 | L.F. | $0.00 | $0.00 |
| Type Cb Concrete Patch | 11 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 4 | EA | $0.00 | $0.00 |
| TOTAL Option 1 PRICE (Contract Line Item Number 1 through 22) ------------------------------------ | | | | | $ - 0 |
CLIN 29-PHASE 2B OPTION 2
| CONTRACT PRICE SCHEDULE - CLIN #29 - PHASE 2B OPTION 2 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 29 | CLIN #29 - PHASE 2B OPTION 2 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 33 | S.F. | $0.00 | $0.00 |
| Type F Concrete Patch - No Anodes | 19 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 70 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 42 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 22 | L.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 12 | L.F. | $0.00 | $0.00 |
| Type Ci Crack Repair - Epoxy Injection | 8 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 11 | EA | $0.00 | $0.00 |
| Type W Concrete Patch – Through Wall | 15 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 52 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #29 - PHASE 2B OPTION2 ------------------------------------ | | | | | $ - 0 |
CLIN 30-PHASE 2B OPTION 3
| CONTRACT PRICE SCHEDULE - CLIN #30 - PHASE 2B OPTION 3 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 30 | CLIN #30 - PHASE 2B OPTION 3 | | | | |
| General Work Items | 1 | Lump Sum | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 41 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 21 | L.F. | | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 45 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 9 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 23 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 4 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Interior | 8 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 29 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN#30 - PHASE 2B OPTION 3 ------------------------------------ | | | | | $ - 0 |
CLIN 31-PHASE 2B OPTION 4
| CONTRACT PRICE SCHEDULE - CLIN #31 - PHASE 2B OPTION 4 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Option Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 31 | CLIN #31 - PHASE 2B OPTION 4 | | | | |
| General Work Items | | | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 57 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 26 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 114 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 19 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 9 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 4 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Interior | 11 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch – Through Wall | 20 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 64 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #31 - PHASE 2B OPTION 4 ------------------------------------ | | | | | $ - 0 |
CLIN 32-PHASE 2B OPTION 5
| CONTRACT PRICE SCHEDULE - CLIN #32 - PHASE 2B OPTION 5 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Option Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 32 | CLIN #32 - PHASE 2B OPTION 5 | | | | |
| General Work Items | | | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 117 | S.F. | $0.00 | $0.00 |
| Type F Concrete Patch - No Anodes | 15 | S.F. | $0.00 | $0.00 |
| Type FT Concrete Patch - No Anodes | 30 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 30 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 49 | L.F. | $0.00 | $0.00 |
| Type T Concrete Patch | 75 | S.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 54 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 9 | L.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 42 | L.F. | $0.00 | $0.00 |
| Type Cb Concrete Patch | 6 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - Interior | 7 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #32 - PHASE 2B OPTION 5 ------------------------------------ | | | | | $ - 0 |
CLIN 33-PHASE 2B OPTION 6
| CONTRACT PRICE SCHEDULE - CLIN #33 - PHASE 2B OPTION 6 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Option Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 33 | CLIN #33 - PHASE 2B OPTION 6 | | | | |
| General Work Items | 1 | | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 90 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 54 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 21 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 9 | S.F. | $0.00 | $0.00 |
| Type Ci Crack Repair - Epoxy Injection | 6 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Interior | 8 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch – Through Wall | 8 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #33 - PHASE 2B OPTION 6 ------------------------------------ | | | | | $ - 0 |
CLIN 34-PHASE 2B OPTION 7
| CONTRACT PRICE SCHEDULE - CLIN #34 - PHASE 2B OPTION 7 |
| SOLICITATION NUMBER: |
| PARK - PMIS: GOGA/149952 |
| DEVELOPED AREA: Golden Gate National Recreation Area - Alcatraz Island |
| PROJECT TITLE: Stabilize & Repair the Exterior Walls of the Cellhouse for Visitor/Resource Protection - Alcatraz Option Phases 2B: Exterior Concrete Repair, Interior Wall Repair and Window Repair. |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 365 calendar days from the date of award. If 2A Options, 1 through 4, are not exercised at time of initial award, they, or any 2B Options will only be exercised if the Phase 2B Option is exercised and the contract completion date is extended 365 calendar days. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | | | | | |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 34 | CLIN #34 - PHASE 2B OPTION 7 | | | | |
| General Work Items | | | $0.00 | $0.00 |
| Type F Concrete Patch - With Anodes | 54 | S.F. | $0.00 | $0.00 |
| Type F Concrete Patch - No Anodes | 7 | S.F. | $0.00 | $0.00 |
| Type E Concrete Patch - With Anodes | 151 | L.F. | $0.00 | $0.00 |
| Type E Concrete Patch - No Anodes | 7 | L.F. | $0.00 | $0.00 |
| Type W Concrete Patch - Exterior - No Anodes | 48 | L.F. | $0.00 | $0.00 |
| Type Ws Concrete Patch | 20 | L.F. | $0.00 | $0.00 |
| Type P Concrete Patch | 75 | S.F. | $0.00 | $0.00 |
| Type O Concrete Patch | 28 | L.F. | $0.00 | $0.00 |
| Type AI Patch - Remove Abandoned Insert | 18 | EA | $0.00 | $0.00 |
| Type W Concrete Patch - Interior | 26 | L.F. | $0.00 | $0.00 |
| TOTAL CLIN #34 - PHASE 2B OPTION 7 ------------------------------------ | | | | | $ - 0 |