This package includes construction drawings and specifications for a federal contract solicitation to construct a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work involves constructing three new operating rooms and supporting infrastructure on the second floor of Buildings 2 and 38, including three ORs, pre-op and post-op areas, sterile core, soiled and clean holding, and mechanical and electrical upgrades to support the new surgical suites. The drawings depict demolition of existing areas, new fire suppression layouts, and reflected ceiling plans to coordinate MEPFP systems. The specifications reference compliance with NFPA 13 for fire protection installation and OSHA and VA infection control requirements. The solicitation is for project number 657-501 to create new inpatient and ambulatory surgical facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf | ||
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL TEE
SCREWED END
NEW PIPING
NOTE: SEE FLOOR
PLAN FOR EXISTING
AND NEW PIPE SIZES.
2" NIPPLE 4" LONG
WITH CAP.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
FEED OR CROSS MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
FLUSHING CONNECTION
MECHANICAL TEE
ADJUSTABLE RING HANGER.
AUTO. SPRINKLER PIPE.
SURGE RESTRAINER.
EXPANSION ANCHOR HILTI QUIK BOLT
TZ OR APPROVED EQUAL. EXPANSION
ANCHOR SHALL BE QUALIFIED FOR
USE IN CRACKED CONCRETE PER ACI
355.2.
EXIST. CONCRETE FLOOR
CONCRETE
STEEL BEAM.
C-CLAMP.
THREADED HANGER ROD.
RETAINING STRAP.
SET SCREW.
STEEL BEAM
NOTE: HANGING DETAILS SHOWN ARE SUBJECT
TO REQUIREMENTS OF SEISMIC DESIGN.
UPRIGHT HEAD.
PROVIDE GUARD.
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
NOTES:
1. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR
OTHER OBSTRUCTION OVER 48" IN WIDTH.
2. SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE HVAC AND GENERAL
CONTRACTOR.
3. SPRINKLER CONTRACTOR SHALL INCLUDE COST OF ADDITIONAL SUPPORTS, AS
REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN FULL CONFORMANCE WITH NFPA
REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG FROM DUCT WORK.
SPRINKLER BRANCH LINE
UPRIGHT HEAD
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
FIRE RATED WALL AND OR SLAB
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL AS
REQUIRED.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE & SLEEVE.
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE
FIRESTOPPING APPROVED
BY LOCAL CODES)
NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENTRATIONS OF
CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC
REQUIREMENTS.
WALL
MAX AREA PER HEAD
225 SQ. FT.
130 SQ. FT.
6'-0" MIN
15'-0" MAX
LIGHT HAZARD
ORDINARY HAZARD
6" MIN
7'-6" MAX
SPRINKLER HEAD
DENSITY PER 1500 SQ. FT.
0.1 GPM / SQ. FT.
0.15 GPM / SQ. FT.
SUSPENDED CEILING
DROP NIPPLE
PENDENT SPRINKLER
HEAD.
1"x1/2" R.C.
REDUCER
BRANCH LINE
1"x0'-2" NIPPLE
1" 90 EL.
1" X ARMOVER
1" X DROP
HANGERS
SHALL BE
PROVIDED
AS REQUIRED
BY NFPA 13.
TYPICAL
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED
QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
FIRE PROTECTION GENERAL NOTES
A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 8, “PLANS AND
CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER
SYSTEM.
B. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED
EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF VA.
C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY CODE & VA REQUIREMENTS
FOR THE APPROPRIATE HAZARD CLASSIFICATION.
D. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS
REQUIRED BY NFPA AND VA FOR THE APPROPRIATE HAZARD CLASSIFICATION.
E. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13
AND VA STANDARDS.
F. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND
OPERABLE SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.
G. FIRE PROTECTION CONTRACTOR SHOULD OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE
AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED.
H. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.
SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES
TO AVOID CONFLICT.
I. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE
PROTECTION SYSTEM.
J. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT
PRIMARY BUILDING STRUCTURAL MEMBERS.
K. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.
L. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER
DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.
M. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL
WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.
N. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
O. INCLUDE IN BID, PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL CITY OR VA FOR COMPLETION OF WORK
SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO OWNER.
P. PROMPTLY INFORM THE VA, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL
COST TO THE OWNER.
Q. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
R. ALL EXPENSES CARRIED BY THE A/E IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A
CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.
S. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
T. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED BY SPRINKLER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.
U. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED, INSTALLED AND TESTED BY PLUMBING CONTRACTOR. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED
BACKFLOW PREVENTER DEVICE IN HYDRAULIC CALCULATIONS.
V. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.
W. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS
OR CEILING TILE.
X. THE FIRE PROTECTION CONTRACTOR SHALL LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS
IN ACCORDANCE WITH NFPA-13.
Y. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR
MORE THAN 48 INCHES ABOVE ADJACENT SURFACE.
FIRE PROTECTION CONTRACTOR
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINE FPCFL
TAMPER SWITCH
FLOW SWITCH
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
ORDINARY HAZARD
GROUP 1 OCCUPANCY
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
KEYNOTE
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER CONNECT TO EXISTING
LIMITS OF DEMOLITION
BACKFLOW PREVENTER
FIRE PROTECTION DEMOLITION GENERAL NOTES
A. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR IS
TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND
VALVES PRIOR TO THE START OF WORK.
B. COORDINATE WITH VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE OWNER THREE (3) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR
INTERRUPTION.
C. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
D. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN
OFFSITE AND DISPOSED OF.
BUILDING AND OCCUPANT SAFETY -
INTERRUPTION OF FIRE PROTECTION SERVICE
A. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT
PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.
B. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN
ESTABLISHED AREA.
C. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY
DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.
D. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).
E. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS
USE.
F. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
FLOW TEST INFORMATION
THE BUILDING IS SERVED BY A FIRE PUMP. SEE EXISTING RISER PRESSURE GAUGE READING, DETAIL 7 ON
THIS SHEET.
T&D
TS
FS
ORDINARY HAZARD
GROUP 2 OCCUPANCY
INFECTION CONTROL MEASURES
A. CONTRACTOR SHALL COMPLY WITH VA INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
B. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE
MAINTAINED.
C. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
D. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBOURNE OPPORTUNISTIC
PATHOGENS.
E. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
SEISMIC DESIGN CRITERIA
(REFER TO STRUCTURAL DRAWINGS)
SS = 0.99
SI = 0.310
IE = 1.5
SDS = 0.688
RISK CATEGORY IV
SEISMIC DESIGN
CATEGORY - D
SD1 = 0.36
(PROVIDE SEISMIC SUPPORTS/BRACING AS REQUIRED.)
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, ESPECIALLY CHAPTERS 6 (TYPES OF CONSTRUCTION) AND CHAPTER 9 (FIRE
PROTECTION SYSTEMS), NFPA 13 (CHAPTER 8), AND THE PROJECT SPECIFICATIONS
FOR OTHER FIRE PROTECTION REQUIREMENTS.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:0
:4
P M
FS001
FIRE SUPPRESSION GENERAL
INFORMATION AND STANDARD
DETAILS
1 4NAS
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
2, 38
RBK
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL
Scale: No Scale
TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL
Scale: No Scale
TYPICAL SEMI-RECESSED PENDENT SPRINKLER
Scale: No Scale
FIRE SUPPRESSION RISER PRESSURE GAUGE
DocuSign Envelope ID: 4F810D56-F7FC-4A6F-92E9-37BF1FEFC9E6
11/14/2019
A
MN K G F
E D C
AREA OF WORK
4" FL
2" FL
FIBER OPTIC
236B
LOGISTICS
WOMEN
HAC
MEN
MECH.
INPATIENT DIETETIC
217A
CLINICAL DIETITION
INPATIENT DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STRESS LAB
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC SERVICE
STORAGE
208A
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION SERVICES
OUTPATIENT NUTRITION
OUTPATIENT NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207BCART STORAGE
207C
KITCHEN
PAMN
PAGING EQUIPMENT
ELEVATOR 2
ELEVATOR 1
OXYGEN STORAGE
WHEELCHAIR ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
ELEVATOR LOBBY
C1
2" FL
4" FL
4" FL
4" FL
4"
4"
" 4" 4"
2"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:4
P M
FD101
SECOND FLOOR FIRE SUPPRESSION
DEMOLITION PLAN
2 4NAS
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
2, 38
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN
01 2"FL UP TO PENTHOUSE. RELOCATE AS
INDICATED.
02 DEMOLISH ALL FL PIPING IN THIS AREA BACK
TO MAIN AS INDICATED. ROUTE NEW PIPING
FROM RISER.
03 DEMOLISH ALL EXISTING CPVC & STEEL
PIPING IN THIS AREA BACK TO MAINS AS
INDICATED.
04 SEE DETAIL 2 FOR PICTURE OF EXISTING 4"
RISER AND 2" DRAIN.
05 SEE DETAIL 3 FOR PICTURE OF EXISTING 4"
RISER AND 2" DRAIN.
01 REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
02 DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AS INDICATED.
03 EXISTING PIPE SIZES ARE APPROXIMATE.
Scale: No Scale
BUILDING 2 SPRINKLER RISER
Scale: No Scale
BUILDING 38 SPRINKLER RISER
A
MN K G F
E D C
MEN'S LOCKER
STAFF TOILET
STAFF TOILET
STAFF LOUNGE
CORRIDOR
C203-38
CORRIDOR
C201-38
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PACU
MEDS
CORRIDOR
C207-02
OR
CORRIDOR
C204-2
CORRIDOR
205-02
OR
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
ELEVATOR SHAFT
C202-54
CHASE
C202-56
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
FIBER OPTIC
LOGISTICS
PAMN
C207-02F
PAGING EQUIPMENT
C207-02G
WHEELCHAIR ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
STRESS LAB
ELEVATOR LOBBY
C1
AREA OF WORK
OR
TOILET
TOILET
N. MANAGER OFFICE
PSA OFFICE
BIO-MED
WOMEN'S LOCKER
ANESTHESIA
EQUIPMENT
HAC
215ELECTRICAL
ELECTRICAL
WAITING
CONSULTATION
PRE/POST
PRE/POST
PRE/POST
PRE/POST
PRE/POST
TOILET
TOILET
STAFF TOILET
ISOLATION
ANTE
CARE STATION
238 DICTATION
SOILED HOLDING
HAC
PRE/POST
PACU
PACU
CLEAN SUPPLY
IMMED. STER.
STERILE CORE
CORRIDOR
C201-02
4" FL
2" FL
4" FL
2" FL
4" FL
4" FL
2" FL
2" FL
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:4
P M
FS101
SECOND FLOOR FIRE SUPPRESSION
PLAN
3 4NAS
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
2, 38
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN 0 4 8 16
NORTH
PLAN
01 PROVIDE NEW SPRINKLER HEADS AS PER
NEW LAYOUT.
02 PROVIDE NEW FL MAINS AND BRANCH
PIPING.
03 RELOCATED 2" FL UP TO PENTHOUSE.
04 CONNECT TO EXISTING MAINS.
05 2" FL FROM BELOW.
01 EXISTING FIRE AND SMOKE ZONES SHALL BE
MAINTAINED.
02 FOR OCCUPANCY CLASSIFICATION, REFER
TO SPECIFICATIONS.
Scale: 1/8" = 1'-0"
PENTHOUSE FIRE PROTECTION PLAN
PP
PP
PP
ES
PP
PP
PP
ES
PP
PP
PPES
PP
ES
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP ESPP
PP
PPPP PPPP PPPP
PP
PP
PP
PP
PP
PP
PP
PP
PPES
PP PP
PP PP
PP
ES
ES
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P M
FS102
SECOND FLOOR FIRE SUPPRESSION
REFLECTED CEILING PLAN
4 4NAS
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
2, 38
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
0 4 8 16
NORTH
PLAN
01 SPRINKLER HEADS SHOWN ARE FOR
COORDINATION PURPOSE ONLY.
02 NEW SPRINKLER LAYOUT SHALL BE PER
NFPA-13 AND HYDRAULICALLY DESIGINED
SYSTEM.
03 MAINTAIN EXISTING SMOKE ZONES.
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN
| Sheets |
| FS001 - FIRE SUPPRESSION GENERAL INFORMATION AND STANDARD DETAILS |
| FD101 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN |
| FS101 - SECOND FLOOR FIRE SUPPRESSION PLAN |
| FS102 - SECOND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN |
| 2019-11-14T08:23:54-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .