The solicitation is for the construction of a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work includes creating three inpatient operating rooms and supporting services on the second floor of Building 2 and Building 38, where the current recreation hall and kitchen are located. Infrastructure for uninterruptible power supply to meet all VA requirements is also required. The completed project will provide the VA with a fully operational three operating room inpatient surgical and endovascular suite, as well as an ambulatory surgical service. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The opportunity number is 36C25520R0040_1 and the project number referenced is 657-501. The response due date and award date are not specified in the document provided.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTEGRATED PROJECT TEAM

APPROVAL SIGNATURES

DIRECTOR, MARION VAMC

ASSOCIATE DIRECTOR, MARION VAMC

CHIEF OF STAFF, MARION VAMC

COR, MARION VAMC

SAFETY

VA POLICE

PRIVACY OFFICER

INFECTION PREVENTION

PATIENT SAFETY

MENTAL HEALTH

PROJECT ENGINEER

WOMEN'S HEALTH COORDINATOR

MAINTENANCE AND OPERATIONS

ENERGY ENGINEER

STRATEGIC PLANNER

ENVIRONMENTAL MANAGEMENT / INTERIOR DESIGN

OFFICE OF INFORMATION AND TECHNOLOGY

CLINICAL SERVICES

FOOD AND NUTRITION

PHARMACY

STERILE PROCESSING AND DISTRIBUTION

BIOMEDICAL / ELECTRONICS

LOGISTICS

NURSING SERVICE

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1 /2

:2

:4

P M

G-001

COVER

1 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

MM

MARION VAMC

MARION, IL 62959

VA PROJECT #: 657-501

APOGEE PROJECT # 19-126

NORTH PERIPHERY

ROAD

SOUTH PERIPHERY

ROAD

W E S T

P E R

IP

H E R Y

R O A D

E A S T

P E R

IP

H E R Y

R O A D

QUONSET

STRUCTURES

T105 T106 T107 T108 T109

SWITCHGEAR

STATION

COOLING

TOWER

PAVILION

YARD

D O C K

WATER TOWER

P A V

IL

IO

N

8 82

MOD 6

MOD 5

MOD 1

MOD 4

16 15

MOD 3

LIQ.

OXYG.

STOR.

x x x x xx

SIDEWALK

S

ID

E W

AL

K

SIDEWALK

PATIO

RAMP

SIDEWALK

SID

EW

ALK

S

ID

E W

AL

K

WALK/STAIRS

S

ID

E W A L K

CONCRETE

TRASH

SIDEWALK

SIDEWALK

SIDEWALK

CONCRETE

WHEELCHAIR

RAMP

ENTRY

SIDEWALK

W H E E L C H

AI

R

P

AT

IE

N T V

IS

TO

R

P

AT

IE

N T V

IS

TO

R

P

AT

IE

N T V

IS

IT

O R

P

AT

IE

N T V

IS

IT

O R

O P E N

P A R K

IN

G

O P E N

P A R K

IN

G

VO

L.

VO

L.

VO

L.

VO

L.

VO

L.

VOL.

VOL.

VOL.

VOL.

VOL.

W H E E L C H

AI

R

W H E E L C H

AI

R

W H E E L C H

AI

R

GOV.CO

NS

UL

T

GOV.

DAV

DAV

DAV

OR

C

LE

RG

Y

CO

NS

UL

T

OR

C

LE

RG

Y

CO

NS

UL

T

OR

C

LE

RG

Y

CO

NS

UL

T

OR

C

LE

RG

Y

CO

NS

UL

T

OR

C

LE

RG

Y

VISITOR

VISITOR

VISITOR

VISITOR

VISITOR

O P E N

P A R K

IN

G

O P E N

P A R K

IN

G

GO

V.

VIS

ITO

R

VIS

ITO

R

W H E E L C H

AI

R

OPEN PARKING

C O M M A N D E R

D R

IV

E

AS

PH

AL

T

PA

VE

ME

NT

BLDG. 8 DRIVE

E D U C B

LD

G S E R V

IC

E

D R

P U

LL

O

FF

A P R O N

NHCU STAFF PARKING LOT

WAREHOUSE/SHOPS PARKING

ENGIN./SAFETY

CONCRETE

ASPHALT

GRAVEL

G R A V E L

C O M M A N D E R

D R

IV

E

M O B

IL

E

C A

TS

C A N

P A R K

IN

G

S P A C E

NHCU

LOADING

DOCK

PARKING

CONCRETE

ENGIN./SAFETY

FUEL TRUCK APRON

NHCU SERVICE DRIVE

STAFF PARKING

LOADING DOCK APRON

STAFF PARKING

STAFF PARKING

CUSHMAN

PARKING

CUSHMAN

PARKING

PARKING

ASPHALT

ENGIN./SAFETY

PARKING

STAFF PARKING

STAFF PARKING

STAFF PARKING

x x xxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx x x x x x x x x x

DEPT. VA

MEDICAL CENTER

ILLINOIS

EastWest

South

North

STATE LOCATION MAP

MARION

MARION LOCATION MAP

2000 FEET

PROJECT LOCATION

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1 /2

:2

:5

P M

G-002

DRAWING INDEX AND PROJECT

INFORMATION

2 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

MM

N

CAMPUS MAP

SCALE: NTS

GENERAL

G-001 COVER 1 5

G-002 DRAWING INDEX AND PROJECT IMFORMATION 2 5

LS101 LIFE SAFETY FLOOR PLAN 3 5

LS111 LIFE SAFETY - ACCESSIBILITY GUIDELINES 4 5

LS112 LIFE SAFETY - ACCESSIBILITY GUIDELINES 5 5

INDUSTRIAL HYGIENE

HA-101 ASBESTOS ABATEMENT PLAN, FIRST FLOOR 1 5

HA-102 ASBESTOS ABATEMENT PLAN, SECOND FLOOR 2 5

HA-103 LEAD ABATEMENT PLAN, SECOND FLOOR 3 5

HA-104 ASBESTOS DUCT SEAM SEALANT DISMANTLING PLAN - SECOND FLOOR 4 5

HA-105 ASBESTOS & LEAD ABATEMENT PLAN, PENTHOUSE MECHANICAL ROOMS 5 5

STRUCTURAL

SS001 ABBREVIATIONS AND SYMBOLS 1 15

SS002 GENERAL NOTES 2 15

SS003 SPECIAL INSPECTION REQUIREMENTS 3 15

SS004 LOAD MAPS 4 15

SD101 SECOND FLOOR DEMOLITION PLAN 5 15

SD102 ROOF DEMOLITION PLAN 6 15

SS102 BUILDING 02 SECOND FLOOR PLAN AREA 'A' FRAMING PLAN 7 15

SS103 BUILDING 02 SECOND FLOOR PLAN AREA 'B' FRAMING PLAN 8 15

SS105 BUILDING 02 SECOND FLOOR PLAN CEILING AREA 'B' FRAMING PLAN 9 15

SS106 BUILDING 02 ROOF AREA 'A' FRAMING PLAN 10 15

SS107 BUILDING 02 ROOF AREA 'B' FRAMING PLAN 11 15

SS108 BUILDING 38 ROOF FRAMING PLAN 12 15

SS301 CONCRETE SCHEDULES, SECTIONS AND DETAILS 12 15

SS501 STEEL SCHEDULES, SECTIONS AND DETAILS 13 15

SS502 STEEL SECTIONS AND DETAILS 15 15

ARCHITECTURAL

A-001 ARCHITECTURAL NOTES, ABBREVIATIONS, AND SYMBOLS 1 28

A-002 SECOND FLOOR EXISTING PLAN 2 28

A-003 PHASING AND INFECTION CONTROL PLAN 3 28

AD-101 SECOND FLOOR DEMOLITION PLAN 4 28

A-101 SECOND FLOOR OVERALL RENOVATION PLAN 5 28

A-102 BUILDING 02 SECOND FLOOR AREA 'A' RENOVATION PLAN 6 28

A-103 BUILDING 02 SECOND FLOOR AREA 'B' RENOVATION PLAN 7 28

A-104 BUILDING 38 SECOND FLOOR REFLECTED CEILING PLAN 8 28

A-105 ROOF PLAN 9 28

AC-101 SECOND FLOOR REFLECTED CEILING PLAN 10 28

AC-102 BUILDING 02 SECOND FLOOR AREA 'A' REFLECTED CEILING PLAN 11 28

AC-103 BUILDING 02 SECOND FLOOR AREA 'B' REFLECTED CEILING PLAN 12 28

AC-104 BUILDING 38 SECOND FLOOR REFLECTED CEILING PLAN 13 28

A-201 EXTERIOR BUILDING ELEVATIONS 14 28

A-202 EXTERIOR BUILDING ELEVATIONS 15 28

A-301 BUILDING SECTIONS 16 28

A-401 ENLARGED PLANS 17 28

A-501 PARTITION TYPE DETAILS 18 28

A-502 GENERAL DETAILS 19 28

A-511 CASEWORK ELEVATIONS AND SCHEDULE 20 28

A-512 CASEWORK DETAILS 21 28

A-513 WALL PROTECTION ELEVATIONS 22 28

A-514 WALL PROTECTION ELEVATIONS 23 28

A-601 DOOR SCHEDULE, DOOR ELEVATIONS, AND DETAILS 24 28

AI-101 SECOND FLOOR FINISH PLAN 25 28

AI-102 FLOOR PATTERN FLOOR PLAN 26 28

AI-103 WALL PROTECTION FLOOR PLAN AND DETAILS 27 28

AI-104 SIGNAGE FLOOR PLAN AND SCHEDULE 28 28

INTERIORS

I-001 FFE AND EQUIPMENT SCHEDULES 1 8

I-002 FFE AND EQUIPMENT SCHEDULES 2 8

I-003 FFE AND EQUIPMENT SCHEDULES 3 8

I-101 OVERALL SECOND FLOOR FFE PLAN 4 8

I-401 ENLARGED TYPICAL FFE PLANS 5 8

I-402 ENLARGED TYPICAL FFE PLANS 6 8

I-411 INTERIOR ELEVATIONS 7 8

I-412 INTERIOR ELEVATIONS 8 8

EQUIPMENT

QH-001 BUILDING 02 SECOND FLOOR AREA 'A' EQUIPMENT PLAN 1 3

I-002 BUILDING 02 SECOND FLOOR AREA 'B' EQUIPMENT PLAN 2 3

I-003 BUILDING 38 SECOND FLOOR EQUIPMENT PLAN 3 3

PLUMBING

P-000 PLUMBING LEGEND 1 25

PD-102A SECOND FLOOR PLUMBING DEMOLITION PLAN AREA 'A' 2 25

PD-102B SECOND FLOOR PLUMBING DEMOLITION PLAN AREA 'B' 3 25

PD-102C SECOND FLOOR PLUMBING DEMOLITION PLAN BLDG. 38 4 25

PP-100A PARTIAL BASEMENT PLUMBING PLAN BLDG. #2 5 25

PP-100B PARTIAL GROUND FLOOR PLUMBING PLAN 6 25

PL-101A FIRST FLOOR SANITARY PLAN A 7 25

PL-101B FIRST FLOOR SANITARY PLAN B 8 25

PL-101C FIRST FLOOR SANITARY PLAN BLDG. 38 9 25

PL-102A SECOND FLOOR SANITARY PLAN A 10 25

PL-102B SECOND FLOOR SANITARY PLAN B 11 25

PL-102C SECOND FLOOR SANITARY PLAN BLDG. 38 12 25

PP-102A SECOND FLOOR DOMESTIC WATER PLAN A 13 25

PP-102B SECOND FLOOR DOMESTIC WATER PLAN B 14 25

PP-102C SECOND FLOOR DOMESTIC WATER PLAN BLDG. 38 15 25

PG-102A SECOND FLOOR MED GAS PLAN A 16 25

PG-102B SECOND FLOOR MED GAS PLAN B 17 25

PG-102C SECOND FLOOR MED GAS PLAN BLDG. 38 18 25

PG-104 PARTIAL PENTHOUSE MED GAS PLAN 19 25

P-301 PLUMBING RISER DIAGRAMS 20 25

P-302 PLUMBING RISER DIAGRAMS 21 25

P-401 ENLARGED PLUMBING PLANS 22 25

P-501 PLUMBING DETAILS 23 25

P-502 PLUMBING DETAILS 24 25

P-601 PLUMBING SCHEDULES 25 25

MECHANICAL

M-000 MECHANICAL LEGENDS AND ABBREVIATIONS 1 31

MHD-101 MECHANICAL HVAC PLAN - BLDG 2 & 38 OVERALL LEVEL 1 FLOOR PLAN 2 31

MHD-102A MECHANICAL HVAC DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 3 31

MHD-102B MECHANICAL HVAC DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 4 31

MHD-102C MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 5 31

MHD-103 MECHANICAL HVAC PLAN - BLDG 38, OVERALL LEVEL 3 FLOOR PLAN 6 31

MPD-102A MECHANICAL PIPING DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 7 31

MPD-102B MECHANICAL PIPING DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 8 31

MPD-102C MECHANICAL PIPING DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 9 31

MD-104A MECHANICAL DEMOLITION PLAN - BLDG 2, PENTHOUSE LEVEL 10 31

MD-104B MECHANICAL DEMOLITION PLAN - BLDG 38, PENTHOUSE LEVEL 11 31

MH-102A MECHANICAL HVAC PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 12 31

MH-102B MECHANICAL HVAC PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 13 31

MH-102C MECHANICAL HVAC PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 14 31

MH-103 MECHANICAL HVAC PLAN - BLDG 38, LEVEL 3 FLOOR PLAN 15 31

MP-102A MECHANICAL HVAC PIPING PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 16 31

MP-102B MECHANICAL HVAC PIPING PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 17 31

MP-102C MECHANICAL HVAC PIPING PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 18 31

MH-104A MECHANICAL HVAC PIPING PLAN - BLDG 2, PENTHOUSE LEVEL 19 31

MH-104B MECHANICAL HVAC PIPING PLAN - BLDG 38, PENTHOUSE LEVEL 20 31

M-301 MECHANICAL SECTIONS I 21 31

M-401 MECHANICAL HVAC PLAN - TYPICAL OPERATING ROOM PARTIAL PLAN 22 31

M-501 MECHANICAL DETAILS I 23 31

M-601 MECHANICAL SCHEDULES I 24 31

M-602 MECHANICAL SCHEDULES II 25 31

M-701 MECHANICAL CONTROLS I 26 31

M-702 MECHANICAL CONTROLS II 27 31

M-703 MECHANICAL CONTROLS III 28 31

M-704 MECHANICAL CONTROLS IV 29 31

M-705 MECHANICAL CONTROLS V 30 31

M-706 MECHANICAL CONTROLS VI 31 31

ELECTRICAL

E-001 ELECTRICAL LEGEND 1 15

ED-102 BUILDING 2 AND BUILDING 38 SECOND FLOOR ELECTRICAL DEMOLITION PLAN 2 15

EL-102A BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL LIGHTING PLAN 3 15

EL-102B BUILDING 2 SECOND FLOOR AREA 'B' ELECTRICAL LIGHTING PLAN 4 15

EL-102C BUILDING 38 SECOND FLOOR ELECTRICAL LIGHTING PLAN 5 15

EP-102B BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL POWER PLAN 6 15

EP-102B BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL POWER PLAN 7 15

EP-102C BUILDING 38 SECOND FLOOR ELECTRICAL POWER PLAN 8 15

EP104 BUILDING 2 PENTHOUSE ELECTRICAL POWER PLAN 9 15

E-501 ELECTRICAL DETAILS 10 15

E-601 ELECTRICAL ONE-LINE DIAGRAM 11 15

E-602 ELECTRICAL SCHEDULES 12 15

E-603 PANEL SCHEDULES 13 15

E-604 PANEL SCHEDULES 14 15

E-701 LIGHTING CONTROL DIAGRAMS 15 15

TECHNOLOGY

TK-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND AND ABBREVIATIONS 1 7

TD-101 SECOND FLOOR TECHNOLOGY/SYSTEMS DEMOLITION PLAN 2 7

TK-101 SECOND FLOOR TECHNOLOGY PLAN 3 7

TK-102 SECOND FLOOR SYSTEMS PLAN 4 7

TK-401 TECHNOLOGY ENLARGEMENTS 5 7

TK-501 TECHNOLOGY DETAILS 6 7

TK-502 TECHNOLOGY DETAILS 7 7

FIRE ALARM

FA-001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2

FA-101 SECOND FLOOR FIRE ALARM 2 2

FIRE SUPPRESSION

FS-001 FIRE SUPPRESSION GENERAL INFORMATION AND STANDARD DETAILS 1 4

FD-101 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN 2 4

FS-101 SECOND FLOOR FIRE SUPPRESSION PLAN 3 4

FS-102 SECOND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN 4 4

DRAWING INDEX

NO. DESCRIPTION DWG of DWG NO. DESCRIPTION DWG of DWG

DN

MN K G F

E D C B A

Q

2-11

O M.2 K.1 F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-2

2-1

2-9

AA AC

2-4

2-7

L.5

N

D

K.2

F.8

A

146 SF

STAIR

S2-02

330 SF

CARE STATION

467 SF

CORRIDOR

C206-02

117 SF

PACU

244 155 SF

CLEAN SUPPLY

136 SF

PRE/POST

125 SF

PRE/POST

276 SF

CORRIDOR

C204-02

100 SF

CORRIDOR

C207-02

57 SF

SOILED HOLDING

112 SF

MEDS

53 SF

HAC

808 SF

STERILE CORE

585 SF

OR

28 SF

ALCOVE

C207-02A

95 SF

CORRIDOR

C204-2

100 SF

CORRIDOR

205-02

563 SF

OR

535 SF

CORRIDOR

C201-02

159 SF

EQUIPMENT

306 SF

CORRIDOR

C202-02

148 SF

CORRIDOR

C203-02

108 SF

STORAGE

70 SF

STAIR

S1-02

672 SF

WAITING

39 SF

ELECTRICAL

CHASE

323 SF

CORRIDOR

C201-38

359 SF

STAFF LOUNGE

97 SF

SOILED

31 SF

ELECTRICAL

47 SF

HAC

93 SF

CORRIDOR

C203-38

45 SF

STAFF TOILET

44 SF

STAFF TOILET

200 SF

WOMEN'S

LOCKER

147 SF

MEN'S LOCKER

CHASE

ELEVATOR

SHAFT

64 SF

ELEVATOR 2

C207-02B

61 SF

ELEVATOR 1

C207-02C

63 SF

PAMN

C207-02F

89 SF

FIBER OPTIC

113 SF

LOGISTICS

309 SF

PAGING

EQUIPMENT

C207-02G

110 SF

WHEELCHAIR

ALCOVE

C3

51 SF

SOILED UTILITY

70 SF

ELEC.

135 SF

CORRIDOR

C2

280 SF

ELEVATOR

LOBBY

C1

678 SF

STRESS LAB

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B

U

IL

D

IN

G

B U

IL

D

IN

G

B

U

IL

D

IN

G

CLEAR DOOR WIDTH = 33"

EXIT CAPACITY = 165

CLEAR DOOR WIDTH = 33"

EXIT CAPACITY = 165

CLEAR DOOR WIDTH = 33"

EXIT STAIR WIDTH = 44"

EXIT CAPACITY = 146

CLEAR DOOR WIDTH = 33"

EXIT STAIR WIDTH = 44"

EXIT CAPACITY = 146

ACTUAL CLEAR DOOR

WIDTH = 34 1/2"

ACTUAL EXIT STAIR

WIDTH = 36"

EXIT CAPACITY = 120

ACTUAL CLEAR DOOR

WIDTH = 67"

EXIT CAPACITY = 165

ACTUAL CLEAR DOOR

WIDTH = 33"

ACTUAL EXIT STAIR

WIDTH = 28"

EXIT CAPACITY = 146

SUITE 2.1

AREA: 3,485 SF

CIRCULATION STAIR

ACTUAL CLEAR DOOR

WIDTH = 67"

EXIT CAPACITY = 165

131 SF

PRE/POST

134 SF

PRE/POST

133 SF

PRE/POST

125 SF

PRE/POST

360 SF

CORRIDOR

C208-02

148 SF

ISOLATION

74 SF

ANTE

47 SF

STAFF TOILET

258 22 SF

SCRUB STATION

247A

16 SF

ALCOVE

249A

38 SF

SCRUB STATION

249B

17 SF

SCRUB STATION

250A

47 SF

CHASE

C202-57

171 SF

PRE/POST

113 SF

PACU

111 SF

PACU

32 SF

ALCOVE

C206-02A

103 SF

DICTATION

49 SF

TOILET

49 SF

TOILET

100 SF

ANESTHESIA

140 SF

IMMED. STER.

21 SF

BIO-MED

46 SF

TOILET

56 SF

TOILET

88 SF

N. MANAGER

OFFICE

82 SF

CONSULTATION

113 SF

RECEPTION

100 SF

PSA OFFICE

15 SF

CHASE

543 SF

OR

D N

E

E

E

E

E

E

E

E

E

E

E

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

DISTANCE: 77'-10"

DISTANCE: 70'-8"

DISTANCE: 59'-0"

MARION VA - BUILDING 38 - LEVEL 2

OCCUPANT LOAD CALCULATION

BUSINESS: 2,620 sf / 100sf PER PERSON = 26

STORAGE: 302sf / 300sf PER PERSON = 1

ASSEMBLY: 937sf / 15sF PER PERSON = 62

LOCKER ROOMS: 301sf / 50sf PER PERSON = 6

TOTAL: = 95

MARION VA - BUILDING 2 - LEVEL 2

OCCUPANT LOAD CALCULATION

AHC: 8,484sf / 150sf PER PERSON = 56

STORAGE: 1,503sf / 300sf PER PERSON = 5

TOTAL: = 61

LIFE SAFETY LEGEND:

NEW 2-HR FIRE BARRIER

EXISTING 2-HR FIRE/SMOKE BARRIER

NEW SMOKE PARTITION

EXIT SIGN

TRAVEL DISTANCE

FIRE EXTINGUISHER CABINET

E

F.E.C.

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1 /2

:2

:0

P M

LS101

LIFE SAFETY FLOOR PLAN

3 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

2, 38

MM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/8" = 1'-0"

SECOND FLOOR OVERALL LIFE SAFETY PLAN

THE EXISTING EXIT ARRANGEMENT TO REMAIN

ONLY UPON APPROVAL OF THE LOCAL AUTHORITY

HAVING JURISDICTION GIVEN THE EXISTING

GEOMETRY TO REMAIN, THE DOORS LOCATED

BETWEEN BUILDINGS 1 AND 38 DO NOT SWING IN

THE PROPER DIRECTION NEEDED TO PROVIDE A

SECOND EXIT. THESE DOORS WOULD NEED TO BE

REPLACED WITH DOUBLE EGRESS DOORS TO

SATISFY THE EXITING REQUIREMENTS, PRESENTLY

BEYOND THE SCOPE OF THIS CONTRACT.

1.

AUTHORITY HAVING JURISDICTION

DEPARTMENT OF VETERAL AFFAIRS

SEE LIFE SAFETY NARRATIVE FOR APPLICABLE

CODES

CODE SUMMARY -

T his D rawing Produ ced by the U.S. A ccess Board

T his Drawing Pro duced by the U. S. Access Board

T his Drawing Produced by the U.S. A ccess Board

Th is Dra win g Pro du ce d b y th e U.S. Ac ce s s Bo ard

/2

M

A X

/4

M

A X

48" MIN.

M

IN

M

IN

30" MIN.

M

IN

48" MIN.

(A) FORWARD

(B) PARALLEL

MAX.

6"

M

IN

17"-25"

(A) ELEVATION (B) PLAN

4" MAX.

X

X

M

IN

M

A X

M

A X

M

A X

20" MAX. ˃20 - 25" MAX.

(A) (B)

10" MAX.

M

IN

M

A X

M

A X

M

A X

M

A X

M

A X

10" MAX. ˃10" - 24" MAX.

(A) (B)

M

IN

M

IN

M

IN

M

IN

24" MAX.48" MIN.24" MAX.

M

IN

M

IN

42" MIN. 42" MIN.

X ˂ 48"

36" MIN.

X ˂ 48"

36" MIN.

(A)

180˚ TURN

(B)

180˚ TURN

(EXCEPTION)

32" MIN.*

.0

0°

(A) HINGED DOOR

*VA REQUIRED PATIENT ROOM

DOORWAY CLEAR WIDTH IS 4'-0".

48" MIN. 48" MIN.

48" MIN.

(A) (B)

(C)

(C)

WALKING SURFACES

/2

M

IN

2 1/4" MIN.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1 /2

:2

:1

P M

LS111

LIFE SAFETY - ACCESSIBILITY

GUIDELINES

4 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

2, 38

MM

12" = 1'-0"

FIG. 302.2 - CARPET PILE HT.

12" = 1'-0"

FIG. 303.2 - VERT. CHANGE IN LEVEL

3/4" = 1'-0"

FIG. 305.3 - CLEAR FLOOR SPACE

3/4" = 1'-0"

FIG. 305.5 - FORWARD / PARALLEL APPROACH

3/4" = 1'-0"

FIG. 306.2 - TOE CLEARANCE

3/4" = 1'-0"

FIG. 307.2 LIMITS OF PROTRUDING OBJECTS

3/4" = 1'-0"

FIG. 308.2.1 - UNOBSTR. FORWARD REACH

3/4" = 1'-0"

FIG. 308.2.2 - OBSTR. HIGH FORWARD REACH

3/4" = 1'-0"

FIG. 308.3.1 - UNOBSTR. SIDE REACH

3/4" = 1'-0"

FIG. 308.3.2 - OBSTR. SIDE REACH

3/4" = 1'-0"

FIG. 403.5.1 - CLEAR WIDTH OF AN ACCESSIBLE ROUTE

1/2" = 1'-0"

FIG. 403.5.2 - CLEAR WIDTH AT TURN

3/4" = 1'-0"

FIG. 404.2.3 - CLEAR WIDTH OF DOORWAYS

3/4" = 1'-0"

FIG. 404.2.6 - DOORS/GATES IN SERIES

3/4" = 1'-0"

FIG. 505.4 - HANDRAIL HEIGHT

1 1/2" = 1'-0"

FIG. 505.5/505.6 - HANDRAIL CLEARANCE

LIBRARY

M

IN

18" MIN.

(A)

FRONT APPROACH, PULL SIDE

(B)

FRONT APPROACH,

PUSH SIDE

M

IN

M

IN

12" MIN.

(C)

FRONT APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

M

IN

36" MIN.

(D)

HINGE APPROACH, PULL SIDE

(E)

HINGE APPROACH, PULL SIDE

M

IN

42" MIN.

(F)

HINGE APPROACH,

PUSH SIDE

M

IN

22" MIN.

M

IN

22" MIN.

(G)

HINGE APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

(H)

LATCH APPROACH, PULL SIDE

M

IN

24" MIN.

M

IN

24" MIN.

(I)

LATCH APPROACH, PULL SIDE

DOOR PROVIDED WITH CLOSER

(J)

LATCH APPROACH,

PUSH SIDE

M

IN

24" MIN.

(K)

LATCH APPROACH, PUSH SIDE

DOOR PROVIDED WITH CLOSER

M

IN

24" MIN.

16"-18"

C L

(A)

WHEELCHAIR ACCESSIBLE

WATER CLOSETS

60" MIN.

M

IN

M

IN

-1

/2

M

IN

(A)

PROJECTING OBJECTS

(B)

RECESSED OBJECTS

/8

HEIGHT OF OPERABLE PORTION

DISPENSER OUTLET

LOCATION

VERTICAL GRAB BAR

M

A X

13 1/2" MIN.

M A

X

U P

P E

R R

A N

G E

L O

W E

R R

A N

G E

M

IN

12" MIN. 24" MIN.

36" MIN.

CL CL

M

A X

M

A X

16"-18" 1' - 3"

M

A X

7"-9"

42" MIN. 12" MAX.

54" MIN.

M

IN

CL

VERTICAL GRAB BAR

24 min m in

22 min m in m in m in

(d) stop or latch approach

(c) pocket or hinge approach

(b) side approach

(a) front approach

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1 /2

:2

:2

P M

LS112

LIFE SAFETY - ACCESSIBILITY

GUIDELINES

5 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

2, 38

MM

1/2" = 1'-0"

FIG. 404.2.4.1 - MANEUVERING CLEARANCE AT MANUAL SWINGING DOORS AND GATES

3/4" = 1'-0"

FIG. 604.2 - WATER CLOSET LOCATION

3/4" = 1'-0"

FIG. 604.3.1 - CLEARANCE AT WATER CLOSETS

1" = 1'-0"

FIG. 609.3 - GRAB BAR SPACING

1 1/2" = 1'-0"

FIG. 703.2.5 - HT. OF RAISED CHARACTERS

3/4" = 1'-0"

TYPICAL MOUNTING HEIGHTS

1/2" = 1'-0"

WITHOUT DOORS, SLIDING DOORS, GATES, AND FOLDING DOORS

FIG. 404.2.4.2 - MANEUVERING CLEARANCES AT DOORWAYS

File details come from the government source that posted it. Updated .