P09 Drawings 01 General 100 BID - 5 pages.pdf
PDF 831 KB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040_1
About this file
The solicitation is for the construction of a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work includes creating three inpatient operating rooms and supporting services on the second floor of Building 2 and Building 38, where the current recreation hall and kitchen are located. Infrastructure for uninterruptible power supply to meet all VA requirements is also required. The completed project will provide the VA with a fully operational three operating room inpatient surgical and endovascular suite, as well as an ambulatory surgical service. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The opportunity number is 36C25520R0040_1 and the project number referenced is 657-501. The response due date and award date are not specified in the document provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf | ||
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTEGRATED PROJECT TEAM
APPROVAL SIGNATURES
DIRECTOR, MARION VAMC
ASSOCIATE DIRECTOR, MARION VAMC
CHIEF OF STAFF, MARION VAMC
COR, MARION VAMC
SAFETY
VA POLICE
PRIVACY OFFICER
INFECTION PREVENTION
PATIENT SAFETY
MENTAL HEALTH
PROJECT ENGINEER
WOMEN'S HEALTH COORDINATOR
MAINTENANCE AND OPERATIONS
ENERGY ENGINEER
STRATEGIC PLANNER
ENVIRONMENTAL MANAGEMENT / INTERIOR DESIGN
OFFICE OF INFORMATION AND TECHNOLOGY
CLINICAL SERVICES
FOOD AND NUTRITION
PHARMACY
STERILE PROCESSING AND DISTRIBUTION
BIOMEDICAL / ELECTRONICS
LOGISTICS
NURSING SERVICE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:4
P M
G-001
COVER
1 5ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
MARION VAMC
MARION, IL 62959
VA PROJECT #: 657-501
APOGEE PROJECT # 19-126
NORTH PERIPHERY
ROAD
SOUTH PERIPHERY
ROAD
W E S T
P E R
IP
H E R Y
R O A D
E A S T
P E R
IP
H E R Y
R O A D
QUONSET
STRUCTURES
T105 T106 T107 T108 T109
SWITCHGEAR
STATION
COOLING
TOWER
PAVILION
YARD
D O C K
WATER TOWER
P A V
IL
IO
N
8 82
MOD 6
MOD 5
MOD 1
MOD 4
16 15
MOD 3
LIQ.
OXYG.
STOR.
x x x x xx
SIDEWALK
S
ID
E W
AL
K
SIDEWALK
PATIO
RAMP
SIDEWALK
SID
EW
ALK
S
ID
E W
AL
K
WALK/STAIRS
S
ID
E W A L K
CONCRETE
TRASH
SIDEWALK
SIDEWALK
SIDEWALK
CONCRETE
WHEELCHAIR
RAMP
ENTRY
SIDEWALK
W H E E L C H
AI
R
P
AT
IE
N T V
IS
TO
R
P
AT
IE
N T V
IS
TO
R
P
AT
IE
N T V
IS
IT
O R
P
AT
IE
N T V
IS
IT
O R
O P E N
P A R K
IN
G
O P E N
P A R K
IN
G
VO
L.
VO
L.
VO
L.
VO
L.
VO
L.
VOL.
VOL.
VOL.
VOL.
VOL.
W H E E L C H
AI
R
W H E E L C H
AI
R
W H E E L C H
AI
R
GOV.CO
NS
UL
T
GOV.
DAV
DAV
DAV
OR
C
LE
RG
Y
CO
NS
UL
T
OR
C
LE
RG
Y
CO
NS
UL
T
OR
C
LE
RG
Y
CO
NS
UL
T
OR
C
LE
RG
Y
CO
NS
UL
T
OR
C
LE
RG
Y
VISITOR
VISITOR
VISITOR
VISITOR
VISITOR
O P E N
P A R K
IN
G
O P E N
P A R K
IN
G
GO
V.
VIS
ITO
R
VIS
ITO
R
W H E E L C H
AI
R
OPEN PARKING
C O M M A N D E R
D R
IV
E
AS
PH
AL
T
PA
VE
ME
NT
BLDG. 8 DRIVE
E D U C B
LD
G S E R V
IC
E
D R
P U
LL
O
FF
A P R O N
NHCU STAFF PARKING LOT
WAREHOUSE/SHOPS PARKING
ENGIN./SAFETY
CONCRETE
ASPHALT
GRAVEL
G R A V E L
C O M M A N D E R
D R
IV
E
M O B
IL
E
C A
TS
C A N
P A R K
IN
G
S P A C E
NHCU
LOADING
DOCK
PARKING
CONCRETE
ENGIN./SAFETY
FUEL TRUCK APRON
NHCU SERVICE DRIVE
STAFF PARKING
LOADING DOCK APRON
STAFF PARKING
STAFF PARKING
CUSHMAN
PARKING
CUSHMAN
PARKING
PARKING
ASPHALT
ENGIN./SAFETY
PARKING
STAFF PARKING
STAFF PARKING
STAFF PARKING
x x xxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx x x x x x x x x x
DEPT. VA
MEDICAL CENTER
ILLINOIS
EastWest
South
North
STATE LOCATION MAP
MARION
MARION LOCATION MAP
2000 FEET
PROJECT LOCATION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:5
P M
G-002
DRAWING INDEX AND PROJECT
INFORMATION
2 5ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
N
CAMPUS MAP
SCALE: NTS
GENERAL
G-001 COVER 1 5
G-002 DRAWING INDEX AND PROJECT IMFORMATION 2 5
LS101 LIFE SAFETY FLOOR PLAN 3 5
LS111 LIFE SAFETY - ACCESSIBILITY GUIDELINES 4 5
LS112 LIFE SAFETY - ACCESSIBILITY GUIDELINES 5 5
INDUSTRIAL HYGIENE
HA-101 ASBESTOS ABATEMENT PLAN, FIRST FLOOR 1 5
HA-102 ASBESTOS ABATEMENT PLAN, SECOND FLOOR 2 5
HA-103 LEAD ABATEMENT PLAN, SECOND FLOOR 3 5
HA-104 ASBESTOS DUCT SEAM SEALANT DISMANTLING PLAN - SECOND FLOOR 4 5
HA-105 ASBESTOS & LEAD ABATEMENT PLAN, PENTHOUSE MECHANICAL ROOMS 5 5
STRUCTURAL
SS001 ABBREVIATIONS AND SYMBOLS 1 15
SS002 GENERAL NOTES 2 15
SS003 SPECIAL INSPECTION REQUIREMENTS 3 15
SS004 LOAD MAPS 4 15
SD101 SECOND FLOOR DEMOLITION PLAN 5 15
SD102 ROOF DEMOLITION PLAN 6 15
SS102 BUILDING 02 SECOND FLOOR PLAN AREA 'A' FRAMING PLAN 7 15
SS103 BUILDING 02 SECOND FLOOR PLAN AREA 'B' FRAMING PLAN 8 15
SS105 BUILDING 02 SECOND FLOOR PLAN CEILING AREA 'B' FRAMING PLAN 9 15
SS106 BUILDING 02 ROOF AREA 'A' FRAMING PLAN 10 15
SS107 BUILDING 02 ROOF AREA 'B' FRAMING PLAN 11 15
SS108 BUILDING 38 ROOF FRAMING PLAN 12 15
SS301 CONCRETE SCHEDULES, SECTIONS AND DETAILS 12 15
SS501 STEEL SCHEDULES, SECTIONS AND DETAILS 13 15
SS502 STEEL SECTIONS AND DETAILS 15 15
ARCHITECTURAL
A-001 ARCHITECTURAL NOTES, ABBREVIATIONS, AND SYMBOLS 1 28
A-002 SECOND FLOOR EXISTING PLAN 2 28
A-003 PHASING AND INFECTION CONTROL PLAN 3 28
AD-101 SECOND FLOOR DEMOLITION PLAN 4 28
A-101 SECOND FLOOR OVERALL RENOVATION PLAN 5 28
A-102 BUILDING 02 SECOND FLOOR AREA 'A' RENOVATION PLAN 6 28
A-103 BUILDING 02 SECOND FLOOR AREA 'B' RENOVATION PLAN 7 28
A-104 BUILDING 38 SECOND FLOOR REFLECTED CEILING PLAN 8 28
A-105 ROOF PLAN 9 28
AC-101 SECOND FLOOR REFLECTED CEILING PLAN 10 28
AC-102 BUILDING 02 SECOND FLOOR AREA 'A' REFLECTED CEILING PLAN 11 28
AC-103 BUILDING 02 SECOND FLOOR AREA 'B' REFLECTED CEILING PLAN 12 28
AC-104 BUILDING 38 SECOND FLOOR REFLECTED CEILING PLAN 13 28
A-201 EXTERIOR BUILDING ELEVATIONS 14 28
A-202 EXTERIOR BUILDING ELEVATIONS 15 28
A-301 BUILDING SECTIONS 16 28
A-401 ENLARGED PLANS 17 28
A-501 PARTITION TYPE DETAILS 18 28
A-502 GENERAL DETAILS 19 28
A-511 CASEWORK ELEVATIONS AND SCHEDULE 20 28
A-512 CASEWORK DETAILS 21 28
A-513 WALL PROTECTION ELEVATIONS 22 28
A-514 WALL PROTECTION ELEVATIONS 23 28
A-601 DOOR SCHEDULE, DOOR ELEVATIONS, AND DETAILS 24 28
AI-101 SECOND FLOOR FINISH PLAN 25 28
AI-102 FLOOR PATTERN FLOOR PLAN 26 28
AI-103 WALL PROTECTION FLOOR PLAN AND DETAILS 27 28
AI-104 SIGNAGE FLOOR PLAN AND SCHEDULE 28 28
INTERIORS
I-001 FFE AND EQUIPMENT SCHEDULES 1 8
I-002 FFE AND EQUIPMENT SCHEDULES 2 8
I-003 FFE AND EQUIPMENT SCHEDULES 3 8
I-101 OVERALL SECOND FLOOR FFE PLAN 4 8
I-401 ENLARGED TYPICAL FFE PLANS 5 8
I-402 ENLARGED TYPICAL FFE PLANS 6 8
I-411 INTERIOR ELEVATIONS 7 8
I-412 INTERIOR ELEVATIONS 8 8
EQUIPMENT
QH-001 BUILDING 02 SECOND FLOOR AREA 'A' EQUIPMENT PLAN 1 3
I-002 BUILDING 02 SECOND FLOOR AREA 'B' EQUIPMENT PLAN 2 3
I-003 BUILDING 38 SECOND FLOOR EQUIPMENT PLAN 3 3
PLUMBING
P-000 PLUMBING LEGEND 1 25
PD-102A SECOND FLOOR PLUMBING DEMOLITION PLAN AREA 'A' 2 25
PD-102B SECOND FLOOR PLUMBING DEMOLITION PLAN AREA 'B' 3 25
PD-102C SECOND FLOOR PLUMBING DEMOLITION PLAN BLDG. 38 4 25
PP-100A PARTIAL BASEMENT PLUMBING PLAN BLDG. #2 5 25
PP-100B PARTIAL GROUND FLOOR PLUMBING PLAN 6 25
PL-101A FIRST FLOOR SANITARY PLAN A 7 25
PL-101B FIRST FLOOR SANITARY PLAN B 8 25
PL-101C FIRST FLOOR SANITARY PLAN BLDG. 38 9 25
PL-102A SECOND FLOOR SANITARY PLAN A 10 25
PL-102B SECOND FLOOR SANITARY PLAN B 11 25
PL-102C SECOND FLOOR SANITARY PLAN BLDG. 38 12 25
PP-102A SECOND FLOOR DOMESTIC WATER PLAN A 13 25
PP-102B SECOND FLOOR DOMESTIC WATER PLAN B 14 25
PP-102C SECOND FLOOR DOMESTIC WATER PLAN BLDG. 38 15 25
PG-102A SECOND FLOOR MED GAS PLAN A 16 25
PG-102B SECOND FLOOR MED GAS PLAN B 17 25
PG-102C SECOND FLOOR MED GAS PLAN BLDG. 38 18 25
PG-104 PARTIAL PENTHOUSE MED GAS PLAN 19 25
P-301 PLUMBING RISER DIAGRAMS 20 25
P-302 PLUMBING RISER DIAGRAMS 21 25
P-401 ENLARGED PLUMBING PLANS 22 25
P-501 PLUMBING DETAILS 23 25
P-502 PLUMBING DETAILS 24 25
P-601 PLUMBING SCHEDULES 25 25
MECHANICAL
M-000 MECHANICAL LEGENDS AND ABBREVIATIONS 1 31
MHD-101 MECHANICAL HVAC PLAN - BLDG 2 & 38 OVERALL LEVEL 1 FLOOR PLAN 2 31
MHD-102A MECHANICAL HVAC DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 3 31
MHD-102B MECHANICAL HVAC DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 4 31
MHD-102C MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 5 31
MHD-103 MECHANICAL HVAC PLAN - BLDG 38, OVERALL LEVEL 3 FLOOR PLAN 6 31
MPD-102A MECHANICAL PIPING DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 7 31
MPD-102B MECHANICAL PIPING DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 8 31
MPD-102C MECHANICAL PIPING DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 9 31
MD-104A MECHANICAL DEMOLITION PLAN - BLDG 2, PENTHOUSE LEVEL 10 31
MD-104B MECHANICAL DEMOLITION PLAN - BLDG 38, PENTHOUSE LEVEL 11 31
MH-102A MECHANICAL HVAC PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 12 31
MH-102B MECHANICAL HVAC PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 13 31
MH-102C MECHANICAL HVAC PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 14 31
MH-103 MECHANICAL HVAC PLAN - BLDG 38, LEVEL 3 FLOOR PLAN 15 31
MP-102A MECHANICAL HVAC PIPING PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN 16 31
MP-102B MECHANICAL HVAC PIPING PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN 17 31
MP-102C MECHANICAL HVAC PIPING PLAN - BLDG 38, LEVEL 2 FLOOR PLAN 18 31
MH-104A MECHANICAL HVAC PIPING PLAN - BLDG 2, PENTHOUSE LEVEL 19 31
MH-104B MECHANICAL HVAC PIPING PLAN - BLDG 38, PENTHOUSE LEVEL 20 31
M-301 MECHANICAL SECTIONS I 21 31
M-401 MECHANICAL HVAC PLAN - TYPICAL OPERATING ROOM PARTIAL PLAN 22 31
M-501 MECHANICAL DETAILS I 23 31
M-601 MECHANICAL SCHEDULES I 24 31
M-602 MECHANICAL SCHEDULES II 25 31
M-701 MECHANICAL CONTROLS I 26 31
M-702 MECHANICAL CONTROLS II 27 31
M-703 MECHANICAL CONTROLS III 28 31
M-704 MECHANICAL CONTROLS IV 29 31
M-705 MECHANICAL CONTROLS V 30 31
M-706 MECHANICAL CONTROLS VI 31 31
ELECTRICAL
E-001 ELECTRICAL LEGEND 1 15
ED-102 BUILDING 2 AND BUILDING 38 SECOND FLOOR ELECTRICAL DEMOLITION PLAN 2 15
EL-102A BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL LIGHTING PLAN 3 15
EL-102B BUILDING 2 SECOND FLOOR AREA 'B' ELECTRICAL LIGHTING PLAN 4 15
EL-102C BUILDING 38 SECOND FLOOR ELECTRICAL LIGHTING PLAN 5 15
EP-102B BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL POWER PLAN 6 15
EP-102B BUILDING 2 SECOND FLOOR AREA 'A' ELECTRICAL POWER PLAN 7 15
EP-102C BUILDING 38 SECOND FLOOR ELECTRICAL POWER PLAN 8 15
EP104 BUILDING 2 PENTHOUSE ELECTRICAL POWER PLAN 9 15
E-501 ELECTRICAL DETAILS 10 15
E-601 ELECTRICAL ONE-LINE DIAGRAM 11 15
E-602 ELECTRICAL SCHEDULES 12 15
E-603 PANEL SCHEDULES 13 15
E-604 PANEL SCHEDULES 14 15
E-701 LIGHTING CONTROL DIAGRAMS 15 15
TECHNOLOGY
TK-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND AND ABBREVIATIONS 1 7
TD-101 SECOND FLOOR TECHNOLOGY/SYSTEMS DEMOLITION PLAN 2 7
TK-101 SECOND FLOOR TECHNOLOGY PLAN 3 7
TK-102 SECOND FLOOR SYSTEMS PLAN 4 7
TK-401 TECHNOLOGY ENLARGEMENTS 5 7
TK-501 TECHNOLOGY DETAILS 6 7
TK-502 TECHNOLOGY DETAILS 7 7
FIRE ALARM
FA-001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
FA-101 SECOND FLOOR FIRE ALARM 2 2
FIRE SUPPRESSION
FS-001 FIRE SUPPRESSION GENERAL INFORMATION AND STANDARD DETAILS 1 4
FD-101 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN 2 4
FS-101 SECOND FLOOR FIRE SUPPRESSION PLAN 3 4
FS-102 SECOND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN 4 4
DRAWING INDEX
NO. DESCRIPTION DWG of DWG NO. DESCRIPTION DWG of DWG
DN
MN K G F
E D C B A
Q
2-11
O M.2 K.1 F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-2
2-1
2-9
AA AC
2-4
2-7
L.5
N
D
K.2
F.8
A
146 SF
STAIR
S2-02
330 SF
CARE STATION
467 SF
CORRIDOR
C206-02
117 SF
PACU
244 155 SF
CLEAN SUPPLY
136 SF
PRE/POST
125 SF
PRE/POST
276 SF
CORRIDOR
C204-02
100 SF
CORRIDOR
C207-02
57 SF
SOILED HOLDING
112 SF
MEDS
53 SF
HAC
808 SF
STERILE CORE
585 SF
OR
28 SF
ALCOVE
C207-02A
95 SF
CORRIDOR
C204-2
100 SF
CORRIDOR
205-02
563 SF
OR
535 SF
CORRIDOR
C201-02
159 SF
EQUIPMENT
306 SF
CORRIDOR
C202-02
148 SF
CORRIDOR
C203-02
108 SF
STORAGE
70 SF
STAIR
S1-02
672 SF
WAITING
39 SF
ELECTRICAL
CHASE
323 SF
CORRIDOR
C201-38
359 SF
STAFF LOUNGE
97 SF
SOILED
31 SF
ELECTRICAL
47 SF
HAC
93 SF
CORRIDOR
C203-38
45 SF
STAFF TOILET
44 SF
STAFF TOILET
200 SF
WOMEN'S
LOCKER
147 SF
MEN'S LOCKER
CHASE
ELEVATOR
SHAFT
64 SF
ELEVATOR 2
C207-02B
61 SF
ELEVATOR 1
C207-02C
63 SF
PAMN
C207-02F
89 SF
FIBER OPTIC
113 SF
LOGISTICS
309 SF
PAGING
EQUIPMENT
C207-02G
110 SF
WHEELCHAIR
ALCOVE
C3
51 SF
SOILED UTILITY
70 SF
ELEC.
135 SF
CORRIDOR
C2
280 SF
ELEVATOR
LOBBY
C1
678 SF
STRESS LAB
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
CLEAR DOOR WIDTH = 33"
EXIT CAPACITY = 165
CLEAR DOOR WIDTH = 33"
EXIT CAPACITY = 165
CLEAR DOOR WIDTH = 33"
EXIT STAIR WIDTH = 44"
EXIT CAPACITY = 146
CLEAR DOOR WIDTH = 33"
EXIT STAIR WIDTH = 44"
EXIT CAPACITY = 146
ACTUAL CLEAR DOOR
WIDTH = 34 1/2"
ACTUAL EXIT STAIR
WIDTH = 36"
EXIT CAPACITY = 120
ACTUAL CLEAR DOOR
WIDTH = 67"
EXIT CAPACITY = 165
ACTUAL CLEAR DOOR
WIDTH = 33"
ACTUAL EXIT STAIR
WIDTH = 28"
EXIT CAPACITY = 146
SUITE 2.1
AREA: 3,485 SF
CIRCULATION STAIR
ACTUAL CLEAR DOOR
WIDTH = 67"
EXIT CAPACITY = 165
131 SF
PRE/POST
134 SF
PRE/POST
133 SF
PRE/POST
125 SF
PRE/POST
360 SF
CORRIDOR
C208-02
148 SF
ISOLATION
74 SF
ANTE
47 SF
STAFF TOILET
258 22 SF
SCRUB STATION
247A
16 SF
ALCOVE
249A
38 SF
SCRUB STATION
249B
17 SF
SCRUB STATION
250A
47 SF
CHASE
C202-57
171 SF
PRE/POST
113 SF
PACU
111 SF
PACU
32 SF
ALCOVE
C206-02A
103 SF
DICTATION
49 SF
TOILET
49 SF
TOILET
100 SF
ANESTHESIA
140 SF
IMMED. STER.
21 SF
BIO-MED
46 SF
TOILET
56 SF
TOILET
88 SF
N. MANAGER
OFFICE
82 SF
CONSULTATION
113 SF
RECEPTION
100 SF
PSA OFFICE
15 SF
CHASE
543 SF
OR
D N
E
E
E
E
E
E
E
E
E
E
E
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
DISTANCE: 77'-10"
DISTANCE: 70'-8"
DISTANCE: 59'-0"
MARION VA - BUILDING 38 - LEVEL 2
OCCUPANT LOAD CALCULATION
BUSINESS: 2,620 sf / 100sf PER PERSON = 26
STORAGE: 302sf / 300sf PER PERSON = 1
ASSEMBLY: 937sf / 15sF PER PERSON = 62
LOCKER ROOMS: 301sf / 50sf PER PERSON = 6
TOTAL: = 95
MARION VA - BUILDING 2 - LEVEL 2
OCCUPANT LOAD CALCULATION
AHC: 8,484sf / 150sf PER PERSON = 56
STORAGE: 1,503sf / 300sf PER PERSON = 5
TOTAL: = 61
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:0
P M
LS101
LIFE SAFETY FLOOR PLAN
3 5ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
SECOND FLOOR OVERALL LIFE SAFETY PLAN
THE EXISTING EXIT ARRANGEMENT TO REMAIN
ONLY UPON APPROVAL OF THE LOCAL AUTHORITY
HAVING JURISDICTION GIVEN THE EXISTING
GEOMETRY TO REMAIN, THE DOORS LOCATED
BETWEEN BUILDINGS 1 AND 38 DO NOT SWING IN
THE PROPER DIRECTION NEEDED TO PROVIDE A
SECOND EXIT. THESE DOORS WOULD NEED TO BE
REPLACED WITH DOUBLE EGRESS DOORS TO
SATISFY THE EXITING REQUIREMENTS, PRESENTLY
BEYOND THE SCOPE OF THIS CONTRACT.
1.
AUTHORITY HAVING JURISDICTION
DEPARTMENT OF VETERAL AFFAIRS
SEE LIFE SAFETY NARRATIVE FOR APPLICABLE
CODES
CODE SUMMARY -
T his D rawing Produ ced by the U.S. A ccess Board
T his Drawing Pro duced by the U. S. Access Board
T his Drawing Produced by the U.S. A ccess Board
Th is Dra win g Pro du ce d b y th e U.S. Ac ce s s Bo ard
/2
M
A X
/4
M
A X
48" MIN.
M
IN
M
IN
30" MIN.
M
IN
48" MIN.
(A) FORWARD
(B) PARALLEL
MAX.
6"
M
IN
17"-25"
(A) ELEVATION (B) PLAN
4" MAX.
X
X
M
IN
M
A X
M
A X
M
A X
20" MAX. ˃20 - 25" MAX.
(A) (B)
10" MAX.
M
IN
M
A X
M
A X
M
A X
M
A X
M
A X
10" MAX. ˃10" - 24" MAX.
(A) (B)
M
IN
M
IN
M
IN
M
IN
24" MAX.48" MIN.24" MAX.
M
IN
M
IN
42" MIN. 42" MIN.
X ˂ 48"
36" MIN.
X ˂ 48"
36" MIN.
(A)
180˚ TURN
(B)
180˚ TURN
(EXCEPTION)
32" MIN.*
.0
0°
(A) HINGED DOOR
*VA REQUIRED PATIENT ROOM
DOORWAY CLEAR WIDTH IS 4'-0".
48" MIN. 48" MIN.
48" MIN.
(A) (B)
(C)
(C)
WALKING SURFACES
/2
M
IN
2 1/4" MIN.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:1
P M
LS111
LIFE SAFETY - ACCESSIBILITY
GUIDELINES
4 5ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
12" = 1'-0"
FIG. 302.2 - CARPET PILE HT.
12" = 1'-0"
FIG. 303.2 - VERT. CHANGE IN LEVEL
3/4" = 1'-0"
FIG. 305.3 - CLEAR FLOOR SPACE
3/4" = 1'-0"
FIG. 305.5 - FORWARD / PARALLEL APPROACH
3/4" = 1'-0"
FIG. 306.2 - TOE CLEARANCE
3/4" = 1'-0"
FIG. 307.2 LIMITS OF PROTRUDING OBJECTS
3/4" = 1'-0"
FIG. 308.2.1 - UNOBSTR. FORWARD REACH
3/4" = 1'-0"
FIG. 308.2.2 - OBSTR. HIGH FORWARD REACH
3/4" = 1'-0"
FIG. 308.3.1 - UNOBSTR. SIDE REACH
3/4" = 1'-0"
FIG. 308.3.2 - OBSTR. SIDE REACH
3/4" = 1'-0"
FIG. 403.5.1 - CLEAR WIDTH OF AN ACCESSIBLE ROUTE
1/2" = 1'-0"
FIG. 403.5.2 - CLEAR WIDTH AT TURN
3/4" = 1'-0"
FIG. 404.2.3 - CLEAR WIDTH OF DOORWAYS
3/4" = 1'-0"
FIG. 404.2.6 - DOORS/GATES IN SERIES
3/4" = 1'-0"
FIG. 505.4 - HANDRAIL HEIGHT
1 1/2" = 1'-0"
FIG. 505.5/505.6 - HANDRAIL CLEARANCE
LIBRARY
M
IN
18" MIN.
(A)
FRONT APPROACH, PULL SIDE
(B)
FRONT APPROACH,
PUSH SIDE
M
IN
M
IN
12" MIN.
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
M
IN
36" MIN.
(D)
HINGE APPROACH, PULL SIDE
(E)
HINGE APPROACH, PULL SIDE
M
IN
42" MIN.
(F)
HINGE APPROACH,
PUSH SIDE
M
IN
22" MIN.
M
IN
22" MIN.
(G)
HINGE APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
(H)
LATCH APPROACH, PULL SIDE
M
IN
24" MIN.
M
IN
24" MIN.
(I)
LATCH APPROACH, PULL SIDE
DOOR PROVIDED WITH CLOSER
(J)
LATCH APPROACH,
PUSH SIDE
M
IN
24" MIN.
(K)
LATCH APPROACH, PUSH SIDE
DOOR PROVIDED WITH CLOSER
M
IN
24" MIN.
16"-18"
C L
(A)
WHEELCHAIR ACCESSIBLE
WATER CLOSETS
60" MIN.
M
IN
M
IN
-1
/2
M
IN
(A)
PROJECTING OBJECTS
(B)
RECESSED OBJECTS
/8
HEIGHT OF OPERABLE PORTION
DISPENSER OUTLET
LOCATION
VERTICAL GRAB BAR
M
A X
13 1/2" MIN.
M A
X
U P
P E
R R
A N
G E
L O
W E
R R
A N
G E
M
IN
12" MIN. 24" MIN.
36" MIN.
CL CL
M
A X
M
A X
16"-18" 1' - 3"
M
A X
7"-9"
42" MIN. 12" MAX.
54" MIN.
M
IN
CL
VERTICAL GRAB BAR
24 min m in
22 min m in m in m in
(d) stop or latch approach
(c) pocket or hinge approach
(b) side approach
(a) front approach
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:2
P M
LS112
LIFE SAFETY - ACCESSIBILITY
GUIDELINES
5 5ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
1/2" = 1'-0"
FIG. 404.2.4.1 - MANEUVERING CLEARANCE AT MANUAL SWINGING DOORS AND GATES
3/4" = 1'-0"
FIG. 604.2 - WATER CLOSET LOCATION
3/4" = 1'-0"
FIG. 604.3.1 - CLEARANCE AT WATER CLOSETS
1" = 1'-0"
FIG. 609.3 - GRAB BAR SPACING
1 1/2" = 1'-0"
FIG. 703.2.5 - HT. OF RAISED CHARACTERS
3/4" = 1'-0"
TYPICAL MOUNTING HEIGHTS
1/2" = 1'-0"
WITHOUT DOORS, SLIDING DOORS, GATES, AND FOLDING DOORS
FIG. 404.2.4.2 - MANEUVERING CLEARANCES AT DOORWAYS
File details come from the government source that posted it. Updated .