P09 Drawings 04A Architectural 100BID - 20 pages.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040_1
About this file
This solicitation is for the construction of a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work includes creating three inpatient operating rooms and supporting services on the second floor of Buildings 2 and 38, where the current recreation hall and kitchen are located. Infrastructure will be installed to provide uninterruptible power supply to meet all VA requirements. Upon completion, the facility will have a fully operational three operating room inpatient surgical/endovascular suite and ambulatory surgical service. The solicitation number is 36C25520R0040_1 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 15. The anticipated award date is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES, THE GENERAL NOTES, AND THE
REQUIREMENTS IDENTIFIED IN THE DIVISION 01 SPECIFICATION "GENERAL
CONDITIONS."
PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED
SURFACES HAVE BEEN EXPOSED BY DEMOLITION. THIS INCLUDES ALL FINISHES
SCHEDULED TO REMAIN. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND
FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT,
VINYL WALL COVERING, ETC.) REPLACED FROM CORNER TO CORNER AND FLOOR TO
CEILING.
UNLESS NOTED OTHERWISE, WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE
MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES
OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE
GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.
UNLESS NOTED OTHERWISE, SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED
DURING NORMAL WORKING HOURS AND MUST BE SCHEDULED WITH THE VA COR FOR
OTHER TIMES. THIS INCLUDES JACK-HAMMERING CONCRETE, SAW-CUTTING
CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE, ETC.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN
WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED
CONTRACTOR AT THE EXPENSE OF THE CONTRACTOR. ALL CONDUITS IN WALLS SHALL
BE GROUTED OR SEALED INTO OPENINGS.
GENERAL CONTRACTOR SHALL RECORD ALL "OWNER ASSET NUMBERS" THAT ARE
TAGGED AND SCHEDULED TO BE REMOVED AND/OR DEMOLISHED. SUCH TAGS ARE
LABELED "EE..." CONTRACTOR SHALL PROVIDE A LOG OF ALL ASSET TAGS TO COR.
GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL
DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR INFECTION CONTROL. REFER TO
INFECTION CONTROL AND PHASING FOR ADDITIONAL DETAILS. COORDINATE
REQUIREMENTS WITH THE VA MEDICAL CENTER INFECTION CONTROL POLICY. REMOVE
TEMPORARY PARTITIONS AT END OF CONSTRUCTION OR WHEN DIRECTED BY COR.
PATCH ADJACENT FINISHES DAMAGED DURING REMOVAL PROCESS.
ALL AREAS AND ADJACENT SPACES, NOT INDICATED AS CONSTRUCTION SITE, WILL BE
OCCUPIED.
THE EXTENT OF PLUMBING, MECHANICAL, AND ELECTRICAL UTILITIES TO BE REMOVED
IS SHOWN ON THE PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS.
GENERAL CONTRACTOR REMOVE ALL WALL HUNG EQUIPMENT/FURNISHINGS (FIRE
EXTINGUISHERS, GRAB BARS, WALL PROTECTION, SIGNAGE, ETC.) WHETHER
INDICATED OR NOT, REINSTALL, DISPOSE OF, OR TURN OVER ITEMS TO THE VA PER
THE COR'S DIRECTION.
GENERAL CONTRACTOR SHALL SAWCUT AND REMOVE PORTIONS OF EXISTING
CONCRETE FLOOR SLAB AS REQUIRED TO COMPLETE INSTALLATION OF STRUCTURAL
IMPROVEMENTS. PATCH FLOOR SLAB AND PREPARE FOR NEW FLOORING UPON
COMPLETION OF STRUCTURAL MEMBER INSTALLATION. COORDINATE WITH
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL
PANELS, ACCESS PANELS, SPRINKLER PIPING, ETC., TO MATCH ADJACENT FINISH
UNLESS OTHERWISE NOTED.
2. UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH
SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS
FRAMES. REFER TO INTERIOR SHEETS FOR COLORS.
3. ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED
ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR
CONCRETE CONSTRUCTION, SHALL BE FURRED IN, THE FURRING FINISHED TO MATCH
THE ROOM FINISH.
4. REFER TO THE LIFE SAFETY PLAN FOR FIRE/SMOKE RATED PARTITIONS. NEW OR
EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH APPROVED FIRE
STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED.
PENETRATIONS THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
5. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE
DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING
WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A
COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL COST.
6. WHETHER INDICATED ON THE DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL
CORNER GUARDS ON ALL CORNERS CREATED BY NEW WORK IN THIS PROJECT,
INCLUDING TEMPORARY CONSTRUCTION BARRIER WALLS. CORNER GUARDS SHALL
EXTEND FROM 4" A.F.F. TO 7'-2" A.F.F.
7. WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR
EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND
REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT WITH WATER OR OTHER
LIQUIDS.
8. COORDINATE WITH STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE
PROTECTION DRAWINGS FOR RELATED WORK.
9. WHETHER INDICATED ON DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL JOINT
COVERS AT ALL EXPANSION JOINT LOCATIONS. TYPICAL AT FLOOR, WALL AND CEILING
JOINTS.
RENOVATION GENERAL NOTES
ABBREVIATIONS:
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
A/C AIR CONDITIONING
ALUM ALUMINUM
& AND
APPROX APPROXIMATE
@ AT
BRG BEARING
BLK BLOCK
BD BOARD
BD FT BOARD FEET
A.O.C. BOTTOM OF CONCRETE
BLDG. BUILDING
CPT CARPET
C.L. OR CLG CEILING
CT CERAMIC TILE
CB CHALK BOARD
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONC BL CONCRETE BLOCK
CONC FL CONCRETE FLOOR
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CJ CONTROL JOINT
CRS COURSE
CU CUBIC
CU FT CUBIC FOOT
CU YD CUBIC YARD
DIA DIAMETER
DBL DOUBLE
DN DOWN
DS DOWNSPOUT
DWG DRAWING
DF DRINKING FOUNTAIN
EA EACH
ELECT ELECTRIC
EC ELECTRIC CONTRACTOR
EP ELECTRICAL PANEL BOARD
EL ELEVATION
ELEV ELEVATION
EQ EQUAL
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
EB EXPANSION BOLT
EJ EXPANSION JOINT
EXT EXTERIOR
FE FIRE EXTINGUISHER
FT OR ' FEET
FIN FINISH
FD FLOOR DRAIN
FL FLOOR LINE
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
GALV GALVANIZED
GA GAUGE
GC GENERAL CONTRACTOR
GYP GYPSUM BOARD
H/AC HEATING/AIR CONDITIONING
HM HOLLOW METAL
HT HEIGHT
HR HOUR
HWSF HEAT-WELDED SHEET FLOORING
IN OR " INCH
JT JOINT
JST JOIST
LAM LAMINATE
LF LINEAR FOOT
MFR MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
NOM NOMINAL
NO OR # NUMBER
O.C. ON CENTER
OPG OPENING
O.H. OPPOSITE HAND
PT PAINT
% PERCENT
PLAM PLASTIC LAMINATE
+/- PLUS OR MINUS
PVC POLYVINYL CHLORIDE
LBS OR # POUNDS
PSI POUNDS PER SQUARE INCH
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PT PRESSURE TREATED
RAD RADIATOR
RBR RUBBER BASE
RE: REFER
REFRIG REFRIGERATOR
REINF REINFORCEMENT
REP REPRESENTATIVE
REQD REQUIRED
RD ROOF DRAIN
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FOOT
STD STANDARD
STL STEEL
STRUCT STRUCTURE
SUSP SUSPENDED
SYS SYSTEM
TB TACKBOARD
TYP TYPICAL
VCT VINYL COMPOSITION TILE
VERIFY VERIFY
W/ WITH
W/O WITHOUT
WD WOOD
ARCHITECTURAL SYMBOLS LEGEND
A
C2
A100A
FEC
NORTH
AS-1000
AS-1000
DIMENSION LINE
DOOR OPENING/BORROWED LIGHT IDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
FIRE EXTINGUISHER CABINET
NORTH ARROW
DETAIL NUMBER
SECTION MARKER
PARTITION TYPE. RE: SHEET A-501A
1AS-1000 ELEVATION MARKER
DRAWING TITLE
1 1/2" = 1' - 0"
CORRIDOR
SHEET LOCATION
WINDOW TYPE
ELEVATION
AE100
A
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING ADJACENT CONSTRUCTION AND EQUIPMENT FROM DUST AND DAMAGE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN, REPAIR, REPLACE, OR PATCH ANY EXISTING CONSTRUCTION DAMAGED DURING THE CONSTRUCTION PROCESS AT NO ADDITIONAL EXPENSE TO THE VA. ANY DAMAGED AREAS SHALL BE RETURNED TO EQUAL OR BETTER CONDITION THAN THAT OF THE EXISTING CONSTRUCTION PRIOR TO DAMAGE.
DRAWINGS WERE PREPARED BASED ON INSPECTIONS OF THE SITE (BUILDING) AND INFORMATION GATHERED FROM EXISTING DRAWINGS.
THEY ARE INTENDED TO REPRESENT THE CONDITIONS OF THE SITE (BUILDING). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO
THE COR.
A CLEAN SITE SHALL BE MAINTAINED AT ALL TIMES. GC SHALL BE RESPONSIBLE FOR CLEANING DEBRIS FROM THE SITE.
CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR
INFECTION CONTROL. VERIFY EXACT LOCATIONS AND REQUIREMENTS WITH THE COR.
WORK MAY NEED TO BE PHASED AND/OR LIMITED TO OFF HOURS TO ACCOMMODATE CONTINUOUS NORMAL OPERATION OF THE FACILITY.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE
REQUIREMENTS IDENTIFIED IN THE DIVISION 1 SPECIFICATION "GENERAL REQUIREMENTS."
CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.
CONTRACTOR WILL FIELD VERIFY AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, LIFE SAFETY, AND SECURITY PROVISIONS PRIOR
TO PLACING BID AND COMMENCEMENT OF CONSTRUCTION.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY COR OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF
ANY COMPONENTS.
COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL
SYSTEM.
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, AND DOOR REPAIR, ETC.
CONTRACTOR PARKING ON SITE IS LIMITED. CONTRACTOR TO COORDINATE VEHICLE PARKING WITH COR PRIOR TO CONSTRUCTION.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT
TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.
THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE
INSTALLED.
DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK, FURNISHING
SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO
ADDITIONAL COST.
ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS.
BEFORE CONTRACTOR PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL
NEW OR RELOCATED WORK IN THIS PROJECT.
ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.
SPACE FOR CONSTRUCTION MATERIAL DUMPSTERS ON SITE IS LIMITED. THE VA DOES NOT PROVIDE A DUMPSTER FOR THIS MATERIAL.
COORDINATE WITH COR FOR APPROVED DUMPSTER LOCATION.
ALL PIPING AND OTHER MECHANICAL ITEMS WHERE ASBESTOS INSULATION IS REMOVED MUST BE RE-INSULATED WITH MATERIALS
ACCORDING TO THE SPECIFICATIONS.
STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH COR PRIOR TO CONSTRUCTION.
NAME BRANDS USED WITHIN THE CONTRACT DOCUMENTS ARE NOT MEANT TO BE RESTRICTIVE, BUT ONLY TO INDICATE A BRAND THAT REFLECTS THE CHARACTERISTICS AND LEVEL OF QUALITY THAT WILL SATISFY THE GOVERNMENT'S NEEDS. THE SALIENT PHYSICAL, FUNCTIONAL, OR PERFORMANCE CHARACTERISTICS THAT "EQUAL PRODUCTS" MUST MEET ARE IDENTIFIED IN THE CONTRACT
DOCUMENTS.
SEE INTERIORS SHEET AI-101 FOR ALL CASEWORK ELEVATION MARKERS
THE ROOM NUMBERING SEQUENCE IS FOR CONSTRUCTION IDENTIFICATION ONLY.
FINAL ROOM NUMBERING SHALL BE CORRELATED WITH CURREST BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED DUE TO
DEMOLITION.
FINAL ROOM NUMBERING AND SIGNAGE SHALL BE APPROVED BY VA STAFF ON SITE.
ALL DOOR RETURNS 4" UNLESS NOTED OTHERWISE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
GENERAL NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:5
P M
A-001
ARCHITECTURAL NOTES,
ABBREVIATIONS, AND SYMBOLS
1 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-50119-126
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
DN
UP
FEC
F E
C
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
FIBER OPTIC
236B
LOGISTICS
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STRESS LAB
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
8PAMN
PAGING
EQUIPMENT
ELEVATOR 2
ELEVATOR 1
OXYGEN
STORAGE
WHEELCHAIR
ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
ELEVATOR
LOBBY
C1
D N
LEGEND
AREA TO BE RENOVATED
AREA OUTSIDE OF PROJECT
BOUNDARY WHERE TIE-IN WORK
OR RELATED WORK OCCURS OR
MAY OCCUR. CONTRACTOR
SHALL COORDINATE WITH COR
AND INFECTION CONTROL FOR
CONTAINMENT BARRIERS.
MATCHLINE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:0
P M
A-002
SECOND FLOOR EXISTING PLAN
2 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
SECOND FLOOR EXISTING FLOOR PLAN
N
A-301
A-301
STAIR
S2-02
CARE STATION
CORRIDOR
C206-02
PACU
CLEAN SUPPLY
PRE/POST
PRE/POST
CORRIDOR
C204-02
CORRIDOR
C207-02
SOILED HOLDING
MEDS
HAC
STERILE CORE
OR
ALCOVE
C207-02A
CORRIDOR
C204-2
CORRIDOR
205-02
OR
CORRIDOR
C201-02
EQUIPMENT
CORRIDOR
C202-02
CORRIDOR
C203-02
STORAGE
259 STAIR
S1-02
WAITING
ELECTRICAL
CHASE
CORRIDOR
C201-38
STAFF LOUNGE
SOILED
ELECTRICAL
HAC
CORRIDOR
C203-38
STAFF TOILET
STAFF TOILET
WOMEN'S
LOCKER
MEN'S LOCKER
CHASE
ELEVATOR
SHAFT
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
PAMN
C207-02FFIBER OPTIC
LOGISTICS
PAGING
EQUIPMENT
C207-02G
WHEELCHAIR
ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2 ELEVATOR
LOBBY
C1
STRESS LAB
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
A-102
A-103
A-104
CONSTRUCTION FOOTPRINT. PROVIDE
CONTAINMENT BARRIERS AND ILSM MEASURES
ANTE ROOM WITH SOLID WALL, DOOR, AND DOOR
CLOSER. OUTSIDE: PROVIDE GRADUATED AIR
PRESSURE MONITOR. INSIDE: PROVIDE TACKY
MATS, HEPA VAC, AND WASTE BIN. MINIMUM SIZE
OF ANTE ROOM SHALL BE 5'-0" x 7'-0"
NEGATIVE AIR VENTILATION MACHINES WITH HEPA
FILTRATION EXHAUSTING OUT PERIMETER
WINDOWS TO EXTERIOR. TYPICAL. CONFIRM
REQUIRED NUMBER WITH VA COR.
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
CHASE
C202-57
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
ANESTHESIA
IMMED. STER.
BIO-MED
TOILET
TOILET
N. MANAGER
OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
OR
CORRIDOR
C208-02
A-502
OFFICE
ELEVATOR
LOBBY
C202-38
D N
CONTRACTOR TO DESIGNATE
(1) WINDOW FOR TRASH
CHUTE. SEE PHASING
GENERAL NOTE 7.
LEGEND
CONST. FOOTPRINT WITH CONTAINMENT
BARRIERS AND ILSM MEASURES
TEMPORARY CONST. PARTITION. RE:
PARTITION TYPES
NEGATIVE AIR MACHINE EXHAUSTING TO THE
OUTSIDE.
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:1
P M
A-003
PHASING AND INFECTION CONTROL
PLAN
3 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
1/8" = 1'-0"
SECOND FLOOR OVERALL PHASING AND INFECTION CONTROL PLAN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B N
CONSTRUCTION BARRIERS: CONSTRUCTION AREA
TO BE SEPARATED FROM OTHER AREAS BY FIRE
RESISTIVE BARRIERS THAT KEEP THE DIRT AND
DUST INSIDE THE WORKSITE AND PROVIDE A
COMPLETE SEAL OF THE CONSTRUCTION AREA
FROM ADJACENT AREAS. THE BARRIER IS TO BE
CONSTRUCTED OF RIGID CONSTRUCTION. WALLS
MUST BE DUSTPROOF WITH AIRTIGHT SEALS
MAINTAINED AT THE FULL PERIMETER OF THE WALLS
AS WELL AS ALL PENETRATIONS. ALL AIR VENTS
MUST BE SEALED OFF NEAR THE CONSTRUCTION
AREA AS REQUIRED AFTER COORDINATION WITH
COR TO ENSURE NON-INTERFERENCE WITH HVAC
AND NEGATIVE PRESSURE SYSTEMS. DUST TO BE
CONTROLLED WITHIN THE WORK SITE FROM FLOOR
TO DECK.
TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES WILL BE DEFINED AND CLEARLY
ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE
PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS
MUST BE MAINTAINED FREE OF DEBRIS AT ALL
TIMES. THEY MUST BE UTILIZED AT SCHEDULED
TIMES ONLY AS COORDINATED WITH COR. DUST
MATS MUST BE PLACED AT ENTRANCES/EXITS OF
WORK AREA AND REPLACED DAILY OR MORE
FREQUENTLY IF NECESSARY. DEBRIS WHEN
TRANSPORTED THROUGH HOSPITAL AREAS MUST BE
COMPLETELY COVERD TO CONTAIN DUST DURING
TRANSPORT. DEBRIS SHALL BE REMOVED IN
EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL
CART WHEELS MUST BE CLEANED BEFORE LEAVING
THE CONSTRUCTION AREA.
CLEANING: THE CONSTRUCTION ZONE AND
ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A
CLEAN AND SANITARY MANNER BY THE
CONTRACTOR AND WILL BE HIGH EFFICIENCY
PARTICULATE AIR (HEPA) VACUUMED AND WET
MOPPED DAILY OR MORE FREQUENTLY AS NEEDED
TO MINIMIZE DUST GENERATION. CLOTHING SHALL
BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING
THE CONSTRUCTION ZONE. PROVIDE PERSONAL
PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS,
GLOVES, AND N95 RESPIRATORS REQUIRED BY THE
SAFETY SPECIFICATION.
INFECTION CONTROL CONSTRUCTION PERMIT:
CONTRACTOR SHALL APPLY FOR AND ASSIST VA
COR THROUGH THE REQUIRED INFECTION CONTROL
CONSTRUCTION PERMIT.
STAGING AREAS WILL BE DESIGNATED BY THE COR.
CONTRACTOR TO COORDINATE WITH THE COR
PRIOR TO CONSTRUCTON.
CONTAINMENT BARRIERS, ILSM, AND ICRA
ENCLOSURES HAVE BEEN SHOWN FOR REFERENCE
ONLY. THE CONTRACTOR SHALL COORDINATE WITH
RISK ASSESSMENT DOCUMENTATION AND THE COR
PRIOR TO IMPLEMENTATION.
AT THE ENTRANCE TO EACH CONSTRUCTION AREA,
WHETHER INDICATED OR NOT, CONTRACTOR SHALL
PROVIDE AN ANTE ROOM WITH A SOLID WALL, DOOR,
AND DOOR CLOSER. OUTSIDE SHALL INCLUDE A
GRADUATED AIR PRESSURE MONITOR. INSIDE SHALL
INCLUDE TACKY MATS, HEPA VAC, AND WASTE BIN.
MINIMUM SIZE OF ANTE ROOM SHALL BE 5'-0" x 7'-0".
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
ENSURING THAT ALL SUBCONTRACTORS ARE
FAMILIAR WITH THESE NOTES AND THE
REQUIREMENTS IDENTIFED IN THE DIVISION 1
SPECIFICATION “GENERAL CONDITIONS.”
WHEN WORKING IN OCCUPIED AREAS OF THE
MEDICAL CENTER, THE CONTRACTOR CANNOT
LEAVE TOOLS, EQUIPMENT, LADDERS, ETC.,
UNATTENDED AT ANY TIME. THE CONTRACTOR
CANNOT LEAVE CEILING AREA, INCLUDING CEILING
TILES AND CEILING ACCESS PANELS, UNATTENDED
AT ANY TIME.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN
OF EXISTING SERVICE SHALL BE DONE AT TIMES
OTHER THAN NORMAL WORKING HOURS AT NO
ADDITIONAL COST TO THE GOVERNMENT. WORK
MUST BE SCHEDULED WITH THE COR.
HEAVY NOISE AND VIBRATION PRODUCING WORK IS
TO BE COMPLETED OUTSIDE NORMAL WORKING
HOURS, UNLES NOTED OTHERWISE. WORK MUST BE
SCHEDULED WITH THE VA COR.
COORDINATE ALL WORK WITH OTHER TRADES AND
EXISTING CONDITIONS TO ELIMINATE CONFLICTS
AND/OR INTERFERENCES.
REFER TO EXISTING CONDITIONS DRAWINGS FOR
WORK IN AREAS OUTSIDE THE CONTSTRUCTION
FOOTPRINT(S). THE MAJORITY OF THESE AREAS
WILL BE OCCUPIED AND WILL REQUIRE WORK TO BE
COMPLETED AT TIMES OTHER THAN NORMAL
WORKING HOURS, UNLESS NOTED OTHERWISE.
CONTRACTOR WILL BE RESPONSIBLE FOR
PROVIDING CONTAINMENT BARRIERS, ILSM
MEASURES AND TEMPORARY CONSTRUCTION
PARTITIONS AS REQUIRED.
CONTRACTOR SHALL REMOVE AND REINSTALL OR
REPLACE WINDOW AT KITCHEN AREA USED FOR
TRASH CHUTE.
COORDINATE FINAL PHASING SEQUENCE WITH THE
VA COR PRIOR TO START OF CONSTRUCTION.
IN AREAS WHERE CONSTRUCTION ACTIVITIES
EXPOSE THE BUILDING INTERIOR TO THE EXTERIOR
ENVIRONMENT, CONTRACTOR SHALL CONSTRUCT
TEMPORARY BARRIERS AND WEATHERPROOF
ENCLOSRUES AS REQUIRED TO MEET INFECTION
CONTROL REQUIREMENTS AND PROTECT THE
BUILIDNG INTERIOR (FINISHES, BUILDING SYSTEMS,
ETC.) FROM DAMAGE.
THE VA RESERVES THE RIGHT TO START AND STOP
WORK BETWEEN PHASES AS REQUIRED TO
RELOCATE STAFF AND PATIENTS AND OBTAIN
NECESSARY CLEARANCES. THE CONTRACTOR
SHALL ALLOW TEN (10) DAYS BETWEEN EACH
PHASE FOR THESE ACTIVITIES. CONTRACTOR SHALL
NOT RECEIVE ADDITIONAL COMPENSATION FOR
THESE PERIODS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
PHASING
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
INFECTION CONTROL
GENERAL NOTES
UP
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
1 1
7 2
A
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
A
D N
5 EXISTING MOP SINK
AREAS OF WALL DEMOLITION
LEGEND: DEMOLITION
FLOOR PLAN
INDICATES AREA OF EXISTING
CONSTRUCTION TO BE REMOVED.
PER KEYNOTES 1, 2, & 7.
TEMPORARY PARTITION/BARRIER.
RE: PHASING AND INFECTION
CONTROL PLAN.
TEMPORARY PARTITION/BARRIER
AND DOOR. RE: PHASING AND
INFECTION CONTROL PLAN.
EXISTING POURED TERRAZZO BASE
EXISTING QUARRY TILE, AS OF
LAST F.V.
CONCRETE PATCH FOR FULL
DEPTH OF EXIST. FLOOR.
CONT. 3x2X1/4" STL. ANGLES
ALL SIDES, ANCHOR TO SLAB
8" O.C. MAX
#3 BARS TACK WELDED TO ANGLE
8" O.C. EA. WAY
EXIST.
CONCRETE SLAB
EXIST. PIPE
FIRE RATED SEALANT
FIRE SAFING
EXIST. CONCRETE SLAB
CONCRETE PATCH FOR FULL DEPTH
OF EXIST. FLOOR. PIN TO EXIST. SLAB
ON ALL SIDES W/ MIN. 1/4" PINS ON
OPENINGS 8" AND SMALLER.
ABANDONED FORMING - FIRE TREATED
PLYWD. REINFORCED GYP BD.
#2 PINS @ 8" O.C. ALL SIDES
CONCRETE PATCH FOR FULL
DEPTH OF EXIST. FLOOR.
FORMING - FIRE TREATED
PLYWD. REINFORCED GYP BD.
#2 PINS @ 8" O.C. ALL SIDES
LOOSE-FITTED #3 BAR
DRILLED INTO EXIST. SLAB,
MAX. 8" O.C. EA. WAY.
TIE WIRES FOR FORM
SUPPORT
EXIST. PIPE PENETRATIONS.
CONTRACTOR TO FIELD VERIFY
QUANTITY AND LOCATIONS. PROVIDE
FIRE SAFING AT ALL PIPE
PENETRATIONS.
FIRE RATED SEALANT
FIRE SAFING
METAL FRAMING ANGLE CLIPS
ALL SIDES.
EXIST. PIPE PENETRATIONS. CONTRACTOR TO
FIELD VERIFY QUANTITY AND LOCATIONS.
PROVIDE FIRE SAFING AT ALL PIPE
PENETRATIONS.
TEMPORARY FORMING
#2 PINS @ 8" O.C. EA. WAY
NON-SHRINK GROUT
PUMP HOLE FOR GROUT
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:3
P M
AD101
SECOND FLOOR DEMOLITION PLAN
4 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN
N
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
EXCEPT WHERE SPECIFICALLY INDICATED TO
REMAIN, DEMOLISH AND REMOVE ALL EXISTING
INTERIOR WALL CONSTRUCTION AND FINISHES TO
EXISTING STRUCTURAL SUBSTRATES. REMOVAL
INCLUDES WALL FURRING, SHEATHING, PLASTER,
FRAMING, FINISH MATERIAL, WALL MOUNTED ITEMS,
ETC. PLASTER AT EXTERIOR WALLS SHALL REMAIN
INTACT. MAINTAIN AND PROTECT EXISTING BUILDING
SERVICES WHICH TRANSMIT THE AREA AFFECTED BY
SELECTIVE DEMOLITION. REFER TO PLUMBING,
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION
DRAWINGS FOR ADDITIONAL INFORMATION.
DEMOLISH AND REMOVE EXISTING FLOORING
MATERIAL TO EXPOSE EXISTING SLAB. THIS
INCLUDES THE REMOVAL OF POURED TERRAZZO
BASE AND QUARRY FLOOR TILE. ASSUME 1” DEPTH.
AT AREAS WHERE POURED TERRAZZO BASE AND
QUARRY TILE ARE REMOVED, INFILL ENTIRE 2ND
FLOOR CONCRETE FLOOR SLAB WITH SELF-
LEVELING UNDERLAYMENT. CLEAN AND PREPARE
EXISTING SLAB TO RECEIVE NEW FLOORING
MATERIALS AS SCHEDULED.
REMOVE EXISTING DOOR, FRAME, AND HARDWARE
IN ITS ENTIRETY. TURN EXISTING DOOR HARDWARE
OVER TO THE VA COR.
REMOVAL ALL INTERIOR FINISHES TO EXPOSE
EXISTING STRUCTURAL STUBSTRATE FROM
INDICATED SIDE OF WALL ONLY. MAINTAIN AND
PROTECT EXISTING BUILDING SERVICES WHICH
TRANSMIT THE AREA AFFECTED BY SELECTIVE
DEMOLITION. REFER TO PLUMBING, MECHANICAL,
ELECTRICAL, AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL INFORMATION.
REMOVE EXISITNG PLUMBING FIXTURES AND
PLUMBING ACCESSORIES IN THEIR ENTIRETY. REFER
TO PLUMBING AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
REMOVE EXISTING ROOM AND INTERIOR SIGNAGE
AND TURN OVER TO THE VA COR.
EXCEPT WHERE SPECIFICALLY INDICATED TO
REMAIN, DEMOLISH AND REMOVE ALL EXISTING
CEILINGS TO EXPOSE EXISTING STRUCTURAL
SUBSTRATES. REMOVAL INCLUDES CEILING PANELS,
GRIDS, PLASTER, GYPSUM BOARD, FRAMING, FINISH
MATERIAL, ABANDONED IN PLACE CONCEALED
EQUIPMENT MOUNTS, ETC. MAINTAIN AND PROTECT
EXISTING BUILDING SERVICES WHICH TRANSMIT THE
AREA AFFECTED BY SELECTIVE DEMOLITION. REFER
TO PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL
INFORMATION.
EXISTING BUILT-UP CONCRETE RAMP TO COOLER
(COOLER REMOVED UNDER SEPARATE CONTRACT).
REMOVE EXISTING RAMP IN ITS ENTIRETY. GRIND
SMOOTH TO LEVEL OF ADJACENT FLOOR AND
PREPARE REMAINING SLAB TO RECEIVE NEW
FLOORING MATERIALS AS SCHEDULED.
EXISTING ELEVATOR TO BE REMOVED IN ITS
ENTIRETY. REFER TO STRUCTURAL DRAWINGS FOR
STRUCTURAL AND FLOOR INFILL REQUIREMENTS.
RECONFIGURE AND REPLACE PORTIONS OF
EXISTING CEILING SYSTEM AS REQUIRED FOR
RENOVATION WORK.
REPAIR ALL EXISTING AND NEW PENETRATIONS IN
FIRE BARRIERS (FLOORS, WALLS, CEILINGS). FIELD
VERIFY LOCATIONS. THIS INCLUDES FIRE
SEPARATIONS AT CHASES AND EXPANSION JOINTS.
STAIRWELL TO REMAIN UNDISTURBED. STAIRWELL
ACCESS SHALL BE CLOSED OFF AT THIS FLOOR
LEVEL DURING CONSTRUCTION. PROVIDE SIGNAGE
AS DIRECTED BY VA.
REMOVE EXISTING METAL STAIRS AND EXISTING
CONCRETE LANDING COMPLETELY. PATCH
REMAINING FLOOR SLAB AND WALL SURFACES,
PREPARE FOR NEW FINISHES. SEE DETAIL 09/AD101
DEMOLITION
KEYED NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
1 1/2" = 1'-0"
FIRE RATING REPAIR - EXISTING AND NEW 2' OPENING OR LARGER
1 1/2" = 1'-0"
FIRE RATING REPAIR - EXISTING AND NEW PIPE PENETRATION ABOVE
1 1/2" = 1'-0"
FIRE RATING REPAIR - 8" OR SMALLER
1 1/2" = 1'-0"
FIRE RATING REPAIR - LARGER THAN 8"
1 1/2" = 1'-0"
FIRE RATING REPAIR OVERHEAD - NOT ACCESSIBLE FROM ABOVE
1 1/2" = 1'-0"
FIRE RATING REPAIR OVERHEAD - NOT ACCESSIBLE FROM ABOVE - ALT. METHOD
PROJECTION ROOM LOCATED ABOVE NUTRITION
SERVICES TO REMAIN. INFILL OPENINGS IN WALL TO
MATCH ADJACENT SUBSTRATES. SEE 09/AD101
INFILL CONCRETE SLAB AFTER DUCT REMOVAL.
SEE STRUCTURAL.
14.
15.
DEMOLITION
KEYED NOTES
1 : 30
PHOTO @ EXISTING STAIR
STAIR
S2-02
Q
2-11
O M.2 K.1 F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-2
2-1
2-9
AA AC
2-4
2-7
L.5
N
D
K.2
F.8
A
CARE STATION
CORRIDOR
C206-02
PACU
CLEAN SUPPLY
PRE/POST
PRE/POST
CORRIDOR
C204-02
CORRIDOR
C207-02
SOILED HOLDING
MEDS
HAC
STERILE CORE
OR
ALCOVE
C207-02A
CORRIDOR
C204-2
CORRIDOR
205-02
OR
CORRIDOR
C201-02
EQUIPMENT
CORRIDOR
C202-02
CORRIDOR
C203-02
STORAGE
STAIR
S1-02
WAITING
ELECTRICAL
CHASE
CORRIDOR
C201-38
STAFF LOUNGE
SOILED
ELECTRICAL
HAC
CORRIDOR
C203-38
STAFF TOILET
STAFF TOILET
WOMEN'S
LOCKER
CHASE
ELEVATOR
SHAFT
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
PAMN
C207-02FFIBER OPTIC
LOGISTICS
PAGING
EQUIPMENT
C207-02G
WHEELCHAIR
ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2 ELEVATOR
LOBBY
C1
STRESS LAB
A-301
A-301
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
A-102
1 A-103
A-104
A-502
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
ANESTHESIA
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
CHASE
C202-57
MEN'S LOCKER
IMMED. STER.
BIO-MED
TOILET
TOILET
N. MANAGER
OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
PRE/POST
D N
PRE/POST
PRE/POST
PRE/POST
OR
CORRIDOR
C208-02
2 2 2
A-502
ELEVATOR
LOBBY
C202-38
OFFICE
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:2
P M
A-101
SECOND FLOOR OVERALL
RENOVATION PLAN
5 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
1/8" = 1'-0"
SECOND FLOOR OVERALL RENOVATION PLAN
N
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
ELECTRICAL
ELECTRICAL
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
259 STAIR
S1-02
CORRIDOR
C203-02
C207
C202C203
B
H
C
A
E
B B
D
Q Q
Q D
PD
D
B
B
B
B
D
11' - 8 3/8" 2' - 6 1/8" 29' - 6 5/8"
P P
D
B
D
DP
P
B
B
B
D
D
B
D
D
B
H
D
P P
/4
/2
/2
/2
/2
/4
/4
/8
/2
13' - 1 3/8" 14' - 11 7/8" 26' - 10 7/8" 15' - 0"
/4
/8
/4
/8
/2
7' - 10 1/8" 7' - 3" 7' - 0 1/2" 10' - 4 3/4"
12' - 4 7/8" 7' - 9 3/4" 11' - 4 1/2"
/4
/4
/4
/4
135.00°
/4
/2
/4
7' - 9 3/4" 8' - 2 3/4" 3' - 1 3/4"
/8
/8
/4
D
8' - 0" 3' - 3 7/8"
A-301
A-401
A-401
A-401
A-401
E
2 2 1 1
2 E
2 2 2 2
D
D D
D D
D
D
D
B
D
P
4' - 8 7/8"
D
D
/4
/8
/4
B
1' - 6 1/2"
/8
B
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C208-02
B
/8
/2
5' - 9 5/8"
1' - 3 3/8" 3' - 9 3/8" 5"
B
B
B
14' - 2 1/2"
14' - 2 1/2"
14' - 2 3/8"
12' - 3 7/8" 2' - 2 3/4"
13' - 1 3/8" 26' - 10 7/8"
/8
/4
/8
/8
/4
/8
C
L
/2
C
9' - 5 1/2" 1' - 0 1/2"
3' - 6 5/8" 7' - 6 1/2" 7' - 4 7/8" 6' - 5"
H
L
/8
6'
5/
8"
.0
2' - 9 1/8"
6'
1/
4"
2' - 11 3/8"
8' - 1 3/8"
/8
7' - 9 3/4"
12' - 4 7/8"
BB
2' - 10 3/4" 16' - 3 1/2" 2' - 11 3/8"
B
B
/4
/4
3' - 4 3/4"
1' - 6 1/2"
B
9' - 8"
13' - 1" 1' - 0 3/4"
/4
13' - 10 1/8"
/8
14' - 7 1/8" 7' - 6 1/2"
B
B
/2
B
E
E
E
E
E
E
B
C
J
J
A
P
E
H
P
D
P
C
D
DE
8' - 1 5/8"
/4
5' - 11 1/2"
/8
/8
H
D
B
B
P
F.E.C
F.E.C
F.E.C
F.E.C
F.E.C
5' - 6 5/8" 4' - 8"
F F F
A-502
Sim
A-502
Sim
INSTALL SOLID SURFACE WINDOW SILLS AT ALL
EXTERIOR WINDOWS. TYPICAL, U.N.O.
SEE DETAIL - 10/A502
EXISTING WINDOW TO REMAIN. INSTALL BLACKOUT
FILM OVER WINDOW AND COVER WITH METAL
FRAMING AND GYPSUM BOARD. REMOVE PORTION
OF SILL AS REQUIRED TO PROVIDE SMOOTH
TRANSITION. FINISH TO MATCH ADJACENT
SURFACES. SEE A-502 FOR WINDOW RENOVATION
DETAIL
PROVIDE FIRE EXTINGUISHER CABINET.
FIELD VERIFY LOCATION OF EXISTING VERTICAL
VENTILATION. ADJUST LOCATION OF NEW CHASE
WALLS AS REQUIRED.
RENOVATION PLAN
KEYED NOTES
1.
2.
3.
4.
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:4
P M
A-102
BUILDING 02 SECOND FLOOR AREA 'A'
RENOVATION PLAN
6 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
1/4" = 1'-0"
BUILDING 02 SECOND FLOOR AREA 'A' RENOVATION PLAN
N
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
S2-02
OR
CORRIDOR
C204-2
CORRIDOR
205-02
OR
STERILE CORE
CORRIDOR
C201-02
Q
Q Q
Q D
Q
D
B
D
P
P
D
D C
P
C
P
Q
Q
B
B
D
Q P P P
D D D
B
P
P P
P C
P
P
250249247
247A 249A 250A
C202
ALCOVE
C207-02A
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
CHASE
C202-57
B
F
PB
B
Q
19' - 8 1/8" 6' - 8" 2' - 5 1/8" 19' - 4" 19' - 3 7/8"
/4
F .V
/2
/4
/4
/4
/8
/8
/8
/8
/2
/4
F
.V
3' - 1"5' - 9 1/4" 14' - 6 1/4" 5' - 4" 3' - 1 7/8" 19' - 7 5/8" 19' - 1 3/8"
F .V
/8
/8
/4
P
/4
/4
4' - 10 7/8" 11 7/8" 7' - 0 1/2" 6' - 4 5/8"
+/- 67' - 8 7/8" F.V.
3' - 5 7/8" 6' - 9" 2' - 5 5/8" 2' - 0" 4' - 7 1/2"
6' - 8 1/8" 28' - 6 1/8" 22' - 0 3/8" +/- 10' - 2 1/4" F.V.
5' - 5" 1' - 1 1/2" 5' - 4 1/2" 7' - 5" 14' - 0" 8' - 0 3/8" 6' - 5 1/4"
7' - 10 7/8" 11' - 4 5/8"
D
A-401
TYP
2 2 2 2 2 2 2 2 2 2
P
D
R R R
C
5' - 5 5/8" 2' - 1 3/4" 11' - 8 1/4" 47' - 11 1/4"
10' - 6 1/2" 1' - 8 1/8" 7' - 5 1/2"
R
P
P R
R P R
P
P
E
P
2' - 5 7/8"
/8
/8
2' - 5 5/8"
P
2' - 5 5/8"
/8
/8
/8
.0
2' - 7"
/2
2' - 3 5/8"
2' - 4 1/8"
/8
/8
5' - 3"
1' - 10 1/4"
/8
/8
5' - 3 5/8" 9' - 3 3/8" 9' - 10"
286A
OR
B
/8
/2
IMMED. STER.
B B
R
2' - 0 3/4"
/4
2' - 7 5/8"
/2
2' - 4 7/8"
/4
P
/4
2' - 7 1/4"
A-103
A-103
TYP
A-103
TYP
A-103
TYP
A-103
TYP
A-103
TYP
DDD P
10 1/2"
CORRIDOR
205-02
CORRIDOR
C204-2
P PPB
P
R R
D
P
FFFFF F
F.E.C
F .E
.C
INSTALL SOLID SURFACE WINDOW SILLS AT ALL
EXTERIOR WINDOWS. TYPICAL, U.N.O.
SEE DETAIL - 10/A502
EXISTING WINDOW TO REMAIN. INSTALL BLACKOUT
FILM OVER WINDOW AND COVER WITH METAL
FRAMING AND GYPSUM BOARD. REMOVE PORTION
OF SILL AS REQUIRED TO PROVIDE SMOOTH
TRANSITION. FINISH TO MATCH ADJACENT
SURFACES. SEE A-502 FOR WINDOW RENOVATION
DETAIL
PROVIDE FIRE EXTINGUISHER CABINET.
FIELD VERIFY LOCATION OF EXISTING VERTICAL
VENTILATION. ADJUST LOCATION OF NEW CHASE
WALLS AS REQUIRED.
RENOVATION PLAN
KEYED NOTES
1.
2.
3.
4.
W A
L L
O P
E N
IN
G
3 5/8" 2" 3 5/8"
RECESSED
ISOLATION PANEL: SEE
ELECTRICAL
18 GA. MTL STUD @ 16" O.C.
5/8" GYP. TYPE X
ACCESS SIDE
18 GA. MTL STUDS
@ 16: O.C.
8"
1/2"
2 3/8"
10 1/2"
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:5
P M
A-103
BUILDING 02 SECOND FLOOR AREA 'B'
RENOVATION PLAN
7 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
1/4" = 1'-0"
BUILDING 02 SECOND FLOOR AREA 'B' RENOVATION PLAN
N
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1 1/2" = 1'-0"
ISOLATION PANELS TYPICAL
MEN'S LOCKER
STAFF TOILET
WOMEN'S
LOCKER
STAFF TOILET
EQUIPMENT
STAFF LOUNGE
SOILED
HAC
ELECTRICAL
CORRIDOR
C203-38
ELECTRICAL
CORRIDOR
C201-38
WAITING
B
H
K
B
G
A
19' - 6 5/8" 12' - 6 1/2"
11' - 2 1/8" 6' - 4 7/8" 14' - 3 5/8"
/2
/4
/4
/8
/2
/8
F
.V
/8
/8
/4
/4
7' - 0"
6' - 10 7/8" 8' - 4 7/8" 12' - 8 1/4" 3' - 10 5/8"
B
G
B
B
B
D
B
D
B
D
B
B
2' - 7 7/8" 1' - 11 5/8" 12' - 8 1/2" 5' - 4 7/8"
V
V
B
7' - 7 1/4" 6' - 5" 8' - 10 7/8" 14' - 1"
/2
F .V
/8
/2
/8
/8
7' - 6 1/8" 6' - 0 5/8"
/4
/8
/2
/4
/8
/2
/8
A-401
A-401
A
D
C1
C
T
4' - 5 5/8"
/8
E
E
B
6"
8' - 0"
P
E
D
P
P
B
B
T
V
B
A-502
/8
D
D
D
H
J
B
B
B
A
E
E
5 1/8"
2' - 6 3/4" 5' - 2 7/8"
/8
6' - 5 1/2"
PP
P
P
9' - 0 1/8" 2' - 10 5/8" 6' - 9 3/4"
3' - 9 5/8"
/8
4' - 3" 5' - 1 1/2"
/2
/2
/2
4' - 8 1/2" 7' - 6 1/8" 6' - 3"
P
D
E
E
E
P
B
C
B
D
K
K P
P
P
284 285
CORRIDOR
C202-02
CORRIDOR
C204-02
CHASE
CHASE
C202-56
ANESTHESIA
BIO-MED
TOILET
TOILET
N. MANAGER
OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
E
H
B
B
A
B
V
/8 " 4' - 6 1/8"
13' - 3 1/2"
A-502
D
D
D
DDD
212A
E
BB
B
P
P
P
B
OFFICE
D N
F.E.C
F.E.C
ELEVATOR
LOBBY
C202-38
A-502
Sim
A-502
Sim
A-502
Sim
INSTALL SOLID SURFACE WINDOW SILLS AT ALL
EXTERIOR WINDOWS. TYPICAL, U.N.O.
SEE DETAIL - 10/A502
EXISTING WINDOW TO REMAIN. INSTALL BLACKOUT
FILM OVER WINDOW AND COVER WITH METAL
FRAMING AND GYPSUM BOARD. REMOVE PORTION
OF SILL AS REQUIRED TO PROVIDE SMOOTH
TRANSITION. FINISH TO MATCH ADJACENT
SURFACES. SEE A-502 FOR WINDOW RENOVATION
DETAIL
PROVIDE FIRE EXTINGUISHER CABINET.
FIELD VERIFY LOCATION OF EXISTING VERTICAL
VENTILATION. ADJUST LOCATION OF NEW CHASE
WALLS AS REQUIRED.
RENOVATION PLAN
KEYED NOTES
1.
2.
3.
4.
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:0
P M
A-104
BUILDING 38 SECOND FLOOR
RENOVATION PLAN
8 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
1/4" = 1'-0"
BUILDING 38 SECOND FLOOR RENOVATION PLAN
N
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
10' - 1"
14' - 8 1/4"
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:1
P M
A-105
ROOF PLAN
9 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
ROOF PLAN
N
1. NO ARCHITECTURAL WORK TO BE PERFORMED
ON ROOF. REFER TO MECHANICAL, PLUMBING,
AND ELECTRICAL FOR PENTHOUSE AND ROOF
DETAILS
S2-02
MEN'S LOCKER
STAFF TOILET
WOMEN'S
LOCKER
STAFF TOILET
EQUIPMENT
STAFF LOUNGE
SOILED
HAC
ELECTRICAL
CORRIDOR
C203-38
ELECTRICAL
CORRIDOR
C201-38
WAITING
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
OR
CORRIDOR
C204-2
CORRIDOR
205-02
OR
STERILE CORE
CORRIDOR
C201-02
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
ELEVATOR
SHAFT
C202-54
CHASE
CHASE
CHASE
C202-57
AC104
AC102
AC103
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
D N
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
FIBER OPTIC
LOGISTICS
PAMN
C207-02F
PAGING
EQUIPMENT
C207-02G
WHEELCHAIR
ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
STRESS LAB
ELEVATOR
LOBBY
C1
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
ANESTHESIA
IMMED. STER.
BIO-MED
TOILET
TOILET
N. MANAGER
OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
OR
CORRIDOR
C208-02
ELEVATOR
LOBBY
C202-38
OFFICE
RECONFIGURE EXISTING SUSPENDED CEILING
SYSTEM AS REQUIRED TO INSTALL NEW
SOFFIT AND ADJACENT CEILING SYSTEM
3/8" MIN.
CROSS TEE
STABILIZER BAR TO PREVENT PERIMETER
COMPONENTS FROM SPREADING APART
3/4" MIN. @ UNATTACHED WALLS
2" MIN.
MAIN TEE
(STABILIZER END VIEW)
STABILIZER BAR TO PREVENT
PERIMETER COMPONENTS
FROM SPREADING APART
ANGLE MOLDING
#12 HANGER WIRE
ANCHORED TO
STRUCTURE ABOVE
MAIN TEEMAIN TEE
MAIN TEE
STEEL STUD COMPRESSION POST
ON MAIN TEE - LOCATED 6'-0" MAX.
FROM END WALL AND 12"-0" MAX.
EACH WAY IN FIELD.
#12 HANGER
WIRE
45° O R
LESS45
° O R L
ESS
IN ADDITION: PROVIDE #12
HANGER WIRE AT EACH CORNER
(4 TYP.) OF ALL LIGHT FIXTURES
AND MECHANICAL GRILLES.
NOTE: DETAILS TO BE USED
AT ALL SUSPENDED
LOCATIONS THROUGHOUT.
O R
L E
S S
° O
R L
E S
S
CROSS TEE
MAIN TEE
(STABILIZER SIDE VIEW)
LEGEND: REFLECTED
CEILING PLAN
2x2 ACOUSTICAL CEILING TILE
GYPSUM BOARD CEILING
2x4 LIGHT FIXTURE
PENDANT LIGHT FIXTURE
AIR TERMINAL
RETURN AIR GRILLE
SUPPLY AIR
EXHAUST AIR
CUBICLE CURTAIN TRACKS
CEILING HEIGHT
CIRCULAR DOWNLIGHT
SURGICAL LIGHTS
CEILING MOUNTED DUAL MONITOR
24"X24" ACCESS PANEL
PATIENT LIFT
EXIT SIGN
X' - X"
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:4
P M
AC101
SECOND FLOOR REFLECTED CEILING
PLAN
10 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B 1/8" = 1'-0"
SECOND FLOOR OVERALL RENOVATION CEILING PLAN
N
1" = 1'-0"
SEISMIC CEILING DETAILS
ELECTRICAL
ELECTRICAL
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
9' - 0"
10' - 0"
9' - 0"
9' - 0"
8' - 0"
8' - 6"
9' - 0"
8' - 0"
9' - 0"
9' - 0"
9' - 0"
AC102
AC102
AC102
Sim
AC102
AC102
Sim
AC102
8' - 6"
9' - 0"9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
AC102
Sim
8' - 0"
8' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0" 8' - 0"
AC102
8' - 9"
8' - 9"
8' - 9" 8' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"9' - 0"9' - 0"
9' - 0"
8' - 6"
4"
3' - 4"
3'
4"
"5
/8
8' - 0 5/8" 5' - 0"
1' - 0"
1' - 0"
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C208-02
AFTER REMOVAL OF TEMPORARY
PARTITION/CONSTRUCTION BARRIER, MODIFY
EXISTING CORRIDOR CEILING SYSTEM (TILE AND
GRID) AS REQUIRED TO INSTALL NEW CEILING AS
INDICATED. REPLACE ANY PORTION OF CEILING
DAMAGED DURING RENOVATION TO MATCH
EXISTING.
PROVIDE NEW CEILING SYSTEM (TILE AND GRID) AS
INDICATED. TIE-IN TO EXISTING CEILING SYSTEM
WHERE REMOVAL IS NOT REQUIRED. MATCH
EXISTING CEILING GRID AND TILE (MATERIALS AND
LAYOUT). PROVIDE SEAMLESS TRANSITION BETWEEN
NEW AND EXISTING.
REFLECTED CEILING
PLAN KEYED NOTES
1.
2.
LEGEND: REFLECTED
CEILING PLAN
2x2 ACOUSTICAL CEILING TILE
GYPSUM BOARD CEILING
2x4 LIGHT FIXTURE
PENDANT LIGHT FIXTURE
AIR TERMINAL
RETURN AIR GRILLE
SUPPLY AIR
EXHAUST AIR
CUBICLE CURTAIN TRACKS
CEILING HEIGHT
CIRCULAR DOWNLIGHT
SURGICAL LIGHTS
CEILING MOUNTED DUAL MONITOR
24"X24" ACCESS PANEL
PATIENT LIFT
EXIT SIGN
X' - X"
M
IN
9'-0" A.F.F.
8'-6" A.F.F.
1' - 0"
ACOUSTICAL
CEILING TILE
3 5/8" METAL STUD
FRAMING, TYP.
5/8" TYPE 'X' GYPSUM
BOARD, TYP.
O
10'-0" A.F.F.
8'-6" A.F.F.
3 5/8" METAL
STUD
FRAMING, TYP.
ACOUSTICAL
CEILING TILE
9'-0" A.F.F.
5/8" TYPE 'X'
GYPSUM BOARD
M
IN
8'-9" A.F.F.
5/8" TYPE 'X'
GYPSUM BOARD
RECESSED LIGHT
RE: ELECTRICAL
1' - 0"5' - 0"
5/8" TYPE 'X'
GYPSUM BOARD
3 5/8" METAL
STUD
FRAMING, TYP.
3 5/8" METAL STUD
FRAMING, TYP.
EXISTING CONCRETE DECK
FRAMING EXTENDS
TO DECKING
DEFLECTION CLIPS
TOP OF STUD, CHANNEL
ACOUSTICAL
CEILING TILE
9'-0" A.F.F.
ACOUSTICAL
CEILING TILE
9'-0" A.F.F. 6
M
IN
8'-0" A.F.F.
VARIES
5/8" TYPE 'X'
GYPSUM BOARD,
TYP.
3 5/8" METAL STUD
FRAMING, TYP.
RECESSED
LIGHT. RE:
ELECTRICAL.
4"
WALL BEYOND
2-6 2-7F
3' - 0"
M
IN
RECESSED LIGHT. RE:
ELECTRICAL.
8'-0" A.F.F.
5/8" TYPE 'X'
GYPSUM BOARD, TYP.
3 5/8" METAL STUD
FRAMING, TYP.
ACOUSTICAL
CEILING TILE
9'-0" A.F.F.9'-0" A.F.F.
WALL BEYOND
4"
9'-0" A.F.F.
8'-0" A.F.F.
3' - 4"
9'-0" A.F.F.
5/8" TYPE 'X'
GYPSUM BOARD, TYP.
3 5/8" METAL STUD
FRAMING, TYP.
ACOUSTICAL
CEILING TILE
M
IN
RECESSED LIGHT
RE: ELECTRICAL
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1 /2
:2
:0
P M
AC102
BUILDING 02 SECOND FLOOR AREA 'A'
REFLECTED CEILING PLAN
11 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
BUILDING 02 SECOND FLOOR AREA 'A' REFLECTED CEILING PLAN
N
1" = 1'-0"
CORRIDOR SOFFIT DETAIL - TYP.
1" = 1'-0"
CORRIDOR SOFFIT DETAIL - C205-02 SOUTH
1" = 1'-0"
CARE/SCRUB STATION SOFFIT DETAIL - TYP.
1" = 1'-0"
ALCOVE C206-02A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .