P09 Drawings 08 Electrical 100 BID - 15 pages.pdf

PDF 7 MB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This is a solicitation for a construction project to create a three operating room inpatient surgical/endovascular services and ambulatory surgical service on the second floor of Building 2 and Building 38 at the Marion VA Medical Center in Marion, Illinois. The scope of work includes constructing three operating rooms and supporting services to accommodate the new surgical suites. Infrastructure will be installed to meet UPS power requirements. Upon project completion, the VA will have a fully operational three operating room inpatient surgical/endovascular suite and ambulatory surgical service. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UE

OE

M/G 400A/3P

M/G 400A/3P

C

PC

R

TS

T

100/3

100/3/70

100/3/70/1

100/3/CB

PP

J

GF

OR

OR

OR

EPO

AM

VM

DM

ST

KK

GFR

M

SPD

R

CU

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL, TECHNOLOGY OR FIRE ALARM

PLUMBING EQUIPMENT DESIGNATION

EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL REFERENCE

SECTION CUT DESIGNATION

ELECTRICAL: (AFF, AFG UNLESS NOTED OTHERWISE)

LP1

A1

LIGHT FIXTURE, CEILING MOUNTED

a

LIGHTING TRACK WITH TRACK LIGHT FIXTURES

LIGHT FIXTURE, POLE MOUNTED

LIGHT FIXTURE, WALL MOUNTED

EMERGENCY BATTERY PACK LIGHT FIXTURE,

WALL MOUNTED

EMERGENCY BATTERY PACK LIGHT FIXTURE,

CEILING MOUNTED

EXIT SIGN, WALL MOUNTED, FACE/ARROWS AS INDICATED

EXIT SIGN, CEILING MOUNTED, FACE/ARROWS AS INDICATED

EMERGENCY LIGHT FIXTURE, CEILING MOUNTED

A1E a

A1 a

A1

A1

X1E

X1E

Y1E

Y1E

HOMERUN TO PANELBOARD, ARROWS INDICATE

NUMBER OF CIRCUITS, TICK MARKS INDICATE

NUMBER OF CONDUCTORS. DESIGNATIONS ARE

PANELBOARD AND CIRCUIT NUMBERS.

UNSWITCHED HOT CONDUCTORS SHOWN LEADING

NEUTRAL CONDUCTOR

NEUTRAL CONDUCTOR

SWITCHED HOT CONDUCTORS SHOWN TRAILING

GROUND CONDUCTOR

EQUIPMENT GROUNDING CONDUCTOR IN RACEWAY

ISOLATED GROUNDING CONDUCTOR IN RACEWAY

CONCEALED RACEWAY

EXPOSED RACEWAY

RACEWAY TURNING DOWN

RACEWAY TURNING UP

EQUIPMENT TERMINATION

LOW VOLTAGE CABLE (NOT ROUTED IN CONDUIT)

LIGHT FIXTURE, BOLLARDA1

RECEPTACLE, SIMPLEX, NEMA 5-20R, UNO

RECEPTACLE, DUPLEX, NEMA 5-20R, UNO

RECEPTACLE, DOUBLE-DUPLEX, NEMA 5-20R, UNO

RECEPTACLE, DUPLEX, CEILING MOUNTED, NEMA 5-20R, UNO

RECEPTACLE, SPECIAL PURPOSE

RECEPTACLE, TWIST-LOCK

RECEPTACLE, DUPLEX, FLOOR MOUNTED, NEMA 5-20R, UNO

RECEPTACLE, DUPLEX, DROP CORD, NEMA 5-20R, UNO

RECEPTACLE, MOUNTED 6" ABOVE COUNTER,

TYPE AS INDICATED ABOVE

RECEPTACLE DESIGNATIONS AS FOLLOWS:

SWITCH, SINGLE POLE

SWITCH DESIGNATIONS AS FOLLOWS:

OCCUPANCY SENSOR, CEILING MOUNTED

POWER PACK FOR LIGHTING CONTROL

JUNCTION BOX

RECEPTACLE ON EMERGENCY POWER

RECEPTACLE, ISOLATED GROUND TYPE

MULTI-OUTLET, SURFACE RACEWAY, 24" ON CENTER,

NEMA 5-20R, UNO

SWITCHBOARD, MOTOR CONTROL CENTER OR DISTRIBUTION

PANELBOARD ON HOUSEKEEPING PAD

PANELBOARD, RECESS MOUNTED

PANELBOARD, SURFACE MOUNTED

TRANSFORMER

DISCONNECT SWITCH, NON-FUSED, 100/3 INDICATES

AMPERES/POLES, CB = CIRCUIT BREAKER TYPE

DISCONNECT SWITCH, FUSED, 100/3/70 INDICATES

AMPERES/POLES/FUSE, CB = CIRCUIT BREAKER TYPE

COMBINATION DISCONNECT SWITCH WITH MOTOR STARTER

100/3/70/1 INDICATES AMPERES/POLES/FUSE/ NEMA STARTER

SIZE, NF = NON-FUSED, CB = CIRCUIT BREAKER TYPE

MAGNETIC MOTOR STARTER, NEMA SIZE AS NOTED,

3-POLE, UNO

CONTACTOR

PHOTOCELL

RELAY

TIME SWITCH

LOW-VOLTAGE TRANSFORMER

PUSH BUTTON, TYPE AS NOTED

VARIABLE FREQUENCY DRIVE WITH DISCONNECT SWITCH

100/3/70 INDICATES AMPERES/POLES/FUSE SIZE,

NF = NON-FUSED, CB = CIRCUIT BREAKER TYPE

UNDERGROUND ELECTRIC LINE

MULTI-SERVICE FLOOR BOX/POKE-THRU WITH POWER/DATA,

TYPE AS NOTED AND/OR SCHEDULED

CABINET, RECESS MOUNTED

CABINET, SURFACE MOUNTED

RECEPTACLE, DUPLEX, GROUND-FAULT CIRCUIT

INTERRUPTER, NEMA 5-20R, UNO

MULTI-SERVICE POWER POLE WITH POWER/DATA,

TYPE AS NOTED AND/OR SCHEDULED

OVERHEAD ELECTRIC LINE

MUSHROOM TYPE PUSH BUTTON, TYPE AS NOTED

PLAN NOTE CALL OUT

TRANSFER SWITCH, RATINGS AS INDICATED

ATS = AUTOMATIC TRANSFER SWITCH

TX#

600AF

3P

500AT

400AS

3P

225AF

275KW STANDBY

480Y/277V, 3PH, 4W

GENERATOR, SEPARATELY DERIVED

SOURCE, TYPE AND RATINGS AS INDICATED

275KW STANDBY

480Y/277V, 3PH, 4W

GENERATOR, NON-SEPARATELY DERIVED

SOURCE, TYPE AND RATINGS AS INDICATED

DRAWOUT CIRCUIT

BREAKER, RATINGS

AS INDICATED

600AF

3P

500AT

CIRCUIT BREAKER,

RATINGS AS

INDICATED

LPS-R

FUSED DISCONNECT

SWITCH, RATINGS

AS INDICATED

400AS

3P

225AF

LPS-R

COMBINATION FUSED

SWITCH AND STARTER,

RATINGS AS

PANELBOARD,

SINGLE-SECTION,

RATINGS PER

SCHEDULES

PANELBOARD,

MULTI-SECTION,

RATINGS PER

SCHEDULES

NEMA 1

AMMETER

VOLTMETER

COMBINATION DIGITAL

SHUNT-TRIP RELAY

KIRK-KEY INTERLOCK

GROUND-FAULT RELAY

UTILITY METER

RELAY

SURGE PROTECTION

AMMETER/VOLTMETER

DEVICE

AUTOMATIC TRANSFER SWITCH WITH BYPASS

TYPE AND RATINGS AS INDICATED

VARIABLE FREQUENCY

DRIVE WITH

DISCONNECT, RATINGS

GROUND CONNECTION

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

GROUND CONNECTION

WITH TEST WELL

CONTACT, OPEN

CONTACT, CLOSED

MOTOR

FEEDER TAGCAPACITOR

SURGE ARRESTER

HEATER

225A 3P

NEMA 1

INDICATED

COMBINATION CIRCUIT

BREAKER AND

STARTER, RATINGS AS

INDICATED AS INDICATED

225A 3P

200A 3P

ATS#

200A 3P

ATS#

TRANSFORMER

TX#

TRANSFORMER,

SHIELDED

200A DEAD-FRONT ELBOW

600A DEAD-FRONT ELBOW

DEAD-FRONT SPLITTER

FAULT INDICATOR

LIGHTNING PROTECTION AIR TERMINAL

LIGHTNING PROTECTION CABLE CONNECTION

LIGHTNING PROTECTION GROUND ROD

LIGHTNING PROTECTION CONDUCTOR

MTS = MANUAL TRANSFER SWITCH

EP-101

EP-101

LIGHTNING PROTECTION SYMBOLS

ELECTRICAL ONE-LINE DIAGRAM SYMBOLS

M (CONT'D)

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT

OS# = CEILING MOUNTED OCCUPANCY SENSOR, REFER

TO OCCUPANCY SENSOR AND SWITCH SCHEDULE

2 = TWO-POLE WALL SWITCH

3 = THREE-WAY WALL SWITCH

4 = FOUR-WAY WALL SWITCH

D = DIMMER SWITCH

OS# = OCCUPANCY SENSOR WALL SWITCH, REFER

TO OCCUPANCY SENSOR AND SWITCH SCHEDULE

P = SINGLE-POLE, SINGLE-THROW PILOT LIGHT

WALL SWITCH

K = KEYED WALL SWITCH

M = MOTOR RATED SWITCH

WP = WEATHER PROOF SWITCH AND COVER

C = CLOCK HANGER

E = EMERGENCY POWER

GF = GROUND FAULT CIRCUIT INTERRUPTER

IG = ISOLATED GROUND

S = SWITCHED

TR = TAMPER RESISTANT

WP = WEATHER PROOF COVER

WR = WEATHER RESISTANT

XP = EXPLOSION PROOF

A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT

FIXTURE SCHEDULE

Y1E = LIGHT FIXTURE TYPE "Y1E" REFER TO LIGHT

FIXTURE SCHEDULE

Y1E = LIGHT FIXTURE TYPE "Y1E" REFER TO LIGHT

FIXTURE SCHEDULE

X1E = LIGHT FIXTURE TYPE "X1E" REFER TO LIGHT

FIXTURE SCHEDULE

X1E = LIGHT FIXTURE TYPE "X1E" REFER TO LIGHT

FIXTURE SCHEDULE

A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT

FIXTURE SCHEDULE

A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT

FIXTURE SCHEDULE

A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT

FIXTURE SCHEDULE

a = SWITCHED BY SWITCH "a"

A1E = LIGHT FIXTURE TYPE "A1E" REFER TO LIGHT

FIXTURE SCHEDULE

a = SWITCHED BY SWITCH "a"

NL = NIGHT LIGHT

A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT

FIXTURE SCHEDULE

a = SWITCHED BY SWITCH "a"

NL = NIGHT LIGHT

= ARROW INDICATES AIMING DIRECTION

LIGHTING SYMBOLS

POWER EQUIPMENT SYMBOLS

WIRING DEVICE SYMBOLS

AUDIBLE APPLIANCES (CENTERLINE) 84"

ALARMS (TOP) 48"

ANNUNCIATOR PANELS (TOP) 48"

CLOCK OUTLETS (CENTERLINE) 84"

CONTROLS (TOP) 48"

EXIT SIGNS (WALL-MOUNTED, BOTTOM) 80"

FIRE ALARM ANNUNCIATOR PANEL (DISPLAY) 60"

FIRE ALARM BELL (EXTERIOR) 120"

FIRE ALARM CONTROL PANEL/UNIT (DISPLAY) 60"

INTERCOM (AFEA ONLY) 36"

INTERCOMS (TOP) 48"

PANELS & PANELBOARDS (TOP) 72"

PULL STATIONS (TOP) 48"

PHOTOCELLS 144"

RECEPTACLES (BOTTOM) 18"

RECEPTACLES, EXTERIOR (BOTTOM) 24"

RECEPTACLES, GARAGES (BOTTOM) 26"

RECEPTACLES IN EQUIPMENT ROOMS (TOP) 48"

RECEPTACLES ABOVE COUNTERTOPS (TOP) 44"

REMOTE INDICATING LIGHT, EQUIPMENT ROOMS (TOP) 48"

REMOTE INDICATING LIGHT, FINISHED AREAS (TOP) CEILING

SAFETY SWITCHES & STARTERS 48"

SWITCHES (TOP) 48"

TELEPHONE/DATA/TV OUTLETS (BOTTOM) 18"

VISIBLE APPLIANCES (CENTERLINE) 84"

X

W

V

U

T

S

R

CIRCUITING SYMBOLS

ANNOTATION STANDARD MOUNTING HEIGHTS

P

O

N

M

L

K

J

I

H

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FI FILM ILLUMINATOR

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLUOR FLUORESCENT

FO FIBER-OPTIC

FP FIRE PROTECTION

FT FEET OR FOOT

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G

F

E

D

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMER. MONITORING CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

ESMT EASEMENT

ETD EXISTING TO BE DEMOLISHED

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR PNL DISTRIBUTION PANEL

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

C CONDUIT

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CFE CONTRACTOR FURNISHED

EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

C

B

A

ABBREVIATIONS

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VCM VERTICAL CABLE MANAGER

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

TC TIME CLOCK

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REC RECESSED

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RU RACK UNIT

N NEUTRAL

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

KV KILOVOLT

KVA KILOVOLT AMPERE

KVAH KILOVOLT AMPERE PER HOUR

KVAR KILOVOLT AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

KWHM KILOWATT HOUR METER

JB JUNCTION BOX

J-BOX JUNCTION BOX

XFER TRANSFER

XFMR TRANSFORMER

XP EXPLOSION PROOF

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTCP LOCAL TEMPERATURE CONTROL PANEL

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

IESNA ILLUMINATION ENGINEERING SOCIETY

OF NORTH AMERICA

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

G OR GND GROUND OR GENERATOR

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR

PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

POE POWER OVER ETHERNET

PP PATCH PANEL

PT POTENTIAL TRANSFORMER

PTRV POWER TYPE ROOF VENTILATION

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

1P SINGLE POLE

1PH SINGLE-PHASE

3P THREE POLE

3PH THREE-PHASE

3W THREE WIRE

4W FOUR WIRE

A/C AIR CONDITIONING

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

ADO AUTOMATIC DOOR OPENER

AF AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR

AVAILABLE FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

HCM HORIZONTAL CABLE MANAGER

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BIL BASIC INSULATION LEVEL

BLDG BUILDING

BLK BLOCK

BPIP BOILER PLANT

INSTRUMENTATION PANEL

BRKR BREAKER

BYP BY PASS

IC INSULATION CONTACT

ES EMERGENCY SHUNT RELAY

ISO ISOLATION

RECEPTACLE, DUPLEX, SERVICE POLE, NEMA 5-20R

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:3

:5

P M

E-001

ELECTRICAL LEGEND

1 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

GENERAL DEMOLITION NOTES:

1. PERFORM ALL DEMOLITION WORK AS REQUIRED INCLUDING MINOR ITEMS OF MATERIAL OR EQUIPMENT NECESSARY TO MEET THE

REQUIREMENTS AND INTENT OF THE PROJECT.

2. PRIOR TO SUBMITTING PROPOSAL, BIDDER SHALL EXAMINE GENERAL CONSTRUCTION DRAWINGS AND SHALL HAVE VISITED THE CONSTRUCTION SITE. BIDDER SHALL BE FAMILIAR WITH THE EXISTING CONDITIONS UNDER WHICH THEY HAVE TO OPERATE AND WHICH WILL IN ANY WAY AFFECT THE WORK UNDER THIS CONTRACT IN BEHALF OF THE CONTRACTOR FOR ANY ERROR OR

NEGLIGENCE ON HIS PART.

3. CERTAIN REMODELING OF ELECTRICAL FACILITIES WILL BE REQUIRED IN THE EXISTING BUILDING. EXISTING CONDUIT RUNS ARE GENERALLY NOT SHOWN, INFORMATION HAS BEEN TAKEN FROM EXISTING RECORD DRAWING OF THIS PROJECT. THE EXISTING LOCATION OF EXISTIG EQUIPMENT, OUTLETS, FIXTURES, ETC; SHOWN IN EXISTING AREAS ON DRAWINGS ARE APPROXIMATE ONLY

AND SHALL BE FIELD VERIFIED.

4. EXISTING CONDUIT NOT BEING UTILIZED SHALL BE REMOVED BACK TO SOURCE EXCEPT WHERE EXISTING CONDUIT IS TO BE ABANDONED, THE CONDUIT SHALL BE REMOVED IF IT IS EXPOSED. IN A CRAWL SPACE OR ANY ACCESSIBLE CEILING, WHERE IT IS

IMPOSSIBLE TO REMOVE THE CONDUIT, IT SHALL BE CUT OFF AND PLUGGED.

5. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING PATCHING PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS OF

THIS SPECIFICATION, CLOSE ALL OPENINGS, REPAIR ALL SURFACES, ETC; AS REQUIRED.

6. THE CONTRACTOR SHALL EMPLOY QUALIFIED AND EXPERIENCED WORKMEN FOR THIS WORK; ALL RESTORATION WORK SHALL BE

SUBJECT TO THE APPROVAL OF THE ARCHITECT AND/OR COR.

7. ALL TEMPORARY AND REMODELING WORK SHALL BE CONSIDERED A PART OF THIS CONTRACT AND NO EXTRA CHARGES WILL BE ALLOWED. THIS SHALL INCLUDE MINOR ITEMS OF MATERIAL OR EQUIPMENT NECESSARY TO MEET THE REQUIREMENTS AND INTENT

OF THE PROJECT.

8. EXAMINE ARCHITECTURAL, STRUCTURAL, AND MECHANICAL DRAWINGS AND SPECIFICATIONS TO DETERMINE THE SEQUENCE OF CONSTRUCTION THROUGHOUT THE PROJECT INCLUDING EXISTING, TEMPORARY, REMODELED, AND NEW AREAS.

GENERAL NOTES:

1. READ THE SPECIFICATIONS AND REVIEW DRAWINGS OF ALL DIVISIONS OF WORK. COORDINATE THIS WORK WITH ALL OTHER DIVISIONS OF WORK AND ALL SUBCONTRACTORS. PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS.

2. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF WORK. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE CONTRACTING OFFICER OF ANY CONFLICTS OR DISREPANCIES PRIOR TO

SUBMISSION OF BID.

3. DRAWINGS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIEMENTS.

4. VERIFY ROUGH-IN REQUIREMENTS, LOCATIONS, MOUNTING HEIGHTS, VOLTAGE, PHASE, AMPS, HP, KW, ETC. FOR ALL GOVERNMENT

FURNISHED EQUIPMENT BEFORE PROVIDING ROUGH-IN.

5. UNLESS OTHERWISE NOTED, ALL CIRCUITRY SHALL BE #12 AWG IN 3/4" CONDUIT MINIMUM.

6. PROVIDE A SEPERATE, CODE SIZED GREEN EQUIPMENT GROUND CONDUCTOR IN ALL CONDUITS AND RACEWAYS CONTAINING LINE VOLTAGE CIRCUITS. FOR ALL 20A CIRCUITS, EQUIPMENT GROUND CONDUCTOR SIZE SHALL MATCH PHASE CONDUCTOR SIZE. FOR CIRCUITS UPSIZED FOR VOLTAGE DROP INCREASE EQUIPMENT GROUNDING CONDUCTOR SIZE PER CODE.

7. PROVIDE ALL MOUNTING AND SUPPORT HARDWARE FOR LIGHT FIXTURES TO MEET SPECIFIED MOUNTING HEIGHTS.

8. ALL JUNCTION BOXES SHALL BE RIGIDLY ATTACHED TO STRUCTURE OR MILLWORK.

9. VERIFY REQUIREMENTS WITH EQUIPMENT SUPPLIER AND PROVIDE ALL NECESSARY ITEMS TO MEET THE EQUIPMENT'S ELECTRICAL

INSTALLATION REQUIREMENTS.

10. FIELD VERIFY EXACT LOCATION AND ELECTRICAL REQUIREMENTS OF ALL HVAC AND PLUMBING EQUIPMENT WITH OTHER TRADE

CONTRACTORS PRIOR TO ORDERING RELATED ELECTRICAL EQUIPMENT.

11. VERIFY REQUIREMENTS OF ALL MECHANICAL EQUIPMENT WITH SHOP DRAWING SUBMITTALS. NOTIFY ENGINEER OF ANY CONFLICTS

BETWEEN EQUIPMENT SUBMITTALS AND ELECTRICAL DRAWINGS.

12. ALL GFCI PROTECTED CIRCUITS SHALL HAVE INDIVIDUAL AND DEDICATED NEUTRALS.

13. PROVIDE A MINIMUM OF (3) SPARE 1" CONDUITS FROM RECESSED PANELBOARD UP TO ACCESSIBLE CEILING SPACE.

14. REFER TO SPECIFICATIONS FOR ADDITIONAL PANELBOARD INSTALLATION REQUIREMENTS AND IDENTIFICATION.

15. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL

NOT BE USED.

16. EACH BRANCH HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL PARTS, PIECES, AND APPURTENANCES FOR FULLY OPERATIONAL LIGHTING, POWER, AND SPECIAL SYSTEMS. COORDINATE WITH ALL OTHER TRADES AND ANY RELEVANT EQUIPMENT INFORMATION.

ED102

D-1 (RELOCATE)

B-6 (SECTION 1) (ETR) B-6 (SECTION 2) (ETR)

EC-23 (ETR)

EL-23 (ETR)

Q

2-11

O M.2 F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-2

2-1

2-9

AA AC

2-4

2-7

F.8

AREA OF DEMOLITION

2-C (ETD)

BUSWAY (ETR)

B-6 (SECTION 1) (ETR)

EC-23 (ETR)

EL-23 (ETR)

B-6 (SECTION 2) (ETR)

EQUIPMENT IN

THIS ROOM IS

EXISTING TO

REMAIN

2-2

ELECTRICAL

ETD

ROOM

203C

RECREATION

FIBER OPTIC

236B

LOGISTICS

WOMEN

HAC

MEN

MECH.

INPATIENT DIETETIC

217A

CLINICAL DIETITION

INPATIENT DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STRESS LAB

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC SERVICE

STORAGE

208A

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION SERVICES

OUTPATIENT NUTRITION

OUTPATIENT NUTRITION

204A

STORAGE

204B

OFFICE

207A

STORAGE

203D

ROOM

203A

ROOM

203B

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

PAMN

OXYGEN STORAGE

WHEELCHAIR ALCOVE

C3

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:3

:5

P M

ED102

BUILDING 2 AND BUILDING 38 SECOND

FLOOR ELECTRICAL DEMOLITION PLAN

2 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

1/8" = 1'-0"1

BUILDING 2 AND BUILDING 38 SECOND FLOOR

ELECTRICAL DEMOLITION PLAN 0

1" = 8'

4 8 16 32

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"2

SECOND FLOOR ENLARGED PLAN

ELECTRICAL ROOM 213

1" = 4'

2 4 8 16

A. REMOVE ALL ELECTRICAL DEVICES, CONDUIT,

AND WIRE WITHIN AREA OF WORK. DEMOLISH

WIRE AND CONDUIT BACK TO SOURCE PANEL.

B. REMOVE EXISTING LIGHT FIXTURES AND

CONTROLS WITHIN THE PROJECT AREA.

COORDINATE DISPOSAL OR STORAGE OF

FIXTURES WITH CONTRACTING OFFICER'S

REPRESENTATIVE. DEMOLISH LIGHTING

CIRCUITS BACK TO SOURCE PANEL.

C. FACILITY COR SHALL HAVE RIGHT OF FIRST

REFUSAL FOR ANY SALVAGED MATERIAL.

1. REFER TO DETAIL 2, SHEET EP102C FOR NEW

LOCATION OF EXISTING PANEL.

2. PROVIDE ELECTRICAL DEMOLITION FOR

ELEVATORS. COORDINATE WITH ALL OTHER

TRADES.

PP

PPES

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PPES

PP

ES

DICTATION

PRE/POST

PRE/POST

PRE/POST

CORRIDOR

C204-02

PRE/POST

PACU

PACU

PACU

CORRIDOR

C208-02

ISOLATION

MEDS

CORRIDOR

C206-02

CLEAN SUPPLY

HAC

TOILET

STAFF TOILET

A2DE

A3

A3

A4E A4 A4

A4DA4DE

A4E

A4

A4E

A4A4E

A4

A2DE

A2DEA2DE

A2DE

A2DE

A2DE

A2DE

A3

A3

A4

A4

A4

A4E

D1

D1D1

D1

D1D1

D1 D1

D1

D1

D1

D1

A4E

A4

A4E

A4D

D1

A4 A4 A4

A4

D1

CORRIDOR

C203-02

CORRIDOR

C202-02

OS2

OS2

OS2

OS2

OS2

OS2

OS2

LV1

RC1

OS1

OS2

OS2

OS2

A3

OS1

LVD

D1

RC1

RC2

LVD

LVD

LVD

LVD

LVOD

RC1

LVD

RC1

LVD

RC1

LVD

RC1

LVD

LVD

RC1 RC1

LVD

RC3

RC3

LV1

,c ,b

,a a a a

OS1

a b c

L V

D

L V

D

L V

D

D1DD1DD1DD1D

LVD

LVD

D1D a b b a

LVD

D1D

LVD

D1D

D1D

LVD

LVD

D1D a a b b a b b a a b a b b b a a b b a

OS1

OS1

LV1

LV1

Q

2-11

O M.2 F.9

2-10

2-8

2-6

2-5

2-3

2-2

2-1

2-9

2-4

2-7

F.8

D1

SOILED HOLDING

a e f d e f

X1E

X1E

X1E

X1E

X1E

X1E

RC1

RC1

RC1

RC1

L V

D d

L V

D b

L V

D c

LV1

RC1

a

LVD

a

LVD

D1

ELECTRICAL

LVD

a

LVD

a

LVD

a

LVD

a

CORRIDOR

C207-02

ANTE

A2DEA2D

P2P2

P2

P2

P2 A4DEA4D

D1D D1D

D1D

A4

A2DE

D1D

A2DE

RC1

RC1

a b

RC1

A2DE

a

D1D b a

LVD

LVD

a b

LVD

a

P1

P1

P1

LV1

OS1

LVD

OS1

TOILET

OS1

RC1

a a

LVD

b b b b b b

TO EL102B-3

EC-23B

B-6 (SECTION 2)

RC1

EC-23 (ETR)

EL-23 (ETR)

B-6 (SECTION 1) (ETR)

B-6 (SECTION 2) (ETR)

A4

CARE STATION

STORAGE

A4

A4

TO EL102C-1

TO EL102B-2

TO EL102B-1

TO EL102C-2

OS1

B-6 (SECTION 2)

PRE/POST

PRE/POST

PRE/POST

2 2 2

RC1

STAIRS

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:5

P M

EL102A

BUILDING 2 SECOND FLOOR AREA 'A'

ELECTRICAL LIGHTING PLAN

3 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"1

BUILDING 2 SECOND FLOOR AREA 'A'

ELECTRICAL LIGHTING PLAN 0

1" = 4'

2 4 8 16

A. UNLESS OTHERWISE NOTED, SWITCHES AND

OCCUPANCY SENSORS CONTROL THE SPACES

IN WHICH THEY ARE LOCATED.

B. LOWER CASE LETTERS DENOTE SWITCHING

ZONES.

1 LOCATE CONTROLLER IN ADJACENT ACCESSIBLE

CEILING.

2 LIGHT FIXTURE CONTROLS PROVIDED IN CARE

STATION 238.

E-701

E-701

TYP. OF 7

E-701

E-701

E-701

E-701

ES

ESPP

PP

PPPP PPPP PPPP

STERILE CORE

OR

PASSAGE

248B

OR

OR

STAIR

S2-02

D2D D2D

D2D D2D

A1D

A1DE A1D A1DE

A1D

A1DE

A1D

A1DEA1DA1DE

A1D

A1DE

D1 D1

A4

A4E A4 A4 A4E

A4D A4D

A4D A4D A4D

A4D

A4D

A4E

A4D A4DA4DE A4DE

A4D

A4DE

A4

D2D D2D

D2D D2D

A1DE A1D A1DE

A1D

A1DE

A1D

A1DEA1DA1DE

A1D

A1DE

A1D

D2D D2D

A1DE A1D A1DE

A1DE

A1D

A1DEA1DA1DE

D2D D2D

A1D

A1DE

A1D

OS2

OS2 OS2

LVD

OS2

OS2

OS2 OS2 OS2

OS2

IPPLC (NEW)

IPP3N (NEW)

IPP2N (NEW)

RC1

IPP1N (NEW)

D1 D1 D1 D1

LV1

RC1

LV1

IPP1C2 (NEW)

IPP1C1 (NEW)

PS

F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-9

AA AC

2-4

2-7

F.8

RC1

RC1

1 1

RC1

L V

D L V

D ba aa a a

L V

D L V

D b a a b a b a b a b a b a b

L V

D L V

D b a

L V

D L V

D ba aa a a b a b a b a a b a b a b

L V

D L V

D ba

L V

D L V

D a b aa aa b a b a b a b a b a b

X1E

X1E

X1E

X1E

X1E

X1E

IPP2C2 (NEW) IPP3C2 (NEW)

IPP3C1 (NEW)

IPP2C1 (NEW)

A1D a

CORRIDOR

C201-02

RC1

PASSAGE

248A

RC1 RC1 RC1

1 1 1

IMMED. STER.

D1

LVD

LVD

OS1

TO EL102A-3

E-701

TYP. OF 3

E-701

E-701

E-701

LVD

TO RM C201-02

TO RM 248B

B-6 (SECTION 2)

TO EL102A-2

EL-23

B-6 (SECTION 2)

EL-23

5 B-6 (SECTION 2)

EL-23

B-6 (SECTION 2)

TO EL102A-1

TO EL102C

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:5

P M

EL102B

BUILDING 2 SECOND FLOOR AREA 'B'

ELECTRICAL LIGHTING PLAN

4 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"1

BUILDING 2 SECOND FLOOR AREA 'B'

ELECTRICAL LIGHTING PLAN 0

1" = 4'

2 4 8 16

1 LOCATE CONTROLLER IN ADJACENT ACCESSIBLE

CEILING.

A. UNLESS OTHERWISE NOTED, SWITCHES AND

OCCUPANCY SENSORS CONTROL THE SPACES

IN WHICH THEY ARE LOCATED.

B. LOWER CASE LETTERS DENOTE SWITCHING

ZONES.

PP

PP

ES

PP

PP

PP

ES

PP

PP

PP

PP

PP

PP PP

PP PP

ES

PP

WAITING

N. MANAGER OFFICE

CORRIDOR

C201-38

MEN'S LOCKER

STAFF TOILET

WOMEN'S LOCKER

STAFF LOUNGE

ANESTHESIA

EQUIPMENT

SOILED

HAC

RECEPTION

A3D

A4DE

A4

A4E

A4

A4

A4

A4E

A4D

A3D

A4DE

A4D

A3

A3

A3

D3

D3

A4 A4

A4D

A4

A4

A3DA3D

A4D

A4D

A4

A4

A4

A3A3

A4D A4D

D1D

OS1

OS1 OS1

LVD

OS1

LVOD

OS1

LVOD

OS2

RC1

LV1

OS2

RC2

RC1

RC1

LV1

RC2

OS1

OS1

OS1

LV1

RC2

OS1

LVD

RC1

OS1

PS

RC1

LV1

OS2

EL-23 (ETR)

EC-23 (ETR)

EC-23B (NEW)

T-EC23B (NEW)

D-1 (RELOCATED)

OS1

LV1

LV1

LVD

LVD

LVD

OS1

LVD

LVD

LVD

OS1

Q O M.2 F.9 C.9 A.5

2-2

2-1

AA AC

F.8

ELEVATOR SHAFT

C202-54

STAFF TOILET

CORRIDOR

C203-38

CONSULTATION

LV1

OS1

F1 F1E F1

F1E

RC1

LV1

ELECTRICAL

ELECTRICAL

X1E

X1E

X1E

PS

LV1

LV1

RC1

LVD

A4DE

A4D

A4DA4DA4D

A4D A4DE

D1D

D1D

RC1

PSA OFFICE

TOILET

TOILET

OS1

OS1

OS1

B-6 (SECTION 1) (ETR)

B-6 (SECTION 2) (ETR)

OS1OS1

LVD

RC1

EL-23

E-701

E-701

E-701

E-701

E-701

E-701

E-701

E-701

E-701

E-701

E-701

E-701

B-6 (SECTION 1)

RC1 RC1

TO EL102B

TO EL102A-2

LV1LV1

RC1 RC1TO EL102A-1

A3D

B-6 (SECTION 1)

D1D

P1E

P1

P1

P1

P1

A3

OS1

LVD

RC1

OFFICE

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:5

P M

EL102C

BUILDING 38 SECOND FLOOR

ELECTRICAL LIGHTING PLAN

5 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1" = 4'

2 4 8 16

1/4" = 1'-0"1

BUILDING 38 SECOND FLOOR

ELECTRICAL LIGHTING PLAN

A. UNLESS OTHERWISE NOTED, SWITCHES AND

OCCUPANCY SENSORS CONTROL THE SPACES

IN WHICH THEY ARE LOCATED.

B. LOWER CASE LETTERS DENOTE SWITCHING

ZONES.

J JJ JJ JJ J

J

J

J

J

J

J

J

J

J

J

J

J J

J

J

J

CORRIDOR

C207-02

DICTATION

ANTE

STAFF TOILET

258TOILET

ISOLATION

MEDS

SOILED HOLDING

HAC

PRE/POST

CLEAN SUPPLY

PACU

PACU

PACU

PRE/POST

PRE/POST

PRE/POST

CORRIDOR

C204-02

CORRIDOR

C202-02

CORRIDOR

C208-02

+48" +48" +48"

+48"

M

M

M

M

M

Q

2-11

O M.2 F.9

2-10

2-8

2-6

2-5

2-3

2-2

2-9

2-4

2-7

F.8

VAV

2A-2

VAV

2A-5

VAV

2A-8

CORRIDOR

C206-02

CORRIDOR

C203-02

VAV

2A-4

VAV

2A-6

M

M

VAV

2A-3

M

VAV

2A-10

VAV

2A-7

+40"

+40"

VAV

2A-1

VAV

2A-9

AAP

+52"

CARE STATION

PRE/POST

PRE/POST

PRE/POST

TOILET

B-6 (SECTION 1)

EC-23B

EC-23B

EC-23B

B-6 (SECTION 1)

B-6 (SECTION 1)

EC-23B

+52"

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

EC-23B

B-6 (SECTION 1)

B-6 (SECTION 1)

EC-23B

EC-23B

EC-23B

EC-23B

B-6 (SECTION 2)

EC-23B

B-6 (SECTION 2)

B-6 (SECTION 1)

EC-23B

B-6 (SECTION 2)

EC-23B

B-6 (SECTION 2)

EC-23B

B-6 (SECTION 2)

EC-23B

B-6 (SECTION 2)

B-6 (SECTION 2)

EC-23B

EC-23B

B-6 (SECTION 2)

B-6 (SECTION 2)

EC-23B

EC-23B

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 2)

EC-23B

M

M

+52"

B-6 (SECTION 1)

M

B-6 (SECTION 2)

+52" +52" +52"

+52"

STORAGE

B-6 (SECTION 1)

B-6 (SECTION 2)

EL-23

+52"

+52"

+52"

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 1)

31B-6 (SECTION 1)

B-6 (SECTION 1)

+64"

SAV

2A-1

B-6 (SECTION 1)

B-6 (SECTION 1)

EAV

2A-1

M

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:0

P M

EP102A

BUILDING 2 SECOND FLOOR AREA 'A'

ELECTRICAL POWER PLAN

6 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

A. THE AREA OF WORK SHOWN IS ASSOCIATED WITH

AN OPERATING FACILITY THAT MUST REMAIN IN

SERVICE 24/7.

B. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

BEFORE THE START OF WORK.

C. COORDINATE ELECTRICAL WORK WITH ALL OTHER

TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

D. PANELBOARDS AND OTHER ELECTRICAL

EQUIPMENT REQUIRE SHUTDOWN. COORDINATE

SERVICE SHUTDOWN FOR ALL EQUIPMENT WITH

CONTRACTING OFFICER’S REPRESENTATIVE.

E. PROVIDE POWER TO ALARM PANELS AS

REQUIRED FOR MEDICAL GAS AND SIMILAR

SYSTEMS.

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1" = 4'

2 4 8 16

1/4" = 1'-0"1

BUILDING 2 SECOND FLOOR AREA 'A'

ELECTRICAL POWER PLAN

1 COORDINATE FINAL CONNECTIONS WITH HEADWALL

INSTALLER. TYPICAL FOR ALL PRE/POST ROOMS,

PACU'S, AND ISOLATION ROOMS.

J

J J J

OR

OR

OR

CORRIDOR

C201-02

STAIR

S2-02

PASSAGE

248B

PASSAGE

248A

STERILE CORE

IPP1N (NEW)

IPP2N (NEW)

IPP3N (NEW)

IPPLC (NEW)

IPP1C1 (NEW)

IPP1C2 (NEW)

2-11

F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-2

2-9

AA AC

2-4

2-7

F.8

IPP2C1 (NEW)

IPP2C2 (NEW) IPP3C2 (NEW)

IPP3C1 (NEW)

+48"

+48"

+48"

+48" +48"

+48"

+60"

2 2 2

VAV

2B-4

+52"

+52"

B-6 (SECTION 1)

EC-23B

B-6 (SECTION 1)

B-6 (SECTION 1)

IPP1C1

B-6 (SECTION 1)

IPP2C1

IPP2C2

IPP2C2

IPP2C1

IPP3C1

IPP3C2

B-6 (SECTION 1)

IPP3C1

+52"

+52" +52"

B-6 (SECTION 2)

B-6 (SECTION 2)

SAV

2B-1

RAV

2B-1

SAV

2B-2

RAV

2B-2

VAV

2B-3

SAV

2B-3

RAV

2B-3

VAV

2B-1

M

M

M M M

M

LAF

LAF

LAF

M

M

M

IPP1N

IPP2N

IPP3N

1 1 1

B-6 (SECTION 2)

SP1

SP1

EC-23B

EC-23B

EC-23B

EC-23B

EC-23B

VAV

2B-2

IPP1N

IPP2N

IPP3N

IPP1C2

IPP3C2

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

IPP1C1

13 IPP1C1

IPP1C1

10 IPP1C1

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP1C2

IPP2C1

IPP2C1

IPP2C1

IPP2C1

IPP2C1

13 IPP2C1

IPP2C1

10 IPP2C1

IPP2C1

IPP2C1

IPP2C1

IPP2C1

IPP2C2

IPP2C2

IPP2C2

IPP2C2

IPP2C2

IPP2C2

IPP2C2

IPP2C2

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C1

IPP3C2

IPP3C2

IPP3C2

IPP3C2

IPP3C2

IPP3C2

IPP3C2

IPP3C2

2 2 2

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:0

P M

EP102B

BUILDING 2 SECOND FLOOR AREA 'B'

ELECTRICAL POWER PLAN

7 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"1

BUILDING 2 SECOND FLOOR AREA 'B'

ELECTRICAL POWER PLAN 0

1" = 4'

2 4 8 16

A. BOND ALL PERMANENTLY INSTALLED METAL

ELEMENTS IN OPERATING ROOM TO BUILDING

GROUNDING SYSTEM.

B. PROVIDE FINAL INTERCONNECTIONS FOR ALL

MEDICAL EQUIPMENT AS REQUIRED BY MEDICAL

EQUIPMENT MANUFACTURER'S SHOP DRAWINGS.

FINAL INTERCONNECTIONS TO INCLUDE CONDUIT

AND/OR CONDUCTORS BETWEEN PIECES OF THE

MEDICAL EQUIPMENT AND THEIR CONTROL

SYSTEMS INDICATED ON THE MEDICAL EQUIPMENT

MANUFACTURER'S SHOP DRAWINGS.

C. RECEPTACLES IN OPERATING ROOMS SHALL BE

MOUNTED AT 24" TO BOTTOM OF RECEPTACLE

UNLESS OTHERWISE NOTED.

1. PROVIDE INTEGRAL LINE ISOLATION POWER

MONITOR INDICATOR FOR ISOLATED POWER PANEL

LOCATED IN 248B.

2. PROVIDE POWER AND GROUND MODULES

CONTAINING (4) DUPLEX RECEPTACLES AND (4)

HOSPITAL GRADE GROUND JACKS. INSTALL AT 24"

AFF TO BOTTOM OF MODULE.

3. COORDINATE ALL BOOM AND PLENUM SYSTEM

REQUIREMENTS WITH MANUFACTURER AND

SPECIFICATION 11 76 00 OPERATING ROOM

EQUIPMENT AND MANAGEMENT SYSTEMS.

WOMEN'S LOCKER

STAFF TOILET

CORRIDOR

C203-38

SOILED

PSA OFFICE

WAITING

RECEPTION

LOGISTICS

FIBER OPTIC

CORRIDOR

C201-38

STRESS LAB

CORR.

C203-38

WAIT.

3 EXAM.

EXAM

EXAM.

EQUIPMENT

STAFF LOUNGE

MEN'S LOCKER

ELECTRICAL

HAC

N. MANAGER OFFICE

STAFF TOILET

CONSULTATION

EL-23 (ETR)

EC-23 (ETR)

D-1 (RELOCATED)

T-EC23B (NEW)

EC-23B (NEW)

M

M

M

M

M

M

O M.2 F.9 C.9 A.5

2-2

2-1

AA

F.8

ELEVATOR SHAFT

C202-54

ANESTHESIA

VAV

38-1

VAV

38-4

VAV

38-2

VAV

38-7

VAV

38-9

VAV

38-8

M

VAV

38-12

M

VAV

38-11

M

VAV

38-10

M

/1 EP102B

EP102C

ELECTRICAL

+40"

(ETR)

+52"

400/3/225

B-6 (SECTION 1) (ETR)

B-6 (SECTION 2) (ETR)

+52" +52"

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

+52"

+52"

B-6 (SECTION 1)

B-6 (SECTION 2)

+52"

+52"

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 1)

M

M

B-6 (SECTION 2)

VAV

38-5

B-6 (SECTION 1)

B-6 (SECTION 2)

VAV

38-6

VAV

38-3

B-6 (SECTION 1)

B-6 (SECTION 1)

B-6 (SECTION 2)

B-6 (SECTION 2)

D-1

+64"

+64"

B-6 (SECTION 2)

B-6 (SECTION 2)

B-6 (SECTION 2)

TOILET

TOILET

B-6 (SECTION 2)

+40" 200/3

B-6 (SECTION 1)

D-1

OFFICE

D-1

F.9

2-2

2-1

F.8

EC-23 (ETR)

B-6 (SECTION 1) (ETR)

EL-23 (ETR)

(ETR)

B-6 (SECTION 2) (ETR)

EC-23B (NEW)

D-1 (RELOCATED)

T-EC23B (NEW)

ELECTRICAL

ELECTRICAL

400/3/225

200/3

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:0

P M

EP102C

BUILDING 38 SECOND FLOOR

ELECTRICAL POWER PLAN

8 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"1

BUILDING 38 SECOND FLOOR

ELECTRICAL POWER PLAN 0

1" = 4'

2 4 8 16

1" = 4'

2 4 8 16

1/4" = 1'-0"2

SECOND FLOOR NEW POWER PLAN -

ELECTRICAL ROOMS 213 & 216

1. SUSPEND TRANSFORMER TO 8' AFF FROM

STRUCTURE.

Q

2-11

O M.2 F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-2

2-1

2-9

AA AC

2-4

2-7

F.8

DIV. 23

DIV. 23

EQ-2P1 (NEW)

PE-MVP

PE-WAGD

30/3

30/3

2-EF

(NEW)

(NEW)

WP/WR

EQ-2P1

8,10,12

HHWP

HHWP

2-EF

(NEW)

(NEW)

HHWP

HHWP

HHWP

(NEW)

(NEW)

DIV. 23

EQ-2P1

7,9,11

EQ-2P1

13,15,17

DIV. 23

DIV. 23

EQ-2P1

20,22,24

2-HU

EQ-2P1

25,27,29

EQ-2P1

19,21,23

2-HU

38-EF

AHU

SPD

CWP

CWP

ACC

(NEW)

(NEW)

EQ-2P1

26,28,30

EQ-2P1

32,34,36

30/3/NF/3R

D-1 10,12,14

M M

M

D-1

M

EQ-2P1

100/3/70

60/3/35

D-1 16,18,20

DP-EQ1

(NEW)

(NEW)

(ETR)

(NEW)

(NEW)

(NEW)

(NEW)

(NEW)

(NEW)

(NEW)

(NEW)

(NEW)

2-EF

1.1

2-EF

1.2

EQ-2P1

14,16,18

DIV. 23

D-1

2-AHU

EQ-2P1

37,39,41

EQ-2P1

EQ-2P1

EQ-2P1

1,3,5

2-HD

2-AHU

(ETR)

TCP

2-AHU

D-1 2,4,6

TCP

D-1

D-1

EL-23

11M

2-HD

EQUIPMENT LOCATED ON

PENTHOUSE ROOF

EQUIPMENT LOCATED ON

PENTHOUSE ROOF

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL BE APPROVED BY VA STAFF ON

SITE

/1 /2

:3

:1

P M

EP104

BUILDING 2 PENTHOUSE ELECTRICAL

POWER PLAN

9 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/8" = 1'-0"1

BUILDING 2 PENTHOUSE ELECTRICAL POWER PLAN 0

1" = 8'

4 8 16 32

2-AHU-3

ELECTRICAL PANEL

2-AHU-2

ELECTRICAL PANEL

A. PROVIDE AIR TERMINALS AND CROSS

CONDUCTORS TO CONNECT NEW MECHANICAL

EQUIPMENT TO EXISTING LIGHTNING

PROTECTION SYSTEM. ALL NEW COMPONENTS

OF THE LIGHTNING PROTECTION SYSTEM

SHALL BE AS REQUIRED FOR A UL MASTER

LABEL.

1. PROVIDE NEMA 3R RATED J-BOX FOR HEAT TRACE

SYSTEM. COORDINATE EXACT REQUIREMENTS

WITH MANUFACTURER.

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS

AND USING THE RECOMMENDED MOUNTING HARDWARE.

DRYWALL BORDER

LUMINAIRE.

REFER TO

SCHEDULE

CEILING CROSS BEAM

GYPSUM BOARD

CEILING CROSS BEAM

LUMINAIRE MANUFACTURER'S

MOUNTING HARDWARE

REFER TO SPECIFICATION SECTION

26 51 00

LUMINAIRE.

REFER TO

SCHEDULE

GYPSUM BOARD (TYP)

CEILING MAIN BEAM

FIXTURE WHIP FROM

JUNCTION BOX

(1829mm (6') LONG

MAX.)

3 TWIST MINIMUM

(TYP)

LUMINAIRE SUSPENSION

WIRES REFER TO

SPECIFICATION

SECTION 26 51 00

ARCHITECTURAL

CEILING GRID

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS

AND USING THE RECOMMENDED MOUNTING HARDWARE.

LUMINAIRE.

REFER TO

SCHEDULE

ACOUSTICAL CEILING

TILE (TYP)

LUMINAIRE.

REFER TO

SCHEDULE

FIXTURE WHIP FROM

JUNCTION BOX

(1829mm (6') LONG

MAX.)

LUMINAIRE SUSPENSION

WIRES REFER TO

SPECIFICATION

SECTION 26 51 00

3 TWIST MINIMUM

(TYP)

LUMINAIRE MANUFACTURER'S

MOUNTING HARDWARE

REFER TO SPECIFICATION SECTION

26 51 00

WIRE TIE OR SCREW

BAR HANGER TO CROSS

BEAM TYP.

CEILING MAIN

BEAM

CEILING

CROSS BEAM

FIXTURE WHIP FROM

JUNCTION BOX (1829mm (6')

LONG MAX)

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS

AND USING THE RECOMMENDED MOUNTING HARDWARE.

RECESSED CAN

LUMINAIRE

CEILING BEAM

RECESSED CAN

LUMINAIRE

REFER TO

SCHEDULE.

GYPSUM

BOARD (TYP)

LUMINAIRE

BAR HANGERS

CEILING HANGER

WIRE, TYP.

LUMINAIRE SUSPENSION WIRES

REFER TO SPECIFICATION SECTION 26 51 00

RECESSED CAN

LUMINAIRE

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING RECOMMENDED MOUNTING HARDWARE

FIXTURE WHIP FROM

JUNCTION BOX (1829mm (6')

LONG MAX) ARCHITECUTRAL

CEILING GRID

RECESSED CAN

LUMINAIRE

ACOUSTICAL

CEILING TILE (TYP)

LUMINAIRE SUSPENSION WIRE

REFER TO SPECIFICATION SECTION

26 51 00.

LUMINAIRE

BAR HANGERS

WIRE TIE OR SCREW

BAR HANGER TO

ARCHITECTURAL

CEILING GRID TYP.

ARCHITECTURAL

CEILING GRID

CEILING HANGER

WIRE, TYP.

DRYWALL CEILING

CROSS TEE, TYP.

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO STRUCTURE

REFER TO SPECIFICATION SECTION

26 51 00

CEILING MAIN

BEAM.

DRYWALL CEILING

CROSS TEE, TYP.

GYPSUM

BOARD

WIRE TIE THROUGH

MOUNTING CHANNEL &

CROSS BEAM, TYP.

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS

AND USING THE RECOMMENDED MOUNTING HARDWARE.

LOCKING SQUARE

WASHER & NUT

6.35mm (1/4") SCREW

JUNCTION BOX

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

FIXTURE WHIP FROM JUNCTION BOX

(1829mm (6') LONG MAX)

CEILING HANGER WIRE

ARCHITECTURAL

CEILING GRID

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO STRUCTURE

REFER TO SPECIFICATION SECTION

26 51 00

ARCHITECTURAL

CEILING GRID

ACOUSTICAL

CEILING

TILE (TYP)

ARCHITECTURAL

CEILING GRID

WIRE TIE THROUGH

MOUNTING CHANNEL &

CROSS BEAM, TYP.

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS

AND USING THE RECOMMENDED MOUNTING HARDWARE.

LOCKING SQUARE

WASHER & NUT

6.35mm (1/4") SCREW

JUNCTION BOX

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

FIXTURE WHIP FROM JUNCTION BOX

(1829mm (6') LONG MAX)

CEILING HANGER WIRE

SPRING NUT

CONDUIT COMPRESSION

FITTING

JUNCTION BOX (SIZE AS

REQUIRED)

STEEL EXPANSION

ANCHOR

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL

15" FLEXIBLE GALVANIZED STEEL

CONDUIT WITH CONDUCTORS & GREEN

INSULATED EQUIPMENT GROUNDING

CONDUCTOR.

CONDUIT,

TYP.

BEAM CLAMP, TYP.

[914mm]

CONDUIT TRAPEZE

PER SD260533-02,

TYP.

JUNCTION BOX, TYP (SIZE

AS REQUIRED)

STRUCTURAL MEMBER

(BEAM, JOIST, ETC.), TYP.

FLOOR OR ROOF STRUCTURE. FIELD

VERIFY ACTUAL CONDITIONS, TYP.

SEISMIC OR EXPANSION

JOINT. FIELD VERIFY

ACTUAL CONDITIONS &

LOCATIONS.

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

WASHER &

LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

LOCKING SQUARE

WASHER & LOCKNUT

LENGTH AS REQUIRED

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL

LONGER THAN 915mm (36") SHALL BE INSTALLED WITH A CENTER

SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED

METHOD PER SPECIFICATION 26 05 33, RACEWAY AND BOXES

FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT CONDITIONS.

3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER TO

SPECIFICATION SECTION 13 05 41, SEISMIC RESTRAINT

REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.

REFER TO PLANS FOR

QUANTITY & SIZE OF

CONDUITS

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

CONDUIT CLAMP. SIZE

AS REQUIRED

m m

(1

M

A X m m

(1

M

A X

SECTION "A-A"

ELEVATION

RIGID STEEL CONDUIT

FOR SUPPORT PER N.E.C.

ART. 314

ROOF PENETRATION AND

CONDUIT SUPPORT PER

"CONDUIT ROOF MOUNTING DETAIL"

RIGID STEEL CONDUIT

FOR WIRING

A

A

CAST METAL

"WHILE-IN-USE"

WP COVER(S) &

RECEPTACLE(S).

CAST METAL, 2-GANG, NEMA

3R JUNCTION BOX WITH

THREADED HUBS.

TOP OF HANDLE

6'-6" AFF MAXIMUM

4'-0" +/- AFF

FRONT VIEWSIDE VIEW

DISCONNECT SWITCH, CIRCUIT

BREAKER ENCLOSURE, OR

MOTOR CONTROLLER

CHANNEL STRUT POST BASE W

(4) 1/4" EXPANSION ANCHORS.

(TYPICAL)

PROVIDE RIGID CONDUIT TO

MECHANICAL/PLUMBING

EQUIPMENT. CONVERT TO

FLEXIBLE CONDUIT WITH BOND

WIRE FOR FINAL CONNECTION TO

EQUIPMENT.

FLOOR

STRUCTURAL CEILING

CHANNEL STRUT SUPPORT

FRAME.

1'-7" (MIN.)

OPTION 3: CHANNEL STRUT

ANGLE BRACKET SUPPORT

FOR EACH SUPPORT LEG WITH

1/2" FLOOR EXPANSION

ANCHOR.

PROVIDE RIGID CONDUIT BACK

TO ELECTRICAL SOURCE.

NOTE:

1. DISCONNECT SWITCHES, CIRCUIT BREAKER ENCLOSURES, MOTOR CONTROLLERS & VARIABLE FREQUENCY DRIVES, AND CONTROL CABINETS MAY BE DIRECTLY MOUNTED TO STRUCTURAL WALLS, OR TO MECHANICAL EQUIPMENT

WHEN PERMITTED BY THE MECHANICAL EQUIPMENT MANUFACTURER AND WHERE IT DOES NOT BLOCK ACCESS OR

OPERATION OF THE EQUIPMENT. WHERE A SUITABLE STRUCTURAL WALL IS NOT AVAILABLE, PROVIDE SUPPORT FRAME AND

CONNECT THE SUPPORT FRAME WITH A MINIMUM OF (4) POINTS OF CONTACT TO THE BUILDING STRUCTURE TO PROVIDE A

RIGID ASSEMBLY. OPTION 1, 2, OR 3 MAY BE UTILIZED TO PROVIDE THE ADDITIONAL (2) POINTS OF CONTACT IN ADDITION TO

THE (2) POINTS OF CONTACT AT THE FLOOR.

OPTION 1: EXTEND CHANNEL

STRUT FRAME TO STRUCTURAL

CEILING AND CONNECT TO STEEL

STRUCTURE OR CONCRETE

SLAB.

S T

R U

C T

U R

A L W

A L L

OPTION 2: PROVIDE CHANNEL

STRUT FRAME TO WALL AND

CONNECT TO STRUCTURE OF

WALL.

0'-6" (MIN.)

(M

IN

(M

IN

ELECTRICAL PANELBOARD

CLEARANCE

ELECTRICAL PANELBOARD

DEDICATED ELECTRICAL SPACE EXTENDS TO

6' ABOVE PANELBOARD OR TO STRUCTURAL

CEILING, WHICHEVER IS LOWER.

MAXIMUM OF 10' SECONDARY

CONDUCTOR LENGTH

INSTALL TRANSFORMER

ABOVE AND IN FRONT OF

ELECTRICAL PANELBOARD.

SUPPORT SYSTEM SHALL BE

DESIGNED BY A LICENSED

STRUCTURAL ENGINEER

FLEXIBLE CONDUIT

RIGID CONDUIT

FLOOR

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1 /2

:3

:5

P M

E-501

ELECTRICAL DETAILS

10 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

NO SCALE

LUMINAIRE MOUNTING - GYPBOARD CEILING

NO SCALE

LUMINAIRE MOUNTING - LAY - IN CEILING

NO SCALE

DOWNLIGHT MOUNTING - GYPBOARD CEILING

NO SCALE

DOWNLIGHT MOUNTING - LAY - IN CEILING

NO SCALE

EXIT SIGN MOUNTING - GYPBOARD CEILING

NO SCALE

EXIT SIGN MOUNTING - LAY - IN CEILING

NO SCALE

CONDUIT JOINT CROSSING DETAIL

NO SCALE

CONDUIT TRAPEZE MOUNTING DETAIL

NO SCALE

VA RECEPTACLE

ROOF MOUNTING DETAIL

NO SCALE

ELECTRICAL EQUIPMENT MOUNTING DETAIL

1" = 1'-0"11

SUSPENDED TRANSFORMER MOUNTING DETAIL

3P

30AS

30AF

ETR

E X

IS

T

IN

G

P N

L B

D E

C -B

T-39 (ETR)

15 KVA

208Y/120V

3PH, 4W

480V-

E X

IS

T

IN

G

P N

L B

D E

C -1

E X

IS

T

IN

G

P N

L B

D E

C -2

3P

60AS

50AF

ETR

E X

IS

T

IN

G

P N

L B

D E

L -2

T-31A (ETR)

30 KVA

208Y/120V

3PH, 4W

480V-

3P

100AS

100AF

ETR

3P

60AS

60AF

ETR

T-14 (ETR)

45 KVA

208Y/120V

3PH, 4W

480V-

3P

400AS

250AF

ETR

P N

L B

D D

-1

3P

400AS

225AF

ETD

C O

N V

E Y

O R

C O

N V

E Y

O R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

R

E T

D

E T

R

T-14A (ETR)

150 KVA

208/120V

3PH, 4W

480V-

E T

R

E T

D

E T

D

E T

D

N E

W

P N

L B

D E

C -2

B

T-EC23B (NEW)

75 KVA

208Y/120V

3PH, 4W

480V-

3P

400AS

225AF

ETR

T

N E

W

P N

L B

D D

-1

T

G

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P C

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P N

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P N

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P N

N E

W

M E

D

IC

A L I S

O P

W R

P N

L B

D I P

P L C

N E

W

2,657 FCA

80 FEET

1,827 FCA

190 FEET

10,667 FCA

20 FEET

11,181 FCA

170 FEET

1,243 FCA

70 FEET

1,172 FCA

75 FEET

1,109 FCA

80 FEET

1,311 FCA

45 FEET

1,740 FCA

25 FEET

803 FCA

95 FEET

1,234 FCA

50 FEET

773 FCA

100 FEET

910 FCA

80 FEET

871 FCA

85 FEET

5,790 FCA

10 FEET

6,010 FCA

30 FEET

3,029 FCA

10 FEET

1,287 FCA

10 FEET

1,142 FCA

10 FEET

2,395 FCA

10 FEET

1,737 FCA

10 FEET

9,431 FCA

10 FEET

10,838 FCA

10 FEET

5,762 FCA

10 FEET

2,824 FCA

10 FEET

1,050 FCA

20 FEET

970 FCA

20 FEET

1,158 FCA

50 FEET

E T

R

E T

R

E T

R

E T

R

23,834 FCA

30 FEET

E T

R

N E

W

P N

L B

D E

Q -2

P

10,754 FCA

200 FEET

E X

IS

T

IN

G

P N

L B

D B

-6

3P

150AS

150AF

NEW

10,754 FCA

200 FEET

TO BUILDING 38

PANEL DP-EMC1

TO BUILDING 38

PANEL DP-EML

TO PANEL

DP5-1E

TO BUILDING 38

PANEL 38 PM-2

3 3

TO BUILDING 38

PANEL DP-EMC2

TO BUILDING 38

38 ATS-EQ1

E X

IS

T

IN

G

D P

-E Q

N E

W A

C C

-1

5 6

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:3

:5

P M

E-601

ELECTRICAL ONE-LINE DIAGRAM

11 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

NO SCALE

ELECTRICAL ONE-LINE DIAGRAM

1 RELOCATE DISCONNECT SWITCH TO NEW

ELECTRICAL ROOM 216. REFER TO SHEET EP101

FOR ADDITIONAL INFORMATION.

2 RELOCATE PANELBOARD D-1 TO NEW ELECTRICAL

ROOM 216. REFER TO SHEET EP101 FOR ADDITIONAL

INFORMATION.

3 REMOVE WIRE, CONDUIT, AND DISCONNECTS FOR

CONVEYORS.

4 PROVIDE NEW 225A/3P CIRCUIT BREAKER FOR NEW

PANELBOARD EQ-2P1.

5 PROVIDE NEW 150A, 3P, 600V BREAKER IN PANEL DP

EMC2 FOR POWER TO NEW TRANSFORMER.

6 PRIOR TO BEGINNING CONSTRUCTION,

CONTRACTOR SHALL METER PANEL DP-EMC2 FOR 30

DAYS IN ACCORDANCE WITH ARTICLE 220.87 OF THE

NEC. IF THE NEW LOAD PLUS 125% OF THE MAXIMUM

EXISTING LOAD EXCEEDS THE CAPACITY OF THE

PANEL, THE CONTRACTOR SHALL UPGRADE PANEL

DP-EMC2, THE FEEDERS TO DP-EMC2, AND THE

BREAKER FEEDING PANEL DP-EMC2 TO THE NEXT

HIGHEST SIZE (400A) THAT WOULD ADEQUATELY

SUPPLY POWER TO ALL LOADS PER NEC AND VA

GUIDELINES.

7 PRIOR TO BEGINNING CONSTRUCTION,

CONTRACTOR SHALL METER PANEL DP-EQ1 FOR 30

DAYS IN ACCORDANCE WITH ARTICLE 220.87 OF THE

NEC. IF THE NEW LOAD PLUS 125% OF THE MAXIMUM

EXISTING LOAD EXCEEDS THE CAPACITY OF THE

PANEL, THE CONTRACTOR SHALL UPGRADE PANEL

DP-EQ1, THE FEEDERS TO DP-EQ1, AND THE

BREAKER FEEDING PANEL DP-EQ1 TO THE NEXT

HIGHEST SIZE (1000A OR 1200A) THAT WOULD

ADEQUATELY SUPPLY POWER TO ALL LOADS PER

NEC AND VA GUIDELINES.

FEEDER/BRANCH CIRCUIT SCHEDULE

TAG

AMPS DESCRIPTION

52 50A (2)#8, (1)#10G, 3/4 IN. C

124 125A (4)#1, (1)#6G, 1-1/2 IN. C

153 150A (3)#1/0, (1)#6G, 1-1/2 IN. C

224 225A (4)#4/0, (1)#4G, 2-1/2 IN. C

ETD N/A EXISTING TO DEMO

ETR N/A EXISTING TO REMAIN

G150 GND #6 COPPER GROUND, 3/4 IN. C

T224 225A (4)#4/0, (1)#2G, 2-1/2 IN. C

NOTE: ALL CONDUCTOR SIZES ARE BASED ON 75 DEGREE C RATED TERMINATION AND

COPPER CONDUCTORS WITH TYPE THHN/THWN-2 INSULATION. FOR TERMINATION OR

INSULATION TYPES RATED LESS THAN 75 DEGREE C, MODIFY SIZES ACCORDING TO

NFPA 70.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1 /2

:3

:5

P M

E-602

ELECTRICAL SCHEDULES

12 15ABM

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

BID DOCUMENTS

657-50119-126

DIW

LIGHT FIXTURE SCHEDULE

TYPE

BASIS OF DESIGN:

MANUFACTURER AND MODEL

MOUNTING

LAMP BALLAST/DRIVER

DESCRIPTION

TYPE LUMENS

COLOR

TEMP

TYPE VOLTAGE

INPUT

WATTS

INPUT

VA

A1D HEW: MST G 2 4 L210 9 35

LAY-IN GRID

CEILING

INTEGRAL

WHITE LED

21000 lm 4000 K

0-10V LOW VOLTAGE

DIMMABLE

ELECTRONIC LED

DRIVER

120 V 180 W 200 VA

2'X4' RECESSED DIRECT/INDIRECT LED LIGHT

FIXTURE WITH WHITE PERFORATED ROUND

SHIELDING WITH FROSTED ACRYLIC SIDE SHIELDS.

PROVIDE BATTERY BACKUP TO PROVIDE 50% LUMEN

OUTPUT. FIXTURE SHALL HAVE A MINIMUM R9 (RED

SATURATION) VALUE OF 90.

A1DE HEW: MST G 2 4 L210 9 35

LAY-IN GRID

CEILING

INTEGRAL

WHITE LED

21000 lm 4000 K

0-10V LOW VOLTAGE

DIMMABLE

ELECTRONIC LED

DRIVER

120 V 180 W 200 VA

SAME AS TYPE 'A1D', EXCEPT CONNECTED TO LIFE

SAFETY BRANCH.

A2D

LC DOANE HRAM-LED SERIES:

24 6W150 40 90 A W 277 MIL 122 33

LAY-IN GRID

CEILING

INTEGRAL

WHITE LED

14794 lm 4000 K

STANDARD

ELECTRONIC LED

DRIVER

120 V 51 W 135 VA

2'X4' RECESSED DIRECT/INDIRECT LED LIGHT

FIXTURE WITH WHITE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .