P09 Drawings 08 Electrical 100 BID - 15 pages.pdf
PDF 7 MB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040_1
About this file
This is a solicitation for a construction project to create a three operating room inpatient surgical/endovascular services and ambulatory surgical service on the second floor of Building 2 and Building 38 at the Marion VA Medical Center in Marion, Illinois. The scope of work includes constructing three operating rooms and supporting services to accommodate the new surgical suites. Infrastructure will be installed to meet UPS power requirements. Upon project completion, the VA will have a fully operational three operating room inpatient surgical/endovascular suite and ambulatory surgical service. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf | ||
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UE
OE
M/G 400A/3P
M/G 400A/3P
C
PC
R
TS
T
100/3
100/3/70
100/3/70/1
100/3/CB
PP
J
GF
OR
OR
OR
EPO
AM
VM
DM
ST
KK
GFR
M
SPD
R
CU
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL, TECHNOLOGY OR FIRE ALARM
PLUMBING EQUIPMENT DESIGNATION
EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL REFERENCE
SECTION CUT DESIGNATION
ELECTRICAL: (AFF, AFG UNLESS NOTED OTHERWISE)
LP1
A1
LIGHT FIXTURE, CEILING MOUNTED
a
LIGHTING TRACK WITH TRACK LIGHT FIXTURES
LIGHT FIXTURE, POLE MOUNTED
LIGHT FIXTURE, WALL MOUNTED
EMERGENCY BATTERY PACK LIGHT FIXTURE,
WALL MOUNTED
EMERGENCY BATTERY PACK LIGHT FIXTURE,
CEILING MOUNTED
EXIT SIGN, WALL MOUNTED, FACE/ARROWS AS INDICATED
EXIT SIGN, CEILING MOUNTED, FACE/ARROWS AS INDICATED
EMERGENCY LIGHT FIXTURE, CEILING MOUNTED
A1E a
A1 a
A1
A1
X1E
X1E
Y1E
Y1E
HOMERUN TO PANELBOARD, ARROWS INDICATE
NUMBER OF CIRCUITS, TICK MARKS INDICATE
NUMBER OF CONDUCTORS. DESIGNATIONS ARE
PANELBOARD AND CIRCUIT NUMBERS.
UNSWITCHED HOT CONDUCTORS SHOWN LEADING
NEUTRAL CONDUCTOR
NEUTRAL CONDUCTOR
SWITCHED HOT CONDUCTORS SHOWN TRAILING
GROUND CONDUCTOR
EQUIPMENT GROUNDING CONDUCTOR IN RACEWAY
ISOLATED GROUNDING CONDUCTOR IN RACEWAY
CONCEALED RACEWAY
EXPOSED RACEWAY
RACEWAY TURNING DOWN
RACEWAY TURNING UP
EQUIPMENT TERMINATION
LOW VOLTAGE CABLE (NOT ROUTED IN CONDUIT)
LIGHT FIXTURE, BOLLARDA1
RECEPTACLE, SIMPLEX, NEMA 5-20R, UNO
RECEPTACLE, DUPLEX, NEMA 5-20R, UNO
RECEPTACLE, DOUBLE-DUPLEX, NEMA 5-20R, UNO
RECEPTACLE, DUPLEX, CEILING MOUNTED, NEMA 5-20R, UNO
RECEPTACLE, SPECIAL PURPOSE
RECEPTACLE, TWIST-LOCK
RECEPTACLE, DUPLEX, FLOOR MOUNTED, NEMA 5-20R, UNO
RECEPTACLE, DUPLEX, DROP CORD, NEMA 5-20R, UNO
RECEPTACLE, MOUNTED 6" ABOVE COUNTER,
TYPE AS INDICATED ABOVE
RECEPTACLE DESIGNATIONS AS FOLLOWS:
SWITCH, SINGLE POLE
SWITCH DESIGNATIONS AS FOLLOWS:
OCCUPANCY SENSOR, CEILING MOUNTED
POWER PACK FOR LIGHTING CONTROL
JUNCTION BOX
RECEPTACLE ON EMERGENCY POWER
RECEPTACLE, ISOLATED GROUND TYPE
MULTI-OUTLET, SURFACE RACEWAY, 24" ON CENTER,
NEMA 5-20R, UNO
SWITCHBOARD, MOTOR CONTROL CENTER OR DISTRIBUTION
PANELBOARD ON HOUSEKEEPING PAD
PANELBOARD, RECESS MOUNTED
PANELBOARD, SURFACE MOUNTED
TRANSFORMER
DISCONNECT SWITCH, NON-FUSED, 100/3 INDICATES
AMPERES/POLES, CB = CIRCUIT BREAKER TYPE
DISCONNECT SWITCH, FUSED, 100/3/70 INDICATES
AMPERES/POLES/FUSE, CB = CIRCUIT BREAKER TYPE
COMBINATION DISCONNECT SWITCH WITH MOTOR STARTER
100/3/70/1 INDICATES AMPERES/POLES/FUSE/ NEMA STARTER
SIZE, NF = NON-FUSED, CB = CIRCUIT BREAKER TYPE
MAGNETIC MOTOR STARTER, NEMA SIZE AS NOTED,
3-POLE, UNO
CONTACTOR
PHOTOCELL
RELAY
TIME SWITCH
LOW-VOLTAGE TRANSFORMER
PUSH BUTTON, TYPE AS NOTED
VARIABLE FREQUENCY DRIVE WITH DISCONNECT SWITCH
100/3/70 INDICATES AMPERES/POLES/FUSE SIZE,
NF = NON-FUSED, CB = CIRCUIT BREAKER TYPE
UNDERGROUND ELECTRIC LINE
MULTI-SERVICE FLOOR BOX/POKE-THRU WITH POWER/DATA,
TYPE AS NOTED AND/OR SCHEDULED
CABINET, RECESS MOUNTED
CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX, GROUND-FAULT CIRCUIT
INTERRUPTER, NEMA 5-20R, UNO
MULTI-SERVICE POWER POLE WITH POWER/DATA,
TYPE AS NOTED AND/OR SCHEDULED
OVERHEAD ELECTRIC LINE
MUSHROOM TYPE PUSH BUTTON, TYPE AS NOTED
PLAN NOTE CALL OUT
TRANSFER SWITCH, RATINGS AS INDICATED
ATS = AUTOMATIC TRANSFER SWITCH
TX#
600AF
3P
500AT
400AS
3P
225AF
275KW STANDBY
480Y/277V, 3PH, 4W
GENERATOR, SEPARATELY DERIVED
SOURCE, TYPE AND RATINGS AS INDICATED
275KW STANDBY
480Y/277V, 3PH, 4W
GENERATOR, NON-SEPARATELY DERIVED
SOURCE, TYPE AND RATINGS AS INDICATED
DRAWOUT CIRCUIT
BREAKER, RATINGS
AS INDICATED
600AF
3P
500AT
CIRCUIT BREAKER,
RATINGS AS
INDICATED
LPS-R
FUSED DISCONNECT
SWITCH, RATINGS
AS INDICATED
400AS
3P
225AF
LPS-R
COMBINATION FUSED
SWITCH AND STARTER,
RATINGS AS
PANELBOARD,
SINGLE-SECTION,
RATINGS PER
SCHEDULES
PANELBOARD,
MULTI-SECTION,
RATINGS PER
SCHEDULES
NEMA 1
AMMETER
VOLTMETER
COMBINATION DIGITAL
SHUNT-TRIP RELAY
KIRK-KEY INTERLOCK
GROUND-FAULT RELAY
UTILITY METER
RELAY
SURGE PROTECTION
AMMETER/VOLTMETER
DEVICE
AUTOMATIC TRANSFER SWITCH WITH BYPASS
TYPE AND RATINGS AS INDICATED
VARIABLE FREQUENCY
DRIVE WITH
DISCONNECT, RATINGS
GROUND CONNECTION
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
GROUND CONNECTION
WITH TEST WELL
CONTACT, OPEN
CONTACT, CLOSED
MOTOR
FEEDER TAGCAPACITOR
SURGE ARRESTER
HEATER
225A 3P
NEMA 1
INDICATED
COMBINATION CIRCUIT
BREAKER AND
STARTER, RATINGS AS
INDICATED AS INDICATED
225A 3P
200A 3P
ATS#
200A 3P
ATS#
TRANSFORMER
TX#
TRANSFORMER,
SHIELDED
200A DEAD-FRONT ELBOW
600A DEAD-FRONT ELBOW
DEAD-FRONT SPLITTER
FAULT INDICATOR
LIGHTNING PROTECTION AIR TERMINAL
LIGHTNING PROTECTION CABLE CONNECTION
LIGHTNING PROTECTION GROUND ROD
LIGHTNING PROTECTION CONDUCTOR
MTS = MANUAL TRANSFER SWITCH
EP-101
EP-101
LIGHTNING PROTECTION SYMBOLS
ELECTRICAL ONE-LINE DIAGRAM SYMBOLS
M (CONT'D)
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
OS# = CEILING MOUNTED OCCUPANCY SENSOR, REFER
TO OCCUPANCY SENSOR AND SWITCH SCHEDULE
2 = TWO-POLE WALL SWITCH
3 = THREE-WAY WALL SWITCH
4 = FOUR-WAY WALL SWITCH
D = DIMMER SWITCH
OS# = OCCUPANCY SENSOR WALL SWITCH, REFER
TO OCCUPANCY SENSOR AND SWITCH SCHEDULE
P = SINGLE-POLE, SINGLE-THROW PILOT LIGHT
WALL SWITCH
K = KEYED WALL SWITCH
M = MOTOR RATED SWITCH
WP = WEATHER PROOF SWITCH AND COVER
C = CLOCK HANGER
E = EMERGENCY POWER
GF = GROUND FAULT CIRCUIT INTERRUPTER
IG = ISOLATED GROUND
S = SWITCHED
TR = TAMPER RESISTANT
WP = WEATHER PROOF COVER
WR = WEATHER RESISTANT
XP = EXPLOSION PROOF
A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT
FIXTURE SCHEDULE
Y1E = LIGHT FIXTURE TYPE "Y1E" REFER TO LIGHT
FIXTURE SCHEDULE
Y1E = LIGHT FIXTURE TYPE "Y1E" REFER TO LIGHT
FIXTURE SCHEDULE
X1E = LIGHT FIXTURE TYPE "X1E" REFER TO LIGHT
FIXTURE SCHEDULE
X1E = LIGHT FIXTURE TYPE "X1E" REFER TO LIGHT
FIXTURE SCHEDULE
A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT
FIXTURE SCHEDULE
A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT
FIXTURE SCHEDULE
A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT
FIXTURE SCHEDULE
a = SWITCHED BY SWITCH "a"
A1E = LIGHT FIXTURE TYPE "A1E" REFER TO LIGHT
FIXTURE SCHEDULE
a = SWITCHED BY SWITCH "a"
NL = NIGHT LIGHT
A1 = LIGHT FIXTURE TYPE "A1" REFER TO LIGHT
FIXTURE SCHEDULE
a = SWITCHED BY SWITCH "a"
NL = NIGHT LIGHT
= ARROW INDICATES AIMING DIRECTION
LIGHTING SYMBOLS
POWER EQUIPMENT SYMBOLS
WIRING DEVICE SYMBOLS
AUDIBLE APPLIANCES (CENTERLINE) 84"
ALARMS (TOP) 48"
ANNUNCIATOR PANELS (TOP) 48"
CLOCK OUTLETS (CENTERLINE) 84"
CONTROLS (TOP) 48"
EXIT SIGNS (WALL-MOUNTED, BOTTOM) 80"
FIRE ALARM ANNUNCIATOR PANEL (DISPLAY) 60"
FIRE ALARM BELL (EXTERIOR) 120"
FIRE ALARM CONTROL PANEL/UNIT (DISPLAY) 60"
INTERCOM (AFEA ONLY) 36"
INTERCOMS (TOP) 48"
PANELS & PANELBOARDS (TOP) 72"
PULL STATIONS (TOP) 48"
PHOTOCELLS 144"
RECEPTACLES (BOTTOM) 18"
RECEPTACLES, EXTERIOR (BOTTOM) 24"
RECEPTACLES, GARAGES (BOTTOM) 26"
RECEPTACLES IN EQUIPMENT ROOMS (TOP) 48"
RECEPTACLES ABOVE COUNTERTOPS (TOP) 44"
REMOTE INDICATING LIGHT, EQUIPMENT ROOMS (TOP) 48"
REMOTE INDICATING LIGHT, FINISHED AREAS (TOP) CEILING
SAFETY SWITCHES & STARTERS 48"
SWITCHES (TOP) 48"
TELEPHONE/DATA/TV OUTLETS (BOTTOM) 18"
VISIBLE APPLIANCES (CENTERLINE) 84"
X
W
V
U
T
S
R
CIRCUITING SYMBOLS
ANNOTATION STANDARD MOUNTING HEIGHTS
P
O
N
M
L
K
J
I
H
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FI FILM ILLUMINATOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLUOR FLUORESCENT
FO FIBER-OPTIC
FP FIRE PROTECTION
FT FEET OR FOOT
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G
F
E
D
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMER. MONITORING CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
ETD EXISTING TO BE DEMOLISHED
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
C CONDUIT
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
C
B
A
ABBREVIATIONS
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VCM VERTICAL CABLE MANAGER
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
TC TIME CLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REC RECESSED
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RU RACK UNIT
N NEUTRAL
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
JB JUNCTION BOX
J-BOX JUNCTION BOX
XFER TRANSFER
XFMR TRANSFORMER
XP EXPLOSION PROOF
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LTCP LOCAL TEMPERATURE CONTROL PANEL
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
IESNA ILLUMINATION ENGINEERING SOCIETY
OF NORTH AMERICA
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR
PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
POE POWER OVER ETHERNET
PP PATCH PANEL
PT POTENTIAL TRANSFORMER
PTRV POWER TYPE ROOF VENTILATION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
1P SINGLE POLE
1PH SINGLE-PHASE
3P THREE POLE
3PH THREE-PHASE
3W THREE WIRE
4W FOUR WIRE
A/C AIR CONDITIONING
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR
AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
HCM HORIZONTAL CABLE MANAGER
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BLK BLOCK
BPIP BOILER PLANT
INSTRUMENTATION PANEL
BRKR BREAKER
BYP BY PASS
IC INSULATION CONTACT
ES EMERGENCY SHUNT RELAY
ISO ISOLATION
RECEPTACLE, DUPLEX, SERVICE POLE, NEMA 5-20R
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:3
:5
P M
E-001
ELECTRICAL LEGEND
1 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
GENERAL DEMOLITION NOTES:
1. PERFORM ALL DEMOLITION WORK AS REQUIRED INCLUDING MINOR ITEMS OF MATERIAL OR EQUIPMENT NECESSARY TO MEET THE
REQUIREMENTS AND INTENT OF THE PROJECT.
2. PRIOR TO SUBMITTING PROPOSAL, BIDDER SHALL EXAMINE GENERAL CONSTRUCTION DRAWINGS AND SHALL HAVE VISITED THE CONSTRUCTION SITE. BIDDER SHALL BE FAMILIAR WITH THE EXISTING CONDITIONS UNDER WHICH THEY HAVE TO OPERATE AND WHICH WILL IN ANY WAY AFFECT THE WORK UNDER THIS CONTRACT IN BEHALF OF THE CONTRACTOR FOR ANY ERROR OR
NEGLIGENCE ON HIS PART.
3. CERTAIN REMODELING OF ELECTRICAL FACILITIES WILL BE REQUIRED IN THE EXISTING BUILDING. EXISTING CONDUIT RUNS ARE GENERALLY NOT SHOWN, INFORMATION HAS BEEN TAKEN FROM EXISTING RECORD DRAWING OF THIS PROJECT. THE EXISTING LOCATION OF EXISTIG EQUIPMENT, OUTLETS, FIXTURES, ETC; SHOWN IN EXISTING AREAS ON DRAWINGS ARE APPROXIMATE ONLY
AND SHALL BE FIELD VERIFIED.
4. EXISTING CONDUIT NOT BEING UTILIZED SHALL BE REMOVED BACK TO SOURCE EXCEPT WHERE EXISTING CONDUIT IS TO BE ABANDONED, THE CONDUIT SHALL BE REMOVED IF IT IS EXPOSED. IN A CRAWL SPACE OR ANY ACCESSIBLE CEILING, WHERE IT IS
IMPOSSIBLE TO REMOVE THE CONDUIT, IT SHALL BE CUT OFF AND PLUGGED.
5. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING PATCHING PLASTERING, PAINTING AND/OR OTHER REPAIR DUE TO THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS OF
THIS SPECIFICATION, CLOSE ALL OPENINGS, REPAIR ALL SURFACES, ETC; AS REQUIRED.
6. THE CONTRACTOR SHALL EMPLOY QUALIFIED AND EXPERIENCED WORKMEN FOR THIS WORK; ALL RESTORATION WORK SHALL BE
SUBJECT TO THE APPROVAL OF THE ARCHITECT AND/OR COR.
7. ALL TEMPORARY AND REMODELING WORK SHALL BE CONSIDERED A PART OF THIS CONTRACT AND NO EXTRA CHARGES WILL BE ALLOWED. THIS SHALL INCLUDE MINOR ITEMS OF MATERIAL OR EQUIPMENT NECESSARY TO MEET THE REQUIREMENTS AND INTENT
OF THE PROJECT.
8. EXAMINE ARCHITECTURAL, STRUCTURAL, AND MECHANICAL DRAWINGS AND SPECIFICATIONS TO DETERMINE THE SEQUENCE OF CONSTRUCTION THROUGHOUT THE PROJECT INCLUDING EXISTING, TEMPORARY, REMODELED, AND NEW AREAS.
GENERAL NOTES:
1. READ THE SPECIFICATIONS AND REVIEW DRAWINGS OF ALL DIVISIONS OF WORK. COORDINATE THIS WORK WITH ALL OTHER DIVISIONS OF WORK AND ALL SUBCONTRACTORS. PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS.
2. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF WORK. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE CONTRACTING OFFICER OF ANY CONFLICTS OR DISREPANCIES PRIOR TO
SUBMISSION OF BID.
3. DRAWINGS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIEMENTS.
4. VERIFY ROUGH-IN REQUIREMENTS, LOCATIONS, MOUNTING HEIGHTS, VOLTAGE, PHASE, AMPS, HP, KW, ETC. FOR ALL GOVERNMENT
FURNISHED EQUIPMENT BEFORE PROVIDING ROUGH-IN.
5. UNLESS OTHERWISE NOTED, ALL CIRCUITRY SHALL BE #12 AWG IN 3/4" CONDUIT MINIMUM.
6. PROVIDE A SEPERATE, CODE SIZED GREEN EQUIPMENT GROUND CONDUCTOR IN ALL CONDUITS AND RACEWAYS CONTAINING LINE VOLTAGE CIRCUITS. FOR ALL 20A CIRCUITS, EQUIPMENT GROUND CONDUCTOR SIZE SHALL MATCH PHASE CONDUCTOR SIZE. FOR CIRCUITS UPSIZED FOR VOLTAGE DROP INCREASE EQUIPMENT GROUNDING CONDUCTOR SIZE PER CODE.
7. PROVIDE ALL MOUNTING AND SUPPORT HARDWARE FOR LIGHT FIXTURES TO MEET SPECIFIED MOUNTING HEIGHTS.
8. ALL JUNCTION BOXES SHALL BE RIGIDLY ATTACHED TO STRUCTURE OR MILLWORK.
9. VERIFY REQUIREMENTS WITH EQUIPMENT SUPPLIER AND PROVIDE ALL NECESSARY ITEMS TO MEET THE EQUIPMENT'S ELECTRICAL
INSTALLATION REQUIREMENTS.
10. FIELD VERIFY EXACT LOCATION AND ELECTRICAL REQUIREMENTS OF ALL HVAC AND PLUMBING EQUIPMENT WITH OTHER TRADE
CONTRACTORS PRIOR TO ORDERING RELATED ELECTRICAL EQUIPMENT.
11. VERIFY REQUIREMENTS OF ALL MECHANICAL EQUIPMENT WITH SHOP DRAWING SUBMITTALS. NOTIFY ENGINEER OF ANY CONFLICTS
BETWEEN EQUIPMENT SUBMITTALS AND ELECTRICAL DRAWINGS.
12. ALL GFCI PROTECTED CIRCUITS SHALL HAVE INDIVIDUAL AND DEDICATED NEUTRALS.
13. PROVIDE A MINIMUM OF (3) SPARE 1" CONDUITS FROM RECESSED PANELBOARD UP TO ACCESSIBLE CEILING SPACE.
14. REFER TO SPECIFICATIONS FOR ADDITIONAL PANELBOARD INSTALLATION REQUIREMENTS AND IDENTIFICATION.
15. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL
NOT BE USED.
16. EACH BRANCH HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL PARTS, PIECES, AND APPURTENANCES FOR FULLY OPERATIONAL LIGHTING, POWER, AND SPECIAL SYSTEMS. COORDINATE WITH ALL OTHER TRADES AND ANY RELEVANT EQUIPMENT INFORMATION.
ED102
D-1 (RELOCATE)
B-6 (SECTION 1) (ETR) B-6 (SECTION 2) (ETR)
EC-23 (ETR)
EL-23 (ETR)
Q
2-11
O M.2 F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-2
2-1
2-9
AA AC
2-4
2-7
F.8
AREA OF DEMOLITION
2-C (ETD)
BUSWAY (ETR)
B-6 (SECTION 1) (ETR)
EC-23 (ETR)
EL-23 (ETR)
B-6 (SECTION 2) (ETR)
EQUIPMENT IN
THIS ROOM IS
EXISTING TO
REMAIN
2-2
ELECTRICAL
ETD
ROOM
203C
RECREATION
FIBER OPTIC
236B
LOGISTICS
WOMEN
HAC
MEN
MECH.
INPATIENT DIETETIC
217A
CLINICAL DIETITION
INPATIENT DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STRESS LAB
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC SERVICE
STORAGE
208A
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION SERVICES
OUTPATIENT NUTRITION
OUTPATIENT NUTRITION
204A
STORAGE
204B
OFFICE
207A
STORAGE
203D
ROOM
203A
ROOM
203B
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
PAMN
OXYGEN STORAGE
WHEELCHAIR ALCOVE
C3
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:3
:5
P M
ED102
BUILDING 2 AND BUILDING 38 SECOND
FLOOR ELECTRICAL DEMOLITION PLAN
2 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
1/8" = 1'-0"1
BUILDING 2 AND BUILDING 38 SECOND FLOOR
ELECTRICAL DEMOLITION PLAN 0
1" = 8'
4 8 16 32
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"2
SECOND FLOOR ENLARGED PLAN
ELECTRICAL ROOM 213
1" = 4'
2 4 8 16
A. REMOVE ALL ELECTRICAL DEVICES, CONDUIT,
AND WIRE WITHIN AREA OF WORK. DEMOLISH
WIRE AND CONDUIT BACK TO SOURCE PANEL.
B. REMOVE EXISTING LIGHT FIXTURES AND
CONTROLS WITHIN THE PROJECT AREA.
COORDINATE DISPOSAL OR STORAGE OF
FIXTURES WITH CONTRACTING OFFICER'S
REPRESENTATIVE. DEMOLISH LIGHTING
CIRCUITS BACK TO SOURCE PANEL.
C. FACILITY COR SHALL HAVE RIGHT OF FIRST
REFUSAL FOR ANY SALVAGED MATERIAL.
1. REFER TO DETAIL 2, SHEET EP102C FOR NEW
LOCATION OF EXISTING PANEL.
2. PROVIDE ELECTRICAL DEMOLITION FOR
ELEVATORS. COORDINATE WITH ALL OTHER
TRADES.
PP
PPES
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PPES
PP
ES
DICTATION
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C204-02
PRE/POST
PACU
PACU
PACU
CORRIDOR
C208-02
ISOLATION
MEDS
CORRIDOR
C206-02
CLEAN SUPPLY
HAC
TOILET
STAFF TOILET
A2DE
A3
A3
A4E A4 A4
A4DA4DE
A4E
A4
A4E
A4A4E
A4
A2DE
A2DEA2DE
A2DE
A2DE
A2DE
A2DE
A3
A3
A4
A4
A4
A4E
D1
D1D1
D1
D1D1
D1 D1
D1
D1
D1
D1
A4E
A4
A4E
A4D
D1
A4 A4 A4
A4
D1
CORRIDOR
C203-02
CORRIDOR
C202-02
OS2
OS2
OS2
OS2
OS2
OS2
OS2
LV1
RC1
OS1
OS2
OS2
OS2
A3
OS1
LVD
D1
RC1
RC2
LVD
LVD
LVD
LVD
LVOD
RC1
LVD
RC1
LVD
RC1
LVD
RC1
LVD
LVD
RC1 RC1
LVD
RC3
RC3
LV1
,c ,b
,a a a a
OS1
a b c
L V
D
L V
D
L V
D
D1DD1DD1DD1D
LVD
LVD
D1D a b b a
LVD
D1D
LVD
D1D
D1D
LVD
LVD
D1D a a b b a b b a a b a b b b a a b b a
OS1
OS1
LV1
LV1
Q
2-11
O M.2 F.9
2-10
2-8
2-6
2-5
2-3
2-2
2-1
2-9
2-4
2-7
F.8
D1
SOILED HOLDING
a e f d e f
X1E
X1E
X1E
X1E
X1E
X1E
RC1
RC1
RC1
RC1
L V
D d
L V
D b
L V
D c
LV1
RC1
a
LVD
a
LVD
D1
ELECTRICAL
LVD
a
LVD
a
LVD
a
LVD
a
CORRIDOR
C207-02
ANTE
A2DEA2D
P2P2
P2
P2
P2 A4DEA4D
D1D D1D
D1D
A4
A2DE
D1D
A2DE
RC1
RC1
a b
RC1
A2DE
a
D1D b a
LVD
LVD
a b
LVD
a
P1
P1
P1
LV1
OS1
LVD
OS1
TOILET
OS1
RC1
a a
LVD
b b b b b b
TO EL102B-3
EC-23B
B-6 (SECTION 2)
RC1
EC-23 (ETR)
EL-23 (ETR)
B-6 (SECTION 1) (ETR)
B-6 (SECTION 2) (ETR)
A4
CARE STATION
STORAGE
A4
A4
TO EL102C-1
TO EL102B-2
TO EL102B-1
TO EL102C-2
OS1
B-6 (SECTION 2)
PRE/POST
PRE/POST
PRE/POST
2 2 2
RC1
STAIRS
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:5
P M
EL102A
BUILDING 2 SECOND FLOOR AREA 'A'
ELECTRICAL LIGHTING PLAN
3 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"1
BUILDING 2 SECOND FLOOR AREA 'A'
ELECTRICAL LIGHTING PLAN 0
1" = 4'
2 4 8 16
A. UNLESS OTHERWISE NOTED, SWITCHES AND
OCCUPANCY SENSORS CONTROL THE SPACES
IN WHICH THEY ARE LOCATED.
B. LOWER CASE LETTERS DENOTE SWITCHING
ZONES.
1 LOCATE CONTROLLER IN ADJACENT ACCESSIBLE
CEILING.
2 LIGHT FIXTURE CONTROLS PROVIDED IN CARE
STATION 238.
E-701
E-701
TYP. OF 7
E-701
E-701
E-701
E-701
ES
ESPP
PP
PPPP PPPP PPPP
STERILE CORE
OR
PASSAGE
248B
OR
OR
STAIR
S2-02
D2D D2D
D2D D2D
A1D
A1DE A1D A1DE
A1D
A1DE
A1D
A1DEA1DA1DE
A1D
A1DE
D1 D1
A4
A4E A4 A4 A4E
A4D A4D
A4D A4D A4D
A4D
A4D
A4E
A4D A4DA4DE A4DE
A4D
A4DE
A4
D2D D2D
D2D D2D
A1DE A1D A1DE
A1D
A1DE
A1D
A1DEA1DA1DE
A1D
A1DE
A1D
D2D D2D
A1DE A1D A1DE
A1DE
A1D
A1DEA1DA1DE
D2D D2D
A1D
A1DE
A1D
OS2
OS2 OS2
LVD
OS2
OS2
OS2 OS2 OS2
OS2
IPPLC (NEW)
IPP3N (NEW)
IPP2N (NEW)
RC1
IPP1N (NEW)
D1 D1 D1 D1
LV1
RC1
LV1
IPP1C2 (NEW)
IPP1C1 (NEW)
PS
F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-9
AA AC
2-4
2-7
F.8
RC1
RC1
1 1
RC1
L V
D L V
D ba aa a a
L V
D L V
D b a a b a b a b a b a b a b
L V
D L V
D b a
L V
D L V
D ba aa a a b a b a b a a b a b a b
L V
D L V
D ba
L V
D L V
D a b aa aa b a b a b a b a b a b
X1E
X1E
X1E
X1E
X1E
X1E
IPP2C2 (NEW) IPP3C2 (NEW)
IPP3C1 (NEW)
IPP2C1 (NEW)
A1D a
CORRIDOR
C201-02
RC1
PASSAGE
248A
RC1 RC1 RC1
1 1 1
IMMED. STER.
D1
LVD
LVD
OS1
TO EL102A-3
E-701
TYP. OF 3
E-701
E-701
E-701
LVD
TO RM C201-02
TO RM 248B
B-6 (SECTION 2)
TO EL102A-2
EL-23
B-6 (SECTION 2)
EL-23
5 B-6 (SECTION 2)
EL-23
B-6 (SECTION 2)
TO EL102A-1
TO EL102C
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:5
P M
EL102B
BUILDING 2 SECOND FLOOR AREA 'B'
ELECTRICAL LIGHTING PLAN
4 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"1
BUILDING 2 SECOND FLOOR AREA 'B'
ELECTRICAL LIGHTING PLAN 0
1" = 4'
2 4 8 16
1 LOCATE CONTROLLER IN ADJACENT ACCESSIBLE
CEILING.
A. UNLESS OTHERWISE NOTED, SWITCHES AND
OCCUPANCY SENSORS CONTROL THE SPACES
IN WHICH THEY ARE LOCATED.
B. LOWER CASE LETTERS DENOTE SWITCHING
ZONES.
PP
PP
ES
PP
PP
PP
ES
PP
PP
PP
PP
PP
PP PP
PP PP
ES
PP
WAITING
N. MANAGER OFFICE
CORRIDOR
C201-38
MEN'S LOCKER
STAFF TOILET
WOMEN'S LOCKER
STAFF LOUNGE
ANESTHESIA
EQUIPMENT
SOILED
HAC
RECEPTION
A3D
A4DE
A4
A4E
A4
A4
A4
A4E
A4D
A3D
A4DE
A4D
A3
A3
A3
D3
D3
A4 A4
A4D
A4
A4
A3DA3D
A4D
A4D
A4
A4
A4
A3A3
A4D A4D
D1D
OS1
OS1 OS1
LVD
OS1
LVOD
OS1
LVOD
OS2
RC1
LV1
OS2
RC2
RC1
RC1
LV1
RC2
OS1
OS1
OS1
LV1
RC2
OS1
LVD
RC1
OS1
PS
RC1
LV1
OS2
EL-23 (ETR)
EC-23 (ETR)
EC-23B (NEW)
T-EC23B (NEW)
D-1 (RELOCATED)
OS1
LV1
LV1
LVD
LVD
LVD
OS1
LVD
LVD
LVD
OS1
Q O M.2 F.9 C.9 A.5
2-2
2-1
AA AC
F.8
ELEVATOR SHAFT
C202-54
STAFF TOILET
CORRIDOR
C203-38
CONSULTATION
LV1
OS1
F1 F1E F1
F1E
RC1
LV1
ELECTRICAL
ELECTRICAL
X1E
X1E
X1E
PS
LV1
LV1
RC1
LVD
A4DE
A4D
A4DA4DA4D
A4D A4DE
D1D
D1D
RC1
PSA OFFICE
TOILET
TOILET
OS1
OS1
OS1
B-6 (SECTION 1) (ETR)
B-6 (SECTION 2) (ETR)
OS1OS1
LVD
RC1
EL-23
E-701
E-701
E-701
E-701
E-701
E-701
E-701
E-701
E-701
E-701
E-701
E-701
B-6 (SECTION 1)
RC1 RC1
TO EL102B
TO EL102A-2
LV1LV1
RC1 RC1TO EL102A-1
A3D
B-6 (SECTION 1)
D1D
P1E
P1
P1
P1
P1
A3
OS1
LVD
RC1
OFFICE
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:5
P M
EL102C
BUILDING 38 SECOND FLOOR
ELECTRICAL LIGHTING PLAN
5 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1" = 4'
2 4 8 16
1/4" = 1'-0"1
BUILDING 38 SECOND FLOOR
ELECTRICAL LIGHTING PLAN
A. UNLESS OTHERWISE NOTED, SWITCHES AND
OCCUPANCY SENSORS CONTROL THE SPACES
IN WHICH THEY ARE LOCATED.
B. LOWER CASE LETTERS DENOTE SWITCHING
ZONES.
J JJ JJ JJ J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
CORRIDOR
C207-02
DICTATION
ANTE
STAFF TOILET
258TOILET
ISOLATION
MEDS
SOILED HOLDING
HAC
PRE/POST
CLEAN SUPPLY
PACU
PACU
PACU
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C204-02
CORRIDOR
C202-02
CORRIDOR
C208-02
+48" +48" +48"
+48"
M
M
M
M
M
Q
2-11
O M.2 F.9
2-10
2-8
2-6
2-5
2-3
2-2
2-9
2-4
2-7
F.8
VAV
2A-2
VAV
2A-5
VAV
2A-8
CORRIDOR
C206-02
CORRIDOR
C203-02
VAV
2A-4
VAV
2A-6
M
M
VAV
2A-3
M
VAV
2A-10
VAV
2A-7
+40"
+40"
VAV
2A-1
VAV
2A-9
AAP
+52"
CARE STATION
PRE/POST
PRE/POST
PRE/POST
TOILET
B-6 (SECTION 1)
EC-23B
EC-23B
EC-23B
B-6 (SECTION 1)
B-6 (SECTION 1)
EC-23B
+52"
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
EC-23B
B-6 (SECTION 1)
B-6 (SECTION 1)
EC-23B
EC-23B
EC-23B
EC-23B
B-6 (SECTION 2)
EC-23B
B-6 (SECTION 2)
B-6 (SECTION 1)
EC-23B
B-6 (SECTION 2)
EC-23B
B-6 (SECTION 2)
EC-23B
B-6 (SECTION 2)
EC-23B
B-6 (SECTION 2)
B-6 (SECTION 2)
EC-23B
EC-23B
B-6 (SECTION 2)
B-6 (SECTION 2)
EC-23B
EC-23B
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 2)
EC-23B
M
M
+52"
B-6 (SECTION 1)
M
B-6 (SECTION 2)
+52" +52" +52"
+52"
STORAGE
B-6 (SECTION 1)
B-6 (SECTION 2)
EL-23
+52"
+52"
+52"
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 1)
31B-6 (SECTION 1)
B-6 (SECTION 1)
+64"
SAV
2A-1
B-6 (SECTION 1)
B-6 (SECTION 1)
EAV
2A-1
M
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:0
P M
EP102A
BUILDING 2 SECOND FLOOR AREA 'A'
ELECTRICAL POWER PLAN
6 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
A. THE AREA OF WORK SHOWN IS ASSOCIATED WITH
AN OPERATING FACILITY THAT MUST REMAIN IN
SERVICE 24/7.
B. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
BEFORE THE START OF WORK.
C. COORDINATE ELECTRICAL WORK WITH ALL OTHER
TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
D. PANELBOARDS AND OTHER ELECTRICAL
EQUIPMENT REQUIRE SHUTDOWN. COORDINATE
SERVICE SHUTDOWN FOR ALL EQUIPMENT WITH
CONTRACTING OFFICER’S REPRESENTATIVE.
E. PROVIDE POWER TO ALARM PANELS AS
REQUIRED FOR MEDICAL GAS AND SIMILAR
SYSTEMS.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1" = 4'
2 4 8 16
1/4" = 1'-0"1
BUILDING 2 SECOND FLOOR AREA 'A'
ELECTRICAL POWER PLAN
1 COORDINATE FINAL CONNECTIONS WITH HEADWALL
INSTALLER. TYPICAL FOR ALL PRE/POST ROOMS,
PACU'S, AND ISOLATION ROOMS.
J
J J J
OR
OR
OR
CORRIDOR
C201-02
STAIR
S2-02
PASSAGE
248B
PASSAGE
248A
STERILE CORE
IPP1N (NEW)
IPP2N (NEW)
IPP3N (NEW)
IPPLC (NEW)
IPP1C1 (NEW)
IPP1C2 (NEW)
2-11
F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-2
2-9
AA AC
2-4
2-7
F.8
IPP2C1 (NEW)
IPP2C2 (NEW) IPP3C2 (NEW)
IPP3C1 (NEW)
+48"
+48"
+48"
+48" +48"
+48"
+60"
2 2 2
VAV
2B-4
+52"
+52"
B-6 (SECTION 1)
EC-23B
B-6 (SECTION 1)
B-6 (SECTION 1)
IPP1C1
B-6 (SECTION 1)
IPP2C1
IPP2C2
IPP2C2
IPP2C1
IPP3C1
IPP3C2
B-6 (SECTION 1)
IPP3C1
+52"
+52" +52"
B-6 (SECTION 2)
B-6 (SECTION 2)
SAV
2B-1
RAV
2B-1
SAV
2B-2
RAV
2B-2
VAV
2B-3
SAV
2B-3
RAV
2B-3
VAV
2B-1
M
M
M M M
M
LAF
LAF
LAF
M
M
M
IPP1N
IPP2N
IPP3N
1 1 1
B-6 (SECTION 2)
SP1
SP1
EC-23B
EC-23B
EC-23B
EC-23B
EC-23B
VAV
2B-2
IPP1N
IPP2N
IPP3N
IPP1C2
IPP3C2
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
IPP1C1
13 IPP1C1
IPP1C1
10 IPP1C1
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP1C2
IPP2C1
IPP2C1
IPP2C1
IPP2C1
IPP2C1
13 IPP2C1
IPP2C1
10 IPP2C1
IPP2C1
IPP2C1
IPP2C1
IPP2C1
IPP2C2
IPP2C2
IPP2C2
IPP2C2
IPP2C2
IPP2C2
IPP2C2
IPP2C2
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C1
IPP3C2
IPP3C2
IPP3C2
IPP3C2
IPP3C2
IPP3C2
IPP3C2
IPP3C2
2 2 2
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:0
P M
EP102B
BUILDING 2 SECOND FLOOR AREA 'B'
ELECTRICAL POWER PLAN
7 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"1
BUILDING 2 SECOND FLOOR AREA 'B'
ELECTRICAL POWER PLAN 0
1" = 4'
2 4 8 16
A. BOND ALL PERMANENTLY INSTALLED METAL
ELEMENTS IN OPERATING ROOM TO BUILDING
GROUNDING SYSTEM.
B. PROVIDE FINAL INTERCONNECTIONS FOR ALL
MEDICAL EQUIPMENT AS REQUIRED BY MEDICAL
EQUIPMENT MANUFACTURER'S SHOP DRAWINGS.
FINAL INTERCONNECTIONS TO INCLUDE CONDUIT
AND/OR CONDUCTORS BETWEEN PIECES OF THE
MEDICAL EQUIPMENT AND THEIR CONTROL
SYSTEMS INDICATED ON THE MEDICAL EQUIPMENT
MANUFACTURER'S SHOP DRAWINGS.
C. RECEPTACLES IN OPERATING ROOMS SHALL BE
MOUNTED AT 24" TO BOTTOM OF RECEPTACLE
UNLESS OTHERWISE NOTED.
1. PROVIDE INTEGRAL LINE ISOLATION POWER
MONITOR INDICATOR FOR ISOLATED POWER PANEL
LOCATED IN 248B.
2. PROVIDE POWER AND GROUND MODULES
CONTAINING (4) DUPLEX RECEPTACLES AND (4)
HOSPITAL GRADE GROUND JACKS. INSTALL AT 24"
AFF TO BOTTOM OF MODULE.
3. COORDINATE ALL BOOM AND PLENUM SYSTEM
REQUIREMENTS WITH MANUFACTURER AND
SPECIFICATION 11 76 00 OPERATING ROOM
EQUIPMENT AND MANAGEMENT SYSTEMS.
WOMEN'S LOCKER
STAFF TOILET
CORRIDOR
C203-38
SOILED
PSA OFFICE
WAITING
RECEPTION
LOGISTICS
FIBER OPTIC
CORRIDOR
C201-38
STRESS LAB
CORR.
C203-38
WAIT.
3 EXAM.
EXAM
EXAM.
EQUIPMENT
STAFF LOUNGE
MEN'S LOCKER
ELECTRICAL
HAC
N. MANAGER OFFICE
STAFF TOILET
CONSULTATION
EL-23 (ETR)
EC-23 (ETR)
D-1 (RELOCATED)
T-EC23B (NEW)
EC-23B (NEW)
M
M
M
M
M
M
O M.2 F.9 C.9 A.5
2-2
2-1
AA
F.8
ELEVATOR SHAFT
C202-54
ANESTHESIA
VAV
38-1
VAV
38-4
VAV
38-2
VAV
38-7
VAV
38-9
VAV
38-8
M
VAV
38-12
M
VAV
38-11
M
VAV
38-10
M
/1 EP102B
EP102C
ELECTRICAL
+40"
(ETR)
+52"
400/3/225
B-6 (SECTION 1) (ETR)
B-6 (SECTION 2) (ETR)
+52" +52"
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
+52"
+52"
B-6 (SECTION 1)
B-6 (SECTION 2)
+52"
+52"
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 1)
M
M
B-6 (SECTION 2)
VAV
38-5
B-6 (SECTION 1)
B-6 (SECTION 2)
VAV
38-6
VAV
38-3
B-6 (SECTION 1)
B-6 (SECTION 1)
B-6 (SECTION 2)
B-6 (SECTION 2)
D-1
+64"
+64"
B-6 (SECTION 2)
B-6 (SECTION 2)
B-6 (SECTION 2)
TOILET
TOILET
B-6 (SECTION 2)
+40" 200/3
B-6 (SECTION 1)
D-1
OFFICE
D-1
F.9
2-2
2-1
F.8
EC-23 (ETR)
B-6 (SECTION 1) (ETR)
EL-23 (ETR)
(ETR)
B-6 (SECTION 2) (ETR)
EC-23B (NEW)
D-1 (RELOCATED)
T-EC23B (NEW)
ELECTRICAL
ELECTRICAL
400/3/225
200/3
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:0
P M
EP102C
BUILDING 38 SECOND FLOOR
ELECTRICAL POWER PLAN
8 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"1
BUILDING 38 SECOND FLOOR
ELECTRICAL POWER PLAN 0
1" = 4'
2 4 8 16
1" = 4'
2 4 8 16
1/4" = 1'-0"2
SECOND FLOOR NEW POWER PLAN -
ELECTRICAL ROOMS 213 & 216
1. SUSPEND TRANSFORMER TO 8' AFF FROM
STRUCTURE.
Q
2-11
O M.2 F.9 C.9 A.5
2-10
2-8
2-6
2-5
2-3
2-2
2-1
2-9
AA AC
2-4
2-7
F.8
DIV. 23
DIV. 23
EQ-2P1 (NEW)
PE-MVP
PE-WAGD
30/3
30/3
2-EF
(NEW)
(NEW)
WP/WR
EQ-2P1
8,10,12
HHWP
HHWP
2-EF
(NEW)
(NEW)
HHWP
HHWP
HHWP
(NEW)
(NEW)
DIV. 23
EQ-2P1
7,9,11
EQ-2P1
13,15,17
DIV. 23
DIV. 23
EQ-2P1
20,22,24
2-HU
EQ-2P1
25,27,29
EQ-2P1
19,21,23
2-HU
38-EF
AHU
SPD
CWP
CWP
ACC
(NEW)
(NEW)
EQ-2P1
26,28,30
EQ-2P1
32,34,36
30/3/NF/3R
D-1 10,12,14
M M
M
D-1
M
EQ-2P1
100/3/70
60/3/35
D-1 16,18,20
DP-EQ1
(NEW)
(NEW)
(ETR)
(NEW)
(NEW)
(NEW)
(NEW)
(NEW)
(NEW)
(NEW)
(NEW)
(NEW)
2-EF
1.1
2-EF
1.2
EQ-2P1
14,16,18
DIV. 23
D-1
2-AHU
EQ-2P1
37,39,41
EQ-2P1
EQ-2P1
EQ-2P1
1,3,5
2-HD
2-AHU
(ETR)
TCP
2-AHU
D-1 2,4,6
TCP
D-1
D-1
EL-23
11M
2-HD
EQUIPMENT LOCATED ON
PENTHOUSE ROOF
EQUIPMENT LOCATED ON
PENTHOUSE ROOF
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL BE APPROVED BY VA STAFF ON
SITE
/1 /2
:3
:1
P M
EP104
BUILDING 2 PENTHOUSE ELECTRICAL
POWER PLAN
9 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"1
BUILDING 2 PENTHOUSE ELECTRICAL POWER PLAN 0
1" = 8'
4 8 16 32
2-AHU-3
ELECTRICAL PANEL
2-AHU-2
ELECTRICAL PANEL
A. PROVIDE AIR TERMINALS AND CROSS
CONDUCTORS TO CONNECT NEW MECHANICAL
EQUIPMENT TO EXISTING LIGHTNING
PROTECTION SYSTEM. ALL NEW COMPONENTS
OF THE LIGHTNING PROTECTION SYSTEM
SHALL BE AS REQUIRED FOR A UL MASTER
LABEL.
1. PROVIDE NEMA 3R RATED J-BOX FOR HEAT TRACE
SYSTEM. COORDINATE EXACT REQUIREMENTS
WITH MANUFACTURER.
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE.
DRYWALL BORDER
LUMINAIRE.
REFER TO
SCHEDULE
CEILING CROSS BEAM
GYPSUM BOARD
CEILING CROSS BEAM
LUMINAIRE MANUFACTURER'S
MOUNTING HARDWARE
REFER TO SPECIFICATION SECTION
26 51 00
LUMINAIRE.
REFER TO
SCHEDULE
GYPSUM BOARD (TYP)
CEILING MAIN BEAM
FIXTURE WHIP FROM
JUNCTION BOX
(1829mm (6') LONG
MAX.)
3 TWIST MINIMUM
(TYP)
LUMINAIRE SUSPENSION
WIRES REFER TO
SPECIFICATION
SECTION 26 51 00
ARCHITECTURAL
CEILING GRID
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE.
LUMINAIRE.
REFER TO
SCHEDULE
ACOUSTICAL CEILING
TILE (TYP)
LUMINAIRE.
REFER TO
SCHEDULE
FIXTURE WHIP FROM
JUNCTION BOX
(1829mm (6') LONG
MAX.)
LUMINAIRE SUSPENSION
WIRES REFER TO
SPECIFICATION
SECTION 26 51 00
3 TWIST MINIMUM
(TYP)
LUMINAIRE MANUFACTURER'S
MOUNTING HARDWARE
REFER TO SPECIFICATION SECTION
26 51 00
WIRE TIE OR SCREW
BAR HANGER TO CROSS
BEAM TYP.
CEILING MAIN
BEAM
CEILING
CROSS BEAM
FIXTURE WHIP FROM
JUNCTION BOX (1829mm (6')
LONG MAX)
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE.
RECESSED CAN
LUMINAIRE
CEILING BEAM
RECESSED CAN
LUMINAIRE
REFER TO
SCHEDULE.
GYPSUM
BOARD (TYP)
LUMINAIRE
BAR HANGERS
CEILING HANGER
WIRE, TYP.
LUMINAIRE SUSPENSION WIRES
REFER TO SPECIFICATION SECTION 26 51 00
RECESSED CAN
LUMINAIRE
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING
INSTRUCTIONS AND USING RECOMMENDED MOUNTING HARDWARE
FIXTURE WHIP FROM
JUNCTION BOX (1829mm (6')
LONG MAX) ARCHITECUTRAL
CEILING GRID
RECESSED CAN
LUMINAIRE
ACOUSTICAL
CEILING TILE (TYP)
LUMINAIRE SUSPENSION WIRE
REFER TO SPECIFICATION SECTION
26 51 00.
LUMINAIRE
BAR HANGERS
WIRE TIE OR SCREW
BAR HANGER TO
ARCHITECTURAL
CEILING GRID TYP.
ARCHITECTURAL
CEILING GRID
CEILING HANGER
WIRE, TYP.
DRYWALL CEILING
CROSS TEE, TYP.
HANGER WIRE AND MOUNTING
CHANNEL ATTACHED TO STRUCTURE
REFER TO SPECIFICATION SECTION
26 51 00
CEILING MAIN
BEAM.
DRYWALL CEILING
CROSS TEE, TYP.
GYPSUM
BOARD
WIRE TIE THROUGH
MOUNTING CHANNEL &
CROSS BEAM, TYP.
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE.
LOCKING SQUARE
WASHER & NUT
6.35mm (1/4") SCREW
JUNCTION BOX
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
FIXTURE WHIP FROM JUNCTION BOX
(1829mm (6') LONG MAX)
CEILING HANGER WIRE
ARCHITECTURAL
CEILING GRID
HANGER WIRE AND MOUNTING
CHANNEL ATTACHED TO STRUCTURE
REFER TO SPECIFICATION SECTION
26 51 00
ARCHITECTURAL
CEILING GRID
ACOUSTICAL
CEILING
TILE (TYP)
ARCHITECTURAL
CEILING GRID
WIRE TIE THROUGH
MOUNTING CHANNEL &
CROSS BEAM, TYP.
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE.
LOCKING SQUARE
WASHER & NUT
6.35mm (1/4") SCREW
JUNCTION BOX
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
FIXTURE WHIP FROM JUNCTION BOX
(1829mm (6') LONG MAX)
CEILING HANGER WIRE
SPRING NUT
CONDUIT COMPRESSION
FITTING
JUNCTION BOX (SIZE AS
REQUIRED)
STEEL EXPANSION
ANCHOR
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
15" FLEXIBLE GALVANIZED STEEL
CONDUIT WITH CONDUCTORS & GREEN
INSULATED EQUIPMENT GROUNDING
CONDUCTOR.
CONDUIT,
TYP.
BEAM CLAMP, TYP.
[914mm]
CONDUIT TRAPEZE
PER SD260533-02,
TYP.
JUNCTION BOX, TYP (SIZE
AS REQUIRED)
STRUCTURAL MEMBER
(BEAM, JOIST, ETC.), TYP.
FLOOR OR ROOF STRUCTURE. FIELD
VERIFY ACTUAL CONDITIONS, TYP.
SEISMIC OR EXPANSION
JOINT. FIELD VERIFY
ACTUAL CONDITIONS &
LOCATIONS.
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
WASHER &
LOCKNUT
9.52mm (3/8") MIN
GALVANIZED THREADED
ROD, TYP.
LOCKING SQUARE
WASHER & LOCKNUT
LENGTH AS REQUIRED
GENERAL NOTES:
1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL
LONGER THAN 915mm (36") SHALL BE INSTALLED WITH A CENTER
SUPPORT ROD.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED
METHOD PER SPECIFICATION 26 05 33, RACEWAY AND BOXES
FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT CONDITIONS.
3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER TO
SPECIFICATION SECTION 13 05 41, SEISMIC RESTRAINT
REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.
REFER TO PLANS FOR
QUANTITY & SIZE OF
CONDUITS
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
CONDUIT CLAMP. SIZE
AS REQUIRED
m m
(1
M
A X m m
(1
M
A X
SECTION "A-A"
ELEVATION
RIGID STEEL CONDUIT
FOR SUPPORT PER N.E.C.
ART. 314
ROOF PENETRATION AND
CONDUIT SUPPORT PER
"CONDUIT ROOF MOUNTING DETAIL"
RIGID STEEL CONDUIT
FOR WIRING
A
A
CAST METAL
"WHILE-IN-USE"
WP COVER(S) &
RECEPTACLE(S).
CAST METAL, 2-GANG, NEMA
3R JUNCTION BOX WITH
THREADED HUBS.
TOP OF HANDLE
6'-6" AFF MAXIMUM
4'-0" +/- AFF
FRONT VIEWSIDE VIEW
DISCONNECT SWITCH, CIRCUIT
BREAKER ENCLOSURE, OR
MOTOR CONTROLLER
CHANNEL STRUT POST BASE W
(4) 1/4" EXPANSION ANCHORS.
(TYPICAL)
PROVIDE RIGID CONDUIT TO
MECHANICAL/PLUMBING
EQUIPMENT. CONVERT TO
FLEXIBLE CONDUIT WITH BOND
WIRE FOR FINAL CONNECTION TO
EQUIPMENT.
FLOOR
STRUCTURAL CEILING
CHANNEL STRUT SUPPORT
FRAME.
1'-7" (MIN.)
OPTION 3: CHANNEL STRUT
ANGLE BRACKET SUPPORT
FOR EACH SUPPORT LEG WITH
1/2" FLOOR EXPANSION
ANCHOR.
PROVIDE RIGID CONDUIT BACK
TO ELECTRICAL SOURCE.
NOTE:
1. DISCONNECT SWITCHES, CIRCUIT BREAKER ENCLOSURES, MOTOR CONTROLLERS & VARIABLE FREQUENCY DRIVES, AND CONTROL CABINETS MAY BE DIRECTLY MOUNTED TO STRUCTURAL WALLS, OR TO MECHANICAL EQUIPMENT
WHEN PERMITTED BY THE MECHANICAL EQUIPMENT MANUFACTURER AND WHERE IT DOES NOT BLOCK ACCESS OR
OPERATION OF THE EQUIPMENT. WHERE A SUITABLE STRUCTURAL WALL IS NOT AVAILABLE, PROVIDE SUPPORT FRAME AND
CONNECT THE SUPPORT FRAME WITH A MINIMUM OF (4) POINTS OF CONTACT TO THE BUILDING STRUCTURE TO PROVIDE A
RIGID ASSEMBLY. OPTION 1, 2, OR 3 MAY BE UTILIZED TO PROVIDE THE ADDITIONAL (2) POINTS OF CONTACT IN ADDITION TO
THE (2) POINTS OF CONTACT AT THE FLOOR.
OPTION 1: EXTEND CHANNEL
STRUT FRAME TO STRUCTURAL
CEILING AND CONNECT TO STEEL
STRUCTURE OR CONCRETE
SLAB.
S T
R U
C T
U R
A L W
A L L
OPTION 2: PROVIDE CHANNEL
STRUT FRAME TO WALL AND
CONNECT TO STRUCTURE OF
WALL.
0'-6" (MIN.)
(M
IN
(M
IN
ELECTRICAL PANELBOARD
CLEARANCE
ELECTRICAL PANELBOARD
DEDICATED ELECTRICAL SPACE EXTENDS TO
6' ABOVE PANELBOARD OR TO STRUCTURAL
CEILING, WHICHEVER IS LOWER.
MAXIMUM OF 10' SECONDARY
CONDUCTOR LENGTH
INSTALL TRANSFORMER
ABOVE AND IN FRONT OF
ELECTRICAL PANELBOARD.
SUPPORT SYSTEM SHALL BE
DESIGNED BY A LICENSED
STRUCTURAL ENGINEER
FLEXIBLE CONDUIT
RIGID CONDUIT
FLOOR
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
/1 /2
:3
:5
P M
E-501
ELECTRICAL DETAILS
10 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
NO SCALE
LUMINAIRE MOUNTING - GYPBOARD CEILING
NO SCALE
LUMINAIRE MOUNTING - LAY - IN CEILING
NO SCALE
DOWNLIGHT MOUNTING - GYPBOARD CEILING
NO SCALE
DOWNLIGHT MOUNTING - LAY - IN CEILING
NO SCALE
EXIT SIGN MOUNTING - GYPBOARD CEILING
NO SCALE
EXIT SIGN MOUNTING - LAY - IN CEILING
NO SCALE
CONDUIT JOINT CROSSING DETAIL
NO SCALE
CONDUIT TRAPEZE MOUNTING DETAIL
NO SCALE
VA RECEPTACLE
ROOF MOUNTING DETAIL
NO SCALE
ELECTRICAL EQUIPMENT MOUNTING DETAIL
1" = 1'-0"11
SUSPENDED TRANSFORMER MOUNTING DETAIL
3P
30AS
30AF
ETR
E X
IS
T
IN
G
P N
L B
D E
C -B
T-39 (ETR)
15 KVA
208Y/120V
3PH, 4W
480V-
E X
IS
T
IN
G
P N
L B
D E
C -1
E X
IS
T
IN
G
P N
L B
D E
C -2
3P
60AS
50AF
ETR
E X
IS
T
IN
G
P N
L B
D E
L -2
T-31A (ETR)
30 KVA
208Y/120V
3PH, 4W
480V-
3P
100AS
100AF
ETR
3P
60AS
60AF
ETR
T-14 (ETR)
45 KVA
208Y/120V
3PH, 4W
480V-
3P
400AS
250AF
ETR
P N
L B
D D
-1
3P
400AS
225AF
ETD
C O
N V
E Y
O R
C O
N V
E Y
O R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
R
E T
D
E T
R
T-14A (ETR)
150 KVA
208/120V
3PH, 4W
480V-
E T
R
E T
D
E T
D
E T
D
N E
W
P N
L B
D E
C -2
B
T-EC23B (NEW)
75 KVA
208Y/120V
3PH, 4W
480V-
3P
400AS
225AF
ETR
T
N E
W
P N
L B
D D
-1
T
G
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P C
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P N
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P N
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P N
N E
W
M E
D
IC
A L I S
O P
W R
P N
L B
D I P
P L C
N E
W
2,657 FCA
80 FEET
1,827 FCA
190 FEET
10,667 FCA
20 FEET
11,181 FCA
170 FEET
1,243 FCA
70 FEET
1,172 FCA
75 FEET
1,109 FCA
80 FEET
1,311 FCA
45 FEET
1,740 FCA
25 FEET
803 FCA
95 FEET
1,234 FCA
50 FEET
773 FCA
100 FEET
910 FCA
80 FEET
871 FCA
85 FEET
5,790 FCA
10 FEET
6,010 FCA
30 FEET
3,029 FCA
10 FEET
1,287 FCA
10 FEET
1,142 FCA
10 FEET
2,395 FCA
10 FEET
1,737 FCA
10 FEET
9,431 FCA
10 FEET
10,838 FCA
10 FEET
5,762 FCA
10 FEET
2,824 FCA
10 FEET
1,050 FCA
20 FEET
970 FCA
20 FEET
1,158 FCA
50 FEET
E T
R
E T
R
E T
R
E T
R
23,834 FCA
30 FEET
E T
R
N E
W
P N
L B
D E
Q -2
P
10,754 FCA
200 FEET
E X
IS
T
IN
G
P N
L B
D B
-6
3P
150AS
150AF
NEW
10,754 FCA
200 FEET
TO BUILDING 38
PANEL DP-EMC1
TO BUILDING 38
PANEL DP-EML
TO PANEL
DP5-1E
TO BUILDING 38
PANEL 38 PM-2
3 3
TO BUILDING 38
PANEL DP-EMC2
TO BUILDING 38
38 ATS-EQ1
E X
IS
T
IN
G
D P
-E Q
N E
W A
C C
-1
5 6
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:3
:5
P M
E-601
ELECTRICAL ONE-LINE DIAGRAM
11 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
NO SCALE
ELECTRICAL ONE-LINE DIAGRAM
1 RELOCATE DISCONNECT SWITCH TO NEW
ELECTRICAL ROOM 216. REFER TO SHEET EP101
FOR ADDITIONAL INFORMATION.
2 RELOCATE PANELBOARD D-1 TO NEW ELECTRICAL
ROOM 216. REFER TO SHEET EP101 FOR ADDITIONAL
INFORMATION.
3 REMOVE WIRE, CONDUIT, AND DISCONNECTS FOR
CONVEYORS.
4 PROVIDE NEW 225A/3P CIRCUIT BREAKER FOR NEW
PANELBOARD EQ-2P1.
5 PROVIDE NEW 150A, 3P, 600V BREAKER IN PANEL DP
EMC2 FOR POWER TO NEW TRANSFORMER.
6 PRIOR TO BEGINNING CONSTRUCTION,
CONTRACTOR SHALL METER PANEL DP-EMC2 FOR 30
DAYS IN ACCORDANCE WITH ARTICLE 220.87 OF THE
NEC. IF THE NEW LOAD PLUS 125% OF THE MAXIMUM
EXISTING LOAD EXCEEDS THE CAPACITY OF THE
PANEL, THE CONTRACTOR SHALL UPGRADE PANEL
DP-EMC2, THE FEEDERS TO DP-EMC2, AND THE
BREAKER FEEDING PANEL DP-EMC2 TO THE NEXT
HIGHEST SIZE (400A) THAT WOULD ADEQUATELY
SUPPLY POWER TO ALL LOADS PER NEC AND VA
GUIDELINES.
7 PRIOR TO BEGINNING CONSTRUCTION,
CONTRACTOR SHALL METER PANEL DP-EQ1 FOR 30
DAYS IN ACCORDANCE WITH ARTICLE 220.87 OF THE
NEC. IF THE NEW LOAD PLUS 125% OF THE MAXIMUM
EXISTING LOAD EXCEEDS THE CAPACITY OF THE
PANEL, THE CONTRACTOR SHALL UPGRADE PANEL
DP-EQ1, THE FEEDERS TO DP-EQ1, AND THE
BREAKER FEEDING PANEL DP-EQ1 TO THE NEXT
HIGHEST SIZE (1000A OR 1200A) THAT WOULD
ADEQUATELY SUPPLY POWER TO ALL LOADS PER
NEC AND VA GUIDELINES.
FEEDER/BRANCH CIRCUIT SCHEDULE
TAG
AMPS DESCRIPTION
52 50A (2)#8, (1)#10G, 3/4 IN. C
124 125A (4)#1, (1)#6G, 1-1/2 IN. C
153 150A (3)#1/0, (1)#6G, 1-1/2 IN. C
224 225A (4)#4/0, (1)#4G, 2-1/2 IN. C
ETD N/A EXISTING TO DEMO
ETR N/A EXISTING TO REMAIN
G150 GND #6 COPPER GROUND, 3/4 IN. C
T224 225A (4)#4/0, (1)#2G, 2-1/2 IN. C
NOTE: ALL CONDUCTOR SIZES ARE BASED ON 75 DEGREE C RATED TERMINATION AND
COPPER CONDUCTORS WITH TYPE THHN/THWN-2 INSULATION. FOR TERMINATION OR
INSULATION TYPES RATED LESS THAN 75 DEGREE C, MODIFY SIZES ACCORDING TO
NFPA 70.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
/1 /2
:3
:5
P M
E-602
ELECTRICAL SCHEDULES
12 15ABM
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
DIW
LIGHT FIXTURE SCHEDULE
TYPE
BASIS OF DESIGN:
MANUFACTURER AND MODEL
MOUNTING
LAMP BALLAST/DRIVER
DESCRIPTION
TYPE LUMENS
COLOR
TEMP
TYPE VOLTAGE
INPUT
WATTS
INPUT
VA
A1D HEW: MST G 2 4 L210 9 35
LAY-IN GRID
CEILING
INTEGRAL
WHITE LED
21000 lm 4000 K
0-10V LOW VOLTAGE
DIMMABLE
ELECTRONIC LED
DRIVER
120 V 180 W 200 VA
2'X4' RECESSED DIRECT/INDIRECT LED LIGHT
FIXTURE WITH WHITE PERFORATED ROUND
SHIELDING WITH FROSTED ACRYLIC SIDE SHIELDS.
PROVIDE BATTERY BACKUP TO PROVIDE 50% LUMEN
OUTPUT. FIXTURE SHALL HAVE A MINIMUM R9 (RED
SATURATION) VALUE OF 90.
A1DE HEW: MST G 2 4 L210 9 35
LAY-IN GRID
CEILING
INTEGRAL
WHITE LED
21000 lm 4000 K
0-10V LOW VOLTAGE
DIMMABLE
ELECTRONIC LED
DRIVER
120 V 180 W 200 VA
SAME AS TYPE 'A1D', EXCEPT CONNECTED TO LIFE
SAFETY BRANCH.
A2D
LC DOANE HRAM-LED SERIES:
24 6W150 40 90 A W 277 MIL 122 33
LAY-IN GRID
CEILING
INTEGRAL
WHITE LED
14794 lm 4000 K
STANDARD
ELECTRONIC LED
DRIVER
120 V 51 W 135 VA
2'X4' RECESSED DIRECT/INDIRECT LED LIGHT
FIXTURE WITH WHITE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .