P09 Drawings 04B Architecture 100 BID - 8 pages.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040_1
About this file
This solicitation is for the construction of a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work involves creating three inpatient operating rooms and endovascular/ambulatory surgical services on the second floor of Buildings 2 and 38, where the current recreation hall and kitchen are located. Infrastructure will be installed to provide UPS power meeting all VA requirements. The completed project will deliver a fully operational three OR inpatient surgical/endovascular and ambulatory surgical service for the VA. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROMMETS - FINAL LOCATIONS TO BE COORDINATED WITH
END USER
FILLER PANEL
EQUIPMENT - BY OTHERS
METAL SUPPORT
G
FP
EQ
S
SS-2 SOLID
SURFACE
COUNTERTOP AND
TRANSACTION TOP
S
SS-2
24"D SS-2 SOLID
SURFACE
COUNTERTOP
A-511
S
G
9' - 8 1/4" 3' - 0 3/4" 2' - 6 7/8"
SS-2
12"D SOLID
SURFACE SS-2
TRANSACTION TOP
RB-1
A-511
BR-1
24"D STAINLESS
STEEL
COUNTERTOP AND
BACKSPLASH
2' - 6"2' - 0"
2' - 0" 2' - 6"
4' - 6"
24"D SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
2' - 1 1/8"3' - 0"2' - 6"2' - 6"
10' - 1 1/8"
2' - 6"2' - 6"2' - 6"
24"D SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
2' - 0" 2' - 3" 2' - 6"
6' - 9"
2' - 0" 2' - 3" 2' - 6"
24"D SOLID SURFACE
COUNTERTOP AND
BACKSPLASH
3' - 0" 3' - 0" 2' - 6" 2' - 6"
2 5/8"
3' - 0" 2' - 6" 2' - 6"
FP
FP
8' - 2 5/8"
12"D SOLID SS-1
SURFACE
TRANSACTION TOP
SEE DETAIL 6/A-502
24"D SS-1 SOLID
SURFACE
COUNTERTOP
G
S
24"D SS-1 SOLID
SURFACE
COUNTERTOP
S
G
6' - 2 3/8"
24"D STAINLESS
STEEL
COUNTERTOP AND
BACKSPLASH
3' - 0"2' - 6"2' - 9" 1' - 9" 3' - 0" 2' - 6"
2' - 6"2' - 9" 2' - 6"3' - 0"1' - 9"
7' - 3"FP FP
FP
FP
SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
S
GG
G
24"D SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
2' - 0" 2' - 0"
4' - 0"
4' - 0"
THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK AND
ARE IN ADDITION TO THE GENERAL FINISH NOTES.
A. FIELD VERIFY ALL CASEWORK AND SHELVING DIMENSIONS.
B. ALL SHELVING SHOWN WITH DASHED LINES TO BE
ADJUSTABLE
C. COUNTERTOPS TO HAVE 1/2" RADIUS AT EXPOSED
CORNERS.
D. USE BLACK 2 1/2" DIAMETER GROMMETS WHERE
GROMMETS ARE INDICATED.
E. PROVIDE FINISHED END PANEL AT EXPOSED CASEWORK
ENDS AND BACKS AS NEEDED. PANEL TO MATCH PLASTIC
LAMINATE, STAINLESS STEEL OR MELAMINE FINISH, BASED
ON CABINET TYPE.
F. ADD FILLER PANEL AS NEEDED AT CABINETS, WARDROBES,
DRAWERS, APPLIANCES, ETC. TO ENSURE FULL DOOR
SWING AND DRAWER OPERATION.
G. ALL UPPER CABINETS TO BE 15"D OUT TO OUT UNLESS
NOTED OTHERWISE.
H. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF
CABINET DOOR FACE.
I. ALL BASE CABINETS TO BE 23" DEEP UNLESS NOTED
OTHERWISE.
J. ALL COUNTERTOPS TO HAVE POST FORM PROFILE.
K. ALL COUNTERTOPS ARE 1 1/2" THICK WITH 4" HIGH
BACK/SIDE SPLASHES UNLESS NOTED OTHERWISE
L. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD
BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE
REQUIRED TO BE SECURED TO THE WALLS. REFERENCE
MECHANICAL, PLUMBING, ELECTRICAL AND TECHNOLOGY
DRAWINGS. COORDINATE WITH FURNITURE SUPPLIER
WHERE APPROPRIATE.
M. ALL WALL CABINETS TO HAVE SLOPE TOPS UNLESS A
BULKHEAD IS PRESENT.
N. SEE SHEET A-512 FOR TYPICAL CABINET SECTIONS
SS-2 SOLID SURFACE 1/2" THICK
RB-1
SS-2 SOLID SURFACE
1/2" THICK
METAL BRACKET
3-0" O.C.
3/4" PLYWOOD
RB-1
SS-2 SOLID SURFACE
1/2" THICK
1' - 0"
BLOCKING AS NEEDED
ELECTRICAL
RACEWAY
OPENINGS
2' - 1 3/8"
2' - 6"
GROMMET
BUMPER RAIL
4' - 0"
24"D SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
2' - 6" 2' - 6" 2' - 6"
2' - 6"
24"D SS-1 SOLID
SURFACE
COUNTERTOP AND
BACKSPLASH
7' - 6"
SS-2
SS-2
2' - 11 1/4"
1' - 0"
2' - 11"
SS-2
SS-2
1' - 0"
2' - 11 1/2" 2' - 6" ANGLED
SS-2
SS-2
1/4" = 1'-0" A-511
13 NURSE STATION B
1/4" = 1'-0"
A-511
11 NURSE STATION A
1/4" = 1'-0"
A-511
12 NURSE STATION FRONT
1/4" = 1'-0" A-511
7 SOILED 214
1/4" = 1'-0" A-511
9 MEDS
1/4" = 1'-0"
A-511
8 ANTEROOM
1/4" = 1'-0" A-511
6 STAFF LOUNGE
1/4" = 1'-0"
A-511
3 RECEPTION CHECK IN
1/4" = 1'-0"
A-511
1 RECEPTION A
1/4" = 1'-0"
A-511
2 RECEPTION B
1/4" = 1'-0" A-511
18 IMMEDIATE STERILE
1/4" = 1'-0"
A-511
17 DICTATION
1/4" = 1'-0" A-511
5 CONSULTATION
N
1" = 1'-0" A-511
19 NURSE STATION DESK
STAINLESS STEEL CASEWORK
STAINLESS STEEL CASEWORK
1/4" = 1'-0" A-511
4 REFRESHMENT
1/4" = 1'-0" A-511
10 NOURISHMENT
1/4" = 1'-0" A-511
15 NURSE STATION EAST END
1/4" = 1'-0"
A-511
16 NURSE STATION NORTH END
1/4" = 1'-0"
A-511
14 NURSE STATION D
A-511
20 CARE STATION 3D
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:0
P M
A-511
CASEWORK ELEVATIONS AND
SCHEDULE
20 28ELI
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
DocuSign Envelope ID: AD5C8165-2F2B-4459-976A-BADC963CBCAB
11/14/2019
ADJ.
SHELF
R E
F E
R T
O E
L E
V S
1'-11"
REMOVEABLE PANEL,
ATTACH TO CLEATS
WITH NICKEL PLATED SCREWS
AND FINISH WASHERS. MATCH
REVEAL AND EDGE TREATMENT OF
DOORS AND DRAWERS.
1'-11"
R E
F E
R T
O E
L E
V S
E Q
E
Q
E Q
R E
F E
R T
O E
L E
V S
1'-11"
REFER TO
ELEVATIONS &
SECTIONS FOR
CABINET TYPE
LIGHT
VALANCE IS
3/4" X 2"
WHERE
CALLED FOR
ON THE
ELEVATIONS
(LV)
3/4" ANGLE BRACE
@ 36" O.C
ANGLE CLIPS
FINISHED
CEILING LINE
COND. @
SLOPED SOFFIT
EXTENDED SOFFIT FIN.
END PANEL PASSED CAB.
FIN END 3/8"H MIN.
MATCHING
"T" MOULD
EDGE
WRAP
CONT.-ALL
SIDES
FLUSH OVERLAY HINGE
5 KNUCKLE HINGE
CUT OUT DOOR TO
FLUSH
HINGE TO "T" MOULD
"T" MOULD CONT. AROUND
DOOR (BUTT FLUSH AGAINST
ENDS OF HINGE)
CUT END PIECES
TO BE EASED
EDGE
CAULK-SEE SCRIBE DETAIL
COUNTERTOP-
CAULK
TO SPLASH
3/4" PLYWOOD
ALL TOPS SHALL BE
SCRIBED TO WALL
PRIOR TO
INSTALLATION &
CAULKED
1" R. ALL EXPOSED CORNERS
EXPOSED EDGE
TRIM EDGE OF
SOLID SURFACE
@ THE FORMED
BACK SPLASH
EASED EDGES
2 ADJ.
SHELVES
2" DIA. GROMMET
WITH
RETRACTABLE,
SELF STORING
SLOT
LIGHT VALANCEPLAM SLOPED TOP TYP. CABINET
DRAWER PLAN VIEW
TYP. CABINET
DRAWER ELEVATION
OPEN END ELEVATION SPLASH END ELEVATION
SPLASH END PLANOPEN END PLAN
SCRIBE DETAIL
TYPICAL ADA SINK BASE
TYPICAL ONE DOOR BASETYPICAL FOUR DRAWER BASE
V A
R
IE
S
1" 3
1"
1"
/4
/4
1" 2'-0"
1" 2'-0"1 /2
/4
1/2"
/4
R 1"
R E
F E
R T
O E
L E
V S
R E
F E
R T
O E
L E
V S
R E
F E
R T
O E
L E
V S
R E
F E
R T
O E
L E
V S
1'-3"
2"
SOLID SURFACE COUNTERTOP
GROMMET DETAIL
TYPICAL 30"H WALL CABINET
TYPICAL 18"H WALL CABINET
REF TO ELEVS
1'-11"
E Q
E Q
R E
F E
R T
O E
L E
V S
TYPICAL THREE DRAWER BASE
REF TO ELEVS
1'-3"
2'-0"
END PANEL
V.I.F.
2' -0
TYPICAL ONE DOOR AND 1 DRAWER BASE
ADJ.
SHELF
1'-11"
R E
F E
R T
O E
L E
V S
ADA
COMPLIANT
SINK
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:0
P M
A-512
CASEWORK DETAILS
21 28ELI
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
CASEWORK DETAILS
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
CR-1
CHR-1
BR-1
HR-1 HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
SS-2 SOLID SURFACE
WAINSCOT 5'-0"H (ALL
THREE WALLS AROUND
SINK)
BR-1
A5075 A5082
BR-1
BR-1
A5077
HR-1
BR-1
SS-2 SOLID SURFACE
WAINSCOT 5'-0"H (ALL THREE
WALLS AROUND SINK)
A5075 A5082
BR-1
WP-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1
HR-1
BR-1 3
HR-1
BR-1 BR-1
HR-1
BR-1
HR-1
CG-1 CG-1
U0007 A5145A5145A5145A5145
BR-1
BR-1 BR-1 BR-1 BR-1 BR-1
M0512 A1014
M1802
BR-1
HR-1
BR-1
WP-1
BR-1 BR-1BR-1 BR-1
BR-1 BR-1
SS-2 SOLID SURFACE
WAINSCOT 5'-0"H (ALL
THREE WALLS AROUND
SINK)
A5075
A5082
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:1
P M
A-513
WALL PROTECTION ELEVATIONS
22 28ELI
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
1/4" = 1'-0" A-513
3 CORRIDOR C203-2 SOUTH
1/4" = 1'-0" A-513
8 TYPICAL PRE/POST OP & PACU HEADWALL
1/4" = 1'-0" A-513
1 TYPICAL WAITING (PERIMETER OF ROOM)
1/4" = 1'-0"
A-513
2 CORRIDOR C203-2 NORTH
1/4" = 1'-0" A-513
5 CORRIDOR C208-02 WEST
1/4" = 1'-0"
A-513
6 CORRIDOR C208-02 EAST
1/4" = 1'-0"
A-513
7 CORRIDOR C206-02 NORTH
1/4" = 1'-0" A-513
11 CORRIDOR C206-02 SOUTH A
1/4" = 1'-0"
A-513
9 TYPICAL MEDS/IMMEDIATE STERILE
1/4" = 1'-0" A-513
20 TYPICAL HAC
1/4" = 1'-0" A-513
12 CORRIDOR C206-02 EAST
1/4" = 1'-0"
A-513
13 CORRIDOR C207-02 SOUTH
1/4" = 1'-0" A-513
14 CORRIDOR C207-02 WEST A
1/4" = 1'-0"
A-513
15 ALCOVE C207-02 WEST
1/4" = 1'-0"
A-513
16 ALCOVE C207-02 EAST
1/4" = 1'-0" A-513
17 STERILE CORE 252 EAST
1/4" = 1'-0"
A-513
19 STERILE CORE 252 NORTH
1/4" = 1'-0"
A-513
18 STERILE CORE 252 WEST
BR-1: BUMPER RAIL
CG-1: CORNER GUARD
CHR-1: CHAIR RAIL
CR-1: CRASH RAIL
HR-1: HANDRAIL
WP-1: WALL PROTECTION SHEET
1/4" = 1'-0" A-513
10 CORRIDOR C206-02 SOUTH B
1/4" = 1'-0" A-513
22 TYPICAL EQUIPMENT
1/4" = 1'-0"
A-513
21 STERILE CORE 252 SOUTH
1/4" = 1'-0" A-513
23 PASSAGE 248B EAST
1/4" = 1'-0" A-513
24 PASSAGE 248A WEST
PERIMETER OF ROOM
1/4" = 1'-0" A-513
4 CARE STATION C208-02 WEST
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
HR-1
BR-1
HR-1 HR-1
BR-1
HR-1
BR-1
BR-1
BR-1 BR-1
BR-1 BR-1
HR-1
BR-1
A5082
A5075 A1012 A5082
A5075
A1012
A5075
HR-1
BR-1
HR-1
BR-1
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:1
P M
A-514
WALL PROTECTION ELEVATIONS
23 28Author
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
Checker
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0" A-514
3 CORRIDOR CORRIDOR C201-2 NORTH
1/4" = 1'-0" A-514
4 CORRIDOR C201-2 SOUTH
1/4" = 1'-0" A-514
1 CORRIDOR CS01-38 WEST
BR-1: BUMPER RAIL
CG-1: CORNER GUARD
CHR-1: CHAIR RAIL
CR-1: CRASH RAIL
HR-1: HANDRAIL
WP-1: WALL PROTECTION SHEET
1/4" = 1'-0" A-514
2 CORRIDOR CS01-38 EAST
A
TOILET
TOILET
STAFF
LOUNGE
PSA
N. MANAGER
OFFICE
CONSULTATION
ELECTRICAL
ELECTRICAL
HAC
CORRIDOR
C203-38
SOILED
EQUIPMENT
WOMEN'S
LOCKER
STAFF
TOILET
MEN'S
LOCKER
CORRIDOR
C201-38
CORRIDOR
C201-02
STAFF
TOILET
CORRIDOR
C202-02
OR
OR
OR
CLEAN
SUPPLY
STERILE
CORE
CORRIDOR
205-02
IMMED.
STER.
PACU
PACU
PACU
CORRIDOR
C204-2
9/A-511
/A
-5
/A
-5
11/A-511
12/A-511
/A
-5
7/A-511
/A
-5
2/A-511
3/A-511
18/A-511
17/A-511
BIO-MED
/A
-5
CORRIDOR
C206-02
CORRIDOR
C203-02
ALCOVE
C207-02A
STORAGE
STAIR
S2-02
CHASE
P-2
P-2
P-2
P-2
P-3
P-2
P-3
10/A-511
/A
-5
STAFF
TOILET
PRE/POST
PRE/POST
PRE/POST
ALCOVE
C206-02A
PRE/POST
PRE/POST
PRE/POST
PRE/POST
DICTATION
255CARE
STATION
MEDS
ANTEROOM
ISOLATION
TOILET
TOILET
SOILED
HAC
RECEPTION
ANESTHESIA
SCRUB
STATION
249B
SCRUB
STATION
250A
SCRUB
STATION
247A
CARE
STATION
249A
CORRIDOR
C207-02
CORRIDOR
C208-02
WAITING
P-2
P-2
P-2
P-2
P-2
CORRIDOR
C202-39
P-2
P-2
P-2
16/A-511
/A
-5
/A
-5
STAIR
S1-02
P-2
/A
-5
MN K G F
E D C B A
43/I-411
ELEVATOR
LOBBY
C202-38
OFFICE
P-2
A. REFERENCE ROOM FINISH SCHEDULE AND FINISH MATERIAL
LEGEND FOR MORE INFORMATION.
B. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL
CEILING INFO.
C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR, WALL, AND
CEILING MATERIALS, SHALL BE IN ACCORDANCE WITH FLAME
SPREAD AND SMOKE DEVELOPMENT REQUIREMENTS FOUND IN
THE CURRENT EDITION OF THE INTERNATIONAL BUILDING CODE.
D. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL
NEW INTERIOR WALL AND CEILING FINISHES WILL BE CLASS B
MINIMUM, WITH A FLAME SPREAD RATING OF 75 MAXIMUM AND A
SMOKE DEVELOPED INDEX OF 450 MAXIMUM PER IBC SECTION
E. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR
EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDED INSTALLATION METHODS
AND MATERIALS FOR ALL FINISHES.
F. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR
SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED
UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE
NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT
THE ARCHITECT WITH THE CONCERN. PROCEEDING WITH THE
INSTALLATION OF FINISHES WILL BE INDICATION THAT THE
INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.
G. USE MANUFACTURER'S RECOMMENDED INSTALLATION
METHODS AND MATERIALS FOR ALL FINISHES.
H. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING CONTRACTOR
I. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA
GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM
SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS
APPROVAL PRIOR TO INSTALLATION.
J. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO
BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED
POSITION
K. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT
DOORS, U.N.O.
L. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN
CABINETS.
M. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4,
U.N.O.
N. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED
OTHERWISE.
O. ALL GYP. BOARD CEILINGS TO BE PAINTED P-1, U.N.O.
P. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE
BASE COAT AND (2) TWO FINISH COATS
Q. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL
WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL
DOORS AND METAL FRAMES TO BE SEMI-GLOSS.
R. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE
EXTINGUISHER CABINETS, ETC. WITH PAINT TO MATCH
ADJACENT SURFACE.
S. ALL NEW INTERIOR WINDOW SILLS TO BE SS-2, UNLESS NOTED
OTHERWISE.
T. ALL METAL DOORS AND FRAMES TO BE PAINTED P-5.
CORNER GUARD
CERAMIC WALL TILE
EPOXY PAINT
PAINT
PLASTIC LAMINATE
PORCELAIN TILE - FLOOR
PORCELAIN TILE - BASE
RUBBER BASE
SEALED CONCRETE
SOLID SURFACE
WELDED SHEET FLOORING
WELDED SHEET FLOORING BASE
WALL PROTECTION
LUXURY VINYL TILE
RESINOUS FLOORING
RESINOUS BASE
CG
CWT
EP
P
PL
PT
PTB
RB
SC
SS
WSF
WSFB
WP
LVT
RES
RESB
FINISH LEGEND
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:2
P M
AI101
SECOND FLOOR FINISH PLAN
25 28ELI
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
2, 38
ELI
1/8" = 1'-0"
AI101
1 SECOND FLOOR FINISH PLAN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
ROOM FINISH SCHEDULE
Room Number Room Name Floor Finish Base Finish
North Wall Finish
East Wall Finish
South Wall Finish
West Wall Finish Comments
CHASE EXISTING
205 MEN'S LOCKER PT-1 PTB-1 EP-1 EP-1 EP-1 EP-1
205-02 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
206 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
207 WOMEN'S LOCKER PT-1 PTB-1 EP-1 EP-1 EP-1 EP-1
208 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
209 EQUIPMENT WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
210 ELECTRICAL EXISTING
212 STAFF LOUNGE LVT-1 RB-1 P-1 P-1 P-2 P-1
213 ANESTHESIA WSF-1 WSFB-1 P-1 P-1 P-1 P-1
214 SOILED RES-1 RESB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
215 HAC PT-1 PTB-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 CWT-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
216 ELECTRICAL EXISTING
220 PSA LVT-1 RB-1 P-1 P-1 P-2 P-1
221 OFFICE LVT-1 RB-1 P-2 P-1 P-1 P-1
222 CONSULTATION LVT-1 RB-1 P-1 P-1 P-1 P-2
223 WAITING LVT-1 RB-1 P-1 P-1 P-1 P-3
224 RECEPTION LVT-1 RB-1 P-1 P-1 P-2 P-1
225 BIO-MED LVT-1 RB-1 P-1 P-1 P-1 P-1
226 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
227 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
228 N. MANAGER OFFICE LVT-1 RB-1 P-2 P-1 P-1 P-1
229 SOILED WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
230 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-1 P-2
231 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-1 P-2
232 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2
233 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2
234 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2
235 PRE/POST WSF-1/2 WSFB-1 P-1 P-1 P-1 P-2
236 ANTEROOM WSF-1 WSFB-1 EP-1 EP-1 EP-1 EP-1
237 ISOLATION WSF-1 WSFB-1 EP-1 EP-2 EP-1 EP-1
238 CARE STATION WSF-2/3 WSFB-2/3 P-3 P-1 P-1 P-1
239 MEDS WSF-1 WSFB-1 P-1 P-1 P-1 P-1
241 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-2 P-1
242 PACU WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-2 P-1
243 PACU WSF-1/2 WSFB-1/2 P-1 P-1 P-2 P-1
244 PACU WSF-1/2 WSFB-1/2 P-1 P-1 P-2 P-1
245 CLEAN SUPPLY WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
246 HAC PT-1 PTB-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 CWT-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
247 SOILED WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
247A SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
248 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1
249A CARE STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
249B SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
250 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1
250A SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
251 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1
252 STERILE CORE RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
253 IMMED. STER. RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
255 DICTATION WSF-1 WSFB-1 P-1 P-1 P-1 P-1
256 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
257 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
258 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2
259 STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1
C201-02 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
C201-38 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1
C202-02 CORRIDOR WSF-1/2 WSFB-2 P-1 P-1 P-1 P-1
C202-38 ELEVATOR LOBBY LVT-1 RB-1 P-1 P-1 P-1 P-1
C202-39 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1
C203-02 CORRIDOR WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-1
C203-38 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
C204-2 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1
C206-02 CORRIDOR WSF-1/2/3 WSFB-2/3 P-1 P-1 P-1/SS-2 P-1 SS-2 TO BE BEHIND AND SIDES OF
SINKS AT 5'-0"AFF
C206-02A ALCOVE WSF-2 WSFB-2 P-1/WP-1 P-1/WP-1 P-1/WP-1 P-1/WP-1
C207-02 CORRIDOR WSF-1/2 WSFB-2 P-1 P-1 P-1 P-1
C207-02A ALCOVE WSF-1/2 WSFB-2 P-1/WP-1 P-1/WP-1 P-1/WP-1 P-1/WP-1 WP-1 @ 4'-0'H WAINSCOT
PERIMETER OF ROOM
C208-02 CORRIDOR WSF-1/2/3 WSFB-1/2/3 P-1 P-1/SS-2 P-1 P-1/SS-2 SS-2 TO BE BEHIND AND SIDES OF
SINKS AT 5'-0"AFF
S1-02 STAIR EXISTING
S2-02 STAIR EXISTING
N
TOILET
TOILET
STAFF
LOUNGE
PSA
N. MANAGER
OFFICE
CONSULTATION
ELECTRICAL
ELECTRICAL
HAC
CORRIDOR
C203-38
SOILED
EQUIPMENT
WOMEN'S
LOCKER
STAFF
TOILET
MEN'S
LOCKER
CORRIDOR
C201-38
CORRIDOR
C201-02
STAFF
TOILET
CORRIDOR
C202-02
OR
OR
OR
CLEAN
SUPPLY
STERILE
CORE
CORRIDOR
205-02
IMMED.
STER.
PACU
PACU
PACU
CORRIDOR
C204-2
BIO-MED
CORRIDOR
C206-02
CORRIDOR
C203-02
ALCOVE
C207-02A
STORAGE
STAIR
S2-02
CHASE
2' - 0"
R
' - 0 " R
R
STAFF
TOILET
PRE/POST
PRE/POST
PRE/POST
ALCOVE
C206-02A
PRE/POST
PRE/POST
PRE/POST
PRE/POST
DICTATION
CARE
STATION
MEDS
ANTEROOM
ISOLATION
TOILET
TOILET
SOILED
HAC
RECEPTION
ANESTHESIA
SCRUB
STATION
249B
SCRUB
STATION
250A
SCRUB
STATION
247A
CARE
STATION
249A
CORRIDOR
C207-02
CORRIDOR
C208-02
WAITING
CORRIDOR
C202-39
2' - 0"
R 3' - 0"
1' - 6"
1' - 6"
1' - 6"
R 3' - 0"
1' - 6" 1' - 6"
2'
- 0
"1
3' - 0"
9' - 8"
MN K G F
E D C B A
STAIR
S1-02
ELEVATOR
LOBBY
C202-38
OFFICE
A. REFERENCE ROOM FINISH SCHEDULE AND FINISH MATERIAL
LEGEND FOR MORE INFORMATION.
B. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL
CEILING INFO.
C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR, WALL, AND
CEILING MATERIALS, SHALL BE IN ACCORDANCE WITH FLAME
SPREAD AND SMOKE DEVELOPMENT REQUIREMENTS FOUND IN
THE CURRENT EDITION OF THE INTERNATIONAL BUILDING CODE.
D. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL
NEW INTERIOR WALL AND CEILING FINISHES WILL BE CLASS B
MINIMUM, WITH A FLAME SPREAD RATING OF 75 MAXIMUM AND A
SMOKE DEVELOPED INDEX OF 450 MAXIMUM PER IBC SECTION
E. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR
EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDED INSTALLATION METHODS
AND MATERIALS FOR ALL FINISHES.
F. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR
SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED
UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE
NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT
THE ARCHITECT WITH THE CONCERN. PROCEEDING WITH THE
INSTALLATION OF FINISHES WILL BE INDICATION THAT THE
INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.
G. USE MANUFACTURER'S RECOMMENDED INSTALLATION
METHODS AND MATERIALS FOR ALL FINISHES.
H. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING CONTRACTOR
I. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA
GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM
SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS
APPROVAL PRIOR TO INSTALLATION.
J. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO
BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED
POSITION
K. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT
DOORS, U.N.O.
L. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN
CABINETS.
M. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4,
U.N.O.
N. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED
OTHERWISE.
O. ALL GYP. BOARD CEILINGS TO BE PAINTED P-1, U.N.O.
P. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE
BASE COAT AND (2) TWO FINISH COATS
Q. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL
WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL
DOORS AND METAL FRAMES TO BE SEMI-GLOSS.
R. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE
EXTINGUISHER CABINETS, ETC. WITH PAINT TO MATCH
ADJACENT SURFACE.
S. ALL NEW INTERIOR WINDOW SILLS TO BE SS-2, UNLESS NOTED
OTHERWISE.
T. ALL METAL DOORS AND FRAMES TO BE PAINTED P-5.
FINISH KEY
WSF-2
WSF-3
WSF-1
RES-2
LVT-1 (PATTERN TO BE
HERRINGBONE)
LVT-1 (PATTERN TO BE 1/3 RUNNING
BOND) AS DIRECTION SHOWN IN THE
ROOM
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:2
P M
AI102
FLOOR PATTERN FLOOR PLAN
26 28Author
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
1/8" = 1'-0"
AI102
1 SECOND LEVEL_FLOOR PATTERN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
G.W.B.
(BY OTHERS)
STEEL STUD
(BY OTHERS)
ACROVYN 4000 COVER
(24U004xxx)
ACROVYN CHAMELEON
(24U622xxx)
ALUMINUM RETAINER
(24A340000)
#6 X 1 5/8" BUGLE HD SMS
18" [457.2mm] MAX.
R1/4" [R6.4mm]
2" [50.8mm]
3/8" [9.5mm]
A
TOILET
TOILET
STAFF
LOUNGE
PSA
N. MANAGER
OFFICE
CONSULTATION
ELECTRICAL
ELECTRICAL
HAC
CORRIDOR
C203-38
SOILED
EQUIPMENT
WOMEN'S
LOCKER
STAFF
TOILET
MEN'S
LOCKER
CORRIDOR
C201-38
CORRIDOR
C201-02
STAFF
TOILET
CORRIDOR
C202-02
OR
OR
OR
CLEAN
SUPPLY
STERILE
CORE
CORRIDOR
205-02
IMMED.
STER.
PACU
PACU
PACU
CORRIDOR
C204-2
3/A-513
BIO-MED
STORAGE
CORRIDOR
C206-02
CORRIDOR
C203-02
ALCOVE
C207-02A
STAIR
S2-02
CHASE
/A
-5
/A
-5
2/A-513
/A
-5
7/A-513
11/A-513 12 /A
-5
/A
-5
13/A-513
/A
-5
/A
-5
/A
-5
/A
-5
/A
-5
/A
-5
/A
-5
/A
-5
19/A-513
20/A-513
3/A-514
4/A-514
/A
-5
/A
-5
21/A-513
1 1
1 1
1 1
1 1 1 1
1 1
10/A-513
22/A-513
/A
-5
/A
-5
/A
-5
/A
-5
/A
-5
8/A-513 8/A-513 8/A-513 8/A-513
/A
-5
STAFF
TOILET
PRE/POST
PRE/POST
PRE/POST
ALCOVE
C206-02A
PRE/POST
PRE/POST
PRE/POST
PRE/POST
DICTATION
CARE
STATION
MEDS
ANTEROOM
ISOLATION
TOILET
TOILET
SOILED
HAC
RECEPTION
ANESTHESIA
SCRUB
STATION
249B
SCRUB
STATION
250A
SCRUB
STATION
247A
CARE
STATION
249A
CORRIDOR
C207-02
CORRIDOR
C208-02
WAITING
9/A-513
/A
-5
MN K G F
E D C B A
/A
-5
4 CORRIDOR
C202-39
STAIR
S1-02
ELEVATOR
LOBBY
C202-38
OFFICE
1. ALL CORNER GUARDS TO BE FROM TOP OF BASE TO CEILING
2. PROVIDE BLOCKING IN WALLS BEHIND HAND/CRASH RAILS
AND BUMPER RAILS
FINISHED FLOOR
VINYL BASE (6")
FINISHED WALL
HANDRAIL
T.O. HANDRAIL TO BE 36".
TYPICAL HANDRAIL
BLOCKING
RESILIENT CONTACT SURFACE
BUMPER
NEOPRENE CUSHION AT EACH
FASTENING
FINISHED FLOOR
5" INTEGRAL COVE BASE
FINISHED WALL
S E
E E
L E
V A
T
IO
N
V A
R
IE
S
WALL
PROTECTION
METAL CAP BY WALL
PROTECTION MFR.
TYPICAL WALL PROTECTION
FINISHED FLOOR
BASE VARIES
TYPICAL BUMPER
RESILIENT CONTACT SURFACE
BUMPER
NEOPRENE CUSHION AT EACH
FASTENING
FINISHED FLOOR
BASE VARIES
TYPICAL CHAIR RAIL
RESILIENT CHAIR RAIL
NEOPRENE CUSHION AT EACH
FASTENING
1 CORNER GUARD
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:3
P M
AI103
WALL PROTECTION FLOOR PLAN AND
DETAILS
27 28ELI
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
1/8" = 1'-0"
AI103
1 WALL PROTECTION FLOOR PLAN
1" = 1'-0"
AI103
2 WALL PROTECTION DETAILS
6" = 1'-0"
AI103
3 CORNER GUARD DETAIL
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
TOILET
TOILET
STAFF
LOUNGE
PSA
N. MANAGER
OFFICE
CONSULTATION
ELECTRICAL
210 ELECTRICAL
HAC
CORRIDOR
C203-38
SOILED
EQUIPMENT
WOMEN'S
LOCKER
STAFF
TOILET
MEN'S
LOCKER
CORRIDOR
C201-38
CORRIDOR
C201-02
STAFF
TOILET
258 CORRIDOR
C202-02
OR
OR
OR
CLEAN
SUPPLY
STERILE
CORE
CORRIDOR
205-02
IMMED.
STER.
PACU
PACU
PACU
CORRIDOR
C204-2
BIO-MED
38-02-N009
38-02-N008
38-02-N002
38-02-N007
38-02-N005
38-02-N006
38-02-N012
38-02-N014
38-02-N013
38-02-N017
38-02-N016
02-02-N030
38-02-N018
02-02-N031 02-02-N029 02-02-N028
02-02-N027
02-02-N024
02-02-N023
02-02-N026 02-02-N025
02-02-N020
02-02-N021
02-02-N016
02-02-N010
02-02-N018
02-02-N009
02-02-N022
02-02-N011
02-02-N012
02-02-N013
02-02-N014
02-02-N004
02-02-N001
38-02-N015
02-02-N002
02-02-N019
CORRIDOR
C206-02
CORRIDOR
C203-02
ALCOVE
C207-02A
STORAGE
STAIR
S2-02
CHASE
STAFF
TOILET
PRE/POST
PRE/POST
PRE/POST
ALCOVE
C206-02A
PRE/POST
PRE/POST
PRE/POST
PRE/POST
DICTATION
CARE
STATION
MEDS
ANTEROOM
ISOLATION
TOILET
TOILET
SOILED
HAC
RECEPTION
ANESTHESIA
SCRUB
STATION
249B
SCRUB
STATION
250A
SCRUB
STATION
247A
CARE
STATION
249A
CORRIDOR
C207-02
CORRIDOR
C208-02
WAITING
CORRIDOR
C202-39
02-02-N015
02-02-N017
02-02-N007
02-02-N008
38-02-N004 38-02-N003
38-02-N001
38-02-N010
38-02-N011
38-02-N019
02-02-N003
02-02-N00502-02-N006
MN K G F
E D C B A
STAIR
S1-02
ELEVATOR
LOBBY
C202-38
OFFICE
38-02-N003A
02-02-N032
02-02-N033
249246
241A
242A
238C 237
235236238A238B
251250248
260261262
275 276 277
MOUNTING LEGEND
WM = WALL MOUNTED
DM = DOOR MOUNTED
FM = FLAG MOUNTED
BM = BULKHEAD MOUNTED
CM= CEILING MOUNTED
SIGN GENERAL NOTES:
1. CONTRACTOR TO COORDINATE THE TEXT OF SIGN
INSERTS WITH COR
2. SIGNS TO MATCH VA MARION CAMPUS SIGNAGE
STANDARDS. COLORS TO BE DETERMINED BY FACILITIES.
RED
YELLOW
WHITE
BLUE
DETAIL OF SIGN: IN-01.15
o o ox
XXX-XX-XXXX
FLOOR NUMBER
SIGN NUMBER
NEW SIGN DESIGNATION
BUILDING NUMBER
SIGN DESIGNATION:
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:4
:3
P M
AI104
SIGNAGE FLOOR PLAN AND SCHEDULE
28 28Author
RELOCATE AND UPGRADE
OPERATING SUITES-
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
100% CONSTRUCTION DOCUMENTS
657-501
ELI
1/8" = 1'-0"
AI104
1 SECOND FLOOR SIGNAGE PLAN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
AI104
2 TYPICAL ROOM SIGN
3/32" = 1'-0"
AI104
3 TYPICAL DIRECTIONAL SIGNAGE
N
SIGNAGE SCHEDULE
Mark Type Sign Type Sign Type Name Proposed Content Sign
Mounting VA Room Number
02-02-N001 IN-04.01 Primary Room Identification Room 216: Insert: Electrical WM 247
02-02-N002 IN-15.55b Department ID Insert: Pre/Post Op arrow CM
02-02-N003 IN-04.01 Primary Room Identification Room 210: Insert: Electrical WM 258
02-02-N004 IN-04.01 Primary Room Identification Room 259: Insert: Storage WM 257
02-02-N005 IN-09.03 Restroom Identification Room 258: Insert: Symbol:
Women-Men-Accessible Text: Restroom
WM 260
02-02-N006 IN-09.03 Restroom Identification Room 257: Insert: Symbol:
Women-Men-Accessible Text: Restroom
WM 261
02-02-N007 IN-04.01 Primary Room Identification Room 230: Insert: Pre/Post Op WM 263
02-02-N008 IN-04.01 Primary Room Identification Room 231: Insert: Pre/Post Op WM 265
02-02-N009 IN-09.03 Restroom Identification Room 256: Insert: Symbol:
Women-Men-Accessible Text: Restroom
WM 262
02-02-N010 IN-04.01 Primary Room Identification Room 237: Insert: Isolation WM 264
02-02-N011 IN-04.01 Primary Room Identification Room 232: Insert: Pre/Post Op WM 267
02-02-N012 IN-04.01 Primary Room Identification Room 233: Insert: Pre/Post Op WM 269
02-02-N013 IN-04.01 Primary Room Identification Room 234: Insert: Pre/Post Op WM 271
02-02-N014 IN-04.01 Primary Room Identification Room 235: Insert: Pre/Post Op WM 273
02-02-N015 IN-04.01 Primary Room Identification Room 238: Insert: Nurse Station WM 272
02-02-N016 IN-04.01 Primary Room Identification Room 255: Insert: Dictation WM 270
02-02-N017 IN-04.01 Primary Room Identification Room 239: Insert: Meds WM 268
02-02-N018 IN-04.01 Primary Room Identification Room 236: Insert: Anteroom WM 266
02-02-N019 IN-04.01 Primary Room Identification Room 242-244: Insert: PACU WM 275,276,27
02-02-N020 IN-04.01 Primary Room Identification Room 246: Insert: Housekeeping WM 255
02-02-N021 IN-04.01 Primary Room Identification Room 245: Insert: Clean Supply WM 254
02-02-N022 IN-04.01 Primary Room Identification Room 247: Insert: Soiled Utility WM 256
02-02-N023 IN-04.01 Primary Room Identification Room 253: Insert: Immediate Sterile WM 253
02-02-N024 IN-04.01 Primary Room Identification Room 253: Insert: Immediate Sterile WM 253
02-02-N025 IN-04.01 Primary Room Identification Room 250: Insert: Operating Room WM 250
02-02-N026 IN-04.01 Primary Room Identification Room 248: Insert: Operating Room WM 248
02-02-N027 IN-04.01 Primary Room Identification Room 251: Insert: Operating Room WM 251
02-02-N028 IN-04.01 Primary Room Identification Room 251: Insert: Operating Room WM 251
02-02-N029 IN-04.01 Primary Room Identification Room 250: Insert: Operating Room WM 250
02-02-N030 IN-04.01 Primary Room Identification Room 209: Insert: Equipment WM 249
02-02-N031 IN-04.01 Primary Room Identification Room 248: Insert: Operating Room WM 248
02-02-N032 IN-04.01 Primary Room Identification Room 252: Insert: Sterile Core WM 252
02-02-N033 IN-04.01 Primary Room Identification Room 241: Insert: Pre/Post Op WM 274
38-02-N001 IN-04.01 Primary Room Identification Room 225: Insert: Bio-Med WM 235
38-02-N002 IN-04.01 Primary Room Identification Room 220: Insert: PSA Office WM 237
38-02-N003 IN-04.01 Primary Room Identification Room 228: Insert: Nurse Manager WM 236
38-02-N003A IN-04.01 Primary Room Identification Room 221: Insert: Office WM 238C
38-02-N004 IN-09.03 Restroom Identification Room 227: Insert: Symbol:
Women-Men-Accessible Text: Restroom
WM 238A
38-02-N005 IN-09.03 Restroom Identification Room 226: Insert: Symbol:
Women-Men-Accessible Text: Restroom
WM 238B
38-02-N006 IN-04.01 Primary Room Identification Room 223: Insert: Waiting WM 238
38-02-N007 IN-04.01 Primary Room Identification Room 224: Insert: Reception WM 239
38-02-N008 IN-04.01 Primary Room Identification Room 223: Insert: Waiting WM 238
38-02-N009 IN-04.01 Primary Room Identification Room 222: Insert: Consultation WM 259
38-02-N010 IN-04.01 Primary Room Identification Room 212: Insert: Staff Lounge WM 240
38-02-N011 IN-04.01 Primary Room Identification Room 207: Insert: Women's Locker WM 242
38-02-N012 IN-04.01 Primary Room Identification Room 205: Insert: Men's Locker WM 241
38-02-N013 IN-09.03 Restroom Identification Room 206: Symbol: Women-Men-Accessible Text: Restroom
WM 241A
38-02-N014 IN-09.03 Restroom Identification Room 208: Symbol: Women-Men-Accessible Text: Restroom
WM 242A
38-02-N015 IN-04.01 Primary Room Identification Room 212: Insert: Staff Lounge WM 240
38-02-N016 IN-04.01 Primary Room Identification Room 214: Insert:Soiled WM 243
38-02-N017 IN-04.01 Primary Room Identification Room 213: Insert: Anesthesia WM 246
38-02-N018 IN-04.01 Primary Room Identification Room 215: Insert: Housekeeping WM 245
38-02-N019 IN-15.55b Department ID Insert: Waiting (arrow right) CM
| Sheets |
| A-511 - CASEWORK ELEVATIONS AND SCHEDULE |
| A-512 - CASEWORK DETAILS |
| A-513 - WALL PROTECTION ELEVATIONS |
| A-514 - WALL PROTECTION ELEVATIONS |
| AI101 - SECOND FLOOR FINISH PLAN |
| AI102 - FLOOR PATTERN FLOOR PLAN |
| AI103 - WALL PROTECTION FLOOR PLAN AND DETAILS |
| AI104 - SIGNAGE FLOOR PLAN AND SCHEDULE |
| I-001 - FFE AND EQUIPMENT SCHEDULES |
| I-002 - FFE AND EQUIPMENT SCHEDULES |
| I-003 - FFE AND EQUIPMENT SCHEDULES |
| I-101 - OVERALL SECOND FLOOR FFE PLAN |
| I-401 - ENLARGED TYPICAL FFE PLANS |
| I-402 - ENLARGED TYPICAL FFE PLANS |
| I-411 - INTERIOR ELEVATIONS |
| I-412 - INTERIOR ELEVATIONS |
| QH101 - BUILDING 02 SECOND FLOOR AREA 'A' EQUIPMENT PLAN |
| QH102 - BUILDING 02 SECOND FLOOR AREA 'B' EQUIPMENT PLAN |
| QH103 - BUILDING 38 SECOND FLOOR EQUIPMENT PLAN |
| 2019-11-14T08:25:00-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .