P09 Drawings 04B Architecture 100 BID - 8 pages.pdf

PDF 3 MB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This solicitation is for the construction of a surgical suite addition at the Marion VA Medical Center in Marion, Illinois. The scope of work involves creating three inpatient operating rooms and endovascular/ambulatory surgical services on the second floor of Buildings 2 and 38, where the current recreation hall and kitchen are located. Infrastructure will be installed to provide UPS power meeting all VA requirements. The completed project will deliver a fully operational three OR inpatient surgical/endovascular and ambulatory surgical service for the VA. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROMMETS - FINAL LOCATIONS TO BE COORDINATED WITH

END USER

FILLER PANEL

EQUIPMENT - BY OTHERS

METAL SUPPORT

G

FP

EQ

S

SS-2 SOLID

SURFACE

COUNTERTOP AND

TRANSACTION TOP

S

SS-2

24"D SS-2 SOLID

SURFACE

COUNTERTOP

A-511

S

G

9' - 8 1/4" 3' - 0 3/4" 2' - 6 7/8"

SS-2

12"D SOLID

SURFACE SS-2

TRANSACTION TOP

RB-1

A-511

BR-1

24"D STAINLESS

STEEL

COUNTERTOP AND

BACKSPLASH

2' - 6"2' - 0"

2' - 0" 2' - 6"

4' - 6"

24"D SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

2' - 1 1/8"3' - 0"2' - 6"2' - 6"

10' - 1 1/8"

2' - 6"2' - 6"2' - 6"

24"D SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

2' - 0" 2' - 3" 2' - 6"

6' - 9"

2' - 0" 2' - 3" 2' - 6"

24"D SOLID SURFACE

COUNTERTOP AND

BACKSPLASH

3' - 0" 3' - 0" 2' - 6" 2' - 6"

2 5/8"

3' - 0" 2' - 6" 2' - 6"

FP

FP

8' - 2 5/8"

12"D SOLID SS-1

SURFACE

TRANSACTION TOP

SEE DETAIL 6/A-502

24"D SS-1 SOLID

SURFACE

COUNTERTOP

G

S

24"D SS-1 SOLID

SURFACE

COUNTERTOP

S

G

6' - 2 3/8"

24"D STAINLESS

STEEL

COUNTERTOP AND

BACKSPLASH

3' - 0"2' - 6"2' - 9" 1' - 9" 3' - 0" 2' - 6"

2' - 6"2' - 9" 2' - 6"3' - 0"1' - 9"

7' - 3"FP FP

FP

FP

SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

S

GG

G

24"D SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

2' - 0" 2' - 0"

4' - 0"

4' - 0"

THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK AND

ARE IN ADDITION TO THE GENERAL FINISH NOTES.

A. FIELD VERIFY ALL CASEWORK AND SHELVING DIMENSIONS.

B. ALL SHELVING SHOWN WITH DASHED LINES TO BE

ADJUSTABLE

C. COUNTERTOPS TO HAVE 1/2" RADIUS AT EXPOSED

CORNERS.

D. USE BLACK 2 1/2" DIAMETER GROMMETS WHERE

GROMMETS ARE INDICATED.

E. PROVIDE FINISHED END PANEL AT EXPOSED CASEWORK

ENDS AND BACKS AS NEEDED. PANEL TO MATCH PLASTIC

LAMINATE, STAINLESS STEEL OR MELAMINE FINISH, BASED

ON CABINET TYPE.

F. ADD FILLER PANEL AS NEEDED AT CABINETS, WARDROBES,

DRAWERS, APPLIANCES, ETC. TO ENSURE FULL DOOR

SWING AND DRAWER OPERATION.

G. ALL UPPER CABINETS TO BE 15"D OUT TO OUT UNLESS

NOTED OTHERWISE.

H. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF

CABINET DOOR FACE.

I. ALL BASE CABINETS TO BE 23" DEEP UNLESS NOTED

OTHERWISE.

J. ALL COUNTERTOPS TO HAVE POST FORM PROFILE.

K. ALL COUNTERTOPS ARE 1 1/2" THICK WITH 4" HIGH

BACK/SIDE SPLASHES UNLESS NOTED OTHERWISE

L. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD

BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE

REQUIRED TO BE SECURED TO THE WALLS. REFERENCE

MECHANICAL, PLUMBING, ELECTRICAL AND TECHNOLOGY

DRAWINGS. COORDINATE WITH FURNITURE SUPPLIER

WHERE APPROPRIATE.

M. ALL WALL CABINETS TO HAVE SLOPE TOPS UNLESS A

BULKHEAD IS PRESENT.

N. SEE SHEET A-512 FOR TYPICAL CABINET SECTIONS

SS-2 SOLID SURFACE 1/2" THICK

RB-1

SS-2 SOLID SURFACE

1/2" THICK

METAL BRACKET

3-0" O.C.

3/4" PLYWOOD

RB-1

SS-2 SOLID SURFACE

1/2" THICK

1' - 0"

BLOCKING AS NEEDED

ELECTRICAL

RACEWAY

OPENINGS

2' - 1 3/8"

2' - 6"

GROMMET

BUMPER RAIL

4' - 0"

24"D SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

2' - 6" 2' - 6" 2' - 6"

2' - 6"

24"D SS-1 SOLID

SURFACE

COUNTERTOP AND

BACKSPLASH

7' - 6"

SS-2

SS-2

2' - 11 1/4"

1' - 0"

2' - 11"

SS-2

SS-2

1' - 0"

2' - 11 1/2" 2' - 6" ANGLED

SS-2

SS-2

1/4" = 1'-0" A-511

13 NURSE STATION B

1/4" = 1'-0"

A-511

11 NURSE STATION A

1/4" = 1'-0"

A-511

12 NURSE STATION FRONT

1/4" = 1'-0" A-511

7 SOILED 214

1/4" = 1'-0" A-511

9 MEDS

1/4" = 1'-0"

A-511

8 ANTEROOM

1/4" = 1'-0" A-511

6 STAFF LOUNGE

1/4" = 1'-0"

A-511

3 RECEPTION CHECK IN

1/4" = 1'-0"

A-511

1 RECEPTION A

1/4" = 1'-0"

A-511

2 RECEPTION B

1/4" = 1'-0" A-511

18 IMMEDIATE STERILE

1/4" = 1'-0"

A-511

17 DICTATION

1/4" = 1'-0" A-511

5 CONSULTATION

N

1" = 1'-0" A-511

19 NURSE STATION DESK

STAINLESS STEEL CASEWORK

STAINLESS STEEL CASEWORK

1/4" = 1'-0" A-511

4 REFRESHMENT

1/4" = 1'-0" A-511

10 NOURISHMENT

1/4" = 1'-0" A-511

15 NURSE STATION EAST END

1/4" = 1'-0"

A-511

16 NURSE STATION NORTH END

1/4" = 1'-0"

A-511

14 NURSE STATION D

A-511

20 CARE STATION 3D

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:0

P M

A-511

CASEWORK ELEVATIONS AND

SCHEDULE

20 28ELI

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

DocuSign Envelope ID: AD5C8165-2F2B-4459-976A-BADC963CBCAB

11/14/2019

ADJ.

SHELF

R E

F E

R T

O E

L E

V S

1'-11"

REMOVEABLE PANEL,

ATTACH TO CLEATS

WITH NICKEL PLATED SCREWS

AND FINISH WASHERS. MATCH

REVEAL AND EDGE TREATMENT OF

DOORS AND DRAWERS.

1'-11"

R E

F E

R T

O E

L E

V S

E Q

E

Q

E Q

R E

F E

R T

O E

L E

V S

1'-11"

REFER TO

ELEVATIONS &

SECTIONS FOR

CABINET TYPE

LIGHT

VALANCE IS

3/4" X 2"

WHERE

CALLED FOR

ON THE

ELEVATIONS

(LV)

3/4" ANGLE BRACE

@ 36" O.C

ANGLE CLIPS

FINISHED

CEILING LINE

COND. @

SLOPED SOFFIT

EXTENDED SOFFIT FIN.

END PANEL PASSED CAB.

FIN END 3/8"H MIN.

MATCHING

"T" MOULD

EDGE

WRAP

CONT.-ALL

SIDES

FLUSH OVERLAY HINGE

5 KNUCKLE HINGE

CUT OUT DOOR TO

FLUSH

HINGE TO "T" MOULD

"T" MOULD CONT. AROUND

DOOR (BUTT FLUSH AGAINST

ENDS OF HINGE)

CUT END PIECES

TO BE EASED

EDGE

CAULK-SEE SCRIBE DETAIL

COUNTERTOP-

CAULK

TO SPLASH

3/4" PLYWOOD

ALL TOPS SHALL BE

SCRIBED TO WALL

PRIOR TO

INSTALLATION &

CAULKED

1" R. ALL EXPOSED CORNERS

EXPOSED EDGE

TRIM EDGE OF

SOLID SURFACE

@ THE FORMED

BACK SPLASH

EASED EDGES

2 ADJ.

SHELVES

2" DIA. GROMMET

WITH

RETRACTABLE,

SELF STORING

SLOT

LIGHT VALANCEPLAM SLOPED TOP TYP. CABINET

DRAWER PLAN VIEW

TYP. CABINET

DRAWER ELEVATION

OPEN END ELEVATION SPLASH END ELEVATION

SPLASH END PLANOPEN END PLAN

SCRIBE DETAIL

TYPICAL ADA SINK BASE

TYPICAL ONE DOOR BASETYPICAL FOUR DRAWER BASE

V A

R

IE

S

1" 3

1"

1"

/4

/4

1" 2'-0"

1" 2'-0"1 /2

/4

1/2"

/4

R 1"

R E

F E

R T

O E

L E

V S

R E

F E

R T

O E

L E

V S

R E

F E

R T

O E

L E

V S

R E

F E

R T

O E

L E

V S

1'-3"

2"

SOLID SURFACE COUNTERTOP

GROMMET DETAIL

TYPICAL 30"H WALL CABINET

TYPICAL 18"H WALL CABINET

REF TO ELEVS

1'-11"

E Q

E Q

R E

F E

R T

O E

L E

V S

TYPICAL THREE DRAWER BASE

REF TO ELEVS

1'-3"

2'-0"

END PANEL

V.I.F.

2' -0

TYPICAL ONE DOOR AND 1 DRAWER BASE

ADJ.

SHELF

1'-11"

R E

F E

R T

O E

L E

V S

ADA

COMPLIANT

SINK

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:0

P M

A-512

CASEWORK DETAILS

21 28ELI

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

CASEWORK DETAILS

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

CR-1

CHR-1

BR-1

HR-1 HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

SS-2 SOLID SURFACE

WAINSCOT 5'-0"H (ALL

THREE WALLS AROUND

SINK)

BR-1

A5075 A5082

BR-1

BR-1

A5077

HR-1

BR-1

SS-2 SOLID SURFACE

WAINSCOT 5'-0"H (ALL THREE

WALLS AROUND SINK)

A5075 A5082

BR-1

WP-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1

HR-1

BR-1 3

HR-1

BR-1 BR-1

HR-1

BR-1

HR-1

CG-1 CG-1

U0007 A5145A5145A5145A5145

BR-1

BR-1 BR-1 BR-1 BR-1 BR-1

M0512 A1014

M1802

BR-1

HR-1

BR-1

WP-1

BR-1 BR-1BR-1 BR-1

BR-1 BR-1

SS-2 SOLID SURFACE

WAINSCOT 5'-0"H (ALL

THREE WALLS AROUND

SINK)

A5075

A5082

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:1

P M

A-513

WALL PROTECTION ELEVATIONS

22 28ELI

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

1/4" = 1'-0" A-513

3 CORRIDOR C203-2 SOUTH

1/4" = 1'-0" A-513

8 TYPICAL PRE/POST OP & PACU HEADWALL

1/4" = 1'-0" A-513

1 TYPICAL WAITING (PERIMETER OF ROOM)

1/4" = 1'-0"

A-513

2 CORRIDOR C203-2 NORTH

1/4" = 1'-0" A-513

5 CORRIDOR C208-02 WEST

1/4" = 1'-0"

A-513

6 CORRIDOR C208-02 EAST

1/4" = 1'-0"

A-513

7 CORRIDOR C206-02 NORTH

1/4" = 1'-0" A-513

11 CORRIDOR C206-02 SOUTH A

1/4" = 1'-0"

A-513

9 TYPICAL MEDS/IMMEDIATE STERILE

1/4" = 1'-0" A-513

20 TYPICAL HAC

1/4" = 1'-0" A-513

12 CORRIDOR C206-02 EAST

1/4" = 1'-0"

A-513

13 CORRIDOR C207-02 SOUTH

1/4" = 1'-0" A-513

14 CORRIDOR C207-02 WEST A

1/4" = 1'-0"

A-513

15 ALCOVE C207-02 WEST

1/4" = 1'-0"

A-513

16 ALCOVE C207-02 EAST

1/4" = 1'-0" A-513

17 STERILE CORE 252 EAST

1/4" = 1'-0"

A-513

19 STERILE CORE 252 NORTH

1/4" = 1'-0"

A-513

18 STERILE CORE 252 WEST

BR-1: BUMPER RAIL

CG-1: CORNER GUARD

CHR-1: CHAIR RAIL

CR-1: CRASH RAIL

HR-1: HANDRAIL

WP-1: WALL PROTECTION SHEET

1/4" = 1'-0" A-513

10 CORRIDOR C206-02 SOUTH B

1/4" = 1'-0" A-513

22 TYPICAL EQUIPMENT

1/4" = 1'-0"

A-513

21 STERILE CORE 252 SOUTH

1/4" = 1'-0" A-513

23 PASSAGE 248B EAST

1/4" = 1'-0" A-513

24 PASSAGE 248A WEST

PERIMETER OF ROOM

1/4" = 1'-0" A-513

4 CARE STATION C208-02 WEST

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

HR-1

BR-1

HR-1 HR-1

BR-1

HR-1

BR-1

BR-1

BR-1 BR-1

BR-1 BR-1

HR-1

BR-1

A5082

A5075 A1012 A5082

A5075

A1012

A5075

HR-1

BR-1

HR-1

BR-1

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:1

P M

A-514

WALL PROTECTION ELEVATIONS

23 28Author

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

Checker

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0" A-514

3 CORRIDOR CORRIDOR C201-2 NORTH

1/4" = 1'-0" A-514

4 CORRIDOR C201-2 SOUTH

1/4" = 1'-0" A-514

1 CORRIDOR CS01-38 WEST

BR-1: BUMPER RAIL

CG-1: CORNER GUARD

CHR-1: CHAIR RAIL

CR-1: CRASH RAIL

HR-1: HANDRAIL

WP-1: WALL PROTECTION SHEET

1/4" = 1'-0" A-514

2 CORRIDOR CS01-38 EAST

A

TOILET

TOILET

STAFF

LOUNGE

PSA

N. MANAGER

OFFICE

CONSULTATION

ELECTRICAL

ELECTRICAL

HAC

CORRIDOR

C203-38

SOILED

EQUIPMENT

WOMEN'S

LOCKER

STAFF

TOILET

MEN'S

LOCKER

CORRIDOR

C201-38

CORRIDOR

C201-02

STAFF

TOILET

CORRIDOR

C202-02

OR

OR

OR

CLEAN

SUPPLY

STERILE

CORE

CORRIDOR

205-02

IMMED.

STER.

PACU

PACU

PACU

CORRIDOR

C204-2

9/A-511

/A

-5

/A

-5

11/A-511

12/A-511

/A

-5

7/A-511

/A

-5

2/A-511

3/A-511

18/A-511

17/A-511

BIO-MED

/A

-5

CORRIDOR

C206-02

CORRIDOR

C203-02

ALCOVE

C207-02A

STORAGE

STAIR

S2-02

CHASE

P-2

P-2

P-2

P-2

P-3

P-2

P-3

10/A-511

/A

-5

STAFF

TOILET

PRE/POST

PRE/POST

PRE/POST

ALCOVE

C206-02A

PRE/POST

PRE/POST

PRE/POST

PRE/POST

DICTATION

255CARE

STATION

MEDS

ANTEROOM

ISOLATION

TOILET

TOILET

SOILED

HAC

RECEPTION

ANESTHESIA

SCRUB

STATION

249B

SCRUB

STATION

250A

SCRUB

STATION

247A

CARE

STATION

249A

CORRIDOR

C207-02

CORRIDOR

C208-02

WAITING

P-2

P-2

P-2

P-2

P-2

CORRIDOR

C202-39

P-2

P-2

P-2

16/A-511

/A

-5

/A

-5

STAIR

S1-02

P-2

/A

-5

MN K G F

E D C B A

43/I-411

ELEVATOR

LOBBY

C202-38

OFFICE

P-2

A. REFERENCE ROOM FINISH SCHEDULE AND FINISH MATERIAL

LEGEND FOR MORE INFORMATION.

B. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL

CEILING INFO.

C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR, WALL, AND

CEILING MATERIALS, SHALL BE IN ACCORDANCE WITH FLAME

SPREAD AND SMOKE DEVELOPMENT REQUIREMENTS FOUND IN

THE CURRENT EDITION OF THE INTERNATIONAL BUILDING CODE.

D. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL

NEW INTERIOR WALL AND CEILING FINISHES WILL BE CLASS B

MINIMUM, WITH A FLAME SPREAD RATING OF 75 MAXIMUM AND A

SMOKE DEVELOPED INDEX OF 450 MAXIMUM PER IBC SECTION

E. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR

EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH

MANUFACTURER’S RECOMMENDED INSTALLATION METHODS

AND MATERIALS FOR ALL FINISHES.

F. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR

SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED

UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE

NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT

THE ARCHITECT WITH THE CONCERN. PROCEEDING WITH THE

INSTALLATION OF FINISHES WILL BE INDICATION THAT THE

INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.

G. USE MANUFACTURER'S RECOMMENDED INSTALLATION

METHODS AND MATERIALS FOR ALL FINISHES.

H. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE

PROVIDED AND INSTALLED BY FLOORING CONTRACTOR

I. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA

GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM

SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS

APPROVAL PRIOR TO INSTALLATION.

J. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO

BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED

POSITION

K. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT

DOORS, U.N.O.

L. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN

CABINETS.

M. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4,

U.N.O.

N. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED

OTHERWISE.

O. ALL GYP. BOARD CEILINGS TO BE PAINTED P-1, U.N.O.

P. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE

BASE COAT AND (2) TWO FINISH COATS

Q. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL

WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL

DOORS AND METAL FRAMES TO BE SEMI-GLOSS.

R. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE

EXTINGUISHER CABINETS, ETC. WITH PAINT TO MATCH

ADJACENT SURFACE.

S. ALL NEW INTERIOR WINDOW SILLS TO BE SS-2, UNLESS NOTED

OTHERWISE.

T. ALL METAL DOORS AND FRAMES TO BE PAINTED P-5.

CORNER GUARD

CERAMIC WALL TILE

EPOXY PAINT

PAINT

PLASTIC LAMINATE

PORCELAIN TILE - FLOOR

PORCELAIN TILE - BASE

RUBBER BASE

SEALED CONCRETE

SOLID SURFACE

WELDED SHEET FLOORING

WELDED SHEET FLOORING BASE

WALL PROTECTION

LUXURY VINYL TILE

RESINOUS FLOORING

RESINOUS BASE

CG

CWT

EP

P

PL

PT

PTB

RB

SC

SS

WSF

WSFB

WP

LVT

RES

RESB

FINISH LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:2

P M

AI101

SECOND FLOOR FINISH PLAN

25 28ELI

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

2, 38

ELI

1/8" = 1'-0"

AI101

1 SECOND FLOOR FINISH PLAN

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

ROOM FINISH SCHEDULE

Room Number Room Name Floor Finish Base Finish

North Wall Finish

East Wall Finish

South Wall Finish

West Wall Finish Comments

CHASE EXISTING

205 MEN'S LOCKER PT-1 PTB-1 EP-1 EP-1 EP-1 EP-1

205-02 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

206 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

207 WOMEN'S LOCKER PT-1 PTB-1 EP-1 EP-1 EP-1 EP-1

208 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

209 EQUIPMENT WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

210 ELECTRICAL EXISTING

212 STAFF LOUNGE LVT-1 RB-1 P-1 P-1 P-2 P-1

213 ANESTHESIA WSF-1 WSFB-1 P-1 P-1 P-1 P-1

214 SOILED RES-1 RESB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

215 HAC PT-1 PTB-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 CWT-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

216 ELECTRICAL EXISTING

220 PSA LVT-1 RB-1 P-1 P-1 P-2 P-1

221 OFFICE LVT-1 RB-1 P-2 P-1 P-1 P-1

222 CONSULTATION LVT-1 RB-1 P-1 P-1 P-1 P-2

223 WAITING LVT-1 RB-1 P-1 P-1 P-1 P-3

224 RECEPTION LVT-1 RB-1 P-1 P-1 P-2 P-1

225 BIO-MED LVT-1 RB-1 P-1 P-1 P-1 P-1

226 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

227 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

228 N. MANAGER OFFICE LVT-1 RB-1 P-2 P-1 P-1 P-1

229 SOILED WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

230 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-1 P-2

231 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-1 P-2

232 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2

233 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2

234 PRE/POST WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-2

235 PRE/POST WSF-1/2 WSFB-1 P-1 P-1 P-1 P-2

236 ANTEROOM WSF-1 WSFB-1 EP-1 EP-1 EP-1 EP-1

237 ISOLATION WSF-1 WSFB-1 EP-1 EP-2 EP-1 EP-1

238 CARE STATION WSF-2/3 WSFB-2/3 P-3 P-1 P-1 P-1

239 MEDS WSF-1 WSFB-1 P-1 P-1 P-1 P-1

241 PRE/POST WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-2 P-1

242 PACU WSF-1/2/3 WSFB-1/2/3 P-1 P-1 P-2 P-1

243 PACU WSF-1/2 WSFB-1/2 P-1 P-1 P-2 P-1

244 PACU WSF-1/2 WSFB-1/2 P-1 P-1 P-2 P-1

245 CLEAN SUPPLY WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

246 HAC PT-1 PTB-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 EP-1/CWT-1 CWT-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

247 SOILED WSF-1 WSFB-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 EP-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

247A SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

248 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1

249A CARE STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

249B SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

250 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1

250A SCRUB STATION RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

251 OR RES-1/RES-2 RESB-1 EP-1 EP-1 EP-1 EP-1

252 STERILE CORE RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

253 IMMED. STER. RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

255 DICTATION WSF-1 WSFB-1 P-1 P-1 P-1 P-1

256 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

257 TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

258 STAFF TOILET PT-1 PTB-1 CWT-1/2 CWT-1/2 CWT-1/2 CWT-1/2

259 STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1

C201-02 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

C201-38 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1

C202-02 CORRIDOR WSF-1/2 WSFB-2 P-1 P-1 P-1 P-1

C202-38 ELEVATOR LOBBY LVT-1 RB-1 P-1 P-1 P-1 P-1

C202-39 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1

C203-02 CORRIDOR WSF-1/2 WSFB-1/2 P-1 P-1 P-1 P-1

C203-38 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

C204-2 CORRIDOR RES-1 RESB-1 EP-1 EP-1 EP-1 EP-1

C206-02 CORRIDOR WSF-1/2/3 WSFB-2/3 P-1 P-1 P-1/SS-2 P-1 SS-2 TO BE BEHIND AND SIDES OF

SINKS AT 5'-0"AFF

C206-02A ALCOVE WSF-2 WSFB-2 P-1/WP-1 P-1/WP-1 P-1/WP-1 P-1/WP-1

C207-02 CORRIDOR WSF-1/2 WSFB-2 P-1 P-1 P-1 P-1

C207-02A ALCOVE WSF-1/2 WSFB-2 P-1/WP-1 P-1/WP-1 P-1/WP-1 P-1/WP-1 WP-1 @ 4'-0'H WAINSCOT

PERIMETER OF ROOM

C208-02 CORRIDOR WSF-1/2/3 WSFB-1/2/3 P-1 P-1/SS-2 P-1 P-1/SS-2 SS-2 TO BE BEHIND AND SIDES OF

SINKS AT 5'-0"AFF

S1-02 STAIR EXISTING

S2-02 STAIR EXISTING

N

TOILET

TOILET

STAFF

LOUNGE

PSA

N. MANAGER

OFFICE

CONSULTATION

ELECTRICAL

ELECTRICAL

HAC

CORRIDOR

C203-38

SOILED

EQUIPMENT

WOMEN'S

LOCKER

STAFF

TOILET

MEN'S

LOCKER

CORRIDOR

C201-38

CORRIDOR

C201-02

STAFF

TOILET

CORRIDOR

C202-02

OR

OR

OR

CLEAN

SUPPLY

STERILE

CORE

CORRIDOR

205-02

IMMED.

STER.

PACU

PACU

PACU

CORRIDOR

C204-2

BIO-MED

CORRIDOR

C206-02

CORRIDOR

C203-02

ALCOVE

C207-02A

STORAGE

STAIR

S2-02

CHASE

2' - 0"

R

' - 0 " R

R

STAFF

TOILET

PRE/POST

PRE/POST

PRE/POST

ALCOVE

C206-02A

PRE/POST

PRE/POST

PRE/POST

PRE/POST

DICTATION

CARE

STATION

MEDS

ANTEROOM

ISOLATION

TOILET

TOILET

SOILED

HAC

RECEPTION

ANESTHESIA

SCRUB

STATION

249B

SCRUB

STATION

250A

SCRUB

STATION

247A

CARE

STATION

249A

CORRIDOR

C207-02

CORRIDOR

C208-02

WAITING

CORRIDOR

C202-39

2' - 0"

R 3' - 0"

1' - 6"

1' - 6"

1' - 6"

R 3' - 0"

1' - 6" 1' - 6"

2'

- 0

"1

3' - 0"

9' - 8"

MN K G F

E D C B A

STAIR

S1-02

ELEVATOR

LOBBY

C202-38

OFFICE

A. REFERENCE ROOM FINISH SCHEDULE AND FINISH MATERIAL

LEGEND FOR MORE INFORMATION.

B. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL

CEILING INFO.

C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR, WALL, AND

CEILING MATERIALS, SHALL BE IN ACCORDANCE WITH FLAME

SPREAD AND SMOKE DEVELOPMENT REQUIREMENTS FOUND IN

THE CURRENT EDITION OF THE INTERNATIONAL BUILDING CODE.

D. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL

NEW INTERIOR WALL AND CEILING FINISHES WILL BE CLASS B

MINIMUM, WITH A FLAME SPREAD RATING OF 75 MAXIMUM AND A

SMOKE DEVELOPED INDEX OF 450 MAXIMUM PER IBC SECTION

E. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR

EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH

MANUFACTURER’S RECOMMENDED INSTALLATION METHODS

AND MATERIALS FOR ALL FINISHES.

F. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR

SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED

UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE

NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT

THE ARCHITECT WITH THE CONCERN. PROCEEDING WITH THE

INSTALLATION OF FINISHES WILL BE INDICATION THAT THE

INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.

G. USE MANUFACTURER'S RECOMMENDED INSTALLATION

METHODS AND MATERIALS FOR ALL FINISHES.

H. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE

PROVIDED AND INSTALLED BY FLOORING CONTRACTOR

I. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA

GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM

SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS

APPROVAL PRIOR TO INSTALLATION.

J. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO

BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED

POSITION

K. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT

DOORS, U.N.O.

L. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN

CABINETS.

M. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4,

U.N.O.

N. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED

OTHERWISE.

O. ALL GYP. BOARD CEILINGS TO BE PAINTED P-1, U.N.O.

P. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE

BASE COAT AND (2) TWO FINISH COATS

Q. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL

WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL

DOORS AND METAL FRAMES TO BE SEMI-GLOSS.

R. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE

EXTINGUISHER CABINETS, ETC. WITH PAINT TO MATCH

ADJACENT SURFACE.

S. ALL NEW INTERIOR WINDOW SILLS TO BE SS-2, UNLESS NOTED

OTHERWISE.

T. ALL METAL DOORS AND FRAMES TO BE PAINTED P-5.

FINISH KEY

WSF-2

WSF-3

WSF-1

RES-2

LVT-1 (PATTERN TO BE

HERRINGBONE)

LVT-1 (PATTERN TO BE 1/3 RUNNING

BOND) AS DIRECTION SHOWN IN THE

ROOM

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:2

P M

AI102

FLOOR PATTERN FLOOR PLAN

26 28Author

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

1/8" = 1'-0"

AI102

1 SECOND LEVEL_FLOOR PATTERN

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

N

G.W.B.

(BY OTHERS)

STEEL STUD

(BY OTHERS)

ACROVYN 4000 COVER

(24U004xxx)

ACROVYN CHAMELEON

(24U622xxx)

ALUMINUM RETAINER

(24A340000)

#6 X 1 5/8" BUGLE HD SMS

18" [457.2mm] MAX.

R1/4" [R6.4mm]

2" [50.8mm]

3/8" [9.5mm]

A

TOILET

TOILET

STAFF

LOUNGE

PSA

N. MANAGER

OFFICE

CONSULTATION

ELECTRICAL

ELECTRICAL

HAC

CORRIDOR

C203-38

SOILED

EQUIPMENT

WOMEN'S

LOCKER

STAFF

TOILET

MEN'S

LOCKER

CORRIDOR

C201-38

CORRIDOR

C201-02

STAFF

TOILET

CORRIDOR

C202-02

OR

OR

OR

CLEAN

SUPPLY

STERILE

CORE

CORRIDOR

205-02

IMMED.

STER.

PACU

PACU

PACU

CORRIDOR

C204-2

3/A-513

BIO-MED

STORAGE

CORRIDOR

C206-02

CORRIDOR

C203-02

ALCOVE

C207-02A

STAIR

S2-02

CHASE

/A

-5

/A

-5

2/A-513

/A

-5

7/A-513

11/A-513 12 /A

-5

/A

-5

13/A-513

/A

-5

/A

-5

/A

-5

/A

-5

/A

-5

/A

-5

/A

-5

/A

-5

19/A-513

20/A-513

3/A-514

4/A-514

/A

-5

/A

-5

21/A-513

1 1

1 1

1 1

1 1 1 1

1 1

10/A-513

22/A-513

/A

-5

/A

-5

/A

-5

/A

-5

/A

-5

8/A-513 8/A-513 8/A-513 8/A-513

/A

-5

STAFF

TOILET

PRE/POST

PRE/POST

PRE/POST

ALCOVE

C206-02A

PRE/POST

PRE/POST

PRE/POST

PRE/POST

DICTATION

CARE

STATION

MEDS

ANTEROOM

ISOLATION

TOILET

TOILET

SOILED

HAC

RECEPTION

ANESTHESIA

SCRUB

STATION

249B

SCRUB

STATION

250A

SCRUB

STATION

247A

CARE

STATION

249A

CORRIDOR

C207-02

CORRIDOR

C208-02

WAITING

9/A-513

/A

-5

MN K G F

E D C B A

/A

-5

4 CORRIDOR

C202-39

STAIR

S1-02

ELEVATOR

LOBBY

C202-38

OFFICE

1. ALL CORNER GUARDS TO BE FROM TOP OF BASE TO CEILING

2. PROVIDE BLOCKING IN WALLS BEHIND HAND/CRASH RAILS

AND BUMPER RAILS

FINISHED FLOOR

VINYL BASE (6")

FINISHED WALL

HANDRAIL

T.O. HANDRAIL TO BE 36".

TYPICAL HANDRAIL

BLOCKING

RESILIENT CONTACT SURFACE

BUMPER

NEOPRENE CUSHION AT EACH

FASTENING

FINISHED FLOOR

5" INTEGRAL COVE BASE

FINISHED WALL

S E

E E

L E

V A

T

IO

N

V A

R

IE

S

WALL

PROTECTION

METAL CAP BY WALL

PROTECTION MFR.

TYPICAL WALL PROTECTION

FINISHED FLOOR

BASE VARIES

TYPICAL BUMPER

RESILIENT CONTACT SURFACE

BUMPER

NEOPRENE CUSHION AT EACH

FASTENING

FINISHED FLOOR

BASE VARIES

TYPICAL CHAIR RAIL

RESILIENT CHAIR RAIL

NEOPRENE CUSHION AT EACH

FASTENING

1 CORNER GUARD

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:3

P M

AI103

WALL PROTECTION FLOOR PLAN AND

DETAILS

27 28ELI

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

1/8" = 1'-0"

AI103

1 WALL PROTECTION FLOOR PLAN

1" = 1'-0"

AI103

2 WALL PROTECTION DETAILS

6" = 1'-0"

AI103

3 CORNER GUARD DETAIL

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

N

TOILET

TOILET

STAFF

LOUNGE

PSA

N. MANAGER

OFFICE

CONSULTATION

ELECTRICAL

210 ELECTRICAL

HAC

CORRIDOR

C203-38

SOILED

EQUIPMENT

WOMEN'S

LOCKER

STAFF

TOILET

MEN'S

LOCKER

CORRIDOR

C201-38

CORRIDOR

C201-02

STAFF

TOILET

258 CORRIDOR

C202-02

OR

OR

OR

CLEAN

SUPPLY

STERILE

CORE

CORRIDOR

205-02

IMMED.

STER.

PACU

PACU

PACU

CORRIDOR

C204-2

BIO-MED

38-02-N009

38-02-N008

38-02-N002

38-02-N007

38-02-N005

38-02-N006

38-02-N012

38-02-N014

38-02-N013

38-02-N017

38-02-N016

02-02-N030

38-02-N018

02-02-N031 02-02-N029 02-02-N028

02-02-N027

02-02-N024

02-02-N023

02-02-N026 02-02-N025

02-02-N020

02-02-N021

02-02-N016

02-02-N010

02-02-N018

02-02-N009

02-02-N022

02-02-N011

02-02-N012

02-02-N013

02-02-N014

02-02-N004

02-02-N001

38-02-N015

02-02-N002

02-02-N019

CORRIDOR

C206-02

CORRIDOR

C203-02

ALCOVE

C207-02A

STORAGE

STAIR

S2-02

CHASE

STAFF

TOILET

PRE/POST

PRE/POST

PRE/POST

ALCOVE

C206-02A

PRE/POST

PRE/POST

PRE/POST

PRE/POST

DICTATION

CARE

STATION

MEDS

ANTEROOM

ISOLATION

TOILET

TOILET

SOILED

HAC

RECEPTION

ANESTHESIA

SCRUB

STATION

249B

SCRUB

STATION

250A

SCRUB

STATION

247A

CARE

STATION

249A

CORRIDOR

C207-02

CORRIDOR

C208-02

WAITING

CORRIDOR

C202-39

02-02-N015

02-02-N017

02-02-N007

02-02-N008

38-02-N004 38-02-N003

38-02-N001

38-02-N010

38-02-N011

38-02-N019

02-02-N003

02-02-N00502-02-N006

MN K G F

E D C B A

STAIR

S1-02

ELEVATOR

LOBBY

C202-38

OFFICE

38-02-N003A

02-02-N032

02-02-N033

249246

241A

242A

238C 237

235236238A238B

251250248

260261262

275 276 277

MOUNTING LEGEND

WM = WALL MOUNTED

DM = DOOR MOUNTED

FM = FLAG MOUNTED

BM = BULKHEAD MOUNTED

CM= CEILING MOUNTED

SIGN GENERAL NOTES:

1. CONTRACTOR TO COORDINATE THE TEXT OF SIGN

INSERTS WITH COR

2. SIGNS TO MATCH VA MARION CAMPUS SIGNAGE

STANDARDS. COLORS TO BE DETERMINED BY FACILITIES.

RED

YELLOW

WHITE

BLUE

DETAIL OF SIGN: IN-01.15

o o ox

XXX-XX-XXXX

FLOOR NUMBER

SIGN NUMBER

NEW SIGN DESIGNATION

BUILDING NUMBER

SIGN DESIGNATION:

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:4

:3

P M

AI104

SIGNAGE FLOOR PLAN AND SCHEDULE

28 28Author

RELOCATE AND UPGRADE

OPERATING SUITES-

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/2019

100% CONSTRUCTION DOCUMENTS

657-501

ELI

1/8" = 1'-0"

AI104

1 SECOND FLOOR SIGNAGE PLAN

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/8" = 1'-0"

AI104

2 TYPICAL ROOM SIGN

3/32" = 1'-0"

AI104

3 TYPICAL DIRECTIONAL SIGNAGE

N

SIGNAGE SCHEDULE

Mark Type Sign Type Sign Type Name Proposed Content Sign

Mounting VA Room Number

02-02-N001 IN-04.01 Primary Room Identification Room 216: Insert: Electrical WM 247

02-02-N002 IN-15.55b Department ID Insert: Pre/Post Op arrow CM

02-02-N003 IN-04.01 Primary Room Identification Room 210: Insert: Electrical WM 258

02-02-N004 IN-04.01 Primary Room Identification Room 259: Insert: Storage WM 257

02-02-N005 IN-09.03 Restroom Identification Room 258: Insert: Symbol:

Women-Men-Accessible Text: Restroom

WM 260

02-02-N006 IN-09.03 Restroom Identification Room 257: Insert: Symbol:

Women-Men-Accessible Text: Restroom

WM 261

02-02-N007 IN-04.01 Primary Room Identification Room 230: Insert: Pre/Post Op WM 263

02-02-N008 IN-04.01 Primary Room Identification Room 231: Insert: Pre/Post Op WM 265

02-02-N009 IN-09.03 Restroom Identification Room 256: Insert: Symbol:

Women-Men-Accessible Text: Restroom

WM 262

02-02-N010 IN-04.01 Primary Room Identification Room 237: Insert: Isolation WM 264

02-02-N011 IN-04.01 Primary Room Identification Room 232: Insert: Pre/Post Op WM 267

02-02-N012 IN-04.01 Primary Room Identification Room 233: Insert: Pre/Post Op WM 269

02-02-N013 IN-04.01 Primary Room Identification Room 234: Insert: Pre/Post Op WM 271

02-02-N014 IN-04.01 Primary Room Identification Room 235: Insert: Pre/Post Op WM 273

02-02-N015 IN-04.01 Primary Room Identification Room 238: Insert: Nurse Station WM 272

02-02-N016 IN-04.01 Primary Room Identification Room 255: Insert: Dictation WM 270

02-02-N017 IN-04.01 Primary Room Identification Room 239: Insert: Meds WM 268

02-02-N018 IN-04.01 Primary Room Identification Room 236: Insert: Anteroom WM 266

02-02-N019 IN-04.01 Primary Room Identification Room 242-244: Insert: PACU WM 275,276,27

02-02-N020 IN-04.01 Primary Room Identification Room 246: Insert: Housekeeping WM 255

02-02-N021 IN-04.01 Primary Room Identification Room 245: Insert: Clean Supply WM 254

02-02-N022 IN-04.01 Primary Room Identification Room 247: Insert: Soiled Utility WM 256

02-02-N023 IN-04.01 Primary Room Identification Room 253: Insert: Immediate Sterile WM 253

02-02-N024 IN-04.01 Primary Room Identification Room 253: Insert: Immediate Sterile WM 253

02-02-N025 IN-04.01 Primary Room Identification Room 250: Insert: Operating Room WM 250

02-02-N026 IN-04.01 Primary Room Identification Room 248: Insert: Operating Room WM 248

02-02-N027 IN-04.01 Primary Room Identification Room 251: Insert: Operating Room WM 251

02-02-N028 IN-04.01 Primary Room Identification Room 251: Insert: Operating Room WM 251

02-02-N029 IN-04.01 Primary Room Identification Room 250: Insert: Operating Room WM 250

02-02-N030 IN-04.01 Primary Room Identification Room 209: Insert: Equipment WM 249

02-02-N031 IN-04.01 Primary Room Identification Room 248: Insert: Operating Room WM 248

02-02-N032 IN-04.01 Primary Room Identification Room 252: Insert: Sterile Core WM 252

02-02-N033 IN-04.01 Primary Room Identification Room 241: Insert: Pre/Post Op WM 274

38-02-N001 IN-04.01 Primary Room Identification Room 225: Insert: Bio-Med WM 235

38-02-N002 IN-04.01 Primary Room Identification Room 220: Insert: PSA Office WM 237

38-02-N003 IN-04.01 Primary Room Identification Room 228: Insert: Nurse Manager WM 236

38-02-N003A IN-04.01 Primary Room Identification Room 221: Insert: Office WM 238C

38-02-N004 IN-09.03 Restroom Identification Room 227: Insert: Symbol:

Women-Men-Accessible Text: Restroom

WM 238A

38-02-N005 IN-09.03 Restroom Identification Room 226: Insert: Symbol:

Women-Men-Accessible Text: Restroom

WM 238B

38-02-N006 IN-04.01 Primary Room Identification Room 223: Insert: Waiting WM 238

38-02-N007 IN-04.01 Primary Room Identification Room 224: Insert: Reception WM 239

38-02-N008 IN-04.01 Primary Room Identification Room 223: Insert: Waiting WM 238

38-02-N009 IN-04.01 Primary Room Identification Room 222: Insert: Consultation WM 259

38-02-N010 IN-04.01 Primary Room Identification Room 212: Insert: Staff Lounge WM 240

38-02-N011 IN-04.01 Primary Room Identification Room 207: Insert: Women's Locker WM 242

38-02-N012 IN-04.01 Primary Room Identification Room 205: Insert: Men's Locker WM 241

38-02-N013 IN-09.03 Restroom Identification Room 206: Symbol: Women-Men-Accessible Text: Restroom

WM 241A

38-02-N014 IN-09.03 Restroom Identification Room 208: Symbol: Women-Men-Accessible Text: Restroom

WM 242A

38-02-N015 IN-04.01 Primary Room Identification Room 212: Insert: Staff Lounge WM 240

38-02-N016 IN-04.01 Primary Room Identification Room 214: Insert:Soiled WM 243

38-02-N017 IN-04.01 Primary Room Identification Room 213: Insert: Anesthesia WM 246

38-02-N018 IN-04.01 Primary Room Identification Room 215: Insert: Housekeeping WM 245

38-02-N019 IN-15.55b Department ID Insert: Waiting (arrow right) CM

Sheets
A-511 - CASEWORK ELEVATIONS AND SCHEDULE
A-512 - CASEWORK DETAILS
A-513 - WALL PROTECTION ELEVATIONS
A-514 - WALL PROTECTION ELEVATIONS
AI101 - SECOND FLOOR FINISH PLAN
AI102 - FLOOR PATTERN FLOOR PLAN
AI103 - WALL PROTECTION FLOOR PLAN AND DETAILS
AI104 - SIGNAGE FLOOR PLAN AND SCHEDULE
I-001 - FFE AND EQUIPMENT SCHEDULES
I-002 - FFE AND EQUIPMENT SCHEDULES
I-003 - FFE AND EQUIPMENT SCHEDULES
I-101 - OVERALL SECOND FLOOR FFE PLAN
I-401 - ENLARGED TYPICAL FFE PLANS
I-402 - ENLARGED TYPICAL FFE PLANS
I-411 - INTERIOR ELEVATIONS
I-412 - INTERIOR ELEVATIONS
QH101 - BUILDING 02 SECOND FLOOR AREA 'A' EQUIPMENT PLAN
QH102 - BUILDING 02 SECOND FLOOR AREA 'B' EQUIPMENT PLAN
QH103 - BUILDING 38 SECOND FLOOR EQUIPMENT PLAN
2019-11-14T08:25:00-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .