This document package includes construction drawings and specifications for a surgical suite addition project. The scope of work involves constructing three new operating rooms, endovascular services areas, and ambulatory surgical service spaces on the second floor of Building 2 and Building 38 at the Marion VA Medical Center. Infrastructure will be upgraded to meet all VA power requirements. Upon completion, the VA will have a fully operational three operating room inpatient surgical and endovascular services as well as ambulatory surgical facility. The work is solicited under solicitation number 36C25520R0040_1 and project number 657-501. Relevant details are provided regarding mechanical, electrical and architectural requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf | ||
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
SCW
WS
140°
S
W
ST
RS
RL
CWR
CWS
CHWR
CHWS
HHR
HHS
PD
CD
ACD
D
CD
LPC
LPS
MPC
MPS
HPC
HPS
H
T
H
T
RD
RDB
HPSR
HPWS
RV
CAP
LC
M
AV
26-P 3
XX-1
xx
X100
X100
ETR
GENERAL DUCT SYMBOLS
HVAC PIPING SYMBOLS
VALVE SYMBOLS
WASTE
WATER
EXISTING PIPING
FUEL
STORM
MEDICAL GASES
DENTAL
GENERAL PLUMBING SYMBOLS
ANNOTATION
PLUMBING PIPING SYMBOLS
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGE
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET W/
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
TRAP PRIMER LINE - BELOW SLAB (T)
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
PIPE FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
MEDICAL GAS OUTLET (TYPE)
DIVISION 23 PIPE FITTINGS AND ACCESSORIES
DRAIN (D)
CONDENSATE DRAIN (CD)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
T
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
S
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIALLY LEFT BLANK
I
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
M
M METER, SI UNIT
M/s METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
H
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
C
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
EXISTING TO REMAIN
CO
LIMIT OF DEMOLITION
A
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW FOD
26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
BUILDING NO. WHERE EQUIP. IS LOCATED
10x8AUTOMATIC BALANCING CONTROL VALVE
WYE STRAINER (WITH BALL VALVE
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
QUICK-COUPLE HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER
FLOW METER
EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED
EXISTING DUCTWORK OR EQUIPMENT TO REMAIN
BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH
BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL
RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN
FITTING AND MANUAL VOLUME DAMPER
SUPPLY AIR DUCT UP
RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP
LINEAR SLOT DIFFUSER
ELBOW WITH TURNING VANES
INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)
VOLUME CONTROL DAMPER
NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER
MOTORIZED DAMPER
VOLUME DAMPER
THERMOSTAT
FIRE DAMPER
FIRE SMOKE DAMPER
SMOKE DAMPER
24x24 CEG-1 800 CFM
SIZE, TYPE, CFM OF EXHAUST GRILLE
MANUAL VOLUME DAMPER
SQUARE TO ROUND TRANSITION
RISER DESIGNATION
HUMIDISTAT
EQUIPMENT WITH FLEXIBLE DUCT CONNECTION
10" CSD-1 300 CFM
BACKDRAFT DAMPER
SUPPLY AIR DUCT DOWN
DUCT MOUNTED SMOKE DETECTOR
(SD=SUPPLY/RD=RETURN)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
LOUVER
DUCT WITH SOUND LINING
DAMPERS: (BD, FD, FSD, MD, SD, VD)
TRAP PRIMER WITH DISTRIBUTION UNIT
TRAP PRIMER
P-TRAP
GAS COCK
HEATING HOT WATER RETURN (HHR)
HEATING HOT WATER SUPPLY (HHS)
REFRIGERANT DISCHARGE BYPASS (RDB)
REFRIGERANT SUCTION (RS)
CHILLED WATER RETURN (CHWR)
CONDENSER WATER SUPPLY (CWS)
CONDENSER WATER RETURN (CWR)
REFRIGERANT DISCHARGE (HOT GAS) (RD)
HEAT PUMP WATER RETURN (HPWR)
HEAT PUMP WATER SUPPLY (HPWS)
REFRIGERANT LIQUID (RL)
CHILLED WATER SUPPLY (CHWS)
HIGH PRESSURE STEAM CONDENSATE (HPC)
HIGH PRESSURE STEAM SUPPLY (HPS)
MEDIUM PRESSURE STEAM CONDENSATE (MPC)
MEDIUM PRESSURE STEAM SUPPLY (MPS)
LOW PRESSURE STEAM CONDENSATE (LPC)
LOW PRESSURE STEAM SUPPLY (LPS)
CONDENSATE PUMP DISCHARGE (PD)
EXPANSION JOINT
F & T TRAP
TRIPLE DUTY VALVE WITH PRESSURE PORTS
BALANCING VALVE WITH PRESSURE PORTS
SOLENOID VALVE
STRAINER WITH BLOWOFF
REFRIGERANT VENT (RV)
EJ
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM RELIEF VALVE
PRESSURE / VACUUM SWITCH
LIMIT OF DEMOLITION
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
BACK DRAFT DAMPER
BDD
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
MAKE-UP WATER
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
GHS
GHR
SWS
SWR
GCR
GCS
MW
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
VACUUM CONDENSATE RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
FWPS
FWPD
FEEDWATER SAMPLE (DEAERATOR)
BOILER WATER SAMPLE
CONTINUOUS BLOWDOWN
CF
FWS
BWS
CBD
BO
CHEMICAL FEED
BOILER BLOWOFF
TUBE CLEANER WATER SUPPLYTC
OFL OVERFLOW
REFRIGERANT SIGHT GLASS
QUICK-COUPLE HOSE CONNECTOR
TEMPERATURE SENSOR
HUMIDITY SENSOR
DUCT W/DAMPERS
DIFFUSERS,GRILLES, FLEX CONNECTIONS
FITTINGS & TRANSITIONS
SOFTENED WATERSW
BRINE & SOFT WATER
REFRIGERANT
PLANT PIPING
STEAM
EXISTING TO REMAIN
Y
YR YEAR
W
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
U
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
& HOSE CONNECTION)
ABBREVIATIONS
TFB TO FLOOR BELOW
FFB FROM FLOOR BELOW
FFA FROM FLOOR ABOVE
UTR UP THROUGH ROOF
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:0
:4
P
M
M-000
MECHANICAL LEGEND AND
ABBREVIATIONS
1 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
(E)18"x12" RA
(E)14"Ø UP
(E)18"x12" UP
(E)10"x8" EA
(E)12"x6" SA
(E)12"x8" SA
(E)12"ø SA
(E)12"x8" SA
(E )2
"x
R A
(E)10"x8" EA
(E)20"x12" RA
(E)18"x12" RA
(E)18"x10" RA
(E)16"x8" RA
(E)14"x6" RA
(E)14"x8" SA
(E)14"x8" MA
(E )2
"x
M A
(E )2
"x
E A
(E)12"x8" EA
(E)6"ø SA (E)12"x8" SA
(E)6"ø SA
(E)12"x8" SA
(E)10"x8" EA
(E)10"x8" RA
(E)6"ø SA
(E)10"ø SA
(E)8"ø SA
(E)12"x8" SA
(E)12"x8" SA
(E)12"x8" EA
(E)14"x8" SA
(E)8"ø SA
(E)12"x8" SA
(E)18"x8" SA
(E)14"ø SA
(E)12"x8" SA
(E)12"x10" SA
(E)18"x12" SA
(E)12"x6" SA
(E)12"x10" SA
(E )1
"x
S A
(E)6"ø SA
(E)10"x8" RA
(E)14"x8" RA
(E)16"x16" RA
(E)18"x10" RA
(E)12"x8" RA
HATCHED AREA FED BY 2-AHU-1.
(E)12"x8"
EA UP
(E)20"Ø SA DN
(E)12"Ø SA UP
(E)18"x36" RA DN (E)18"x18" RA UP
(E)10"x8" EA UP
(E)24"x12" EA UP TFA (E)24"x12" MA DN FFA
(E)10"x8" EA
UP TFA
VAV
ETR (TYP.)
ETR (TYP.)
VAV
-- ETR (TYP.)
VAV
DUCTWORK, EQUIPMENT AND
ASSOCIATED ACCESSORIES IN THE
AREA SHOWN ARE PROVIDED FOR
REFERENCE ONLY AND SHALL BE
EXISTING TO REMAIN (ETR).
2-3
2-2
2-1
2-4
2-7
2-8
2-9
2-10
2-6
2-5
O K.2
K.1
F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P
M
MHD101
MECHANICAL HVAC PLAN - BLDG 2 & 38
OVERALL LEVEL 1 FLOOR PLAN
2 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 1 FLOOR PLAN
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
N
26"x12"12"x12"
26"x12"
24"x10"
28"x10"16"x10"
"x
"x
"x
"x
10"x6"
"x
"x
"x
10"x6"
34"X12" SA
DN FFA
26"x12"
"x
"x
12"x12"
6"x6"
MHD102C MHD102C
M H
D
2B M
H D
2B
2-3
2-2
2-4
2-7
2-8
2-9
2-10
2-6
2-5
O M.2 K.2
K.1
F.9
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P
M
MHD102A
MECHANICAL HVAC DEMOLITION PLAN
- BLDG 2A, LEVEL 2 FLOOR PLAN
3 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B
1 AREA TO BE DEMOLISHED PRIOR TO START
OF THIS PROJECT. DIVISION 23 CONTRACTOR
SHALL DEMOLISH ANY REMAINING HVAC
EQUIPMENT, DUCTWORK, AIR DEVICES, AND
ACCESSORIES BACK TO PENTHOUSE IN THIS
AREA.
1/4" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
2 DEMOLISH DUCTWORK AND ACCESSORIES
DOWN TO FLOOR BELOW AND UP TO ROOF.
DEMOLISH EXISITNG EXHAUST FAN. REPAIR
ROOF AS REQUIRED.
24"x10" 14"x10"
"x
"x
"x
"x
"x
"x
"x
"x
20"x16"
18"x6"
14"x5"
18"x6" 18"x6"
18"x10"
20"x10" 20"x10"
16"x10"
10"x5"
20"x16"
"x
12"x10"
34"x12"
34"X12" RA
UP TFA
34"X12" SA
DN FFA
24"X16" RA
UP TFA
"x
"x
"x
"x
"x
16"x8"
6"x6"
M H
D
2A M
H D
2A
MHD102C MHD102C
(E)42"x18" RA
(E)60"x20" RA
(E )6
"x
S A
(E)24"x16" RA
(E)24"x16" RA (E)56"x20" SA
(E)22"x16" SA
(E)40"x18" SA
(E) 42"X18" RA
UP TFA
(E) 60"X20" RA
UP TFA
(E) 24"X16" RA UP FFB
(E) 42"X18" RA
UP FFB
(E) 24"X60" SA
DN FFA
(E) 60"X20" RA UP FFB
(E) 56"X20" SA DN TFB
(E) 22"X 16" SA DN TFB
(E) 40"X 18" SA DN TFB
2-3
2-2
2-4
2-7
2-8
2-9
2-10
2-6
2-5
F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P
M
MHD102B
MECHANICAL HVAC DEMOLITION PLAN
- BLDG 2B, LEVEL 2 FLOOR PLAN
4 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B 1/4" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN
DIVISION 23 CONTRACTOR SHALL DEMOLISH ALL
HVAC EQUIPMENT, DUCTWORK, AIR DEVICES, AND
ACCESSORIES AS SHOWN BACK TO THE
PENTHOUSE UNLESS OTHERWISE NOTED.
DIVISION 23 CONTRACTOR SHALL VERIFY DUCT
ROUTE TO AIR TERMINAL UNIT IN THE LOCATION
SHOWN AND REMOVE.
EXISTING DUCTWORK TO BE VERIFIED AND
DEMOLISHED.
EXISTING DUCT RISERS IN THE LOCATION SHOWN
ARE EXISTING TO REMAIN (ETR).
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
"x
12"x10"
8"ø
12"x8"
"x
"x
18"x8"
(E )1
"x
R A
(E)14"x10" RA
8"x5"
"ø
(E)14"Ø SA UP
(E)14"Ø SA DN
(E)18"x14" RA UP (E)18"x12" RA DN
(E)18"X10" EA UP
NOT IN SCOPE
(E)18"x18" RA FRM BLW
(E)18"Ø SA FRM BLW
(E)10"x8" EA FRM BLW
(E)10"x8" EA UP (E)18"x10" EA
(E)12"x8" EA UP FFB
(E) 24"x12" MA FRM ABV
(E) 24"x12" EA UP 10"x8" EA UP (DEMO)
(E)10"x10" EA UP
(E)10"x8" EA FRM BLW
(E)12"x24" MA DN
(E)12"x24" EA FRM BLW
WEF
VAV
VAV
ETR
"x
12"x8"
10"x8"
6"x6"
(E)8"x8" EA
(E )1
"x
R A
(E )8
"x
E A(E
)2 "x
E A
MHD102A MHD102B2-2
2-1
O K.2 F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P
M
MHD102C
MECHANICAL HVAC DEMOLTION PLAN -
BLDG 38, LEVEL 2 FLOOR PLAN
5 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN
DEMOLISH AIR TERMINAL UNIT AND ASSOCIATED
AIR DEVICES AND ACCESSORIES. REMOVE
ASSOCIATED BRANCH DUCTWORK BACK TO MAIN
AND PREPARE FOR FUTURE CONNECTION. SEE
SHEET MH102C FOR RELATED WORK.
EXISTING EQUIPMENT, DUCTWORK AND
ACCESSORIES IN THE HATCHED AREA SHOWN
ARE EXISTING TO REMAIN (ETR).
DEMOLISH MECHANICAL HVAC DUCTWORK TO
DEMARCATION POINT SHOWN. PROVIDE RISER
DEMOLITION AS REQUIRED FOR NEW
CONNECTION. SEE SHEET MH102C FOR RELATED
INFORMATION.
SCHEDULE WORK AND/OR PROVIDE TEMPORARY
DUCTING SO THAT AREAS SERVICED ON THE
FLOORS BELOW REMAIN UNDISTURBED DURING
CONSTRUCTION.
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
(E)14"ø SA
(E)20"x12" SA
(E )1
"x
S A
(E )1
"x
S A
(E )1
"x
S A
(E)6"x6" EA
(E)8"x8" EA
(E )1
"x
E A
(E)12"x6" EA
(E)8"x8" EA
(E)6"ø EA
(E)16"x8" EA
(E)24"x21" EA
(E )1
"x
E A
(E)12"x8" EA(E)12"x8" EA
(E)16"x8" EA
(E)12"x8" SA
(E )1
"x
S A
(E )6
"ø S
A
(E)6"ø SA
(E)12"x8" SA
(E)16"ø SA
(E)6"ø SA
(E)6"ø SA
(E )1
"x
S A
(E )1
"x
S A
(E) 24"x12" EA UTR
(E) 24"x12" MA DN
FROM ROOF
(E)10"x10" EA
UTR
(E )1
"x
E A
(E)10"x8" EA UP
FFB
(E )1
"x
E A
(E)18"x10" SA(E)14"x8" SA (E)18"x10" SA
(E )1
"ø
S A
(E)20"x10" SA
(E )1
"x
S A
(E)14"x8" SA
(E )1
"ø
S A
(E)16"x8" EA
(E)24"x14" EA
(E )2
"x
E A
(E)14"x8" SA
(E)14"ø SA
(E)10"ø SA
(E)20"ø SA (E)18"ø SA
(E)14"x8" SA
(E)12"x6" SA (E)14"x8" SA
(E )1
"x
S A
(E)12"x8" SA
(E)16"x10" SA
(E )1
"x
S A
(E )1
"x
E A
(E)12"x6" EA
(E)10"x6" EA
(E)14"x8" EA
(E)16"x8" EA
(E )1
"x
E A
(E )2
"x
E A
(E )1
"x
E A
(E )1
"x
E A
(E)12"x8" EA
(E)12"x8" EA
(E )1
"x
E A
(E)14"x8" SA
(E)14"x8" SA
(E)14"x8" SA
(E)12"x8" EA
(E)12"x6" EA(E)12"x6" EA
(E)6"x6" EA
(E)6"x6" EA
(E)14"x6" EA
(E)16"x8" EA
(E)12"x6" SA
(E)14"x10" SA
(E)12"x6" SA
(E) 22"x22"
UP TO EF-3
(E) 18"x14" UP & DN
(E) 18"x10" UP FFB
(E) 16"x16" UP TO
EF-2 (ETR)
(E) 8"x8" UP TO
EF-5 (ETR)
(E) 6"x6" UP TO
EF-6 (ETR)
(E) 22"x22" UP
TO EF-4
(E)22"Ø UP
(E)14"Ø DN
(E) 10"x8" EA FFB
(E) 10"x10"
EA UP
2-2
2-1
O M.2 K.2 F.9 C.9 A.5 AA
10"x8" EA UP (DEMO)
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P
M
MHD103
MECHANICAL HVAC PLAN - BLDG 38,
OVERALL LEVEL 3 FLOOR PLAN
6 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B3/16" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 3 FLOOR PLAN
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
THIS SHEET WAS PROVIDED TO THE CONTRACTOR AS
REFERENCE FOR PROJECT PLANNING AND COORDINATION.
THE AREAS OF WORK SHALL BE CONTAINED TO THE HATCHED
AREAS AS SHOWN. ALL DUCTWORK AND EQUIPMENT OUTSIDE
OF THE HATCHED AREAS ARE EXISTING TO REMAIN (ETR).
MPD102C MPD102C
M P
D
2B M
P D
2B
11-1/2" HWS/HWR UP
1-1/2" HWS/HWR DN
2-3
2-2
2-8
2-9
2-10
2-6
2-5
O M.2 K.2
K.1
F.9
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MPD102A
MECHANICAL PIPING DEMOLITION
PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN
7 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
CONTRACTOR TO VERIFY SIZE AND LOCATION OF
THE HHW MAIN.
REMOVE HHW AND CHW PIPING BACK TO MAIN AND
CAP.
1-1/2" HWS/HWR UP
1-1/2" HWS/HWR DN
MPD102C MPD102C
M P
D
2A M
P D
2A
2-3
2-2
2-4
2-7
2-8
2-9
2-10
2-6
2-5
F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MPD102B
MECHANICAL PIPING DEMOLITION
PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN
8 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B1/4" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
CONTRACTOR TO VERIFY SIZE AND LOCATION OF
THE HHW MAIN.
REMOVE HHW AND CHW PIPING BACK TO MAIN AND
CAP.
VAV
VAV
(E
1/ 2"
(E
1/ 2"
(E
1/ 2" (E
1/
2" (E
) 1
(E ) 1
(E) 1-1/2" HHR UP
(E) 1-1/4" HHR DN
(E) 1-1/2" HHS UP
(E) 1-1/4" HHS DN
(E) 1-1/2" HHR DN TFB
(E) 1-1/2" HHS UP FFB
(E) 1"
(E) 1"
(E) 1/2" HHR
(E) 1/2" HHS
MPD104A MPD104B
2-2
2-1
O M.2 K.2 F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MPD102C
MECHANICAL PIPING DEMOLITION
PLAN - BLDG 38, LEVEL 2 FLOOR PLAN
9 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN
1 DEMOLISH AIR TERMINAL UNIT AND
ACCESSORIES. REMOVE ASSOCIATED
BRANCH PIPING BACK TO DEMARCATION
POINT. SEE SHEET MP102C FOR RELATED
WORK.
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
AHU
AHU
AHU
--3
ETR
2-AHU
(E) 2" HHR
HX
(E
2" H
H S
(E
5" M
P S
(E) 5" CHR
ETR
EF
-- ETR
ETR
LV
-- LV
LV
ETR
(E) 5" MPS
(E) 2 1/2" HHR
(E) 2 1/2" HHS
(E
1/
2" H
H S
(E
1/
2" H
H R
(E) 2 1/2" HHS
(E) 2 1/2" HHR
(E
1/
2" H
H R
(E
1/
2" H
H S
(E) 1 1/2" MPS
(E) 1 1/2" MPS
(E)60"x27" OA
(E)64"x48" OA
(E)60"x20" RA
LV
(E) 2" CHR
(E) 2" CHS
(E) 4" CHR
(E) 4" CHS
(E
1/
2" H
H S
(E
1/
2" H
H R
(E
3" M
P S
HU
--ETR
(E
6" C
H S
(E
6" C
H R
(E) 6" CHS
(E) 6" CHR
PAC
60"x27" OA DN FROM ROOF
MOUNTED LOUVERED INTAKE
HOOD.
ETR
ETR
CWP
--4
HWP
--ETR
ET
ETR
ETR
(E) CHWS/R PIPING ROUTED TO
BLDG 38 PENTHOUSE.
HHP
HHP
LV
EF
(E
2" H
H R
(E) 1 1/2" HHS DN
(E) 1 1/2" HHR DN
(E) 2" CHR
(E) 2" CHS
12"x34"
HX
HX
MD104BMD104B
(E) 1 1/2"
(E) 2"
(E) 2 1/2"(E) 2 1/2"
(E) 2 1/2" (E) 2 1/2"
(E) 2"
(E) 2"
(E) 2"
(E) 2"
(E) 2 1/2"
(E) 2 1/2"
(E) 2 1/2"
2-3
2-2
2-42-4
2-72-7
2-8
2-9
2-10
2-6
2-5
O M.2 K.2
K.1
F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MD104A
MECHANICAL DEMOLITION PLAN -
BLDG 2, PENTHOUSE LEVEL
10 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - BLDG 2, PENTHOUSE LEVEL
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
REMOVE EXISTING AIR HANDLING UNIT AND
ASSOCIATED PIPING, DUCTWORK, AND CONTROLS.
DEMOLISH AHU HEATING HOT WATER, CHILLED
WATER, AND STEAM PIPING BACK TO MAIN AND
PROVIDE SHUTOFF VALVE AND CAP.
EXISTING AIR HANDLING UNIT EQUIPMENT PAD IS
EXISTING TO REMAIN (ETR). ARCHITECTURAL AND
STRUCTURAL TO MODIFY PAD AS NECESSARY TO
ACCOMMODATE NEW AHU BEFORE INSTALLATION.
DEMOLISH ABANDONED CHILLED WATER BOOSTER
PUMP IN LOCATION SHOWN. DEMOLISH ASSOCIATED
PIPING AND ACCESSORIES BACK TO SHUTOFF VALVE
AND CAP FOR FUTURE CONNECTION.
EXISTING PNEUMATIC CONTROLS AIR COMPRESSOR
IN THE LOCATION SHOWN IS EXISTING TO REMAIN
(ETR). MOVE AS NECESSARY TO ACCOMMODATE
NEW AHU AND INSTALLATION.
REMOVE EXISTING LOUVER IN LOCATION SHOWN.
COORDINATE REQUIRED WALL MODIFICATIONS/FILL
IN WITH ARCHITECTURAL.
DEMOLISH EXISTING HEATING HOT WATER PUMPS
AND ASSOCIATED PIPING AND ACCESSORIES AS
SHOWN.
SCHEDULE WORK SO THAT AREAS OR EQUIPMENT
SERVICED BY THE HEATING HOT WATER REMAIN AS
UNDISTURBED AS POSSIBLE DURING
CONSTRUCTION.
DEMOLISH EXISITNG EXHAUST FAN. REPAIR ROOF AS
REQUIRED.
N
(E )1
"x
R A
(E)22"ø SA
(E) 18"X14" DN
(E)22"Ø DN
AHU
SPD
EF
EF
EF
EF
EF
EF
EF
1ST FL KITCHEN MAU AND HOOD
EXHAUST SYSTEM
1ST FL ORAL SURGERY
EXHAUST FAN
ENERGY RECOVERY UNIT
INCLUDES (E)EF-3
ENERGY RECOVERY UNIT
INCLUDES (E)EF-4
1ST FL DARK ROOM EXHAUST
FAN
1ST FL HAC ROOM
EXHAUST FAN
2ND FL TOILET EXHAUST FAN
TO BE DEMOLISHED.
(E)2-1/2"HWH DN
(E)2-1/2"HWHR UP
ABANDONED CHILLER TO BE DEMOLISHED.
STRUCTURE TO BE PREPARED FOR NEW
AIR-COOLED CHILLER. SEE SHEET MH104B
FOR RELATED WORK.
ETR
ETR
ETR ETR
ETR
ETR
MAU
ETR
CT
ETR
ERV
ETR
ERV
-- ETR
CWP
(E) 3"
CONTRACTOR TO ROUTE CONDENSATE TO
NEAREST ROOF DRAIN.
(E) 4"
(E) 3"
(E) 4"
(E) 3" (E) 4"
(E) 3"
(E) 3/4"
(E) 3" CHS
(E) 3" CHS
(E) 4" CHR
(E) 4" CHR
2-2
2-1
O M.2 K.2 F.9 C.9 A.5 AA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MD104B
MECHANICAL DEMOLITION PLAN -
BLDG 38, PENTHOUSE LEVEL
11 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - BLDG 38, PENTHOUSE LEVEL
1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
3. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
4. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK
PRIOR TO SUBMISSION OF PROPOSAL.
DEMOLISH MECHANICAL PIPING TO DEMARCATION
POINT SHOWN AND CAP. SEE SHEET MH104B FOR
RELATED WORK.
DEMOLISH CHILLED WATER PUMP IN LOCATION
SHOWN. DEMOLISH ASSOCIATED PIPING AND
ACCESSORIES AS SHOWN. SEE SHEET MH104B FOR
RELATED WORK.
CONTRACTOR TO VERIFY EXISITING CHILLER MAKE-
UP WATER LINE AND DEMOLISH BACK TO
PENTHOUSE.
PRE/POST
SOILED
HAC
ISOLATION
TOILET
PRE/POST
PRE/POST
PRE/POST
PRE/POST
PRE/POST
STAFF TOILET
MEDS
CORRIDOR-1
C207-02-1
PACU
PACU
PACU
CORRIDOR-1
C202-02-1
CLEAN SUPPLY
STORAGE
CORRIDOR-1
C203-02-1
PRE/POST
CORRIDOR
C208-02
CORRIDOR-2
C203-02-2
CORRIDOR
C206-02
20"x20" SA
6"ø CD-1
6"ø CD-1
6"ø CD-1
8"ø CD-1
6"ø CD-1
"x
S A
6"ø CD-1
6"ø CD-6
6"ø CD-1
6"ø CD-1
8"ø CD-1
6"ø CD-1
14"x14" SA
"x
S A
"x
S A
8"ø CD-1
6"ø SA
8"ø SA
"x
S A
8"ø CD-6
6"ø CD-5
10"x12" SA
"x
S A
8"ø CD-1
8"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
36"x18" SA UP TO AHU
COORDINATE DUCT DROP
WITH BUILDING STRUCTURE.
12"x10" SA
"x
S A
"x
R G
-1
"x
R G
-1
"x
R G
-1
"x
R G
-1
"x
R G
-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-5
10"ø CD-1 300 10"ø CD-1
14"x12" SA
22"x22" RG-1
22"x22" RG-1
26"x16" RA
"x
R A
24"x12" RA
"x
R A
16"x18" SA
8"ø SA
"x
R A
8"x8" SA
VAV
2A-2
VAV
2A-3
VAV
2A-4
VAV
2A-5
VAV
2A-6
VAV
2A-8
VAV
2A-10
8"x8" SA
10"x8" SA
VAV
2A-7
12"x10" SA
24"x14" RA
VAV
2A-1
10"x10" RA
8"x8" SA
12"x10" RA
"x
R A
16"x12" RA
"x
R A
VAV
2A-9
12"x8" RA
"ø
S A
12"ø SA
8"ø SA
"x
R A
CARE STATION
"x
S A
6"ø CD-1
8"ø CD-1
ANTEROOM
DICTATION
TOILET
6"ø CD-5
6"ø CD-5
8"ø CD-1
10"ø RA
22"x22" RG-1
6"ø CD-5
"ø
C D
-5
10"ø CD-1
"x
R G
-1
8"x8" SA
10"x10" EG-2
10"x10" EG-2
10"x10" EA
22"x22" EG-1
6"ø SA
22"x22" EG-1
22"x10" EG-1
10"x10" SA
"x
R A
CORRIDOR-2
C207-02-2
10"x10" EG-2
12X12 EA UP TO
2-EF 2
10"x10" EG-3
16"x10" EG-1
"ø
S A
10"x10" EG-2
"ø
S A
8"ø SA
"ø
S A
12"x10" EA
UP TO EF
SD
SD
FSD
FSD
SD
SAV
2A-1
EAV
2A-1
12"x8" EA
"x
E A
10"x10" EA
"x
E A
"ø
E A
12"x8" EA
16"x4" EA
RHC
2A-1
"x
S A
"x
S A
10"ø SA
SD
"x
R A
"x
R A
26"x16" RA
M502
M502
TYP
3 1
M502
TYP
M502
TYP
M H
2B
M H
2B
MH102C MH102C
36"x18" SA
"x
S A
24"x16" SA20"x20" SA
10"ø CD-1
"x
S A
2-3
2-2
2-4
2-7
2-8
2-9
2-10
2-6
2-5
O M.2 K.2
K.1
F.9
36"x18" RA UP TO AHU
COORDINATE DUCT DROP
WITH BUILDING STRUCTURE.
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:0
P
M
MH102A
MECHANICAL HVAC PLAN - BLDG 2A,
LEVEL 2 FLOOR PLAN
12 32JLF
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
MECHANICAL HVAC PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
UNLESS NOTED OTHERWISE.
1 LABEL EXHAUST DUCTWORK, FILTER, AND
FAN "COMMUNICABLE DISEASE
CONTAMINATED AIR."
2 PLACE DIFFERENTIAL PRESSURE SENSORS
AS NECESSARY TO ENSURE PRESSURE
RELATIONSHIPS BETWEEN THE ISOLATION
AND ANTE ROOMS WITH SURROUNDING
SPACES.
3 EXHAUST GRILLE IN ISOLATION ROOM TO
BE PLACED 7" ABOVE FLOOR, NEAR
PATIENT HEAD REST. COORDINATE CHASE
FOR EXHAUST DUCT RISER WITH
ARCHITECTURAL.
STAIR-1
S2-02-1
68 CFM
OR
OR
OR
C O
R R
ID
O
R
5-
C O
R R
ID
O
R
C
4-
CORRIDOR
C201-02
"x
R G
-1
10"ø CD-1
22"x22" RG-1
8"ø CD-1
10"ø CD-1
22"x22" RG-1
(E)60"x24" SA
(E)56"x20" SA
(E)40"x18" SA
49"x24"
RA UP TFA
(E) 24"x60" SA
DN FFA
8"ø CD-1
8"ø CD-1
8"ø CD-1
8"ø CD-6
VAV
2B-4
(E)22"x16" SA
(E)24"x16" RA
(E)42"x18" RA
IMMED. STER.
22"x22" EG-2
10"x8" EA
(E)60"x20" RA
(E) 60"x20" RA
UP TFA
(E) 42"x18" RA
UP TFA
(E) 42"x18" RA
UP FFB
(E) 60"x20" RA
UP FFB
(E) 24"x16" RA
UP FFB
M-401
"x
R G
-1
22"x22" RG-1
M-4011
M-401
SD
20"x16" RA 26"x16" RA 30"x22" RA 24"x18" RA
"x
R A
20"x16" SA 22"x16" SA 30"x20" SA
12"x10" SA
"x
R A
"x
S A
49"x24" SA
"x
S A
49"x24"
SA DN FFA
LAF 3
LAF 2
LAF 1
RAV
2B-3
SAV
2B-3
VAV
2B-2
VAV
2B-3
RAV
2B-2
SAV
2B-2
RAV
2B-1
SAV
2B-1
VAV
2B-1
SD SD SD
SD SD
SD SDSD
SD
SD
SD
"x
R A
"x
R A
10"ø CD-1
STERILE CORE
RHC
2B-2
RHC
2B-1
RHC
2B-3
"x
R A
12"x14" SA
"ø
S A
12"x8" RA 12"x8" RA
20"x30" SA
22"x22" RG-1
M H
2A
M H
2A
MH102C MH102C
(E) 56"X20" SA DN TFB
(E) 22"X 16" SA DN TFB
(E) 40"X 18" SA DN TFB
"x
R A
SEE SHEET
M-401 FOR
CONTINUATION.
SEE SHEET
M-401 FOR
CONTINUATION.
SEE SHEET
M-401 FOR
CONTINUATION.
M502
TYP
2-3
2-2
2-4
2-7
2-8
2-9
2-10
2-6
2-5
C.9 A.5 AA
12"x12" EA
UP TO EF
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:0
:5
P M
MH102B
MECHANICAL HVAC PLAN - BLDG 2B,
LEVEL 2 FLOOR PLAN
13 32JAD
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/19
BID DOCUMENTS
657-50119-126
2 & 38
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2A 2B 1/4" = 1'-0"
MECHANICAL HVAC PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SCHEDULE WORK TO MINIMIZE DISRUPTION OF
SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
UNLESS NOTED OTHERWISE.
1 NEW OPERATING ROOM LAMINAR AIRFLOW (LAF-X)
CEILING SYSTEM IN THE LOCATION SHOWN TO BE
OWNER FURNISHED AND CONTRACTOR INSTALLED.
COORDINATE INSTALLATION OF PLENUM SYSTEM
REQUIREMENTS WITH THE MANUFACTURER AND
SPECIFICATION 11 76 00 OPERATING ROOM EQUIPMENT
AND MANAGEMENT SYSTEMS.
PLACE DIFFERENTIAL PRESSURE SENSORS AS
NECESSARY TO ENSURE PRESSURE RELATIONSHIPS
BETWEEN THE OR'S WITH SURROUNDING SPACES.
COORDINATE SUPPLY AND RETURN DUCT ROUTING WITH
BUILDING STRUCTURE AND ROUTE BENEATH BEAM IN
THE LOCATION SHOWN.
N
ELECTRICAL
216ELECTRICAL
STAFF LOUNGE
EQUIPMENT
ANESTHESIA
MEN'S LOCKER
WOMEN'S LOCKER
STAFF TOILET
STAFF TOILET
SOILED
HAC
CONSULTATION
RECEPTION
CORRIDOR-1
C203-38-1
CORRIDOR-1
C201-38-1
ELEVATOR SHAFT
C202-54
(E)14"Ø SA UP
(E)14"Ø SA DN
(E)18"x14" RA UP (E)18"x12" RA DN
NOT IN SCOPE
"ø
S A
(E )1
"x
R A
10"x10" EA (E)18"X10"
EA UP
12"x8" RA
12"x12" RA
(E)12"x8" EA
FRM BLW
14"x14" EA
"x
E A
20"x16" EA UP
(E) WEF-1
VAV
38-2
VAV
38-1
VAV
38-7
VAV
38-9
VAV
38-8
VAV
38-12
VAV
38-11 VAV
38-10
12"x10" RA
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-2
6"ø CD-2
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
8"ø CD-1
6"ø CD-1
6"ø CD-1
10"ø CD-1
10"ø CD-1
8"ø CD-1
8"ø CD-1
8"ø CD-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
10"x10" EG-2
22"x10" RG-4
22"x22" RG-1
22"x10" RG-4
10"ø SA
"ø
S A
10"x10" RA
14"x14" EA
22"x22" RG-1
10"x8" RA
CORRIDOR-1
C202-02-1
10"x10" EG-2
10"x10" EG-2
6"ø CD-2
6"ø CD-2
"x
R A
8"x8" SA
18"ø SA
10"x8" SA
6"ø SA
12"x12" SA
8"x8" SA
"x
S A
"x
S A
8"x12" SA
10"ø SA
12"x10" RA
22"x22" EG-1
12"x10" EA
22"x22" EG-1
10"x10" EG-2
10"x10" EG-2
12"x14" EA
10"x10" EG-2
22"x22" RG-1
PSA
WAITING-2
223-2
BIO-MED
6"ø CD-1
6"ø CD-1
10"x8" RA
10"x10" EG-2
"x
E A
10"x10" EG-2
22"x10" RG-4
8"x8" RA
22"x10" RG-4
"x
S A
VAV
38-4
VAV
38-5
TOILET
TOILET-2
227-2
8"x8" SA
6"ø SA
12"x8" RA
6"ø EG-5
6"ø EG-6
6"ø EG-4
"ø
S A
"x
S A
5"ø SA
6"ø SA
6"ø SA
"x
S A
6"ø SA
VAV
38-6
6"ø SA
12"ø SA
8"x8" SA
"ø
S A
10"x8" RA
8"x8" RA
(E)14"x10" RA
(E)14"x10" RA
VAV
38-3
"x
E A
(E) 24"x12" MA FRM ABV
(E) 24"x12" EA UP
(E)10"x10" EA UP
(E)10"x8" EA FRM BLW
(E)12"x24" MA DN
(E)12"x24" EA FRM BLW
FSD
FSD
"x
R A
659 SF
WAITING-2
223-2
15 SF
WAITING-1
223-1
(E )8
"x
E A
(E )2
"x
M A
(E )2
"x
E A
(E)18"x18" RA FRM BLW
(E)18"Ø SA FRM BLW
(E)10"x8" EA FRM BLW
(E)10"x8" EA UP
MH102A MH102B
6"ø EA
8"ø RA
6"ø RA
12…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .