P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf

PDF 5 MB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document package includes construction drawings and specifications for a surgical suite addition project. The scope of work involves constructing three new operating rooms, endovascular services areas, and ambulatory surgical service spaces on the second floor of Building 2 and Building 38 at the Marion VA Medical Center. Infrastructure will be upgraded to meet all VA power requirements. Upon completion, the VA will have a fully operational three operating room inpatient surgical and endovascular services as well as ambulatory surgical facility. The work is solicited under solicitation number 36C25520R0040_1 and project number 657-501. Relevant details are provided regarding mechanical, electrical and architectural requirements.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

MV

CO

EV

VE

AI

FOV

FOR

FOS

FP

LPG

NPW

NO

O

N

G

MPG

G

MPG

CA

V

VBG

VBF

AV

AW

AW

ST

OST

GW

GW

S

W

ID

SPD

T

T

SCW

WS

140°

S

W

ST

RS

RL

CWR

CWS

CHWR

CHWS

HHR

HHS

PD

CD

ACD

D

CD

LPC

LPS

MPC

MPS

HPC

HPS

H

T

H

T

RD

RDB

HPSR

HPWS

RV

CAP

LC

M

AV

26-P 3

XX-1

xx

X100

X100

ETR

GENERAL DUCT SYMBOLS

HVAC PIPING SYMBOLS

VALVE SYMBOLS

WASTE

WATER

EXISTING PIPING

FUEL

STORM

MEDICAL GASES

DENTAL

GENERAL PLUMBING SYMBOLS

ANNOTATION

PLUMBING PIPING SYMBOLS

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

IS LOCATED.

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

LA

LV

OA

IA

TWR

TWS

FILTERED COLD WATERFCW

FUEL OIL DISCHARGE

ANCHOR

CONNECTION - SIDE

ECCENTRIC REDUCER

CONNECTION - BOTTOM, 45° OR 90°

CONNECTION - TOP, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

RISE OR DROP IN PIPE

STRAINER

FLOAT & THERMOSTATIC TRAP SET W/

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

FLOOR DRAIN (FD), SIZE & TYPE

ROOF DRAIN (RD), SIZE & TYPE

FLOOR SINK (FS), SIZE & TYPE

NATURAL GAS BELOW GRADE (G)

SUMP OR SEWAGE PUMP DISCHARGE (SPD)

CONDENSATE DRAIN (CD)

INDIRECT DRAIN (ID)

NATURAL GAS (G)

NITROUS OXIDE (NO)

LIQUIFIED PETROLEUM GAS (LPG)

FIRE PROTECTION (FP)

WATER SERVICE (WS)

COMPRESSED AIR (CA)

NITROGEN (N)

MEDICAL AIR (MA)

OXYGEN (O)

DOMESTIC HOT WATER RECIRC.

SOIL PIPING - ABOVE FLOOR (S)

SOIL PIPING - BELOW FLOOR (S)

STORM DRAIN - ABOVE FLOOR (ST)

STORM DRAIN - BELOW FLOOR (ST)

ACID WASTE - ABOVE FLOOR (AW)

ACID WASTE - BELOW FLOOR (AW)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

140° DOMESTIC HOT WATER (140°)

WASTE PIPING - ABOVE FLOOR (W)

WASTE PIPING - BELOW FLOOR (W)

GREASE WASTE - ABOVE FLOOR (GW)

GREASE WASTE - BELOW FLOOR (GW)

SOFTENED COLD WATER (SCW)

ACID VENT (AV)

VENT PIPING (V)

HOSE BIBB (HB)

NONFREEZE WALL HYDRANT (NW)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

EXTERIOR CLEANOUT (ECO)

THERMOSTATIC MIXING VALVE

BACKFLOW PREVENTER

OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)

NON POTABLE WATER (NPW)

FUEL OIL SUPPLY (FOS)

FUEL OIL RETURN (FOR)

FUEL OIL VENT (FOV)

AUXILIARY CONDENSATE DRAIN (ACD)

VENT BELOW GRADE (VBG)

VENT BELOW FLOOR (VBF)

CARBON DIOXIDE (CO)

MEDICAL VACUUM (MV)

EVACUATION (EV)

MEDICAL VACUUM EXHAUST (VE)

MEDICAL AIR INTAKE (AI)

TRAP PRIMER LINE (T)

WATER METER

MEDIUM PRESSURE NATURAL GAS (MPG)

MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)

ELBOW DOWN WITH SHUT-OFF VALVE

TEE DOWN WITH SHUT-OFF VALVE (SOV)

TEE UP WITH SHUT-OFF VALVE (SOV)

RECIRCULATION PUMP

DIRECTION OF FLOW

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE REMOVED

FLANGE CONNECTION

CLEANOUT

ELBOW DOWN

ELBOW UP

TEE DOWN

ELBOW UP WITH SHUT-OFF VALVE (SOV)

TEE UP

UNION

THERMOMETER

PRESSURE GAUGE

PRESSURE REDUCING VALVE

REDUCER

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT

TECHNOLOGY PLAN NOTE CALL OUT

PLUMBING EQUIPMENT DESIGNATION

MECHANICAL EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL NUMBER

SHEET NUMBER

TRAP PRIMER LINE - BELOW SLAB (T)

DOUBLE EXTERIOR CLEANOUT (ECO)

CLEANOUTS

DRAINS AND TRAPS

EQUIPMENT

PIPE FITTINGS AND ACCESSORIES

SHEET NUMBER

SECTION NUMBER

MEDICAL GAS OUTLET (TYPE)

DIVISION 23 PIPE FITTINGS AND ACCESSORIES

DRAIN (D)

CONDENSATE DRAIN (CD)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

T

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

S

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

O

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J

J INTENTIALLY LEFT BLANK

I

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

M

M METER, SI UNIT

M/s METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

H

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

D

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

C

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING

TOWER

CWS CONDENSER WATER SUPPLY (FROM COOLING

TOWER)

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

EXISTING TO REMAIN

CO

LIMIT OF DEMOLITION

A

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW FOD

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIP. IS LOCATED

10x8AUTOMATIC BALANCING CONTROL VALVE

WYE STRAINER (WITH BALL VALVE

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

QUICK-COUPLE HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER

FLOW METER

EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED

EXISTING DUCTWORK OR EQUIPMENT TO REMAIN

BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH

BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL

RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN

FITTING AND MANUAL VOLUME DAMPER

SUPPLY AIR DUCT UP

RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP

LINEAR SLOT DIFFUSER

ELBOW WITH TURNING VANES

INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)

VOLUME CONTROL DAMPER

NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER

MOTORIZED DAMPER

VOLUME DAMPER

THERMOSTAT

FIRE DAMPER

FIRE SMOKE DAMPER

SMOKE DAMPER

24x24 CEG-1 800 CFM

SIZE, TYPE, CFM OF EXHAUST GRILLE

MANUAL VOLUME DAMPER

SQUARE TO ROUND TRANSITION

RISER DESIGNATION

HUMIDISTAT

EQUIPMENT WITH FLEXIBLE DUCT CONNECTION

10" CSD-1 300 CFM

BACKDRAFT DAMPER

SUPPLY AIR DUCT DOWN

DUCT MOUNTED SMOKE DETECTOR

(SD=SUPPLY/RD=RETURN)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER

DUCT WITH SOUND LINING

DAMPERS: (BD, FD, FSD, MD, SD, VD)

TRAP PRIMER WITH DISTRIBUTION UNIT

TRAP PRIMER

P-TRAP

GAS COCK

HEATING HOT WATER RETURN (HHR)

HEATING HOT WATER SUPPLY (HHS)

REFRIGERANT DISCHARGE BYPASS (RDB)

REFRIGERANT SUCTION (RS)

CHILLED WATER RETURN (CHWR)

CONDENSER WATER SUPPLY (CWS)

CONDENSER WATER RETURN (CWR)

REFRIGERANT DISCHARGE (HOT GAS) (RD)

HEAT PUMP WATER RETURN (HPWR)

HEAT PUMP WATER SUPPLY (HPWS)

REFRIGERANT LIQUID (RL)

CHILLED WATER SUPPLY (CHWS)

HIGH PRESSURE STEAM CONDENSATE (HPC)

HIGH PRESSURE STEAM SUPPLY (HPS)

MEDIUM PRESSURE STEAM CONDENSATE (MPC)

MEDIUM PRESSURE STEAM SUPPLY (MPS)

LOW PRESSURE STEAM CONDENSATE (LPC)

LOW PRESSURE STEAM SUPPLY (LPS)

CONDENSATE PUMP DISCHARGE (PD)

EXPANSION JOINT

F & T TRAP

TRIPLE DUTY VALVE WITH PRESSURE PORTS

BALANCING VALVE WITH PRESSURE PORTS

SOLENOID VALVE

STRAINER WITH BLOWOFF

REFRIGERANT VENT (RV)

EJ

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM RELIEF VALVE

PRESSURE / VACUUM SWITCH

LIMIT OF DEMOLITION

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

BACK DRAFT DAMPER

BDD

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

MAKE-UP WATER

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

GHS

GHR

SWS

SWR

GCR

GCS

MW

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

VACUUM CONDENSATE RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

FWPS

FWPD

FEEDWATER SAMPLE (DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

OFL OVERFLOW

REFRIGERANT SIGHT GLASS

QUICK-COUPLE HOSE CONNECTOR

TEMPERATURE SENSOR

HUMIDITY SENSOR

DUCT W/DAMPERS

DIFFUSERS,GRILLES, FLEX CONNECTIONS

FITTINGS & TRANSITIONS

SOFTENED WATERSW

BRINE & SOFT WATER

REFRIGERANT

PLANT PIPING

STEAM

EXISTING TO REMAIN

Y

YR YEAR

W

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

U

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

& HOSE CONNECTION)

ABBREVIATIONS

TFB TO FLOOR BELOW

FFB FROM FLOOR BELOW

FFA FROM FLOOR ABOVE

UTR UP THROUGH ROOF

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:0

:4

P

M

M-000

MECHANICAL LEGEND AND

ABBREVIATIONS

1 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

(E)18"x12" RA

(E)14"Ø UP

(E)18"x12" UP

(E)10"x8" EA

(E)12"x6" SA

(E)12"x8" SA

(E)12"ø SA

(E)12"x8" SA

(E )2

"x

R A

(E)10"x8" EA

(E)20"x12" RA

(E)18"x12" RA

(E)18"x10" RA

(E)16"x8" RA

(E)14"x6" RA

(E)14"x8" SA

(E)14"x8" MA

(E )2

"x

M A

(E )2

"x

E A

(E)12"x8" EA

(E)6"ø SA (E)12"x8" SA

(E)6"ø SA

(E)12"x8" SA

(E)10"x8" EA

(E)10"x8" RA

(E)6"ø SA

(E)10"ø SA

(E)8"ø SA

(E)12"x8" SA

(E)12"x8" SA

(E)12"x8" EA

(E)14"x8" SA

(E)8"ø SA

(E)12"x8" SA

(E)18"x8" SA

(E)14"ø SA

(E)12"x8" SA

(E)12"x10" SA

(E)18"x12" SA

(E)12"x6" SA

(E)12"x10" SA

(E )1

"x

S A

(E)6"ø SA

(E)10"x8" RA

(E)14"x8" RA

(E)16"x16" RA

(E)18"x10" RA

(E)12"x8" RA

HATCHED AREA FED BY 2-AHU-1.

(E)12"x8"

EA UP

(E)20"Ø SA DN

(E)12"Ø SA UP

(E)18"x36" RA DN (E)18"x18" RA UP

(E)10"x8" EA UP

(E)24"x12" EA UP TFA (E)24"x12" MA DN FFA

(E)10"x8" EA

UP TFA

VAV

ETR (TYP.)

ETR (TYP.)

VAV

-- ETR (TYP.)

VAV

DUCTWORK, EQUIPMENT AND

ASSOCIATED ACCESSORIES IN THE

AREA SHOWN ARE PROVIDED FOR

REFERENCE ONLY AND SHALL BE

EXISTING TO REMAIN (ETR).

2-3

2-2

2-1

2-4

2-7

2-8

2-9

2-10

2-6

2-5

O K.2

K.1

F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P

M

MHD101

MECHANICAL HVAC PLAN - BLDG 2 & 38

OVERALL LEVEL 1 FLOOR PLAN

2 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/8" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 1 FLOOR PLAN

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

N

26"x12"12"x12"

26"x12"

24"x10"

28"x10"16"x10"

"x

"x

"x

"x

10"x6"

"x

"x

"x

10"x6"

34"X12" SA

DN FFA

26"x12"

"x

"x

12"x12"

6"x6"

MHD102C MHD102C

M H

D

2B M

H D

2B

2-3

2-2

2-4

2-7

2-8

2-9

2-10

2-6

2-5

O M.2 K.2

K.1

F.9

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P

M

MHD102A

MECHANICAL HVAC DEMOLITION PLAN

- BLDG 2A, LEVEL 2 FLOOR PLAN

3 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B

1 AREA TO BE DEMOLISHED PRIOR TO START

OF THIS PROJECT. DIVISION 23 CONTRACTOR

SHALL DEMOLISH ANY REMAINING HVAC

EQUIPMENT, DUCTWORK, AIR DEVICES, AND

ACCESSORIES BACK TO PENTHOUSE IN THIS

AREA.

1/4" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

2 DEMOLISH DUCTWORK AND ACCESSORIES

DOWN TO FLOOR BELOW AND UP TO ROOF.

DEMOLISH EXISITNG EXHAUST FAN. REPAIR

ROOF AS REQUIRED.

24"x10" 14"x10"

"x

"x

"x

"x

"x

"x

"x

"x

20"x16"

18"x6"

14"x5"

18"x6" 18"x6"

18"x10"

20"x10" 20"x10"

16"x10"

10"x5"

20"x16"

"x

12"x10"

34"x12"

34"X12" RA

UP TFA

34"X12" SA

DN FFA

24"X16" RA

UP TFA

"x

"x

"x

"x

"x

16"x8"

6"x6"

M H

D

2A M

H D

2A

MHD102C MHD102C

(E)42"x18" RA

(E)60"x20" RA

(E )6

"x

S A

(E)24"x16" RA

(E)24"x16" RA (E)56"x20" SA

(E)22"x16" SA

(E)40"x18" SA

(E) 42"X18" RA

UP TFA

(E) 60"X20" RA

UP TFA

(E) 24"X16" RA UP FFB

(E) 42"X18" RA

UP FFB

(E) 24"X60" SA

DN FFA

(E) 60"X20" RA UP FFB

(E) 56"X20" SA DN TFB

(E) 22"X 16" SA DN TFB

(E) 40"X 18" SA DN TFB

2-3

2-2

2-4

2-7

2-8

2-9

2-10

2-6

2-5

F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P

M

MHD102B

MECHANICAL HVAC DEMOLITION PLAN

- BLDG 2B, LEVEL 2 FLOOR PLAN

4 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B 1/4" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN

DIVISION 23 CONTRACTOR SHALL DEMOLISH ALL

HVAC EQUIPMENT, DUCTWORK, AIR DEVICES, AND

ACCESSORIES AS SHOWN BACK TO THE

PENTHOUSE UNLESS OTHERWISE NOTED.

DIVISION 23 CONTRACTOR SHALL VERIFY DUCT

ROUTE TO AIR TERMINAL UNIT IN THE LOCATION

SHOWN AND REMOVE.

EXISTING DUCTWORK TO BE VERIFIED AND

DEMOLISHED.

EXISTING DUCT RISERS IN THE LOCATION SHOWN

ARE EXISTING TO REMAIN (ETR).

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

"x

12"x10"

8"ø

12"x8"

"x

"x

18"x8"

(E )1

"x

R A

(E)14"x10" RA

8"x5"

"ø

(E)14"Ø SA UP

(E)14"Ø SA DN

(E)18"x14" RA UP (E)18"x12" RA DN

(E)18"X10" EA UP

NOT IN SCOPE

(E)18"x18" RA FRM BLW

(E)18"Ø SA FRM BLW

(E)10"x8" EA FRM BLW

(E)10"x8" EA UP (E)18"x10" EA

(E)12"x8" EA UP FFB

(E) 24"x12" MA FRM ABV

(E) 24"x12" EA UP 10"x8" EA UP (DEMO)

(E)10"x10" EA UP

(E)10"x8" EA FRM BLW

(E)12"x24" MA DN

(E)12"x24" EA FRM BLW

WEF

VAV

VAV

ETR

"x

12"x8"

10"x8"

6"x6"

(E)8"x8" EA

(E )1

"x

R A

(E )8

"x

E A(E

)2 "x

E A

MHD102A MHD102B2-2

2-1

O K.2 F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P

M

MHD102C

MECHANICAL HVAC DEMOLTION PLAN -

BLDG 38, LEVEL 2 FLOOR PLAN

5 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN

DEMOLISH AIR TERMINAL UNIT AND ASSOCIATED

AIR DEVICES AND ACCESSORIES. REMOVE

ASSOCIATED BRANCH DUCTWORK BACK TO MAIN

AND PREPARE FOR FUTURE CONNECTION. SEE

SHEET MH102C FOR RELATED WORK.

EXISTING EQUIPMENT, DUCTWORK AND

ACCESSORIES IN THE HATCHED AREA SHOWN

ARE EXISTING TO REMAIN (ETR).

DEMOLISH MECHANICAL HVAC DUCTWORK TO

DEMARCATION POINT SHOWN. PROVIDE RISER

DEMOLITION AS REQUIRED FOR NEW

CONNECTION. SEE SHEET MH102C FOR RELATED

INFORMATION.

SCHEDULE WORK AND/OR PROVIDE TEMPORARY

DUCTING SO THAT AREAS SERVICED ON THE

FLOORS BELOW REMAIN UNDISTURBED DURING

CONSTRUCTION.

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

(E)14"ø SA

(E)20"x12" SA

(E )1

"x

S A

(E )1

"x

S A

(E )1

"x

S A

(E)6"x6" EA

(E)8"x8" EA

(E )1

"x

E A

(E)12"x6" EA

(E)8"x8" EA

(E)6"ø EA

(E)16"x8" EA

(E)24"x21" EA

(E )1

"x

E A

(E)12"x8" EA(E)12"x8" EA

(E)16"x8" EA

(E)12"x8" SA

(E )1

"x

S A

(E )6

"ø S

A

(E)6"ø SA

(E)12"x8" SA

(E)16"ø SA

(E)6"ø SA

(E)6"ø SA

(E )1

"x

S A

(E )1

"x

S A

(E) 24"x12" EA UTR

(E) 24"x12" MA DN

FROM ROOF

(E)10"x10" EA

UTR

(E )1

"x

E A

(E)10"x8" EA UP

FFB

(E )1

"x

E A

(E)18"x10" SA(E)14"x8" SA (E)18"x10" SA

(E )1

"ø

S A

(E)20"x10" SA

(E )1

"x

S A

(E)14"x8" SA

(E )1

"ø

S A

(E)16"x8" EA

(E)24"x14" EA

(E )2

"x

E A

(E)14"x8" SA

(E)14"ø SA

(E)10"ø SA

(E)20"ø SA (E)18"ø SA

(E)14"x8" SA

(E)12"x6" SA (E)14"x8" SA

(E )1

"x

S A

(E)12"x8" SA

(E)16"x10" SA

(E )1

"x

S A

(E )1

"x

E A

(E)12"x6" EA

(E)10"x6" EA

(E)14"x8" EA

(E)16"x8" EA

(E )1

"x

E A

(E )2

"x

E A

(E )1

"x

E A

(E )1

"x

E A

(E)12"x8" EA

(E)12"x8" EA

(E )1

"x

E A

(E)14"x8" SA

(E)14"x8" SA

(E)14"x8" SA

(E)12"x8" EA

(E)12"x6" EA(E)12"x6" EA

(E)6"x6" EA

(E)6"x6" EA

(E)14"x6" EA

(E)16"x8" EA

(E)12"x6" SA

(E)14"x10" SA

(E)12"x6" SA

(E) 22"x22"

UP TO EF-3

(E) 18"x14" UP & DN

(E) 18"x10" UP FFB

(E) 16"x16" UP TO

EF-2 (ETR)

(E) 8"x8" UP TO

EF-5 (ETR)

(E) 6"x6" UP TO

EF-6 (ETR)

(E) 22"x22" UP

TO EF-4

(E)22"Ø UP

(E)14"Ø DN

(E) 10"x8" EA FFB

(E) 10"x10"

EA UP

2-2

2-1

O M.2 K.2 F.9 C.9 A.5 AA

10"x8" EA UP (DEMO)

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P

M

MHD103

MECHANICAL HVAC PLAN - BLDG 38,

OVERALL LEVEL 3 FLOOR PLAN

6 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B3/16" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BLDG 38, LEVEL 3 FLOOR PLAN

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

THIS SHEET WAS PROVIDED TO THE CONTRACTOR AS

REFERENCE FOR PROJECT PLANNING AND COORDINATION.

THE AREAS OF WORK SHALL BE CONTAINED TO THE HATCHED

AREAS AS SHOWN. ALL DUCTWORK AND EQUIPMENT OUTSIDE

OF THE HATCHED AREAS ARE EXISTING TO REMAIN (ETR).

MPD102C MPD102C

M P

D

2B M

P D

2B

11-1/2" HWS/HWR UP

1-1/2" HWS/HWR DN

2-3

2-2

2-8

2-9

2-10

2-6

2-5

O M.2 K.2

K.1

F.9

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MPD102A

MECHANICAL PIPING DEMOLITION

PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN

7 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

CONTRACTOR TO VERIFY SIZE AND LOCATION OF

THE HHW MAIN.

REMOVE HHW AND CHW PIPING BACK TO MAIN AND

CAP.

1-1/2" HWS/HWR UP

1-1/2" HWS/HWR DN

MPD102C MPD102C

M P

D

2A M

P D

2A

2-3

2-2

2-4

2-7

2-8

2-9

2-10

2-6

2-5

F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MPD102B

MECHANICAL PIPING DEMOLITION

PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN

8 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B1/4" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

CONTRACTOR TO VERIFY SIZE AND LOCATION OF

THE HHW MAIN.

REMOVE HHW AND CHW PIPING BACK TO MAIN AND

CAP.

VAV

VAV

(E

1/ 2"

(E

1/ 2"

(E

1/ 2" (E

1/

2" (E

) 1

(E ) 1

(E) 1-1/2" HHR UP

(E) 1-1/4" HHR DN

(E) 1-1/2" HHS UP

(E) 1-1/4" HHS DN

(E) 1-1/2" HHR DN TFB

(E) 1-1/2" HHS UP FFB

(E) 1"

(E) 1"

(E) 1/2" HHR

(E) 1/2" HHS

MPD104A MPD104B

2-2

2-1

O M.2 K.2 F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MPD102C

MECHANICAL PIPING DEMOLITION

PLAN - BLDG 38, LEVEL 2 FLOOR PLAN

9 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BLDG 38, LEVEL 2 FLOOR PLAN

1 DEMOLISH AIR TERMINAL UNIT AND

ACCESSORIES. REMOVE ASSOCIATED

BRANCH PIPING BACK TO DEMARCATION

POINT. SEE SHEET MP102C FOR RELATED

WORK.

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

AHU

AHU

AHU

--3

ETR

2-AHU

(E) 2" HHR

HX

(E

2" H

H S

(E

5" M

P S

(E) 5" CHR

ETR

EF

-- ETR

ETR

LV

-- LV

LV

ETR

(E) 5" MPS

(E) 2 1/2" HHR

(E) 2 1/2" HHS

(E

1/

2" H

H S

(E

1/

2" H

H R

(E) 2 1/2" HHS

(E) 2 1/2" HHR

(E

1/

2" H

H R

(E

1/

2" H

H S

(E) 1 1/2" MPS

(E) 1 1/2" MPS

(E)60"x27" OA

(E)64"x48" OA

(E)60"x20" RA

LV

(E) 2" CHR

(E) 2" CHS

(E) 4" CHR

(E) 4" CHS

(E

1/

2" H

H S

(E

1/

2" H

H R

(E

3" M

P S

HU

--ETR

(E

6" C

H S

(E

6" C

H R

(E) 6" CHS

(E) 6" CHR

PAC

60"x27" OA DN FROM ROOF

MOUNTED LOUVERED INTAKE

HOOD.

ETR

ETR

CWP

--4

HWP

--ETR

ET

ETR

ETR

(E) CHWS/R PIPING ROUTED TO

BLDG 38 PENTHOUSE.

HHP

HHP

LV

EF

(E

2" H

H R

(E) 1 1/2" HHS DN

(E) 1 1/2" HHR DN

(E) 2" CHR

(E) 2" CHS

12"x34"

HX

HX

MD104BMD104B

(E) 1 1/2"

(E) 2"

(E) 2 1/2"(E) 2 1/2"

(E) 2 1/2" (E) 2 1/2"

(E) 2"

(E) 2"

(E) 2"

(E) 2"

(E) 2 1/2"

(E) 2 1/2"

(E) 2 1/2"

2-3

2-2

2-42-4

2-72-7

2-8

2-9

2-10

2-6

2-5

O M.2 K.2

K.1

F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MD104A

MECHANICAL DEMOLITION PLAN -

BLDG 2, PENTHOUSE LEVEL

10 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - BLDG 2, PENTHOUSE LEVEL

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

REMOVE EXISTING AIR HANDLING UNIT AND

ASSOCIATED PIPING, DUCTWORK, AND CONTROLS.

DEMOLISH AHU HEATING HOT WATER, CHILLED

WATER, AND STEAM PIPING BACK TO MAIN AND

PROVIDE SHUTOFF VALVE AND CAP.

EXISTING AIR HANDLING UNIT EQUIPMENT PAD IS

EXISTING TO REMAIN (ETR). ARCHITECTURAL AND

STRUCTURAL TO MODIFY PAD AS NECESSARY TO

ACCOMMODATE NEW AHU BEFORE INSTALLATION.

DEMOLISH ABANDONED CHILLED WATER BOOSTER

PUMP IN LOCATION SHOWN. DEMOLISH ASSOCIATED

PIPING AND ACCESSORIES BACK TO SHUTOFF VALVE

AND CAP FOR FUTURE CONNECTION.

EXISTING PNEUMATIC CONTROLS AIR COMPRESSOR

IN THE LOCATION SHOWN IS EXISTING TO REMAIN

(ETR). MOVE AS NECESSARY TO ACCOMMODATE

NEW AHU AND INSTALLATION.

REMOVE EXISTING LOUVER IN LOCATION SHOWN.

COORDINATE REQUIRED WALL MODIFICATIONS/FILL

IN WITH ARCHITECTURAL.

DEMOLISH EXISTING HEATING HOT WATER PUMPS

AND ASSOCIATED PIPING AND ACCESSORIES AS

SHOWN.

SCHEDULE WORK SO THAT AREAS OR EQUIPMENT

SERVICED BY THE HEATING HOT WATER REMAIN AS

UNDISTURBED AS POSSIBLE DURING

CONSTRUCTION.

DEMOLISH EXISITNG EXHAUST FAN. REPAIR ROOF AS

REQUIRED.

N

(E )1

"x

R A

(E)22"ø SA

(E) 18"X14" DN

(E)22"Ø DN

AHU

SPD

EF

EF

EF

EF

EF

EF

EF

1ST FL KITCHEN MAU AND HOOD

EXHAUST SYSTEM

1ST FL ORAL SURGERY

EXHAUST FAN

ENERGY RECOVERY UNIT

INCLUDES (E)EF-3

ENERGY RECOVERY UNIT

INCLUDES (E)EF-4

1ST FL DARK ROOM EXHAUST

FAN

1ST FL HAC ROOM

EXHAUST FAN

2ND FL TOILET EXHAUST FAN

TO BE DEMOLISHED.

(E)2-1/2"HWH DN

(E)2-1/2"HWHR UP

ABANDONED CHILLER TO BE DEMOLISHED.

STRUCTURE TO BE PREPARED FOR NEW

AIR-COOLED CHILLER. SEE SHEET MH104B

FOR RELATED WORK.

ETR

ETR

ETR ETR

ETR

ETR

MAU

ETR

CT

ETR

ERV

ETR

ERV

-- ETR

CWP

(E) 3"

CONTRACTOR TO ROUTE CONDENSATE TO

NEAREST ROOF DRAIN.

(E) 4"

(E) 3"

(E) 4"

(E) 3" (E) 4"

(E) 3"

(E) 3/4"

(E) 3" CHS

(E) 3" CHS

(E) 4" CHR

(E) 4" CHR

2-2

2-1

O M.2 K.2 F.9 C.9 A.5 AA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MD104B

MECHANICAL DEMOLITION PLAN -

BLDG 38, PENTHOUSE LEVEL

11 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - BLDG 38, PENTHOUSE LEVEL

1. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

2. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

3. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

4. THE DEMOLITION DRAWINGS ARE DEEMED

SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK

PRIOR TO SUBMISSION OF PROPOSAL.

DEMOLISH MECHANICAL PIPING TO DEMARCATION

POINT SHOWN AND CAP. SEE SHEET MH104B FOR

RELATED WORK.

DEMOLISH CHILLED WATER PUMP IN LOCATION

SHOWN. DEMOLISH ASSOCIATED PIPING AND

ACCESSORIES AS SHOWN. SEE SHEET MH104B FOR

RELATED WORK.

CONTRACTOR TO VERIFY EXISITING CHILLER MAKE-

UP WATER LINE AND DEMOLISH BACK TO

PENTHOUSE.

PRE/POST

SOILED

HAC

ISOLATION

TOILET

PRE/POST

PRE/POST

PRE/POST

PRE/POST

PRE/POST

STAFF TOILET

MEDS

CORRIDOR-1

C207-02-1

PACU

PACU

PACU

CORRIDOR-1

C202-02-1

CLEAN SUPPLY

STORAGE

CORRIDOR-1

C203-02-1

PRE/POST

CORRIDOR

C208-02

CORRIDOR-2

C203-02-2

CORRIDOR

C206-02

20"x20" SA

6"ø CD-1

6"ø CD-1

6"ø CD-1

8"ø CD-1

6"ø CD-1

"x

S A

6"ø CD-1

6"ø CD-6

6"ø CD-1

6"ø CD-1

8"ø CD-1

6"ø CD-1

14"x14" SA

"x

S A

"x

S A

8"ø CD-1

6"ø SA

8"ø SA

"x

S A

8"ø CD-6

6"ø CD-5

10"x12" SA

"x

S A

8"ø CD-1

8"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

36"x18" SA UP TO AHU

COORDINATE DUCT DROP

WITH BUILDING STRUCTURE.

12"x10" SA

"x

S A

"x

R G

-1

"x

R G

-1

"x

R G

-1

"x

R G

-1

"x

R G

-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-5

10"ø CD-1 300 10"ø CD-1

14"x12" SA

22"x22" RG-1

22"x22" RG-1

26"x16" RA

"x

R A

24"x12" RA

"x

R A

16"x18" SA

8"ø SA

"x

R A

8"x8" SA

VAV

2A-2

VAV

2A-3

VAV

2A-4

VAV

2A-5

VAV

2A-6

VAV

2A-8

VAV

2A-10

8"x8" SA

10"x8" SA

VAV

2A-7

12"x10" SA

24"x14" RA

VAV

2A-1

10"x10" RA

8"x8" SA

12"x10" RA

"x

R A

16"x12" RA

"x

R A

VAV

2A-9

12"x8" RA

"ø

S A

12"ø SA

8"ø SA

"x

R A

CARE STATION

"x

S A

6"ø CD-1

8"ø CD-1

ANTEROOM

DICTATION

TOILET

6"ø CD-5

6"ø CD-5

8"ø CD-1

10"ø RA

22"x22" RG-1

6"ø CD-5

"ø

C D

-5

10"ø CD-1

"x

R G

-1

8"x8" SA

10"x10" EG-2

10"x10" EG-2

10"x10" EA

22"x22" EG-1

6"ø SA

22"x22" EG-1

22"x10" EG-1

10"x10" SA

"x

R A

CORRIDOR-2

C207-02-2

10"x10" EG-2

12X12 EA UP TO

2-EF 2

10"x10" EG-3

16"x10" EG-1

"ø

S A

10"x10" EG-2

"ø

S A

8"ø SA

"ø

S A

12"x10" EA

UP TO EF

SD

SD

FSD

FSD

SD

SAV

2A-1

EAV

2A-1

12"x8" EA

"x

E A

10"x10" EA

"x

E A

"ø

E A

12"x8" EA

16"x4" EA

RHC

2A-1

"x

S A

"x

S A

10"ø SA

SD

"x

R A

"x

R A

26"x16" RA

M502

M502

TYP

3 1

M502

TYP

M502

TYP

M H

2B

M H

2B

MH102C MH102C

36"x18" SA

"x

S A

24"x16" SA20"x20" SA

10"ø CD-1

"x

S A

2-3

2-2

2-4

2-7

2-8

2-9

2-10

2-6

2-5

O M.2 K.2

K.1

F.9

36"x18" RA UP TO AHU

COORDINATE DUCT DROP

WITH BUILDING STRUCTURE.

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:0

P

M

MH102A

MECHANICAL HVAC PLAN - BLDG 2A,

LEVEL 2 FLOOR PLAN

12 32JLF

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B

1/4" = 1'-0"

MECHANICAL HVAC PLAN - BLDG 2A, LEVEL 2 FLOOR PLAN

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

UNLESS NOTED OTHERWISE.

1 LABEL EXHAUST DUCTWORK, FILTER, AND

FAN "COMMUNICABLE DISEASE

CONTAMINATED AIR."

2 PLACE DIFFERENTIAL PRESSURE SENSORS

AS NECESSARY TO ENSURE PRESSURE

RELATIONSHIPS BETWEEN THE ISOLATION

AND ANTE ROOMS WITH SURROUNDING

SPACES.

3 EXHAUST GRILLE IN ISOLATION ROOM TO

BE PLACED 7" ABOVE FLOOR, NEAR

PATIENT HEAD REST. COORDINATE CHASE

FOR EXHAUST DUCT RISER WITH

ARCHITECTURAL.

STAIR-1

S2-02-1

68 CFM

OR

OR

OR

C O

R R

ID

O

R

5-

C O

R R

ID

O

R

C

4-

CORRIDOR

C201-02

"x

R G

-1

10"ø CD-1

22"x22" RG-1

8"ø CD-1

10"ø CD-1

22"x22" RG-1

(E)60"x24" SA

(E)56"x20" SA

(E)40"x18" SA

49"x24"

RA UP TFA

(E) 24"x60" SA

DN FFA

8"ø CD-1

8"ø CD-1

8"ø CD-1

8"ø CD-6

VAV

2B-4

(E)22"x16" SA

(E)24"x16" RA

(E)42"x18" RA

IMMED. STER.

22"x22" EG-2

10"x8" EA

(E)60"x20" RA

(E) 60"x20" RA

UP TFA

(E) 42"x18" RA

UP TFA

(E) 42"x18" RA

UP FFB

(E) 60"x20" RA

UP FFB

(E) 24"x16" RA

UP FFB

M-401

"x

R G

-1

22"x22" RG-1

M-4011

M-401

SD

20"x16" RA 26"x16" RA 30"x22" RA 24"x18" RA

"x

R A

20"x16" SA 22"x16" SA 30"x20" SA

12"x10" SA

"x

R A

"x

S A

49"x24" SA

"x

S A

49"x24"

SA DN FFA

LAF 3

LAF 2

LAF 1

RAV

2B-3

SAV

2B-3

VAV

2B-2

VAV

2B-3

RAV

2B-2

SAV

2B-2

RAV

2B-1

SAV

2B-1

VAV

2B-1

SD SD SD

SD SD

SD SDSD

SD

SD

SD

"x

R A

"x

R A

10"ø CD-1

STERILE CORE

RHC

2B-2

RHC

2B-1

RHC

2B-3

"x

R A

12"x14" SA

"ø

S A

12"x8" RA 12"x8" RA

20"x30" SA

22"x22" RG-1

M H

2A

M H

2A

MH102C MH102C

(E) 56"X20" SA DN TFB

(E) 22"X 16" SA DN TFB

(E) 40"X 18" SA DN TFB

"x

R A

SEE SHEET

M-401 FOR

CONTINUATION.

SEE SHEET

M-401 FOR

CONTINUATION.

SEE SHEET

M-401 FOR

CONTINUATION.

M502

TYP

2-3

2-2

2-4

2-7

2-8

2-9

2-10

2-6

2-5

C.9 A.5 AA

12"x12" EA

UP TO EF

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2-HR FIRE BARRIER

2-HR FIRE/SMOKE BARRIER

SMOKE PARTITION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

/1 /2

:0

:5

P M

MH102B

MECHANICAL HVAC PLAN - BLDG 2B,

LEVEL 2 FLOOR PLAN

13 32JAD

RELOCATE AND UPGRADE

OPERATING ROOM SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/15/19

BID DOCUMENTS

657-50119-126

2 & 38

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

2A 2B 1/4" = 1'-0"

MECHANICAL HVAC PLAN - BLDG 2B, LEVEL 2 FLOOR PLAN

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SCHEDULE WORK TO MINIMIZE DISRUPTION OF

SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

UNLESS NOTED OTHERWISE.

1 NEW OPERATING ROOM LAMINAR AIRFLOW (LAF-X)

CEILING SYSTEM IN THE LOCATION SHOWN TO BE

OWNER FURNISHED AND CONTRACTOR INSTALLED.

COORDINATE INSTALLATION OF PLENUM SYSTEM

REQUIREMENTS WITH THE MANUFACTURER AND

SPECIFICATION 11 76 00 OPERATING ROOM EQUIPMENT

AND MANAGEMENT SYSTEMS.

PLACE DIFFERENTIAL PRESSURE SENSORS AS

NECESSARY TO ENSURE PRESSURE RELATIONSHIPS

BETWEEN THE OR'S WITH SURROUNDING SPACES.

COORDINATE SUPPLY AND RETURN DUCT ROUTING WITH

BUILDING STRUCTURE AND ROUTE BENEATH BEAM IN

THE LOCATION SHOWN.

N

ELECTRICAL

216ELECTRICAL

STAFF LOUNGE

EQUIPMENT

ANESTHESIA

MEN'S LOCKER

WOMEN'S LOCKER

STAFF TOILET

STAFF TOILET

SOILED

HAC

CONSULTATION

RECEPTION

CORRIDOR-1

C203-38-1

CORRIDOR-1

C201-38-1

ELEVATOR SHAFT

C202-54

(E)14"Ø SA UP

(E)14"Ø SA DN

(E)18"x14" RA UP (E)18"x12" RA DN

NOT IN SCOPE

"ø

S A

(E )1

"x

R A

10"x10" EA (E)18"X10"

EA UP

12"x8" RA

12"x12" RA

(E)12"x8" EA

FRM BLW

14"x14" EA

"x

E A

20"x16" EA UP

(E) WEF-1

VAV

38-2

VAV

38-1

VAV

38-7

VAV

38-9

VAV

38-8

VAV

38-12

VAV

38-11 VAV

38-10

12"x10" RA

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-2

6"ø CD-2

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

8"ø CD-1

6"ø CD-1

6"ø CD-1

10"ø CD-1

10"ø CD-1

8"ø CD-1

8"ø CD-1

8"ø CD-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

10"x10" EG-2

22"x10" RG-4

22"x22" RG-1

22"x10" RG-4

10"ø SA

"ø

S A

10"x10" RA

14"x14" EA

22"x22" RG-1

10"x8" RA

CORRIDOR-1

C202-02-1

10"x10" EG-2

10"x10" EG-2

6"ø CD-2

6"ø CD-2

"x

R A

8"x8" SA

18"ø SA

10"x8" SA

6"ø SA

12"x12" SA

8"x8" SA

"x

S A

"x

S A

8"x12" SA

10"ø SA

12"x10" RA

22"x22" EG-1

12"x10" EA

22"x22" EG-1

10"x10" EG-2

10"x10" EG-2

12"x14" EA

10"x10" EG-2

22"x22" RG-1

PSA

WAITING-2

223-2

BIO-MED

6"ø CD-1

6"ø CD-1

10"x8" RA

10"x10" EG-2

"x

E A

10"x10" EG-2

22"x10" RG-4

8"x8" RA

22"x10" RG-4

"x

S A

VAV

38-4

VAV

38-5

TOILET

TOILET-2

227-2

8"x8" SA

6"ø SA

12"x8" RA

6"ø EG-5

6"ø EG-6

6"ø EG-4

"ø

S A

"x

S A

5"ø SA

6"ø SA

6"ø SA

"x

S A

6"ø SA

VAV

38-6

6"ø SA

12"ø SA

8"x8" SA

"ø

S A

10"x8" RA

8"x8" RA

(E)14"x10" RA

(E)14"x10" RA

VAV

38-3

"x

E A

(E) 24"x12" MA FRM ABV

(E) 24"x12" EA UP

(E)10"x10" EA UP

(E)10"x8" EA FRM BLW

(E)12"x24" MA DN

(E)12"x24" EA FRM BLW

FSD

FSD

"x

R A

659 SF

WAITING-2

223-2

15 SF

WAITING-1

223-1

(E )8

"x

E A

(E )2

"x

M A

(E )2

"x

E A

(E)18"x18" RA FRM BLW

(E)18"Ø SA FRM BLW

(E)10"x8" EA FRM BLW

(E)10"x8" EA UP

MH102A MH102B

6"ø EA

8"ø RA

6"ø RA

12…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .