This solicitation is for the construction of a surgical suite addition at a Veterans Affairs medical center. The scope of work includes constructing three operating rooms, endovascular services, and an ambulatory surgical service on the second floor of two buildings. Infrastructure will also be installed to support uninterruptible power supply requirements. Upon completion, the facility will have a fully operational three operating room inpatient surgical and endovascular suite as well as an ambulatory surgical service. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 02 HA 100 BID - 5 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf | ||
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
CD
ACD
V
AV
AW
AW
SD
OSD
GW
GW
SS
W
ID
SPD
T
T
SCW
WS
140°
SAN
W
SD
CAP
AV
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (SS)
SOIL PIPING - BELOW FLOOR (SAN)
STORM DRAIN - ABOVE FLOOR (SD)
STORM DRAIN - BELOW FLOOR (SD)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OSD)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE (SOV)
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL SINK & TYPE
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
LIMIT OF DEMOLITION
TRAP PRIMER LINE - BELOW SLAB (T)
CO
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
JANITORS SINK - CORNER
MEDICAL GAS OUTLET (TYPE)
EXISTING TO REMAIN
A
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
B
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
G
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
P
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
S
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
26-P 3
PIPING SYMBOLS
ANNOTATION
XX-1
xx
X100
X100
GENERAL PLUMBING SYMBOLS
DENTAL
MEDICAL GASES
STORM
FUEL
EXISTING PIPING
WATER
WASTE
VALVE SYMBOLS
GENERAL EQUIPMENT
FLOOR MOUNTED FLUSH VALVE
WATER
CLOSET
WALL MOUNTED FLUSH VALVE
WATER
CLOSET
ETR
ABBREVIATIONS
WAGD WASTE ANESTHESIA GAS DISPOSAL
DISTILLED WATERDW
Z
ZVB ZONE VALVE BOX
ETR EXISTING TO REMAIN
FR FROM
ABV ABOVE
DOMESTIC COLD WATER RECIRC.
CONNECT TO EXISITNG
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:5
:0
A
M
P-000
PLUMBING LEGEND
1 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
5" SD
2" DCW TO REMAIN
EXISTING. ROOF
DRAIN TO REMAIN.
V V
EXIST. 4" FD FROM
MECH ROOM ABV.
TO REMAIN.
3” VENT TO REMAIN
4” VTR TO REMAIN
3” VTR TO REMAIN
5” VTR TO REMAIN
EXIST. 4” VENT FROM BELLOW TO REMAIN. EXISTING 2” WASTE
DN/ 2” VENT UP TO
REMAIN
V
V V V
V V V
4" S S
V
E T
R
3" V
4" V
2" DCW ETR
4" V
/1 PD102C
/1 PD102C
EXIST. 4" VTR TO REMAIN2
V V
V V
3"
3"
SD
OSD
SD
OSD
CAP PIPE FLUSH WITH FLOOR
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC SERVICE
STORAGE
208A
CORRIDOR
C202-02
STAIR
S1-02
MEN
CART STORAGE
207C
KITCHEN
OFFSET VENT PIPE BELOW FLOOR.
2" V (ETR)
EXISTING 2" VENT TO REMAIN
X
2"
2"
2"
5" SD
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9
P D
B
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:0
A
M
PD102A
SECOND FLOOR PLUMBING
DEMOLITION PLAN AREA A
2 25Author
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
Checker
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN AREA A
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1. CONTRACTOR IS ONLY TO REMOVE PIPE AT
FITTING TO THIS POINT. VERIFY SIZE AND
LOCATION BEFORE REMOVING.
2. EXISTING SANITARY ABOVE CEILING TO REMAIN.
3. REMOVE EXISTING PLUMBING FIXTURE AND ALL
ASSOCIATED PIPING.
4. DEMO EXISTING DRAIN PIPE SUPPORTED TO
CEILING
5. CAP AND REMOVE EXISTING WATER LINE IN WALL
BELOW FLOOR
N
EXISTING VENT PIPE TO REMAIN
EXISTING VTR
TO REMAIN
V V
V V
2" DCW ETR
4" V
/1 PD102C/1 PD102C
P D
A
P D
A
STAIR
S2-02
CORRIDOR
C203-02
MEN
WOMEN
NUTRITION SERVICES
OUTPATIENT NUTRITION
OUTPATIENT NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
2-2
2-3
2-5
2-6
2-8
2-9
2-10
F.9 C.9 A.5 AA AC
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:0
A
M
PD102B
SECOND FLOOR PLUMBING
DEMOLITION PLAN AREA B
3 25Author
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
Checker
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN AREA B
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1. REMOVE EXISTING PLUMBING FIXTURE AND ALL
ASSOCIATE PIPING. CAP BRANCH LINES IN WALL.
N
4" SS (ETR)
S S
E
T R
2" DCW (ETR)
3/4" DHWR (ETR)
1 1/4" DHW (ETR)
/2
D
H W
E
T R
1/2" DCW (ETR)
2" V
2" V (ETR)
2" V
3/4" DCW (ETR)
2" V
EXISTING 3/4" MEDICAL AIR/
VACUUM AN OXYGEN TO
REMAIN.
EXISTING 2" DCW, 1-14" DHW
AND 3/4" DHWR. TO REMAIN.
2"
V
E T
R
EXISTING MEDICAL AIR AND MEDICAL VACUUM FROM ABV.
2"
V V V
VV
V V
X
V
V
NOT IN SCOPE
2" DCW (ETR)
4" VENT UP ETR
4" FD ABV. ETR
3/4" DHWR (ETR)
3/4" DHW (ETR)
EXIST. VENT UP TO REMAIN.
EXIST. 2" WASTE FR. ABV.
EXIST. 4" WASTE DOWN. TO REMAIN
EXIST. 4" WASTE STACK TO REMAIN
XXX
X
X
REMOVE EXISTING DRINKING FOUNTAIN.
2" V (ETR)
S D
E
T R
2" V (ETR)
2" V
(E
TR
2" V (ETR)
V
E T
R
2" V
D C
W
E T
R
/4
D
H W
E
T R
/4
D
H W
R
E T
R
2" V
/2
D
C W
E
T R
1" DCW (ETR)
1" DCW (ETR)
V
E T
R
4" V
2" DCW (ETR)
/4
D
H W
R
E T
R
1 1/4" DCW (ETR)
1 1/4" DHW (ETR)
3/4" DCW (ETR)
3/4" DHWR
1 1/4" DHW
2" DCW
S S
S S
E
T R
EXISTING
WASTE FR.
ABV. TO
REMAIN
S S
E
T R
ETR
ETR
ETR
4" SS (ETR)
S S
E
T R
4" SS
S S
E
T R
4" SS (ETR
ETR
ETR
2" V
/4
D
H W
R
E T
R
/4
D
C W
E
T R
1" DCW (ETR)
ETR
1/2" DHW (ETR)
S D
2" V
/1 PD102A
FIBER OPTIC
236B
LOGISTICS
WOMEN
HAC
MEN
MECH.
INPATIENT DIETETIC
217A
CLINICAL DIETITION
INPATIENT DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STRESS LAB
WAITING
PAMN
PAGING EQUIPMENT
ELEVATOR 2
ELEVATOR 1
OXYGEN STORAGE
WHEELCHAIR ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
ELEVATOR LOBBY
C1
EXISTING ROOF DRAIN FR. ABV.
2-1
O M.2 F.9 C.9 A.5 AA
/1 PD102B
P D
B
2"
C.O.
C.O.
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:0
A
M
PD102C
SECOND FLOOR PLUMBING
DEMOLITION PLAN BLDG. 38
4 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
1. REMOVE EXISTING PLUMBING FIXTURE AND ALL
ASSOCIATE PIPING. CAP BRANCH LINES IN WALL.
2. CONTRACTOR IS ONLY TO REMOVE PIPE TO THIS
POINT. VERIFY SIZE AND LOCATION BEFORE
REMOVING.
3. EXISTING SANITARY ABOVE CEILING TO REMAIN.
4. EXISTING VENT TO SHOWN FOR REFERENCE
ONLY.
5. EXISTING DOMESTIC WATER LINES TO REMAIN.
1/4" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN BLDG. 38
UP
W.I.F.
(461 SF.)
W.I.C.
(303 SF.)
KITCHEN
DRY
/4
D
H W
R
/4
D H
W
ROUTE NEW 1-1/4" DHW, 3/4"
DHWR, AND 1" OXYGEN
SUPPLY UP TO 2ND FLOOR.1-1/2" DCW (ETR)
1" DHW (ETR)
1/2" DHWR (ETR)
2" DCW (ETR)
1" DHWR (ETR)
2" DCW/ 1-1/2" DHW
& 3/4" DHWR (ETR)
1-1/2" DHW (ETR)
2-1/2" DCW ENTRY (ETR)
3/4" DHW (ETR)
3/4" DCW (ETR)
1/2" DHWR (ETR)
1" DHW (ETR)
1-1/2" DCW (ETR)
EXIST. 1-1/2"
DCW,1" DHW, &
1/2" DHWR (ETR)
1-1/4" DCW (ETR)
3/4" DHW (ETR)
DHW (ETR)
DCW (ETR)
3/4" OX (ETR)
1-1/4" OX (ETR)
2-1/2" DCW
(ETR)
1-1/4" DCW, 1-1/4" DHW,
& 1/2" DHWR (ETR)
DCW (ETR)
1" DHWR (ETR)
1-1/2" DHW (ETR)
2" DCW (ETR)
5" SS
4" SS
S S
EXIST. HEAT EXCHANGER
EXIST. HHW
PUMPS 1-2
4" SS-ETR
EXIST. GW
O
1 1/4" O
/4
O
1 1/4" O
4" SS (ETR)
2" SS
S S
2" WASTE FR. ABV.
S S
4" S
S
4" WASTE FR. ABV.
S
S
S S S
S S
G W
G W
GW
GW
GW
GW
G W
GW
GW
GW
G W
G W
GW
S S
V
V
4"
2"
GW EXIST. MECH ROOM
BLDG. #2
EXISTING PIPE TUNNEL
/4
G
E T
R
/4
O
E T
R
/2
D H
W
E T
R
/4
D
H W
R
E T
R
/4
L P
C
/4
G
M P
S
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9 C.9 A.5 AA AC
C.O.
EXIST. HEAT EXCHANGER
EXIST. MECH ROOM
BLDG. #1
EXIST. FIRE PUMP
EXISTING CIRC. PUMPS.
MOUNTED ON ALL
1 1/4" O (ETR)
/4
G
E T
R
/4
O
E T
R
1 1/4" O (ETR)
4" DCW (ETR)
2 1/2" DHW (ETR)
1 1/2" DHWR (ETR)
1 1/2" DHWR (ETR)
2 1/2" DHW (ETR)
4" DCW (ETR)
2" DCW (ETR)
1" DHW (ETR)
1/2" DHWR (ETR)
1 1/2" DHWR (ETR)
2" DCW (ETR)
1" DHW (ETR)
D C
W R
/2
D C
W
D H
W
/4
D
H W
R
RP-1
EXISTING OPENING FROM
PIPE CHASE TO MECH.
ROOM
NOT IN SCOPE
Q
7 O M.2 F.9 C.9 A.5 AA AC
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:0
A
M
PP100A
PARTIAL PIPE BASEMENT PLUMBING
PLAN
5 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
1, 2
JES
1/8" = 1'-0"
PARTIAL PIPE BASEMENT PLUMBING PLAN
N
1. CONNECT TO EXISTING 1-1/4" OXYGEN
SUPPLY. CONTRACTOR TO VERIFY SIZE AND
LOCATION.
2. CONNECT NEW 1-1/2" DHW TO EXISTING
ARMSTRONG HEAT EXCHANGER IN PIPE
BASEMENT.
3. 3/4" STEAM CONDENSATE FROM ABOVE.
4. 2-1/2" DCW, 1" DHW,3/4" DHWR, & 1" DCWR,
FROM ABOVE.
5. 1" STEAM UP TO 2ND FLOOR FOR
STERILIZER
6. CONNECT NEW STEAM SUPPLY AND
CONDENSATE TO EXISTING STEAM LINES.
VERIFY LOCATION, PRESSURE AND SIZE.
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1/8" = 1'-0"
PARTIAL PIPE BASEMENT PLUMBING PLAN
N
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
BLDG.#1
DN
DN DN
DNCOURTYARD
MRI ADDITION
EXISTING CORRIDOR #8
W.I.F.
(461 SF.)
W.I.C.
(303 SF.)
KITCHEN
LOADING
DOCK
MEN'S
TOILET
WOMEN'S
TOILET
J.
CLO.
KITCHEN
DRY
STORAGE(437 SF.)
OFFICE #2
OFFICE #1
OFFICE #3
EXISTING CANTEEN
(NO CHANGE)
RETAIL
SHOP
EXISTING
SECTION OF
KITCHEN
EXISTING
CORRIDOR #6
EXISTING
STAIR
EXISTING
ELEVATOR
VESTIBULE
INDUSTRIAL
CORRIDOR #2
EXTRACTOR
INDUSTRIAL
CORRIDOR #1
STAIR
#1
RETAIL
STORAGE
CASHIER
PASS-THRU
REFRIG.
LOCKER
EXISTING
OFFICE #1
EXISTING
OFFICE #2
EXIST. ELEC. RM.
EXISTING
FOOD STORAGE
EXISTING CORRIDOR #7
STAFF
TOILET
LOCKER
CORRIDOR #3
CORRIDOR #4
EXISTING
CORRIDOR #5
EXISTING
WORK ROOM
ELEC. ROOM AELEC. ROOM B
EXISTING SERVING AREA
(NO CHANGE)
EXISTING CANTEEN VESTIBULE
DUMPSTER
ENCLOSURE
GREASE
WASTE
ENCLOSURE
COVERED
LOADING DOCK
EXISTING
ELEVATOR
EXISTING
VESTIBULE
COVERED
WALKWAY
COVERED
LOADING
DOCK
EXISTING BIO-WASTE
CONTAINER
TRASH COMPACTOR
EXISTING
BIO-HAZARD WASTE
CONTAINER
LINEN
CONTAINER
STAIR #2
F.E.C.
F.E.C.
F.E.C.
F.E.C.
3"
V.T.R.
4"
4"
3"
4"
3"
4"
FD-A
FD-S
FD-S
FD-S
FD-S
FD-S
FD-S
FD-S
FD-A
FD-A
FD-A
FD-S
FD-A
C.O.1
FD-A
FD-A
C.O.2
V
V
V V
C W
H W
H W R
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
2" WASTE FR. ABV.
ROUTE 2" WASTE DOWN TO PIPE BASEMENT
2" SS
S S
4" WASTE FR. ABV.
4" WASTE DN.
TO PIPE
BASEMENT
OFFSET PIPE IN
CEILING TO FIT IN
CHASE ABV.
Q
2-1
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9 C.9 A.5 AA AC
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PP100B
PARTIAL GROUND FLOOR PLUMBING
PLAN
6 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/8" = 1'-0"
PARTIAL GROUND FLOOR PLUMBING PLAN
N
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
5" ROOF DRAIN (ETR)
3" SS
EXIST. 4” WASTE DN/ 4” VENT UP
EXIST. 2” VENT UP
EXIST. 2”
VENT UP
EXIST. 4" WASTE STACK
EXIST. 2" VENT STACK
S S
S S
2" WASTE FR. ABV.
2" WASTE FR. ABV.
4" C.O.
4" WASTE FR. ABV.
2" WASTE FR. ABV.
3" WASTE FR.
SERVICE SINK
ABV.
2" WASTE
FR. ABV.
2" S
S
S S
S S
2" SS
C.O.
4" WASTE
FR. ABV.
4" WASTE DOWN
C.O.
2" WASTE FR. SINK'S ABV.
4" WASTE DN./ 2" VENT UP
C.O.
S S
4" SS
S S
2" SS
S S
/4
L P
C
3/4" LPC
2" WASTE FR. ABV.
2" SS 2" SS 1-1/2" VENT UP/ 2" WASTE DN.
2" FD FROM ABV.
2" WASTE FR. ABV.
S S
4" WASTE DN/ 2" VENT
UP (TYP.)
2" WASTE FR. ABV.
2" FD ABV.
4" WASTE FR. ABV.
4" WASTE DN/ 2" VENT
UP (TYP.)
2" FD ABV.
2" WASTE FR. ABV.
4" SS2" SS
S S
C.O.
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9
/1 PL101C
P L B
/1 PL101C
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PL101A
FIRST FLOOR SANITARY PLAN A
7 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
FIRST FLOOR SANITARY PLAN AREA A
N
1. ROUTE NEW SANITARY PIPE ABOVE THE
CEILING.
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
3/4" STEAM
CONDENSATE DOWN.
5" ROOF DRAIN (ETR)
4" S.S. (ETR)
2" WASTE FR. ABV.
2" C.O.
2" WASTE DN.
4" C.O.
2" WASTE FR. ABV.
2" SS
C.O.
S S
S S
3" FLOOR DRAIN ABV.
3" WASTE DN./ 2" VENT UP
2" S
S
3" SS
2" WASTE FR. ABV.
2" WASTE FR. ABV.
S S
3/4" LPC
/4
L P
C
3/4" STEAM CONDENSATE DOWN. FR. ABV.
ROUTE 3/4" STEAM
CONDENSATE DOWN
TO BASEMENT
2" WASTE FR. ABV.
2" SS
2" SS
C.O.
2-2
2-3
2-5
2-6
2-8
2-9
2-10
F.9 C.9 A.5 AA AC
/1 PL101C
/1 PL101C
P L A
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PL101B
FIRST FLOOR SANITARY PLAN B
8 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
FIRST FLOOR SANITARY PLAN AREA B
NORTH
1. ROUTE NEW SANITARY PIPE ABOVE THE
CEILING.
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
4" SS (ETR)
S S
4" SS 4" SS
5" ROOF DRAIN (ETR)
2" V (ETR)
2" V (ETR)
2" V (ETR)
2" V (ETR)
2" V (ETR)
V
E T
R
6" SD (ETR)
4" SS
S S
E
T R
4" SS (ETR)
2" SS (ETR)
OFFSET EXISTING
VENT PIPE IN
CEILING
ROUTE EXISTING
VENT UP
ROUTE EXISTING VENT UP
2" WASTE FR. ABV.
EXISTING 4" WASTE STACK
EXISTING 4" WASTE STACK
2" WASTE FR. ABV.
4" WASTE FR. ABV.
4" WASTE FR. ABV.
2" WASTE FR. ABV.
S S
2" WASTE DN./ 2" VENT UP
2" WASTE FROM ABV.
2" WASTE FR. ABV.
3" MSB ABOVE.
2" VENT UP
4" WASTE FR. ABV.
2" WASTE FR. ABV.
2" WASTE
FR. ABV.
4" SS
S S
S S
C.O.
CAP EXISTING WASTE ABV.
REROUTE EXISTING 4" VENT
2" V (ETR)
2" ETR
2" ETR EXIST. 2" VENT UP
ETR
ETR
4" WASTE (ETR)
4" SS (ETR) 4" SS (ETR)
4" SS (ETR)
2" V (ETR)
4" SS (ETR)
2" V (ETR)
4" SS
2" SS FFA
4" SS FFA
4" SS FFA
4" SS (ETR)
2" SS FFA
6" SD (ETR)
V
E T
R
C.O.
C.O.
4" SS (ETR)
V
E T
R
S S
E
T R
2" SS
2-1
O M.2 F.9 C.9 A.5 AA
2" SS
S S
4" SS
4" SSEXISTING 2" VENT UP
P L B
NOT IN SCOPE
4" WASTE DN. 2" VENT UP
4"WASTE DN. 2" VENT UP
/1 PL101A /1 PL101B
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PL101C
FIRST FLOOR SANITARY PLAN BLDG. 38
9 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
FIRST FLOOR SANITARY PLAN BLDG. 38
N
1. ROUTE NEW SANITARY PIPE ABOVE THE
CEILING.
2. 2" FD-C FROM ABOVE.
3. 2" SHOWER DRAIN FROM ABOVE.
2" ETR
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
A
P-414
P-502
P-414
P-708
V
E T
R
EXISTING 3" VENT
2" WASTE DN/
1-1/2" VENT UP
EXIST. 4" VTR
2" WASTE DN./ 1-1/2" VENT UP
3" V
2" V
2" V
V
2" V
1-1/2" VENT
UP FROM
SINK.
ETR VTR
2" VENT UP
V
2" V
2" VENT UP
4" WASTE DN./
2" VENT UP
3" V
5" SD
EXISTING SD ETR
P-414
P-101 P-101
P-414
P-528
P-101
P-414
P-528
P-528
P-414
P-414
P-414 1 1/2" V
1 1/2" V2" V
2" V
/2
V
V
2" V
1-1/2" VENT UP
2" FD-B
EXIST 2" VENT FROM BELOW
P-708
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
PRE/POST
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C208-02
1 1/2" V
2" V
1 1/2" V
2" V
V
V
2" V
2" V
1-1/2" VENT
UP FROM
SINK.
2" VENT UP/ 4"
WASTE DN.
(TYP.)
2" VENT UP/ 4"
WASTE DN.
(TYP.)
2" FD-C
2" FD-C
2" FD-C
4" S
S (E
TR
4" ETR
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9
2" V (ETR)
EXIST 2" VENT FROM BELOW
/1 PL102C
P L B
/1 PL102C
1 / PL102A
1 / PL102B
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PL102A
SECOND FLOOR SANITARY PLAN A
10 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
SECOND FLOOR SANITARY PLAN A
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
N
1. ROUTE NEW VENT PIPE ABOVE THE CEILING.
2. EXISTING SANITARY PIPE IS ABOVE THE
CEILING IS SHOW FOR REFERENCE ONLY.
CONTRACTOR TO VERIFY SIZE AND
LOCATION AND REROUTE TO
ACCOMMODATE OTHER TRADES.
3. REROUTE EXISTING 2" VENT UP TO NEW
VENT LINE.
4. 2" WASTE DOWN, 1-1/2" VENT UP FROM
EYEWASH.
4" V (ETR)
A
P-528 P-528
P-520 P-520
2" V
2" V
2" V
V
2" VTR
2" WASTE DOWN. PROVIDE
AIR ADMITTANCE VALVE
UNDER SINK
2" VENT UP
3" FD-C
3" WASTE DN/ 2" VENT UP
V
V
2" V
3/4" STEAM
CONDENSATE DOWN
FROM STERILIZER.
P-520
1 1/2" V
ELECTRICAL
ALCOVE
C207-02A
CORRIDOR
C204-2
CORRIDOR
205-02
OR
OR
251OR
2" V
V
V
1/
2" V
4" S S (E
TR
2-2
2-3
2-5
2-6
2-8
2-9
2-10
F.9 C.9 A.5 AA AC
/1 PG102C
/1 PL102C
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:1
A
M
PL102B
SECOND FLOOR SANITARY PLAN B
11 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
SECOND FLOOR SANITARY PLAN B
N
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1. 2" WASTE DOWN, 1-1/2" VENT UP FROM
SCRUB SINK
4" SS
4" SS
4" SS FFA
4" SS FFA
4" SS FFA
4" SS (ETR)
2" V (ETR)
P-505
P-502
P-528
P-524
P-708
P-414 P-414
V
2" V
V
CONNECT TO EXISTING VTR
2" VENT
FROM
BELOW
NOT IN SCOPE
4" END VENT ETR
ETR
S S
E
T R
4" SS
S S
E
T R
S S
E
T R
4" WASTE ETR
C.O.
C.O.
S S
E
T R
4" SS (ETR)
EXISTING WASTE FR. ABV. ETR
V
2" V
2" WASTE DN. 2" VENT UP
2" WASTE DN.
2" VENT UP
2" WASTE DN.
2" VENT UP
EXISTING VENT ETR
ETR
WASTE FR. ABV. ETR
C.O.
2" WASTE DN. 1-1/2" VENT UP
P-702
P-702
P-101
P-414
P-101
/2
V
4" V (ETR)
2" VENT
FROM
BELOW
P-528
4" SS (ETR)
4" SS (ETR)
EXIST. 4" WASTE DN.
P-101
P-101
ELECTRICAL
ELECTRICAL
CORRIDOR
C202-02
CORRIDOR
C204-02
CONSULTATION
CHASE
V
EQUIPMENT
ANESTHESIA
CORRIDOR
C203-38
HAC
SOILED
STAFF LOUNGE
WOMEN'S LOCKER
MEN'S LOCKER
STAFF TOILET
STAFF TOILET
CORRIDOR
C201-38
RECEPTION
CHASE
C202-56
WAITING
CORRIDOR
C204-02
OFFICE
PSA OFFICE
N. MANAGER OFFICE
BIO-MED
225TOILET
TOILET
2" V
V
ROUTE TO NEAREST VENT
2" V 1 1/2" V
FD-C
FD-C
FD-C
FD-C
4" WASTE DN/ 2" VENT UP2" V
2" V
V
2-1
O M.2 F.9 C.9 A.5 AA
P L B
2" V
2" V
1 1/2" V 2" V
V
1 / PL102A
1 / PL102B
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:2
A
M
PL102C
SECOND FLOOR SANITARY PLAN BLDG.
12 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
1/4" = 1'-0"
SECOND FLOOR WASTE AND VENT PLAN BLDG.38
N
1. ROUTE NEW VENT PIPE ABOVE THE CEILING.
2. EXISTING SANITARY PIPE IS ABOVE THE
CEILING IS SHOW FOR REFERENCE ONLY.
CONTRACTOR TO VERIFY SIZE AND
LOCATION AND REROUTE TO
ACCOMMODATE OTHER TRADES.
3. 2" WASTE DOWN, 1-1/2" VENT UP FOR
EYEWASH.
4. ROUTE 1-1/2" TRAM-ARM IN WALL TO SINK.
5. EXISTING SANITARY VENT PIPE IS ABOVE
THE CEILING IS SHOW FOR REFERENCE
ONLY. CONTRACTOR TO VERIFY SIZE AND
LOCATION AND REROUTE TO
ACCOMMODATE OTHER TRADES.
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
2" DCW
3/4" DHW
/4
D
C W
1" DHW
D C
W
D H
W
1" DHW
P-414
P-502
P-414
P-708
/4
D H
W
1" D
H W
/4
D
H W
R
/4
D
H W
R
D C
W
3/4" DHW
3/4" DCW
D H
W
/4
D
H W
R
D H
W
/4
D
H W
R
1/2" DHWR
/2
D
H W
R
/4
D
H W
/4
D
C W
P-101
P-414 P-414 P-414
P-101
P-528
P-528
P-414
P-414
M P
S
P-528
1/2" DHWR
P-401
/4
D
C W
3/4" DCW
1/2" DHW
1/2" DHWR
BALANCE VALVE
1/2" DCW3/4" DCW
3/4" DHW
3/4" DCW
P-101
1/2" DCWR
1/2" DCWR
1/2" DHW
3/4" DHWR
3/4" DCWR
/4
D
C W
R
/2
D C
W /4
D
C W
3/4" DCW
3/4" DHW
M P
S
2" DCW
1/2" DCWR
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C208-02
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9
/1 PP102C
P P
B
/1 PP102C
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:2
A
M
PP102A
SECOND FLOOR DOMESTIC WATER
PLAN A
13 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
1/4" = 1'-0"
SECOND FLOOR DOMESTIC PLUMBING PLAN A
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1. PROVIDE 1/2" DCW/DHW DOWN TO SINK.
2. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
COLD WATER SHUT-OFF VALVE.
3. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
HOT WATER SHUT-OFF VALVE.
4. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON HOT
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
5. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON COLD
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
6. 1/2" DCW UP TO HUMIDIFIERS IN PENTHOUSE ABOVE.
7. ROUTE NEW 1-1/4" DHW AND 3/4" DHWR DOWN TO
FLOORS BELOW. PIPE WILL CONNECT IN PIPE
BASEMENT MECH. ROOM IN BUILDING #2.
8. ROUTE NEW 1" STEAM LINE DOWN TO PIPE BASEMENT
IN MECH. ROOM OF BUILDING #2.
9. ROUTE 1/2" DCW DOWN WALL FOR ICE MAKER VALVE
BOX. PROVIDE FILTER AND ISOLATION VALVES FOR ICE
MAKER.
2 3 4 5
CONTINUED ON PP102B
CONTINUED ON PP102C
CONTINUED ON PP102B
3/4" DHWR
1" DCW
P-528
P-528
P-520 P-520
1" DHW
D H
W
/4
D
H W
R
3/4" DHWR 3/4" DHWR
3/4" DHW
1-1/4" DHW AND 3/4" DHWR
DOWN TO BASEMENT
REFER TO PP102A FOR CONT.
REFER TO PP102A FOR CONT.
REFER TO PP102C FOR CONT.
1/2" DHWR
1/2" DCW1/2" DHW
ROUTE 3/4" DHW/DCW
DOWN WALL
1" MPS
1" STEAM PIPE DOWN TO STERILIZER.
3/4" STEAM CONDENSATE DOWN TO FLOOR BELOW.
BALANCE VALVE
3/4" DHW
3/4" DCW
3/4" DCW UP TO PENTHOUSE
1/2" DCWR
3/4" DCW
3/4" DHW
STAIR
S2-02
HAC
ELECTRICAL
OR
CORRIDOR
C204-2
CORRIDOR
205-02
OR
STERILE CORE
CORRIDOR
C201-02
ALCOVE
C207-02A
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
CHASE
C202-57
IMMED. STER.
OR
1" DCW
2-2
2-3
2-5
2-6
2-8
2-9
2-10
F.9 C.9 A.5 AA AC
/1 PP102C
/1 PP102C
P P
A
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:2
A
M
PP102B
SECOND FLOOR DOMESTIC WATER
PLAN B
14 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
1/4" = 1'-0"
SECOND FLOOR DOMESTIC PLUMBING PLAN B
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
2 3 4 5
1. PROVIDE 1/2" DCW/DHW DOWN TO SINK.
2. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
COLD WATER SHUT-OFF VALVE.
3. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
HOT WATER SHUT-OFF VALVE.
4. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON HOT
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
5. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON COLD
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
REFER TO PP102A
FOR CONT.
3/4" DHWR (ETR)
1 1/4" DHW (ETR)
2" DCW (ETR)
3/4" DCW (ETR)
D C
W
/4
D
H W
R
1/2" DHW (ETR)
1/2" DCW (ETR)
3/4" DHWR (ETR)
3/4" DHWR (ETR)
1" DHW
2" DCW
P-401
P-401
NOT IN SCOPE
P-505
P-502
P-528
P-528
P-524
P-708
3/4" DHWR
1" DHW
2 1/2" DCW
/2
D C
W
D H
W
/4
D
H W
R
1 1/2" DCW
3/4" DHW
/4
D
H W
R 3 /4
D
H W
1/2" DHWR
ETR
ETR
ETR
MIXING VALVE
FOR EYEWASH
MIXING VALVE
FOR EYEWASH
3/4" DCW (ETR)
1 1/2" DCW (ETR)
1 1/4" DHW (ETR)
REFER TO PP102C FOR CONT.
P-101
P-414 P-414
P-101
1 1/4" DCW (ETR)
1 1/2" DCW (ETR)
1 1/4" DHW (ETR)
3/4" DCW (ETR)
1 1/4" DHW (ETR)
1/2" DHWR
1/2" DHW
1/2" DCW
/2
D
H W
R
/4
D
H W
/2
D C
W
/2
D C
W
3/4" DHWR
2" DCW
3/4" DHW
1/2" DHWR
D C
W R
1/2" DCWR
3/4" DCWR
/4
D
C W
R
3/4" DCWR
ETR
ETR
3/4" DCWR
/4
D
C W
R
/4
D
C W
1/2" DHW
1/2" DCWR
1" DHW
2" DCW
1/2" DCWR
MEN'S LOCKER
STAFF TOILET
WOMEN'S LOCKER
STAFF TOILET
EQUIPMENT
STAFF LOUNGE
SOILED
HAC
ELECTRICAL
CORRIDOR
C203-38
ELECTRICAL
CORRIDOR
C201-38
WAITING
ELEVATOR SHAFT
C202-54
CHASE
CHASE
C202-56
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
FIBER OPTIC
LOGISTICS
PAMN
C207-02F
PAGING EQUIPMENT
C207-02G
WHEELCHAIR ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2
STRESS LAB
ELEVATOR LOBBY
C1
ANESTHESIA
BIO-MED
TOILET
TOILET
N. MANAGER OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
P-101
P-101
P-414
P-702
P-702
/2
D C
W
D C
W R
OFFICE
2-1
O M.2 F.9 C.9 A.5 AA
REFER TO PP102A FOR CONT.
FD-C
FD-C
FD-C
FD-C
P P
B
P P
A
1/ PP102B1/ PP102A
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:3
A
M
PP102C
SECOND FLOOR DOMESTIC WATER
PLAN BLDG. 38
15 25GH
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
JES
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
1. THE AREA OF WORK SHOWN IS
ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE
24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S
REPRESENTATIVE.
3. COORDINATE PLUMBING WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF
WORK.
4. SCHEDULE WORK IN THE EXISTING
BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. CONTRACTOR TO VERIFY LOCATION AND
SIZE OF EXISTING PIPE BEFORE ANY
CONNECTION OF NEW SYSTEMS ARE
MADE.
1/4" = 1'-0"
SECOND FLOOR DOMESTIC PLUMBING PLAN BLDG. 38
1. PROVIDE 1/2" DCW/DHW DOWN TO SINK.
2. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
COLD WATER SHUT-OFF VALVE.
3. PROVIDE TEMPERATURE SENSOR DOWNSTREAM OF
HOT WATER SHUT-OFF VALVE.
4. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON HOT
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
5. PROVIDE 0.5 GPM FLOW CONTROL VALVE ON COLD
WATER RECIRCULATION LINES. ALL OTHER FLOW
CONTROL VALVES SHALL BE 0.3 GPM UNLESS
OTHERWISE NOTED.
6. 2-1/2" DCW,1" DHW, 1" DCWR AN 3/4" DHWR DOWN TO
BUILDING #1 BASEMENT FOR CONNECTION TO
EXISTING.
7. DCW RECIRCULATION PUMP WILL BE LOCATED IN
BASEMENT OF BUILDING #1 .
8. OFFEST EXISTING WATER LINES IN WALL
1 1/4" MV
1" MA
P-401
M V
M A
2" MED. VACUUM FROM ABV.
1" OXYGEN FROM BELOW
3/4" MA
3/4" MV
3/4" MV
3/4" MA
3/4" MA
3/4" MV
3/4" MV
3/4" MA
3/4" MV
3/4" MA
1" NO
C O
W A
G D
O
M A
M V
W A
G D
O
M A
2" WAGD
2" MV
3/4" O
3/4" MV
3/4" O
3/4" MA
3/4" O
3/4" O
3/4" O
3/4" O
1" MA
1" O
1 1/4" MV
1" O
1 1/4" MV
1" O
1" MA
M A
M V
O
1" M
A
1" O
1/
4" M
V
M A
/4
M V
O
ZVB
AAP
/4
M
V /4
O
/4
M
A
/4
M
V /4
O
/4
M
A
/4
M
V /4
O
/4
M
A
CORRIDOR
C202-02
CORRIDOR
C204-02
PRE/POST
PRE/POST
PACU
CLEAN SUPPLY
SOILED HOLDING
HAC
CARE STATION
MEDS
CORRIDOR
C207-02
ALCOVE
C207-02A
CORRIDOR
C206-02
STORAGE
STAIR
S1-02
CORRIDOR
C203-02
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
CORRIDOR
C208-02
3/4" MV
3/4" O
3/4" MA
Q
2-2
2-3
2-5
2-6
2-8
2-9
2-10
2-11
O M.2 K.1 F.9
/1 PG102C
P G
B
/1 PG102C
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
SMOKE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
/1 /2
:5
:3
A
M
PG102A
SECOND FLOOR MED GAS PLAN A
16 25Author
RELOCATE AND UPGRADE
OPERATING ROOM SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/15/2019
BID DOCUMENTS
657-50119-126
Checker
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
N
1/4" = 1'-0"
SECOND FLOOR MED GAS PLAN AREA A
GAS CYLINDERS, BY OTHERS
GAS CYLINDERS, BY OTHERS
GAS CYLINDERS, BY OTHERS
MEDICAL GAS GENERAL NOTES
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH
AN OPERATING FACILITY THAT MUST REMAIN IN
SERVICE 24/7.
2. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
BEFORE THE START OF WORK.
3. COORDINATE MEDICAL GAS PLUMBING WORK WITH
ALL OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF WORK.
4. SEE SHEET [SHEET #] FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
5. POSITIVE PRESSURE PATIENT MEDICAL GAS PIPING
SHALL NOT BE BREACHED OR PENETRATED BY ANY
MEANS OR PROCESS THAT WILL RESULT IN
RESIDUAL COPPER PARTICLES OR OTHER DEBRIS
REMAINING IN THE PIPING, OR THAT AFFECTS THE
OXYGEN-CLEAN INTERIOR OF THE PIPING. IF
BREACHING OR PENETRATING THE MEDICAL GAS
PIPING IS REQUIRED, THE PROCESS SHALL ENSURE
THAT ANY DEBRIS CREATED BY THE PROCESS
REMAINS CONTAINED WITHIN THE WORK AREA.
6. ALL VALVES IN THE MEDICAL GAS SYSTEMS SHALL
BE QUARTER TURN OFF WITH INDICATION OF
WHETHER THE VALVE IS OPEN OR CLOSED. A LABEL
SHALL BE PROVIDED ON ALL VALVES INDICATING
THE TYPE OF SERVICE, THE AREA(S) OR ROOM(S)
SERVED, AND A WARNING THAT THE VALVE SHALL
NOT BE OPENED OR CLOSED EXCEPT FOR
EMERGENCY SITUATIONS
7. HOT TAPS OR SIMILAR VALVE ASSEMBLIES ARE NOT
PERMITTED IN MEDICAL GAS PIPING SYSTEMS.
8. EACH NEW…