P09 Drawings 02 HA 100 BID - 5 pages.pdf

PDF 2 MB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

These documents provide plans for asbestos and lead abatement work at the Marion VA Medical Center in Marion, Illinois as part of a project to construct a three operating room surgical suite addition. The abatement work includes removing asbestos pipe insulation, floor tile, duct seam sealant, and other materials. It also involves removing lead-based paint from walls, door frames, and other surfaces. Drawings show the locations of these materials and specify removal methods. The abatement is to be conducted in accordance with all applicable regulations and coordinated with the VA to minimize impacts to hospital operations. A separate federal contract opportunity was issued for constructing the surgical suite addition on the second floor of Building 2 and Building 38, which will provide three operating rooms and support services for inpatient and ambulatory surgical services.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

KITCHEN

ROOM

203B

ROOM

203A

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

UP

UP

TO PROJECTION RM

ABOVE NUTRITION SVCS

PROJECTION

ROOM

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

HA-101

ASBESTOS ABATEMENT PLAN

FIRST FLOOR

1 5RAJ

RELOCATE AND UPGRADE

MARION VA MEDICAL CENTER

MARION, IL

657-501

2 & #38

GKYRevisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

19-126

NORTH

SHEET KEY NOTES:#

REMOVE ASBESTOS PIPE INSULATION (INCLUDING ALL

FITTINGS, VALVES, TEES, JOINTS, ETC.) USING GLOVEBAG

REMOVAL PROCEDURES INSIDE NEGATIVE PRESSURE

MINI-CONTAINMENTS. CEILING TILES SHALL BE REMOVED

AND REPLACED ACCORDINGLY.

- RM 171: 25 LF OF ASBESTOS PIPE INSULATION

- RM 192: 35 LF OF ASBESTOS PIPE INSULATION

OTHER ASBESTOS CONTAINING MATERIALS (INCLUDING

FLOOR TILE, PIPE INSULATION, ETC.) MAY BE PRESENT IN THE

WORK AREA AND SHALL BE PROTECTED AS REQUIRED.

REFER TO THE PROJECT INSPECTION REPORT AND PREVIOUS

BUILDING-WIDE INSPECTION REPORTS FOR ADDITIONAL

INFORMATION.

A1.

A2.

ABATEMENT LEGEND

REMOVE ASBESTOS PIPE INSULATION AS INDICATED

IN KEYNOTES.

OPERATING SUITES -

11/15/2019

MARION, IL

A1

A1

A2

A2

A2

A2

A2

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

A2

A2

A2

A2

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF

REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS

PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,

ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS

DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT

CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT

BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK

CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,

REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED

PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING

PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED

PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK ON THE SECOND FLOOR AND

PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED

DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT

WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING

NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR

WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY

THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE

VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND

ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN

THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION

REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.

FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,

THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE

VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,

EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE

PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING

PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,

HVAC AND BOILER PLANT INSULATION; AND/OR VA

SPECIFICATION 22 07 11, PLUMBING INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND

WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH

THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE

COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION

DRAWINGS FOR TEMPORARY PARTITION AND INFECTION

CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS

PIPE INSULATION AND FITTING INSULATION FROM THE STEAM

PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE

LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM

SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA

TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR

SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF

LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.

IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS

AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE

POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR

CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE

MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC

TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.

PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

jhecht VA Marion OR Project (11-15-19)

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

KITCHEN

ROOM

203B

ROOM

203A

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

DECON

CHAMBER

DN

KITCHEN

ROOM

203B

ROOM

203A

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

UP

UP

TO PROJECTION RM

ABOVE NUTRITION SVCS

PROJECTION

ROOM

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

19-126

HA-102

ASBESTOS ABATEMENT PLAN

SECOND FLOOR

2RAJ

RELOCATE AND UPGRADE

MARION VA MEDICAL CENTER

MARION, IL

657-501

2 & #38

GKY

NORTH

SHEET KEY NOTES:#

REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT USING MANUAL

LABOR AND HAND TOOLS.

- 3,280 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

(SINGLE-LAYER)

REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT USING MANUAL

LABOR AND HAND TOOLS.

- 120 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

(DOUBLE-LAYER)

REMOVE CARPET, ASBESTOS FLOOR TILE AND ASBESTOS

MASTIC INSIDE A NEGATIVE PRESSURE CONTAINMENT USING

MANUAL LABOR AND HAND TOOLS.

- 350 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

(SINGLE-LAYER)

REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC

INSIDE A SEPARATE NEGATIVE PRESSURE CONTAINMENT

USING MANUAL LABOR AND HAND TOOLS.

- 260 SF OF ASBESTOS FLOOR TILE AND MASTIC

(SINGLE-LAYER)

REMOVE NON-ASBESTOS PLASTER CHASE AND REMOVE

ASBESTOS PIPE INSULATION, INSIDE A NEGATIVE PRESSURE

CONTAINMENT OR MINI-CONTAINMENT USING GLOVEBAG

TECHNIQUES.

- 40 SF OF NON-ASBESTOS PLASTER CHASE

- 12 LF OF ASBESTOS PIPE INSULATION

REMOVE ASBESTOS MUDDED PIPE FITTINGS INSIDE A

NEGATIVE PRESSURE CONTAINMENT OR MINI-CONTAINMENT

USING GLOVEBAG TECHNIQUES.

- 12 ASBESTOS MUDDED FITTINGS

REMOVE ASBESTOS PIPE INSULATION RISER AND ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS FROM RADIATOR BOXES

IN 10 LOCATIONS INSIDE A NEGATIVE PRESSURE

CONTAINMENT USING DISMANTLING TECHNIQUES.

- 120 SF OF TRANSITE PANELS, TOTAL

- 10 LF OF PIPE INSULATION, TOTAL

REMOVE DRYWALL WITH MOLD GROWTHS INSIDE A NEGATIVE

PRESSURE CONTAINMENT USING DISMANTLING TECHNIQUES.

CLEAN REMAINING WALL CAVITY AND CONTAINMENT WITH AN

APPROPRIATE EPA-REGISTERED ANTI-MICROBIAL SOLUTION.

- 100 SF OF DRYWALL WITH MOLD GROWTHS

A1.

A2.

A3.

A4.

A5.

A6.

A7.

M1.

ABATEMENT LEGEND

REMOVE ASBESTOS FLOOR TILE AND MASTIC AS

INDICATED IN THE KEYNOTES

A1

A1

A1

A1

A1

A1

A3

A3

A1

A1

A1

A1

A1

A1

A3

A1

A2

A4

A5

A6

A7 A7 A7 A7 A7 A7

A7 A7A7A7

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND LEAD)

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

(ASBESTOS AND LEAD)

A1

OPERATING SUITES -

MARION, IL

M1

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (MOLD)

511/15/2019

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF

REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS

PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,

ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS

DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT

CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT

BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK

CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,

REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED

PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING

PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED

PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK ON THE SECOND FLOOR AND

PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED

DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT

WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING

NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR

WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY

THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE

VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND

ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN

THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION

REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.

FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,

THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE

VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,

EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE

PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING

PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,

HVAC AND BOILER PLANT INSULATION; AND/OR VA

SPECIFICATION 22 07 11, PLUMBING INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND

WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH

THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE

COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION

DRAWINGS FOR TEMPORARY PARTITION AND INFECTION

CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS

PIPE INSULATION AND FITTING INSULATION FROM THE STEAM

PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE

LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM

SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA

TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR

SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF

LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.

IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS

AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE

POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR

CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE

MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC

TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.

PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

KITCHEN

ROOM

203B

ROOM

203A

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

UP

UP

TO PROJECTION RM

ABOVE NUTRITION SVCS

PROJECTION

ROOM

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

DN

104A

104B

101A

C103-38

C102-38

C101-38118

C104-42

123A

123B

146 147

148 149

158 159

160161

162163

178 179 180 181

183184

FEC

FEC

DN

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

DN

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

UP

UP

TO PROJECTION RM

ABOVE NUTRITION SVCS

PROJECTION

ROOM

RAJ

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION VA MEDICAL CENTER

MARION, IL

657-501

2 & #38

GKYRevisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

19-126

NORTH

SHEET KEY NOTES:#

REMOVE LEAD-BASED PAINTED PLASTER WALLS INSIDE A

NEGATIVE PRESSURE CONTAINMENT IN FOUR LOCATIONS.

- 550 SF OF LEAD-BASED PAINT ON WALLS, TOTAL

REMOVE LEAD-BASED PAINTED DOOR FRAMES INSIDE A

NEGATIVE PRESSURE CONTAINMENT OR MINI-CONTAINMENT

USING DISMANTLING TECHNIQUES IN THREE LOCATIONS.

- 4 LEAD-BASED PAINTED DOOR FRAMES, TOTAL

REMOVE LEAD-CONTAINING PORCELAIN SINK INSIDE A

RESTRICTED AREA USING DISMANTLING TECHNIQUES.

- 1 SINK

REMOVE ORANGE COLORED LEAD-BASED PRIMER PAINT

FROM STRUCTURAL STEEL TRUSS A MINIMUM OF 12" BEYOND

ALL IMPACTED LOCATIONS WHERE STRUCTURAL

REINFORCEMENTS WILL BE ADDED, AS IDENTIFIED ON

DRAWING SS502. LEAD-BASED PAINT SHALL BE REMOVED

USING ABRASIVE BLASTING TECHNIQUES INSIDE A NEGATIVE

PRESSURE CONTAINMENT. THE LOCATIONS SHALL BE FIELD

VERIFIED AND MARKED ON THE TRUSS SYSTEM PRIOR TO

REMOVAL. TO MINIMIZE THE AMOUNT OF CLEANING

REQUIRED, THIS WORK SHALL BE CONDUCTED INSIDE A

SEPARATE NEGATIVE PRESSURE CONTAINMENT AFTER THE

INITIAL ASBESTOS AND LEAD CONTAINMENT HAS BEEN

CLEARED. CARE SHALL BE TAKEN TO PROTECT THE

CONTAINMENT BARRIERS FROM ABRASIVE BLASTING, AND

MAY REQUIRE USE OF HEAVY TARPS, CANVAS, OR OTHER

PROTECTIVE MEASURES.

- 35 LOCATIONS OF LEAD-BASED PAINT REMOVAL FROM

STRUCTURAL STEEL TRUSS

- 85 LF OF LEAD-BASED PAINT REMOVAL FROM TOP CHORD,

BOTTOM CHORD, AND SELECT DIAGONAL MEMBERS

L1.

L2.

L3.

L4.

ABATEMENT LEGEND

REMOVE LEAD-BASED PAINTED PLASTER WALLS AS

INDICATED IN THE KEYNOTES

REMOVE LEAD-BASED PAINT / PRIMER FROM

STRUCTURAL SUPPORT SYSTEM AS INDICATED IN

THE KEYNOTES

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND LEAD)

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

(ASBESTOS AND LEAD)

L1

L1

L1

L1

L2

L2

L3

L2

MARION, IL

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND LEAD)

L4

PHOTO 1: EXAMPLE OF ORANGE-COLORED

STRUCTURAL SUPPORT SYSTEM

PHOTO 2: EXAMPLE OF ORANGE-COLORED

STRUCTURAL SUPPORT SYSTEM

511/15/2019

LIMITS OF SECOND NEGATIVE

PRESSURE CONTAINMENT

(LEAD ABRASIVE BLASTING)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

HA-103

LEAD ABATEMENT PLAN

SECOND FLOOR

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF

REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS

PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,

ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS

DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT

CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT

BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK

CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,

REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED

PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING

PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED

PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK ON THE SECOND FLOOR AND

PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED

DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT

WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING

NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR

WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY

THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE

VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND

ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN

THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION

REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.

FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,

THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE

VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,

EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE

PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING

PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,

HVAC AND BOILER PLANT INSULATION; AND/OR VA

SPECIFICATION 22 07 11, PLUMBING INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND

WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH

THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE

COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION

DRAWINGS FOR TEMPORARY PARTITION AND INFECTION

CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS

PIPE INSULATION AND FITTING INSULATION FROM THE STEAM

PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE

LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM

SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA

TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR

SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF

LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.

IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS

AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE

POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR

CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE

MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC

TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.

PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

WOMEN

HAC

MEN

MECH.

INPATIENT

DIETETIC

217A

CLINICAL

DIETITION

INPATIENT

DIETETIC

STORAGE

ELEC.

HAC

EXAM

EXAM

EXAM

CLINIC NURSES

RESTROOM

STORAGE

214A

RECEPTIONIST

COORIDOR

C204-38

CORRIDOR

C201-38

CORRIDOR

C202-38

CORRIDOR

C203-38

WAITING

STAIR

S2-02

ELEVATOR 5

P3

ELEVATOR 6

P4

DIET OFFICE

208B

DIETETIC

SERVICE

STORAGE

208A

CORRIDOR

C201-02

CORRIDOR

C202-02

CORRIDOR

C203-02

STAIR

S1-02

MEN

WOMEN

NUTRITION

SERVICES

OUTPATIENT

NUTRITION

OUTPATIENT

NUTRITION

204A

STORAGE

204B

OFFICE

207A

RECREATION

STORAGE

203D

ROOM

203A

ROOM

203B

ROOM

203C

DISHWASHING

207B

CART STORAGE

207C

KITCHEN

24"x10" 14"x10" x x x x x x

18"x6"

14"x5"

18"x6"

18"x6"

18"x10"

20"x10"

20"x10"

16"x10"

12"x10"

34"x12"

12"x10" x x x x

16"x8"

26"x12"12"x12"

26"x12"

24"x10"

28"x10"16"x10" x x x x

26"x12" x x

12"x12"

HA-104

RAJ

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION VA MEDICAL CENTER

MARION, IL

657-501

2 & #38

GKYRevisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

19-126

SHEET KEY NOTES:#

REMOVE ASBESTOS SEAM SEALANT FROM DUCTS USING

DISMANTLING TECHNIQUES IN RESTRICTED AREAS. METHODS

USED SHALL NOT DISTURB THE ASBESTOS SEAM SEALANT. IF

THE ASBESTOS SEAM SEALANT IS DISTURBED DURING THE

REMOVAL PROCESS, THE WORK SHALL BE CONDUCTED INSIDE

A NEGATIVE PRESSURE CONTAINMENT.

- AHU-1 DUCTS: 360 LF OF ASBESTOS SEAM SEALANT,

TOTAL

- AHU KITCHEN DUCTS: 255 LF OF ASBESTOS SEAM SEALANT,

TOTAL

A1.

ABATEMENT LEGEND

REMOVE ASBESTOS DUCT SEAM SEALANT AS

INDICATED IN THE KEYNOTES

LIMITS OF RESTRICTED WORK AREA

(ASBESTOS DUCT SEAM SEALANT DISMANTLING)

MARION, IL

4 511/15/2019

ASBESTOS DUCT SEAM SEALANT

DISMANTLING PLAN - SECOND FLOOR

NORTH

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF

REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS

PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,

ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS

DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT

CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT

BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK

CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,

REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED

PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING

PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED

PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK ON THE SECOND FLOOR AND

PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED

DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT

WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING

NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR

WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY

THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE

VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND

ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN

THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION

REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.

FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,

THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE

VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,

EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE

PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING

PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,

HVAC AND BOILER PLANT INSULATION; AND/OR VA

SPECIFICATION 22 07 11, PLUMBING INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND

WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH

THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE

COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION

DRAWINGS FOR TEMPORARY PARTITION AND INFECTION

CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS

PIPE INSULATION AND FITTING INSULATION FROM THE STEAM

PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE

LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM

SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA

TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR

SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF

LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.

IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS

AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE

POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR

CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE

MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC

TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.

PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

LIMITS OF RESTRICTED WORK AREA

(ASBESTOS DUCT SEAM SEALANT DISMANTLING)

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1

A1

A1

A1

A1

A1

PHMR

WEST

PHMR

EAST

EXHAUST

FAN PHMR

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

AHU-1

AHU

KITCHEN

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

19-126

ASBESTOS & LEAD ABATEMENT PLAN

PENTHOUSE MECHANICAL ROOMS

RAJ

RELOCATE AND UPGRADE

MARION VA MEDICAL CENTER

MARION, IL

657-501

GKY

#2 & #38

OPERATING SUITES -

MARION, IL

NORTH

SHEET NOTES:SHEET KEY NOTES:#

REMOVE FIBERGLASS INSULATION FROM AIR HANDLING UNITS

AND REMOVE ASBESTOS DUCT SEAM SEALANT FROM DUCTS

AND AIR HANDLERS INSIDE A NEGATIVE PRESSURE

CONTAINMENT USING DISMANTLING TECHNIQUES.

- 100 LF OF ASBESTOS DUCT SEAM SEALANT, EAST PHMR

- 100 LF OF ASBESTOS DUCT SEAM SEALANT, WEST PHMR

REMOVE ASSUMED ASBESTOS VIBRATION JOINT CLOTHS

(VJCs) FROM DUCTWORK INSIDE A NEGATIVE PRESSURE

CONTAINMENT USING DISMANTLING TECHNIQUES.

- 12 SF OF WHITE CANVAS VJC, EXHAUST FAN PHMR

- 15 SF OF BLACK CANVAS VJC, EXHAUST FAN PHMR

ASBESTOS INTERIOR TAR/PAPER ROOFING TO REMAIN.

PROTECT AS REQUIRED.

ASBESTOS AND LEAD CONTAINING STUCCO PRESENT ON THE

EXTERIOR OF THE PHMR WEST AND EXHAUST FAN PHMR

HOUSING. PROTECT AS REQUIRED.

WORKERS SHALL USE THE DECONTAMINATION UNIT IN PHMR

WEST AS A REMOTE DECONTAMINATION UNIT FOR

ABATEMENT WORK INSIDE THESE CONTAINMENTS.

REMOVE ASSUMED ASBESTOS BRAKE PADS FROM ELEVATOR

EQUIPMENT USING DISMANTLING TECHNIQUES AND HEPA

VACUUM / WET WIPE REMAINING EQUIPMENT INSIDE A

RESTRICTED AREA.

- 8 EA OF BRAKE PADS, TOTAL

REMOVE MOLD CONTAMINATED FIBERGLASS PIPE

INSULATION INSIDE A NEGATIVE PRESSURE CONTAINMENT

OR MINI-CONTAINMENT USINGS GLOVEBAG TECHNIQUES.

- 20 LF OF MOLD CONTAMINATED INSULATION, EAST PHMR

REMOVE LEAD-BASED PAINTED BLOWER BELT HOUSING

INSIDE A NEGATIVE PRESSURE MINI-CONTAINMENT USING

DISMANTLING TECHNIQUES.

- 1 BLOWER BELT HOUSING, EXHAUST FAN PHMR

DOORS FRAMES AND STRUCTURAL STEEL WITH LEAD-BASED

PAINT TO REMAIN. PROTECT AS REQUIRED.

A1.

A2.

A3.

A4.

A5.

A6.

M1.

L1.

L2.

ABATEMENT LEGEND

REMOVE FIBERGLASS INSULATION AND ASBESTOS

DUCT SEAM SEALANT FROM DUCTS AND AIR

HANDLERS AS INDICATED IN KEYNOTES.

A1

A1

A2

A3

L1

M1

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND MOLD)

A4

L2

A4

A5

A5

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND MOLD)

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (ASBESTOS AND LEAD)

5 5

HA-105

L2

A6

11/15/2019

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF

REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS

PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED

ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,

ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS

DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT

CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT

BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK

CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,

REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED

PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING

PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED

PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK ON THE SECOND FLOOR AND

PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED

DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT

WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING

NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR

WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY

THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE

VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND

ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN

THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION

REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.

FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,

THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE

VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,

EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE

PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING

PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,

HVAC AND BOILER PLANT INSULATION; AND/OR VA

SPECIFICATION 22 07 11, PLUMBING INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND

WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH

THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE

COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION

DRAWINGS FOR TEMPORARY PARTITION AND INFECTION

CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS

PIPE INSULATION AND FITTING INSULATION FROM THE STEAM

PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE

LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM

SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA

TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR

SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF

LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.

IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS

AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE

POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR

CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE

MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC

TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.

PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

VA Marion OR - Drawing HA-101 (BD 11-11-19)
VA Marion OR - Drawing HA-102 (BD 11-11-19)
VA Marion OR - Drawing HA-103 (BD 11-11-19)
VA Marion OR - Drawing HA-104 (BD 11-11-19)
VA Marion OR - Drawing HA-105 (BD 11-11-19)

File details come from the government source that posted it. Updated .