P09 Drawings 02 HA 100 BID - 5 pages.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040_1
About this file
These documents provide plans for asbestos and lead abatement work at the Marion VA Medical Center in Marion, Illinois as part of a project to construct a three operating room surgical suite addition. The abatement work includes removing asbestos pipe insulation, floor tile, duct seam sealant, and other materials. It also involves removing lead-based paint from walls, door frames, and other surfaces. Drawings show the locations of these materials and specify removal methods. The abatement is to be conducted in accordance with all applicable regulations and coordinated with the VA to minimize impacts to hospital operations. A separate federal contract opportunity was issued for constructing the surgical suite addition on the second floor of Building 2 and Building 38, which will provide three operating rooms and support services for inpatient and ambulatory surgical services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Drawings 06 Plumbing 100 BID - 25 pages.pdf | ||
| P09 Drawings 07 Mechanical 100 BID - 32 pages.pdf | ||
| P09 Drawings 03 Structural 100 BID - 15 pages.pdf | ||
| P09 Drawings 10 FS 100 BID - 4 pages.pdf | ||
| P09 Drawings 08 Electrical 100 BID - 15 pages.pdf | ||
| P09 Drawings 05 Interiors 100 BID - 11 pages.pdf | ||
| P09 Revised official MEP Combined Spec Set VOL 2-1236 pages.pdf | ||
| Solicitation 36C25520R0040_1 657-501-Construct Surgical Suite Addition 3.docx | DOCX document | |
| P09 Drawings 01 General 100 BID - 5 pages.pdf | ||
| P09 Drawings 09 LV FIREALARM 100 BID - 9 pages.pdf | ||
| P09 Drawings 04B Architecture 100 BID - 8 pages.pdf | ||
| P09 Drawings 04A Architectural 100BID - 20 pages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
KITCHEN
ROOM
203B
ROOM
203A
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
UP
UP
TO PROJECTION RM
ABOVE NUTRITION SVCS
PROJECTION
ROOM
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
HA-101
ASBESTOS ABATEMENT PLAN
FIRST FLOOR
1 5RAJ
RELOCATE AND UPGRADE
MARION VA MEDICAL CENTER
MARION, IL
657-501
2 & #38
GKYRevisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
19-126
NORTH
SHEET KEY NOTES:#
REMOVE ASBESTOS PIPE INSULATION (INCLUDING ALL
FITTINGS, VALVES, TEES, JOINTS, ETC.) USING GLOVEBAG
REMOVAL PROCEDURES INSIDE NEGATIVE PRESSURE
MINI-CONTAINMENTS. CEILING TILES SHALL BE REMOVED
AND REPLACED ACCORDINGLY.
- RM 171: 25 LF OF ASBESTOS PIPE INSULATION
- RM 192: 35 LF OF ASBESTOS PIPE INSULATION
OTHER ASBESTOS CONTAINING MATERIALS (INCLUDING
FLOOR TILE, PIPE INSULATION, ETC.) MAY BE PRESENT IN THE
WORK AREA AND SHALL BE PROTECTED AS REQUIRED.
REFER TO THE PROJECT INSPECTION REPORT AND PREVIOUS
BUILDING-WIDE INSPECTION REPORTS FOR ADDITIONAL
INFORMATION.
A1.
A2.
ABATEMENT LEGEND
REMOVE ASBESTOS PIPE INSULATION AS INDICATED
IN KEYNOTES.
OPERATING SUITES -
11/15/2019
MARION, IL
A1
A1
A2
A2
A2
A2
A2
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
A2
A2
A2
A2
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF
REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS
PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,
ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS
DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT
CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT
BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK
CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,
REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED
PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING
PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED
PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE
CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK ON THE SECOND FLOOR AND
PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED
DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT
WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING
NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR
WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY
THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE
VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND
ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN
THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION
REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.
FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,
THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE
VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,
EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE
PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING
PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,
HVAC AND BOILER PLANT INSULATION; AND/OR VA
SPECIFICATION 22 07 11, PLUMBING INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND
WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH
THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE
COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION
DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS
PIPE INSULATION AND FITTING INSULATION FROM THE STEAM
PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE
LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM
SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA
TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR
SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF
LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.
IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS
AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE
POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR
CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE
MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC
TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.
PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
jhecht VA Marion OR Project (11-15-19)
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
KITCHEN
ROOM
203B
ROOM
203A
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
DECON
CHAMBER
DN
KITCHEN
ROOM
203B
ROOM
203A
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
UP
UP
TO PROJECTION RM
ABOVE NUTRITION SVCS
PROJECTION
ROOM
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
19-126
HA-102
ASBESTOS ABATEMENT PLAN
SECOND FLOOR
2RAJ
RELOCATE AND UPGRADE
MARION VA MEDICAL CENTER
MARION, IL
657-501
2 & #38
GKY
NORTH
SHEET KEY NOTES:#
REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
INSIDE A NEGATIVE PRESSURE CONTAINMENT USING MANUAL
LABOR AND HAND TOOLS.
- 3,280 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
(SINGLE-LAYER)
REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
INSIDE A NEGATIVE PRESSURE CONTAINMENT USING MANUAL
LABOR AND HAND TOOLS.
- 120 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
(DOUBLE-LAYER)
REMOVE CARPET, ASBESTOS FLOOR TILE AND ASBESTOS
MASTIC INSIDE A NEGATIVE PRESSURE CONTAINMENT USING
MANUAL LABOR AND HAND TOOLS.
- 350 SF OF ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
(SINGLE-LAYER)
REMOVE ASBESTOS FLOOR TILE AND ASBESTOS MASTIC
INSIDE A SEPARATE NEGATIVE PRESSURE CONTAINMENT
USING MANUAL LABOR AND HAND TOOLS.
- 260 SF OF ASBESTOS FLOOR TILE AND MASTIC
(SINGLE-LAYER)
REMOVE NON-ASBESTOS PLASTER CHASE AND REMOVE
ASBESTOS PIPE INSULATION, INSIDE A NEGATIVE PRESSURE
CONTAINMENT OR MINI-CONTAINMENT USING GLOVEBAG
TECHNIQUES.
- 40 SF OF NON-ASBESTOS PLASTER CHASE
- 12 LF OF ASBESTOS PIPE INSULATION
REMOVE ASBESTOS MUDDED PIPE FITTINGS INSIDE A
NEGATIVE PRESSURE CONTAINMENT OR MINI-CONTAINMENT
USING GLOVEBAG TECHNIQUES.
- 12 ASBESTOS MUDDED FITTINGS
REMOVE ASBESTOS PIPE INSULATION RISER AND ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS FROM RADIATOR BOXES
IN 10 LOCATIONS INSIDE A NEGATIVE PRESSURE
CONTAINMENT USING DISMANTLING TECHNIQUES.
- 120 SF OF TRANSITE PANELS, TOTAL
- 10 LF OF PIPE INSULATION, TOTAL
REMOVE DRYWALL WITH MOLD GROWTHS INSIDE A NEGATIVE
PRESSURE CONTAINMENT USING DISMANTLING TECHNIQUES.
CLEAN REMAINING WALL CAVITY AND CONTAINMENT WITH AN
APPROPRIATE EPA-REGISTERED ANTI-MICROBIAL SOLUTION.
- 100 SF OF DRYWALL WITH MOLD GROWTHS
A1.
A2.
A3.
A4.
A5.
A6.
A7.
M1.
ABATEMENT LEGEND
REMOVE ASBESTOS FLOOR TILE AND MASTIC AS
INDICATED IN THE KEYNOTES
A1
A1
A1
A1
A1
A1
A3
A3
A1
A1
A1
A1
A1
A1
A3
A1
A2
A4
A5
A6
A7 A7 A7 A7 A7 A7
A7 A7A7A7
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND LEAD)
LIMITS OF NEGATIVE PRESSURE CONTAINMENT
(ASBESTOS AND LEAD)
A1
OPERATING SUITES -
MARION, IL
M1
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (MOLD)
511/15/2019
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF
REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS
PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,
ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS
DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT
CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT
BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK
CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,
REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED
PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING
PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED
PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE
CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK ON THE SECOND FLOOR AND
PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED
DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT
WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING
NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR
WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY
THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE
VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND
ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN
THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION
REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.
FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,
THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE
VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,
EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE
PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING
PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,
HVAC AND BOILER PLANT INSULATION; AND/OR VA
SPECIFICATION 22 07 11, PLUMBING INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND
WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH
THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE
COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION
DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS
PIPE INSULATION AND FITTING INSULATION FROM THE STEAM
PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE
LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM
SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA
TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR
SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF
LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.
IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS
AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE
POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR
CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE
MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC
TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.
PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
KITCHEN
ROOM
203B
ROOM
203A
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
UP
UP
TO PROJECTION RM
ABOVE NUTRITION SVCS
PROJECTION
ROOM
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
DN
104A
104B
101A
C103-38
C102-38
C101-38118
C104-42
123A
123B
146 147
148 149
158 159
160161
162163
178 179 180 181
183184
FEC
FEC
DN
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
DN
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
UP
UP
TO PROJECTION RM
ABOVE NUTRITION SVCS
PROJECTION
ROOM
RAJ
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION VA MEDICAL CENTER
MARION, IL
657-501
2 & #38
GKYRevisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
19-126
NORTH
SHEET KEY NOTES:#
REMOVE LEAD-BASED PAINTED PLASTER WALLS INSIDE A
NEGATIVE PRESSURE CONTAINMENT IN FOUR LOCATIONS.
- 550 SF OF LEAD-BASED PAINT ON WALLS, TOTAL
REMOVE LEAD-BASED PAINTED DOOR FRAMES INSIDE A
NEGATIVE PRESSURE CONTAINMENT OR MINI-CONTAINMENT
USING DISMANTLING TECHNIQUES IN THREE LOCATIONS.
- 4 LEAD-BASED PAINTED DOOR FRAMES, TOTAL
REMOVE LEAD-CONTAINING PORCELAIN SINK INSIDE A
RESTRICTED AREA USING DISMANTLING TECHNIQUES.
- 1 SINK
REMOVE ORANGE COLORED LEAD-BASED PRIMER PAINT
FROM STRUCTURAL STEEL TRUSS A MINIMUM OF 12" BEYOND
ALL IMPACTED LOCATIONS WHERE STRUCTURAL
REINFORCEMENTS WILL BE ADDED, AS IDENTIFIED ON
DRAWING SS502. LEAD-BASED PAINT SHALL BE REMOVED
USING ABRASIVE BLASTING TECHNIQUES INSIDE A NEGATIVE
PRESSURE CONTAINMENT. THE LOCATIONS SHALL BE FIELD
VERIFIED AND MARKED ON THE TRUSS SYSTEM PRIOR TO
REMOVAL. TO MINIMIZE THE AMOUNT OF CLEANING
REQUIRED, THIS WORK SHALL BE CONDUCTED INSIDE A
SEPARATE NEGATIVE PRESSURE CONTAINMENT AFTER THE
INITIAL ASBESTOS AND LEAD CONTAINMENT HAS BEEN
CLEARED. CARE SHALL BE TAKEN TO PROTECT THE
CONTAINMENT BARRIERS FROM ABRASIVE BLASTING, AND
MAY REQUIRE USE OF HEAVY TARPS, CANVAS, OR OTHER
PROTECTIVE MEASURES.
- 35 LOCATIONS OF LEAD-BASED PAINT REMOVAL FROM
STRUCTURAL STEEL TRUSS
- 85 LF OF LEAD-BASED PAINT REMOVAL FROM TOP CHORD,
BOTTOM CHORD, AND SELECT DIAGONAL MEMBERS
L1.
L2.
L3.
L4.
ABATEMENT LEGEND
REMOVE LEAD-BASED PAINTED PLASTER WALLS AS
INDICATED IN THE KEYNOTES
REMOVE LEAD-BASED PAINT / PRIMER FROM
STRUCTURAL SUPPORT SYSTEM AS INDICATED IN
THE KEYNOTES
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND LEAD)
LIMITS OF NEGATIVE PRESSURE CONTAINMENT
(ASBESTOS AND LEAD)
L1
L1
L1
L1
L2
L2
L3
L2
MARION, IL
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND LEAD)
L4
PHOTO 1: EXAMPLE OF ORANGE-COLORED
STRUCTURAL SUPPORT SYSTEM
PHOTO 2: EXAMPLE OF ORANGE-COLORED
STRUCTURAL SUPPORT SYSTEM
511/15/2019
LIMITS OF SECOND NEGATIVE
PRESSURE CONTAINMENT
(LEAD ABRASIVE BLASTING)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
HA-103
LEAD ABATEMENT PLAN
SECOND FLOOR
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF
REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS
PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,
ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS
DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT
CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT
BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK
CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,
REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED
PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING
PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED
PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE
CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK ON THE SECOND FLOOR AND
PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED
DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT
WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING
NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR
WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY
THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE
VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND
ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN
THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION
REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.
FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,
THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE
VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,
EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE
PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING
PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,
HVAC AND BOILER PLANT INSULATION; AND/OR VA
SPECIFICATION 22 07 11, PLUMBING INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND
WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH
THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE
COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION
DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS
PIPE INSULATION AND FITTING INSULATION FROM THE STEAM
PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE
LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM
SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA
TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR
SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF
LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.
IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS
AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE
POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR
CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE
MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC
TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.
PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
WOMEN
HAC
MEN
MECH.
INPATIENT
DIETETIC
217A
CLINICAL
DIETITION
INPATIENT
DIETETIC
STORAGE
ELEC.
HAC
EXAM
EXAM
EXAM
CLINIC NURSES
RESTROOM
STORAGE
214A
RECEPTIONIST
COORIDOR
C204-38
CORRIDOR
C201-38
CORRIDOR
C202-38
CORRIDOR
C203-38
WAITING
STAIR
S2-02
ELEVATOR 5
P3
ELEVATOR 6
P4
DIET OFFICE
208B
DIETETIC
SERVICE
STORAGE
208A
CORRIDOR
C201-02
CORRIDOR
C202-02
CORRIDOR
C203-02
STAIR
S1-02
MEN
WOMEN
NUTRITION
SERVICES
OUTPATIENT
NUTRITION
OUTPATIENT
NUTRITION
204A
STORAGE
204B
OFFICE
207A
RECREATION
STORAGE
203D
ROOM
203A
ROOM
203B
ROOM
203C
DISHWASHING
207B
CART STORAGE
207C
KITCHEN
24"x10" 14"x10" x x x x x x
18"x6"
14"x5"
18"x6"
18"x6"
18"x10"
20"x10"
20"x10"
16"x10"
12"x10"
34"x12"
12"x10" x x x x
16"x8"
26"x12"12"x12"
26"x12"
24"x10"
28"x10"16"x10" x x x x
26"x12" x x
12"x12"
HA-104
RAJ
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION VA MEDICAL CENTER
MARION, IL
657-501
2 & #38
GKYRevisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
19-126
SHEET KEY NOTES:#
REMOVE ASBESTOS SEAM SEALANT FROM DUCTS USING
DISMANTLING TECHNIQUES IN RESTRICTED AREAS. METHODS
USED SHALL NOT DISTURB THE ASBESTOS SEAM SEALANT. IF
THE ASBESTOS SEAM SEALANT IS DISTURBED DURING THE
REMOVAL PROCESS, THE WORK SHALL BE CONDUCTED INSIDE
A NEGATIVE PRESSURE CONTAINMENT.
- AHU-1 DUCTS: 360 LF OF ASBESTOS SEAM SEALANT,
TOTAL
- AHU KITCHEN DUCTS: 255 LF OF ASBESTOS SEAM SEALANT,
TOTAL
A1.
ABATEMENT LEGEND
REMOVE ASBESTOS DUCT SEAM SEALANT AS
INDICATED IN THE KEYNOTES
LIMITS OF RESTRICTED WORK AREA
(ASBESTOS DUCT SEAM SEALANT DISMANTLING)
MARION, IL
4 511/15/2019
ASBESTOS DUCT SEAM SEALANT
DISMANTLING PLAN - SECOND FLOOR
NORTH
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF
REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS
PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,
ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS
DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT
CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT
BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK
CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,
REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED
PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING
PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED
PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE
CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK ON THE SECOND FLOOR AND
PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED
DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT
WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING
NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR
WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY
THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE
VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND
ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN
THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION
REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.
FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,
THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE
VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,
EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE
PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING
PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,
HVAC AND BOILER PLANT INSULATION; AND/OR VA
SPECIFICATION 22 07 11, PLUMBING INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND
WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH
THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE
COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION
DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS
PIPE INSULATION AND FITTING INSULATION FROM THE STEAM
PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE
LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM
SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA
TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR
SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF
LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.
IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS
AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE
POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR
CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE
MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC
TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.
PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
LIMITS OF RESTRICTED WORK AREA
(ASBESTOS DUCT SEAM SEALANT DISMANTLING)
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1 A1
A1
A1
A1
A1
A1
A1
A1
PHMR
WEST
PHMR
EAST
EXHAUST
FAN PHMR
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
AHU-1
AHU
KITCHEN
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
19-126
ASBESTOS & LEAD ABATEMENT PLAN
PENTHOUSE MECHANICAL ROOMS
RAJ
RELOCATE AND UPGRADE
MARION VA MEDICAL CENTER
MARION, IL
657-501
GKY
#2 & #38
OPERATING SUITES -
MARION, IL
NORTH
SHEET NOTES:SHEET KEY NOTES:#
REMOVE FIBERGLASS INSULATION FROM AIR HANDLING UNITS
AND REMOVE ASBESTOS DUCT SEAM SEALANT FROM DUCTS
AND AIR HANDLERS INSIDE A NEGATIVE PRESSURE
CONTAINMENT USING DISMANTLING TECHNIQUES.
- 100 LF OF ASBESTOS DUCT SEAM SEALANT, EAST PHMR
- 100 LF OF ASBESTOS DUCT SEAM SEALANT, WEST PHMR
REMOVE ASSUMED ASBESTOS VIBRATION JOINT CLOTHS
(VJCs) FROM DUCTWORK INSIDE A NEGATIVE PRESSURE
CONTAINMENT USING DISMANTLING TECHNIQUES.
- 12 SF OF WHITE CANVAS VJC, EXHAUST FAN PHMR
- 15 SF OF BLACK CANVAS VJC, EXHAUST FAN PHMR
ASBESTOS INTERIOR TAR/PAPER ROOFING TO REMAIN.
PROTECT AS REQUIRED.
ASBESTOS AND LEAD CONTAINING STUCCO PRESENT ON THE
EXTERIOR OF THE PHMR WEST AND EXHAUST FAN PHMR
HOUSING. PROTECT AS REQUIRED.
WORKERS SHALL USE THE DECONTAMINATION UNIT IN PHMR
WEST AS A REMOTE DECONTAMINATION UNIT FOR
ABATEMENT WORK INSIDE THESE CONTAINMENTS.
REMOVE ASSUMED ASBESTOS BRAKE PADS FROM ELEVATOR
EQUIPMENT USING DISMANTLING TECHNIQUES AND HEPA
VACUUM / WET WIPE REMAINING EQUIPMENT INSIDE A
RESTRICTED AREA.
- 8 EA OF BRAKE PADS, TOTAL
REMOVE MOLD CONTAMINATED FIBERGLASS PIPE
INSULATION INSIDE A NEGATIVE PRESSURE CONTAINMENT
OR MINI-CONTAINMENT USINGS GLOVEBAG TECHNIQUES.
- 20 LF OF MOLD CONTAMINATED INSULATION, EAST PHMR
REMOVE LEAD-BASED PAINTED BLOWER BELT HOUSING
INSIDE A NEGATIVE PRESSURE MINI-CONTAINMENT USING
DISMANTLING TECHNIQUES.
- 1 BLOWER BELT HOUSING, EXHAUST FAN PHMR
DOORS FRAMES AND STRUCTURAL STEEL WITH LEAD-BASED
PAINT TO REMAIN. PROTECT AS REQUIRED.
A1.
A2.
A3.
A4.
A5.
A6.
M1.
L1.
L2.
ABATEMENT LEGEND
REMOVE FIBERGLASS INSULATION AND ASBESTOS
DUCT SEAM SEALANT FROM DUCTS AND AIR
HANDLERS AS INDICATED IN KEYNOTES.
A1
A1
A2
A3
L1
M1
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND MOLD)
A4
L2
A4
A5
A5
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND MOLD)
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (ASBESTOS AND LEAD)
5 5
HA-105
L2
A6
11/15/2019
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF
REMOVING A NON-ASBESTOS PLASTER CHASE TO ACCESS
PIPING, ASBESTOS PIPE INSULATION AND FITTINGS, ASSUMED
ASBESTOS TRANSITE HEAT SHIELDS BEHIND RADIATORS,
ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC, ASBESTOS
DUCT SEAM SEALANT, ASSUMED ASBESTOS VIBRATION JOINT
CLOTHS AND ASSUMED ASBESTOS ELEVATOR EQUIPMENT
BRAKE PADS. THE SCOPE OF THE LEAD ABATEMENT WORK
CONSISTS OF REMOVING LEAD-BASED PAINT FROM WALLS,
REMOVING LEAD-BASED PAINTED DOOR FRAMES, LEAD-BASED
PAINTED BLOWER BELT HOUSING, A LEAD-CONTAINING
PORCELAIN SINK, AND ABRASIVE BLASTING THE LEAD-BASED
PRIMER PAINT FROM A STRUCTURAL STEEL SUPPORT SYSTEM.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE
CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK ON THE SECOND FLOOR AND
PENTHOUSE MECHANICAL ROOMS SHALL BE CONDUCTED
DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE ABATEMENT
WORK ON THE FIRST FLOOR SHALL BE CONDUCTED DURING
NIGHTS (5:00 PM TO 5:00 AM) MONDAY - FRIDAY AND/OR
WEEKENDS, EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY
THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE
VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
NO ACCESS WAS PROVIDED TO THE PROJECTION ROOM AND
ROOM 203C DURING THE INSPECTIONS. MATERIALS LISTED IN
THESE ROOMS WERE BASED ON THE PREVIOUS INSPECTION
REPORTS OR ASSUMED BASED ON ADJACENT MATERIALS (I.E.
FLOORING). PRIOR TO ANY DISTURBANCE OR ABATEMENT,
THESE MATERIALS SHOULD BE SPECIFICALLY FIELD VERIFIED.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE
VA COR AND VPIH. ABATED PIPE INSULATION AND FITTINGS,
EXCLUDING PIPING THAT WILL BE DEMOLISHED, SHALL BE
PROPERLY RE-INSULATED WITH EQUIVALENT INSULATING
PROPERTIES IN ACCORDANCE WITH VA SPECIFICATION 23 07 11,
HVAC AND BOILER PLANT INSULATION; AND/OR VA
SPECIFICATION 22 07 11, PLUMBING INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND
WASTE DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH
THE VA COR AND VPIH. ALL LOADOUT PROCEDURES SHALL BE
COORDINATED WITH THE VA COR AND VPIH. SEE DEMOLITION
DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF ASBESTOS
PIPE INSULATION AND FITTING INSULATION FROM THE STEAM
PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE
LESS THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM
SHUTDOWNS SHALL BE PROPERLY COORDINATED WITH THE VA
TO MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR AND ABATEMENT CONTRACTOR
SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF
LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT AREAS.
IT SHOULD BE NOTED THAT OSHA DOES NOT RECOGNIZE THIS
AS A THRESHOLD VALUE FOR LEAD EXPOSURE. ALTHOUGH THE
POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION OR
CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE
MAY VARY SIGNIFICATNTLY DEPENDING UPON THE SPECIFIC
TASK, PROCEDURE AND OTHER WORK AREA CONDITIONS.
PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
| VA Marion OR - Drawing HA-101 (BD 11-11-19) |
| VA Marion OR - Drawing HA-102 (BD 11-11-19) |
| VA Marion OR - Drawing HA-103 (BD 11-11-19) |
| VA Marion OR - Drawing HA-104 (BD 11-11-19) |
| VA Marion OR - Drawing HA-105 (BD 11-11-19) |
File details come from the government source that posted it. Updated .