P09 Corrected OR_ARCH_LS101 - LIFE SAFETY FLOOR PLAN - 1 Page.pdf

PDF 283 KB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040-0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document contains a life safety floor plan and federal contract opportunity for construction work at the Marion VA Medical Center in Marion, Illinois. The floor plan outlines the existing layout of Level 2 of Buildings 1, 2, and 38, including room dimensions and occupancy loads. The related federal contract opportunity is solicitation number 36C25520R0040-0001 for a project to construct a surgical suite addition. The opportunity was issued by the Department of Veterans Affairs Veterans Health Administration VISN 15. The solicitation number is Z2DA and the project number is 657-501. The document provides key details on the scope of work and existing conditions for a potential bidder to review.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Construct Surgical Suite Addition P/N: 657-501, newest first.
File Type Posted
S06 36C25520R0040 0001.docx DOCX document
P09 Corrected OR_ARCH_A-104 - BLDG 38 SECOND FLOOR RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC102 - BLDG 2 2nd FLOOR AREA A REFLECTED CEILING PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC101 - SECOND FLOOR REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-105 - ROOF PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS112 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 Page.pdf PDF
P09 Corrected OR_ARCH_G-001 - COVER - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-102 - BLDG 02 2ND FLOOR AREA A RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-301 - BUILDING SECTIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC103 - Bldg 2 2nd FLOOR AREA B REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-502 - GENERAL DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-202 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-103 - BLDG 02 2ND FLOOR AREA B RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS111 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-201 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AD101 - SECOND FLOOR DEMOLITION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-002 - SECOND FLOOR EXISTING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_G-002 - DRAWING INDEX AND PROJECT INFORMATION - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-401 - ENLARGED PLANS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC104 - BLDG 38 2ND FLOOR REFLECTED CEILING PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-501 - PARTITION TYPE DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-601 - DOOR SCHEDULE DOOR ELEVATIONS AND DETAILS - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-003 - PHASING AND INFECTION CONTROL PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-101 - SECOND FLOOR OVERALL RENOVATION PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-001 - ARCHITECTURAL NOTES ABBREVIATIONS AND SYMBOLS - 1 Page.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

MN K G F

E D C B A

Q

2-11

O M.2 K.1 F.9 C.9 A.5

2-10

2-8

2-6

2-5

2-3

2-2

2-1

2-9

AA AC

2-4

2-7

L.5

N

D

K.2

F.8

A

146 SF

STAIR

S2-02

330 SF

CARE STATION

467 SF

CORRIDOR

C206-02

117 SF

PACU

244 155 SF

CLEAN SUPPLY

136 SF

PRE/POST

125 SF

PRE/POST

276 SF

CORRIDOR

C204-02

100 SF

CORRIDOR

C207-02

57 SF

SOILED HOLDING

112 SF

MEDS

53 SF

HAC

808 SF

STERILE CORE

585 SF

OR

28 SF

ALCOVE

C207-02A

95 SF

CORRIDOR

C204-2

100 SF

CORRIDOR

205-02

563 SF

OR

535 SF

CORRIDOR

C201-02

159 SF

EQUIPMENT

306 SF

CORRIDOR

C202-02

148 SF

CORRIDOR

C203-02

108 SF

STORAGE

70 SF

STAIR

S1-02

672 SF

WAITING

39 SF

ELECTRICAL

CHASE

323 SF

CORRIDOR

C201-38

359 SF

STAFF LOUNGE

97 SF

SOILED

31 SF

ELECTRICAL

47 SF

HAC

93 SF

CORRIDOR

C203-38

45 SF

STAFF TOILET

44 SF

STAFF TOILET

200 SF

WOMEN'S

LOCKER

147 SF

MEN'S LOCKER

CHASE

ELEVATOR

SHAFT

64 SF

ELEVATOR 2

C207-02B

61 SF

ELEVATOR 1

C207-02C

63 SF

PAMN

C207-02F

89 SF

FIBER OPTIC

113 SF

LOGISTICS

309 SF

PAGING

EQUIPMENT

C207-02G

110 SF

WHEELCHAIR

ALCOVE

C3

51 SF

SOILED UTILITY

70 SF

ELEC.

135 SF

CORRIDOR

C2

280 SF

ELEVATOR

LOBBY

C1

678 SF

STRESS LAB

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B

U

IL

D

IN

G

B U

IL

D

IN

G

B

U

IL

D

IN

G

CLEAR DOOR WIDTH = 33"

EXIT CAPACITY = 165

CLEAR DOOR WIDTH = 33"

EXIT CAPACITY = 165

CLEAR DOOR WIDTH = 33"

EXIT STAIR WIDTH = 44"

EXIT CAPACITY = 146

CLEAR DOOR WIDTH = 33"

EXIT STAIR WIDTH = 44"

EXIT CAPACITY = 146

ACTUAL CLEAR DOOR

WIDTH = 34 1/2"

ACTUAL EXIT STAIR

WIDTH = 36"

EXIT CAPACITY = 120

ACTUAL CLEAR DOOR

WIDTH = 67"

EXIT CAPACITY = 165

ACTUAL CLEAR DOOR

WIDTH = 33"

ACTUAL EXIT STAIR

WIDTH = 28"

EXIT CAPACITY = 146

SUITE 2.1

AREA: 3,485 SF

CIRCULATION STAIR

ACTUAL CLEAR DOOR

WIDTH = 67"

EXIT CAPACITY = 165

131 SF

PRE/POST

134 SF

PRE/POST

133 SF

PRE/POST

125 SF

PRE/POST

360 SF

CORRIDOR

C208-02

148 SF

ISOLATION

74 SF

ANTE

47 SF

STAFF TOILET

258 22 SF

SCRUB STATION

247A

16 SF

ALCOVE

249A

38 SF

SCRUB STATION

249B

17 SF

SCRUB STATION

250A

47 SF

CHASE

C202-57

171 SF

PRE/POST

113 SF

PACU

111 SF

PACU

32 SF

ALCOVE

C206-02A

103 SF

DICTATION

49 SF

TOILET

49 SF

TOILET

100 SF

ANESTHESIA

140 SF

IMMED. STER.

21 SF

BIO-MED

46 SF

TOILET

56 SF

TOILET

88 SF

N. MANAGER

OFFICE

82 SF

CONSULTATION

113 SF

RECEPTION

100 SF

PSA OFFICE

15 SF

CHASE

543 SF

OR

D N

E

E

E

E

E

E

E

E

E

E

E

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

DISTANCE: 77'-10"

DISTANCE: 70'-8"

DISTANCE: 59'-0"

MARION VA - BUILDING 38 - LEVEL 2

OCCUPANT LOAD CALCULATION

BUSINESS: 2,620 sf / 100sf PER PERSON = 26

STORAGE: 302sf / 300sf PER PERSON = 1

ASSEMBLY: 937sf / 15sF PER PERSON = 62

LOCKER ROOMS: 301sf / 50sf PER PERSON = 6

TOTAL: = 95

MARION VA - BUILDING 2 - LEVEL 2

OCCUPANT LOAD CALCULATION

AHC: 8,484sf / 150sf PER PERSON = 56

STORAGE: 1,503sf / 300sf PER PERSON = 5

TOTAL: = 61

LIFE SAFETY LEGEND:

NEW 2-HR FIRE BARRIER

EXISTING 2-HR FIRE/SMOKE BARRIER

NEW SMOKE PARTITION

EXIT SIGN

TRAVEL DISTANCE

FIRE EXTINGUISHER CABINET

E

F.E.C.

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1

/2

:1

:5

P

M

LS101

LIFE SAFETY FLOOR PLAN

3 5ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

2, 38

MM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

1/8" = 1'-0"

SECOND FLOOR OVERALL LIFE SAFETY PLAN

THE EXISTING EXIT ARRANGEMENT TO REMAIN

ONLY UPON APPROVAL OF THE LOCAL AUTHORITY

HAVING JURISDICTION GIVEN THE EXISTING

GEOMETRY TO REMAIN, THE DOORS LOCATED

BETWEEN BUILDINGS 1 AND 38 DO NOT SWING IN

THE PROPER DIRECTION NEEDED TO PROVIDE A

SECOND EXIT. THESE DOORS WOULD NEED TO BE

REPLACED WITH DOUBLE EGRESS DOORS TO

SATISFY THE EXITING REQUIREMENTS, PRESENTLY

BEYOND THE SCOPE OF THIS CONTRACT.

1.

AUTHORITY HAVING JURISDICTION

DEPARTMENT OF VETERAL AFFAIRS

SEE LIFE SAFETY NARRATIVE FOR APPLICABLE

CODES

CODE SUMMARY -

File details come from the government source that posted it. Updated .