P09 Corrected OR_ARCH_A-003 - PHASING AND INFECTION CONTROL PLAN - 1 Page.pdf
PDF 179 KB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040-0001
About this file
This document contains a phasing and infection control plan for a surgical suite addition project at the Marion VA Medical Center in Marion, Illinois. The plan outlines construction barriers, traffic control measures, cleaning requirements, and other infection control protocols to be followed during the project. Negative air machines with HEPA filtration will be used to exhaust air from construction areas out perimeter windows. At entrances to construction zones, contractors shall provide an ante room with solid wall, door, and door closer, as well as graduated air pressure monitor, tacky mats, HEPA vac, and waste bin. Phasing shall include containment barriers, temporary partitions, and negative air ventilation as indicated. The contractor will be responsible for coordinating related infection control and risk assessment documentation with the VA Contracting Officer's Representative.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
A-301
A-301
STAIR
S2-02
CARE STATION
CORRIDOR
C206-02
PACU
CLEAN SUPPLY
PRE/POST
PRE/POST
CORRIDOR
C204-02
CORRIDOR
C207-02
SOILED HOLDING
MEDS
HAC
STERILE CORE
OR
ALCOVE
C207-02A
CORRIDOR
C204-2
CORRIDOR
205-02
OR
CORRIDOR
C201-02
EQUIPMENT
CORRIDOR
C202-02
CORRIDOR
C203-02
STORAGE
259 STAIR
S1-02
WAITING
ELECTRICAL
CHASE
CORRIDOR
C201-38
STAFF LOUNGE
SOILED
ELECTRICAL
HAC
CORRIDOR
C203-38
STAFF TOILET
STAFF TOILET
WOMEN'S
LOCKER
MEN'S LOCKER
CHASE
ELEVATOR
SHAFT
ELEVATOR 2
C207-02B
ELEVATOR 1
C207-02C
PAMN
C207-02FFIBER OPTIC
LOGISTICS
PAGING
EQUIPMENT
C207-02G
WHEELCHAIR
ALCOVE
C3
SOILED UTILITY
ELEC.
CORRIDOR
C2 ELEVATOR
LOBBY
C1
STRESS LAB
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
B
U
IL
D
IN
G
A-102
A-103
A-104
CONSTRUCTION FOOTPRINT. PROVIDE
CONTAINMENT BARRIERS AND ILSM MEASURES
ANTE ROOM WITH SOLID WALL, DOOR, AND DOOR
CLOSER. OUTSIDE: PROVIDE GRADUATED AIR
PRESSURE MONITOR. INSIDE: PROVIDE TACKY
MATS, HEPA VAC, AND WASTE BIN. MINIMUM SIZE
OF ANTE ROOM SHALL BE 5'-0" x 7'-0"
NEGATIVE AIR VENTILATION MACHINES WITH HEPA
FILTRATION EXHAUSTING OUT PERIMETER
WINDOWS TO EXTERIOR. TYPICAL. CONFIRM
REQUIRED NUMBER WITH VA COR.
SCRUB STATION
247A
ALCOVE
249A
SCRUB STATION
249B
SCRUB STATION
250A
CHASE
C202-57
PRE/POST
PACU
PACU
ALCOVE
C206-02A
ISOLATION
ANTE
DICTATION
TOILET
TOILET
STAFF TOILET
ANESTHESIA
IMMED. STER.
BIO-MED
TOILET
TOILET
N. MANAGER
OFFICE
CONSULTATION
RECEPTION
PSA OFFICE
CHASE
PRE/POST
PRE/POST
PRE/POST
PRE/POST
OR
CORRIDOR
C208-02
A-502
OFFICE
ELEVATOR
LOBBY
C202-38
D N
CONTRACTOR TO DESIGNATE
(1) WINDOW FOR TRASH
CHUTE. SEE PHASING
GENERAL NOTE 7.
LEGEND
CONST. FOOTPRINT WITH CONTAINMENT
BARRIERS AND ILSM MEASURES
TEMPORARY CONST. PARTITION. RE:
PARTITION TYPES
NEGATIVE AIR MACHINE EXHAUSTING TO THE
OUTSIDE.
LIFE SAFETY LEGEND:
NEW 2-HR FIRE BARRIER
EXISTING 2-HR FIRE/SMOKE BARRIER
NEW SMOKE PARTITION
EXIT SIGN
TRAVEL DISTANCE
FIRE EXTINGUISHER CABINET
E
F.E.C.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1
/2
:0
:4
P
M
A-003
PHASING AND INFECTION CONTROL
PLAN
3 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-501
2, 38
MM
1/8" = 1'-0"
SECOND FLOOR OVERALL PHASING AND INFECTION CONTROL PLAN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B N
CONSTRUCTION BARRIERS: CONSTRUCTION AREA
TO BE SEPARATED FROM OTHER AREAS BY FIRE
RESISTIVE BARRIERS THAT KEEP THE DIRT AND
DUST INSIDE THE WORKSITE AND PROVIDE A
COMPLETE SEAL OF THE CONSTRUCTION AREA
FROM ADJACENT AREAS. THE BARRIER IS TO BE
CONSTRUCTED OF RIGID CONSTRUCTION. WALLS
MUST BE DUSTPROOF WITH AIRTIGHT SEALS
MAINTAINED AT THE FULL PERIMETER OF THE WALLS
AS WELL AS ALL PENETRATIONS. ALL AIR VENTS
MUST BE SEALED OFF NEAR THE CONSTRUCTION
AREA AS REQUIRED AFTER COORDINATION WITH
COR TO ENSURE NON-INTERFERENCE WITH HVAC
AND NEGATIVE PRESSURE SYSTEMS. DUST TO BE
CONTROLLED WITHIN THE WORK SITE FROM FLOOR
TO DECK.
TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES WILL BE DEFINED AND CLEARLY
ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE
PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS
MUST BE MAINTAINED FREE OF DEBRIS AT ALL
TIMES. THEY MUST BE UTILIZED AT SCHEDULED
TIMES ONLY AS COORDINATED WITH COR. DUST
MATS MUST BE PLACED AT ENTRANCES/EXITS OF
WORK AREA AND REPLACED DAILY OR MORE
FREQUENTLY IF NECESSARY. DEBRIS WHEN
TRANSPORTED THROUGH HOSPITAL AREAS MUST BE
COMPLETELY COVERD TO CONTAIN DUST DURING
TRANSPORT. DEBRIS SHALL BE REMOVED IN
EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL
CART WHEELS MUST BE CLEANED BEFORE LEAVING
THE CONSTRUCTION AREA.
CLEANING: THE CONSTRUCTION ZONE AND
ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A
CLEAN AND SANITARY MANNER BY THE
CONTRACTOR AND WILL BE HIGH EFFICIENCY
PARTICULATE AIR (HEPA) VACUUMED AND WET
MOPPED DAILY OR MORE FREQUENTLY AS NEEDED
TO MINIMIZE DUST GENERATION. CLOTHING SHALL
BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING
THE CONSTRUCTION ZONE. PROVIDE PERSONAL
PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS,
GLOVES, AND N95 RESPIRATORS REQUIRED BY THE
SAFETY SPECIFICATION.
INFECTION CONTROL CONSTRUCTION PERMIT:
CONTRACTOR SHALL APPLY FOR AND ASSIST VA
COR THROUGH THE REQUIRED INFECTION CONTROL
CONSTRUCTION PERMIT.
STAGING AREAS WILL BE DESIGNATED BY THE COR.
CONTRACTOR TO COORDINATE WITH THE COR
PRIOR TO CONSTRUCTON.
CONTAINMENT BARRIERS, ILSM, AND ICRA
ENCLOSURES HAVE BEEN SHOWN FOR REFERENCE
ONLY. THE CONTRACTOR SHALL COORDINATE WITH
RISK ASSESSMENT DOCUMENTATION AND THE COR
PRIOR TO IMPLEMENTATION.
AT THE ENTRANCE TO EACH CONSTRUCTION AREA,
WHETHER INDICATED OR NOT, CONTRACTOR SHALL
PROVIDE AN ANTE ROOM WITH A SOLID WALL, DOOR,
AND DOOR CLOSER. OUTSIDE SHALL INCLUDE A
GRADUATED AIR PRESSURE MONITOR. INSIDE SHALL
INCLUDE TACKY MATS, HEPA VAC, AND WASTE BIN.
MINIMUM SIZE OF ANTE ROOM SHALL BE 5'-0" x 7'-0".
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
ENSURING THAT ALL SUBCONTRACTORS ARE
FAMILIAR WITH THESE NOTES AND THE
REQUIREMENTS IDENTIFED IN THE DIVISION 1
SPECIFICATION “GENERAL CONDITIONS.”
WHEN WORKING IN OCCUPIED AREAS OF THE
MEDICAL CENTER, THE CONTRACTOR CANNOT
LEAVE TOOLS, EQUIPMENT, LADDERS, ETC.,
UNATTENDED AT ANY TIME. THE CONTRACTOR
CANNOT LEAVE CEILING AREA, INCLUDING CEILING
TILES AND CEILING ACCESS PANELS, UNATTENDED
AT ANY TIME.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN
OF EXISTING SERVICE SHALL BE DONE AT TIMES
OTHER THAN NORMAL WORKING HOURS AT NO
ADDITIONAL COST TO THE GOVERNMENT. WORK
MUST BE SCHEDULED WITH THE COR.
HEAVY NOISE AND VIBRATION PRODUCING WORK IS
TO BE COMPLETED OUTSIDE NORMAL WORKING
HOURS, UNLES NOTED OTHERWISE. WORK MUST BE
SCHEDULED WITH THE VA COR.
COORDINATE ALL WORK WITH OTHER TRADES AND
EXISTING CONDITIONS TO ELIMINATE CONFLICTS
AND/OR INTERFERENCES.
REFER TO EXISTING CONDITIONS DRAWINGS FOR
WORK IN AREAS OUTSIDE THE CONTSTRUCTION
FOOTPRINT(S). THE MAJORITY OF THESE AREAS
WILL BE OCCUPIED AND WILL REQUIRE WORK TO BE
COMPLETED AT TIMES OTHER THAN NORMAL
WORKING HOURS, UNLESS NOTED OTHERWISE.
CONTRACTOR WILL BE RESPONSIBLE FOR
PROVIDING CONTAINMENT BARRIERS, ILSM
MEASURES AND TEMPORARY CONSTRUCTION
PARTITIONS AS REQUIRED.
CONTRACTOR SHALL REMOVE AND REINSTALL OR
REPLACE WINDOW AT KITCHEN AREA USED FOR
TRASH CHUTE.
COORDINATE FINAL PHASING SEQUENCE WITH THE
VA COR PRIOR TO START OF CONSTRUCTION.
IN AREAS WHERE CONSTRUCTION ACTIVITIES
EXPOSE THE BUILDING INTERIOR TO THE EXTERIOR
ENVIRONMENT, CONTRACTOR SHALL CONSTRUCT
TEMPORARY BARRIERS AND WEATHERPROOF
ENCLOSRUES AS REQUIRED TO MEET INFECTION
CONTROL REQUIREMENTS AND PROTECT THE
BUILIDNG INTERIOR (FINISHES, BUILDING SYSTEMS,
ETC.) FROM DAMAGE.
THE VA RESERVES THE RIGHT TO START AND STOP
WORK BETWEEN PHASES AS REQUIRED TO
RELOCATE STAFF AND PATIENTS AND OBTAIN
NECESSARY CLEARANCES. THE CONTRACTOR
SHALL ALLOW TEN (10) DAYS BETWEEN EACH
PHASE FOR THESE ACTIVITIES. CONTRACTOR SHALL
NOT RECEIVE ADDITIONAL COMPENSATION FOR
THESE PERIODS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
PHASING
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
INFECTION CONTROL
GENERAL NOTES
File details come from the government source that posted it. Updated .