P09 Corrected OR_ARCH_A-104 - BLDG 38 SECOND FLOOR RENOVATION PLAN - 1 Page.pdf

PDF 176 KB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040-0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document contains a renovation plan drawing and related federal contract opportunity notice. The renovation plan drawing depicts proposed renovations to the second floor of Building 38 at the Marion Veterans Affairs Medical Center in Marion, Illinois. The renovations include reconfiguring existing spaces to create new operating suites, staff lounge, soiled and clean utility rooms, and corridor revisions. The related federal contract opportunity is solicitation number 36C25520R0040-0001 for the construction of a surgical suite addition with project number 657-501 at the Marion VAMC. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 15 to obtain bids for the stated construction project in support of upgrading and relocating operating suites at the Marion facility.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Construct Surgical Suite Addition P/N: 657-501, newest first.
File Type Posted
P09 Corrected OR_ARCH_A-301 - BUILDING SECTIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC103 - Bldg 2 2nd FLOOR AREA B REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-502 - GENERAL DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-202 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
S06 36C25520R0040 0001.docx DOCX document
P09 Corrected OR_ARCH_LS101 - LIFE SAFETY FLOOR PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC102 - BLDG 2 2nd FLOOR AREA A REFLECTED CEILING PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC101 - SECOND FLOOR REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-105 - ROOF PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS112 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 Page.pdf PDF
P09 Corrected OR_ARCH_G-001 - COVER - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-102 - BLDG 02 2ND FLOOR AREA A RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-501 - PARTITION TYPE DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-601 - DOOR SCHEDULE DOOR ELEVATIONS AND DETAILS - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-003 - PHASING AND INFECTION CONTROL PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-101 - SECOND FLOOR OVERALL RENOVATION PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-001 - ARCHITECTURAL NOTES ABBREVIATIONS AND SYMBOLS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-103 - BLDG 02 2ND FLOOR AREA B RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS111 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-201 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AD101 - SECOND FLOOR DEMOLITION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-002 - SECOND FLOOR EXISTING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_G-002 - DRAWING INDEX AND PROJECT INFORMATION - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-401 - ENLARGED PLANS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC104 - BLDG 38 2ND FLOOR REFLECTED CEILING PLAN - 1 Page.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEN'S LOCKER

STAFF TOILET

WOMEN'S

LOCKER

STAFF TOILET

EQUIPMENT

STAFF LOUNGE

SOILED

HAC

ELECTRICAL

CORRIDOR

C203-38

ELECTRICAL

CORRIDOR

C201-38

WAITING

B

H

K

B

G

A

19' - 6 5/8" 12' - 6 1/2"

11' - 2 1/8" 6' - 4 7/8" 14' - 3 5/8"

/2

/4

/4

/8

/2

/8

F

.V

/8

/8

/4

/4

7' - 0"

6' - 10 7/8" 8' - 4 7/8" 12' - 8 1/4" 3' - 10 5/8"

B

G

B

B

B

D

B

D

B

D

B

B

2' - 7 7/8" 1' - 11 5/8" 12' - 8 1/2" 5' - 4 7/8"

V

V

B

7' - 7 1/4" 6' - 5" 8' - 10 7/8" 14' - 1"

/2

F .V

/8

/2

/8

/8

7' - 6 1/8" 6' - 0 5/8"

/4

/8

/2

/4

/8

/2

/8

A-401

A-401

A

D

C1

C

T

4' - 5 5/8"

/8

E

E

B

6"

8' - 0"

P

E

D

P

P

B

B

T

V

B

A-502

/8

D

D

D

H

J

B

B

B

A

E

E

5 1/8"

2' - 6 3/4" 5' - 2 7/8"

/8

6' - 5 1/2"

PP

P

P

9' - 0 1/8" 2' - 10 5/8" 6' - 9 3/4"

3' - 9 5/8"

/8

4' - 3" 5' - 1 1/2"

/2

/2

/2

4' - 8 1/2" 7' - 6 1/8" 6' - 3"

P

D

E

E

E

P

B

C

B

D

K

K P

P

P

284 285

CORRIDOR

C202-02

CORRIDOR

C204-02

CHASE

CHASE

C202-56

ANESTHESIA

BIO-MED

TOILET

TOILET

N. MANAGER

OFFICE

CONSULTATION

RECEPTION

PSA OFFICE

CHASE

E

H

B

B

A

B

V

/8 " 4' - 6 1/8"

13' - 3 1/2"

A-502

D

D

D

DDD

212A

E

BB

B

P

P

P

B

OFFICE

D N

F.E.C

F.E.C

ELEVATOR

LOBBY

C202-38

A-502

Sim

A-502

Sim

A-502

Sim

INSTALL SOLID SURFACE WINDOW SILLS AT ALL

EXTERIOR WINDOWS. TYPICAL, U.N.O.

SEE DETAIL - 10/A502

EXISTING WINDOW TO REMAIN. INSTALL BLACKOUT

FILM OVER WINDOW AND COVER WITH METAL

FRAMING AND GYPSUM BOARD. REMOVE PORTION

OF SILL AS REQUIRED TO PROVIDE SMOOTH

TRANSITION. FINISH TO MATCH ADJACENT

SURFACES. SEE A-502 FOR WINDOW RENOVATION

DETAIL

PROVIDE FIRE EXTINGUISHER CABINET.

FIELD VERIFY LOCATION OF EXISTING VERTICAL

VENTILATION. ADJUST LOCATION OF NEW CHASE

WALLS AS REQUIRED.

RENOVATION PLAN

KEYED NOTES

1.

2.

3.

4.

LIFE SAFETY LEGEND:

NEW 2-HR FIRE BARRIER

EXISTING 2-HR FIRE/SMOKE BARRIER

NEW SMOKE PARTITION

EXIT SIGN

TRAVEL DISTANCE

FIRE EXTINGUISHER CABINET

E

F.E.C.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1

/2

:0

:0

P

M

A-104

BUILDING 38 SECOND FLOOR

RENOVATION PLAN

8 28ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-501

MM

1/4" = 1'-0"

BUILDING 38 SECOND FLOOR RENOVATION PLAN

N

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

File details come from the government source that posted it. Updated .