P09 Corrected OR_ARCH_A-001 - ARCHITECTURAL NOTES ABBREVIATIONS AND SYMBOLS - 1 Page.pdf
PDF 123 KB Posted
- Attached to
- Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
- Solicitation number
- 36C25520R0040-0001
About this file
This document contains architectural notes, abbreviations, and symbols for a federal construction project to relocate and upgrade operating suites at the Marion VA Medical Center in Marion, Illinois. Key requirements include patching all disturbed and exposed finishes to match adjacent materials and colors; performing noisy work and work in occupied areas at times other than normal hours at no additional cost; sawcutting and removing portions of existing concrete slabs as needed for structural improvements and preparing floor slabs for new flooring; and verifying existing conditions, coordinating all work with other trades, and providing offsets and transitions for fully functional systems. The related solicitation is for contract 36C25520R0040 to construct a surgical suite addition with project number 657-501 at the Marion VAMC, issued by the Department of Veterans Affairs Veterans Health Administration VISN 15.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES, THE GENERAL NOTES, AND THE
REQUIREMENTS IDENTIFIED IN THE DIVISION 01 SPECIFICATION "GENERAL
CONDITIONS."
PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED
SURFACES HAVE BEEN EXPOSED BY DEMOLITION. THIS INCLUDES ALL FINISHES
SCHEDULED TO REMAIN. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND
FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT,
VINYL WALL COVERING, ETC.) REPLACED FROM CORNER TO CORNER AND FLOOR TO
CEILING.
UNLESS NOTED OTHERWISE, WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE
MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES
OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE
GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.
UNLESS NOTED OTHERWISE, SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED
DURING NORMAL WORKING HOURS AND MUST BE SCHEDULED WITH THE VA COR FOR
OTHER TIMES. THIS INCLUDES JACK-HAMMERING CONCRETE, SAW-CUTTING
CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE, ETC.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN
WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED
CONTRACTOR AT THE EXPENSE OF THE CONTRACTOR. ALL CONDUITS IN WALLS SHALL
BE GROUTED OR SEALED INTO OPENINGS.
GENERAL CONTRACTOR SHALL RECORD ALL "OWNER ASSET NUMBERS" THAT ARE
TAGGED AND SCHEDULED TO BE REMOVED AND/OR DEMOLISHED. SUCH TAGS ARE
LABELED "EE..." CONTRACTOR SHALL PROVIDE A LOG OF ALL ASSET TAGS TO COR.
GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL
DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR INFECTION CONTROL. REFER TO
INFECTION CONTROL AND PHASING FOR ADDITIONAL DETAILS. COORDINATE
REQUIREMENTS WITH THE VA MEDICAL CENTER INFECTION CONTROL POLICY. REMOVE
TEMPORARY PARTITIONS AT END OF CONSTRUCTION OR WHEN DIRECTED BY COR.
PATCH ADJACENT FINISHES DAMAGED DURING REMOVAL PROCESS.
ALL AREAS AND ADJACENT SPACES, NOT INDICATED AS CONSTRUCTION SITE, WILL BE
OCCUPIED.
THE EXTENT OF PLUMBING, MECHANICAL, AND ELECTRICAL UTILITIES TO BE REMOVED
IS SHOWN ON THE PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS.
GENERAL CONTRACTOR REMOVE ALL WALL HUNG EQUIPMENT/FURNISHINGS (FIRE
EXTINGUISHERS, GRAB BARS, WALL PROTECTION, SIGNAGE, ETC.) WHETHER
INDICATED OR NOT, REINSTALL, DISPOSE OF, OR TURN OVER ITEMS TO THE VA PER
THE COR'S DIRECTION.
GENERAL CONTRACTOR SHALL SAWCUT AND REMOVE PORTIONS OF EXISTING
CONCRETE FLOOR SLAB AS REQUIRED TO COMPLETE INSTALLATION OF STRUCTURAL
IMPROVEMENTS. PATCH FLOOR SLAB AND PREPARE FOR NEW FLOORING UPON
COMPLETION OF STRUCTURAL MEMBER INSTALLATION. COORDINATE WITH
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL
PANELS, ACCESS PANELS, SPRINKLER PIPING, ETC., TO MATCH ADJACENT FINISH
UNLESS OTHERWISE NOTED.
2. UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH
SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS
FRAMES. REFER TO INTERIOR SHEETS FOR COLORS.
3. ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED
ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR
CONCRETE CONSTRUCTION, SHALL BE FURRED IN, THE FURRING FINISHED TO MATCH
THE ROOM FINISH.
4. REFER TO THE LIFE SAFETY PLAN FOR FIRE/SMOKE RATED PARTITIONS. NEW OR
EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH APPROVED FIRE
STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED.
PENETRATIONS THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
5. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE
DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING
WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A
COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL COST.
6. WHETHER INDICATED ON THE DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL
CORNER GUARDS ON ALL CORNERS CREATED BY NEW WORK IN THIS PROJECT,
INCLUDING TEMPORARY CONSTRUCTION BARRIER WALLS. CORNER GUARDS SHALL
EXTEND FROM 4" A.F.F. TO 7'-2" A.F.F.
7. WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR
EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND
REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT WITH WATER OR OTHER
LIQUIDS.
8. COORDINATE WITH STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE
PROTECTION DRAWINGS FOR RELATED WORK.
9. WHETHER INDICATED ON DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL JOINT
COVERS AT ALL EXPANSION JOINT LOCATIONS. TYPICAL AT FLOOR, WALL AND CEILING
JOINTS.
RENOVATION GENERAL NOTES
ABBREVIATIONS:
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
A/C AIR CONDITIONING
ALUM ALUMINUM
& AND
APPROX APPROXIMATE
@ AT
BRG BEARING
BLK BLOCK
BD BOARD
BD FT BOARD FEET
A.O.C. BOTTOM OF CONCRETE
BLDG. BUILDING
CPT CARPET
C.L. OR CLG CEILING
CT CERAMIC TILE
CB CHALK BOARD
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONC BL CONCRETE BLOCK
CONC FL CONCRETE FLOOR
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CJ CONTROL JOINT
CRS COURSE
CU CUBIC
CU FT CUBIC FOOT
CU YD CUBIC YARD
DIA DIAMETER
DBL DOUBLE
DN DOWN
DS DOWNSPOUT
DWG DRAWING
DF DRINKING FOUNTAIN
EA EACH
ELECT ELECTRIC
EC ELECTRIC CONTRACTOR
EP ELECTRICAL PANEL BOARD
EL ELEVATION
ELEV ELEVATION
EQ EQUAL
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
EB EXPANSION BOLT
EJ EXPANSION JOINT
EXT EXTERIOR
FE FIRE EXTINGUISHER
FT OR ' FEET
FIN FINISH
FD FLOOR DRAIN
FL FLOOR LINE
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
GALV GALVANIZED
GA GAUGE
GC GENERAL CONTRACTOR
GYP GYPSUM BOARD
H/AC HEATING/AIR CONDITIONING
HM HOLLOW METAL
HT HEIGHT
HR HOUR
HWSF HEAT-WELDED SHEET FLOORING
IN OR " INCH
JT JOINT
JST JOIST
LAM LAMINATE
LF LINEAR FOOT
MFR MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
NOM NOMINAL
NO OR # NUMBER
O.C. ON CENTER
OPG OPENING
O.H. OPPOSITE HAND
PT PAINT
% PERCENT
PLAM PLASTIC LAMINATE
+/- PLUS OR MINUS
PVC POLYVINYL CHLORIDE
LBS OR # POUNDS
PSI POUNDS PER SQUARE INCH
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PT PRESSURE TREATED
RAD RADIATOR
RBR RUBBER BASE
RE: REFER
REFRIG REFRIGERATOR
REINF REINFORCEMENT
REP REPRESENTATIVE
REQD REQUIRED
RD ROOF DRAIN
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FOOT
STD STANDARD
STL STEEL
STRUCT STRUCTURE
SUSP SUSPENDED
SYS SYSTEM
TB TACKBOARD
TYP TYPICAL
VCT VINYL COMPOSITION TILE
VERIFY VERIFY
W/ WITH
W/O WITHOUT
WD WOOD
ARCHITECTURAL SYMBOLS LEGEND
A
C2
A100A
FEC
NORTH
AS-1000
AS-1000
DIMENSION LINE
DOOR OPENING/BORROWED LIGHT IDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
FIRE EXTINGUISHER CABINET
NORTH ARROW
DETAIL NUMBER
SECTION MARKER
PARTITION TYPE. RE: SHEET A-501A
1AS-1000 ELEVATION MARKER
DRAWING TITLE
1 1/2" = 1' - 0"
CORRIDOR
SHEET LOCATION
WINDOW TYPE
ELEVATION
AE100
A
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING ADJACENT CONSTRUCTION AND EQUIPMENT FROM DUST AND DAMAGE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN, REPAIR, REPLACE, OR PATCH ANY EXISTING CONSTRUCTION DAMAGED DURING THE CONSTRUCTION PROCESS AT NO ADDITIONAL EXPENSE TO THE VA. ANY DAMAGED AREAS SHALL BE RETURNED TO EQUAL OR BETTER CONDITION THAN THAT OF THE EXISTING CONSTRUCTION PRIOR TO DAMAGE.
DRAWINGS WERE PREPARED BASED ON INSPECTIONS OF THE SITE (BUILDING) AND INFORMATION GATHERED FROM EXISTING DRAWINGS.
THEY ARE INTENDED TO REPRESENT THE CONDITIONS OF THE SITE (BUILDING). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO
THE COR.
A CLEAN SITE SHALL BE MAINTAINED AT ALL TIMES. GC SHALL BE RESPONSIBLE FOR CLEANING DEBRIS FROM THE SITE.
CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR
INFECTION CONTROL. VERIFY EXACT LOCATIONS AND REQUIREMENTS WITH THE COR.
WORK MAY NEED TO BE PHASED AND/OR LIMITED TO OFF HOURS TO ACCOMMODATE CONTINUOUS NORMAL OPERATION OF THE FACILITY.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE
REQUIREMENTS IDENTIFIED IN THE DIVISION 1 SPECIFICATION "GENERAL REQUIREMENTS."
CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.
CONTRACTOR WILL FIELD VERIFY AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, LIFE SAFETY, AND SECURITY PROVISIONS PRIOR
TO PLACING BID AND COMMENCEMENT OF CONSTRUCTION.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY COR OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF
ANY COMPONENTS.
COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL
SYSTEM.
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, AND DOOR REPAIR, ETC.
CONTRACTOR PARKING ON SITE IS LIMITED. CONTRACTOR TO COORDINATE VEHICLE PARKING WITH COR PRIOR TO CONSTRUCTION.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT
TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.
THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE
INSTALLED.
DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK, FURNISHING
SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO
ADDITIONAL COST.
ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS.
BEFORE CONTRACTOR PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL
NEW OR RELOCATED WORK IN THIS PROJECT.
ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.
SPACE FOR CONSTRUCTION MATERIAL DUMPSTERS ON SITE IS LIMITED. THE VA DOES NOT PROVIDE A DUMPSTER FOR THIS MATERIAL.
COORDINATE WITH COR FOR APPROVED DUMPSTER LOCATION.
ALL PIPING AND OTHER MECHANICAL ITEMS WHERE ASBESTOS INSULATION IS REMOVED MUST BE RE-INSULATED WITH MATERIALS
ACCORDING TO THE SPECIFICATIONS.
STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH COR PRIOR TO CONSTRUCTION.
NAME BRANDS USED WITHIN THE CONTRACT DOCUMENTS ARE NOT MEANT TO BE RESTRICTIVE, BUT ONLY TO INDICATE A BRAND THAT REFLECTS THE CHARACTERISTICS AND LEVEL OF QUALITY THAT WILL SATISFY THE GOVERNMENT'S NEEDS. THE SALIENT PHYSICAL, FUNCTIONAL, OR PERFORMANCE CHARACTERISTICS THAT "EQUAL PRODUCTS" MUST MEET ARE IDENTIFIED IN THE CONTRACT
DOCUMENTS.
SEE INTERIORS SHEET AI-101 FOR ALL CASEWORK ELEVATION MARKERS
THE ROOM NUMBERING SEQUENCE IS FOR CONSTRUCTION IDENTIFICATION ONLY.
FINAL ROOM NUMBERING SHALL BE CORRELATED WITH CURREST BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED DUE TO
DEMOLITION.
FINAL ROOM NUMBERING AND SIGNAGE SHALL BE APPROVED BY VA STAFF ON SITE.
ALL DOOR RETURNS 4" UNLESS NOTED OTHERWISE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
GENERAL NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
THE ROOM NUMBERING SEQUENCE IS FOR
CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM
NUMBERING SHALL BE CORRELATED WITH CURRENT
BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED
DUE TO DEMOLITION. FINAL ROOM NUMBERING AND
SIGNAGE SHALL EB APPROVED BY VA STAFF ON
SITE
N
T
C E
I L
TA
S SHEILA
001-016606
CD A R
S E
LYNN
T C
H I
T E
ILOF I L
E NO
I S
EXPIRES 11-30-20
HENSLEY
BAYSINGER
/1
/2
:0
:2
P
M
A-001
ARCHITECTURAL NOTES,
ABBREVIATIONS, AND SYMBOLS
1 28ZC
RELOCATE AND UPGRADE
OPERATING SUITES -
MARION, IL
MARION VAMC
MARION, IL 62959
11/13/2019
BID DOCUMENTS
657-50119-126
2, 38
MM
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
2A 2B
File details come from the government source that posted it. Updated .