P09 Corrected OR_ARCH_A-001 - ARCHITECTURAL NOTES ABBREVIATIONS AND SYMBOLS - 1 Page.pdf

PDF 123 KB Posted

Attached to
Z2DA--Construct Surgical Suite Addition P/N: 657-501 Federal contract opportunity
Solicitation number
36C25520R0040-0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document contains architectural notes, abbreviations, and symbols for a federal construction project to relocate and upgrade operating suites at the Marion VA Medical Center in Marion, Illinois. Key requirements include patching all disturbed and exposed finishes to match adjacent materials and colors; performing noisy work and work in occupied areas at times other than normal hours at no additional cost; sawcutting and removing portions of existing concrete slabs as needed for structural improvements and preparing floor slabs for new flooring; and verifying existing conditions, coordinating all work with other trades, and providing offsets and transitions for fully functional systems. The related solicitation is for contract 36C25520R0040 to construct a surgical suite addition with project number 657-501 at the Marion VAMC, issued by the Department of Veterans Affairs Veterans Health Administration VISN 15.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Construct Surgical Suite Addition P/N: 657-501, newest first.
File Type Posted
P09 Corrected OR_ARCH_A-301 - BUILDING SECTIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC103 - Bldg 2 2nd FLOOR AREA B REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-502 - GENERAL DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-202 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
S06 36C25520R0040 0001.docx DOCX document
P09 Corrected OR_ARCH_A-104 - BLDG 38 SECOND FLOOR RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS101 - LIFE SAFETY FLOOR PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC102 - BLDG 2 2nd FLOOR AREA A REFLECTED CEILING PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC101 - SECOND FLOOR REFLECTED CEILING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-105 - ROOF PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS112 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 Page.pdf PDF
P09 Corrected OR_ARCH_G-001 - COVER - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-102 - BLDG 02 2ND FLOOR AREA A RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-103 - BLDG 02 2ND FLOOR AREA B RENOVATION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_LS111 - LIFE SAFETY - ACCESSIBILITY GUIDELINES - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-201 - EXTERIOR BUILDING ELEVATIONS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AD101 - SECOND FLOOR DEMOLITION PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-002 - SECOND FLOOR EXISTING PLAN - 1 page.pdf PDF
P09 Corrected OR_ARCH_G-002 - DRAWING INDEX AND PROJECT INFORMATION - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-401 - ENLARGED PLANS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_AC104 - BLDG 38 2ND FLOOR REFLECTED CEILING PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-501 - PARTITION TYPE DETAILS - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-601 - DOOR SCHEDULE DOOR ELEVATIONS AND DETAILS - 1 page.pdf PDF
P09 Corrected OR_ARCH_A-003 - PHASING AND INFECTION CONTROL PLAN - 1 Page.pdf PDF
P09 Corrected OR_ARCH_A-101 - SECOND FLOOR OVERALL RENOVATION PLAN - 1 page.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL

SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES, THE GENERAL NOTES, AND THE

REQUIREMENTS IDENTIFIED IN THE DIVISION 01 SPECIFICATION "GENERAL

CONDITIONS."

PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED

SURFACES HAVE BEEN EXPOSED BY DEMOLITION. THIS INCLUDES ALL FINISHES

SCHEDULED TO REMAIN. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND

FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT,

VINYL WALL COVERING, ETC.) REPLACED FROM CORNER TO CORNER AND FLOOR TO

CEILING.

UNLESS NOTED OTHERWISE, WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE

MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES

OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE

GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.

UNLESS NOTED OTHERWISE, SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED

DURING NORMAL WORKING HOURS AND MUST BE SCHEDULED WITH THE VA COR FOR

OTHER TIMES. THIS INCLUDES JACK-HAMMERING CONCRETE, SAW-CUTTING

CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE, ETC.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN

WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED

CONTRACTOR AT THE EXPENSE OF THE CONTRACTOR. ALL CONDUITS IN WALLS SHALL

BE GROUTED OR SEALED INTO OPENINGS.

GENERAL CONTRACTOR SHALL RECORD ALL "OWNER ASSET NUMBERS" THAT ARE

TAGGED AND SCHEDULED TO BE REMOVED AND/OR DEMOLISHED. SUCH TAGS ARE

LABELED "EE..." CONTRACTOR SHALL PROVIDE A LOG OF ALL ASSET TAGS TO COR.

GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL

DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR INFECTION CONTROL. REFER TO

INFECTION CONTROL AND PHASING FOR ADDITIONAL DETAILS. COORDINATE

REQUIREMENTS WITH THE VA MEDICAL CENTER INFECTION CONTROL POLICY. REMOVE

TEMPORARY PARTITIONS AT END OF CONSTRUCTION OR WHEN DIRECTED BY COR.

PATCH ADJACENT FINISHES DAMAGED DURING REMOVAL PROCESS.

ALL AREAS AND ADJACENT SPACES, NOT INDICATED AS CONSTRUCTION SITE, WILL BE

OCCUPIED.

THE EXTENT OF PLUMBING, MECHANICAL, AND ELECTRICAL UTILITIES TO BE REMOVED

IS SHOWN ON THE PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS.

GENERAL CONTRACTOR REMOVE ALL WALL HUNG EQUIPMENT/FURNISHINGS (FIRE

EXTINGUISHERS, GRAB BARS, WALL PROTECTION, SIGNAGE, ETC.) WHETHER

INDICATED OR NOT, REINSTALL, DISPOSE OF, OR TURN OVER ITEMS TO THE VA PER

THE COR'S DIRECTION.

GENERAL CONTRACTOR SHALL SAWCUT AND REMOVE PORTIONS OF EXISTING

CONCRETE FLOOR SLAB AS REQUIRED TO COMPLETE INSTALLATION OF STRUCTURAL

IMPROVEMENTS. PATCH FLOOR SLAB AND PREPARE FOR NEW FLOORING UPON

COMPLETION OF STRUCTURAL MEMBER INSTALLATION. COORDINATE WITH

STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

DEMOLITION GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

1. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL

PANELS, ACCESS PANELS, SPRINKLER PIPING, ETC., TO MATCH ADJACENT FINISH

UNLESS OTHERWISE NOTED.

2. UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH

SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS

FRAMES. REFER TO INTERIOR SHEETS FOR COLORS.

3. ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED

ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR

CONCRETE CONSTRUCTION, SHALL BE FURRED IN, THE FURRING FINISHED TO MATCH

THE ROOM FINISH.

4. REFER TO THE LIFE SAFETY PLAN FOR FIRE/SMOKE RATED PARTITIONS. NEW OR

EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH APPROVED FIRE

STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED.

PENETRATIONS THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.

5. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE

DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT

LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING

WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A

COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL COST.

6. WHETHER INDICATED ON THE DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL

CORNER GUARDS ON ALL CORNERS CREATED BY NEW WORK IN THIS PROJECT,

INCLUDING TEMPORARY CONSTRUCTION BARRIER WALLS. CORNER GUARDS SHALL

EXTEND FROM 4" A.F.F. TO 7'-2" A.F.F.

7. WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR

EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND

REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT WITH WATER OR OTHER

LIQUIDS.

8. COORDINATE WITH STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE

PROTECTION DRAWINGS FOR RELATED WORK.

9. WHETHER INDICATED ON DRAWINGS OR NOT, THE CONTRACTOR SHALL INSTALL JOINT

COVERS AT ALL EXPANSION JOINT LOCATIONS. TYPICAL AT FLOOR, WALL AND CEILING

JOINTS.

RENOVATION GENERAL NOTES

ABBREVIATIONS:

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISH FLOOR

A/C AIR CONDITIONING

ALUM ALUMINUM

& AND

APPROX APPROXIMATE

@ AT

BRG BEARING

BLK BLOCK

BD BOARD

BD FT BOARD FEET

A.O.C. BOTTOM OF CONCRETE

BLDG. BUILDING

CPT CARPET

C.L. OR CLG CEILING

CT CERAMIC TILE

CB CHALK BOARD

CO CLEAN OUT

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONC BL CONCRETE BLOCK

CONC FL CONCRETE FLOOR

CMU CONCRETE MASONRY UNIT

CONST CONSTRUCTION

CJ CONTROL JOINT

CRS COURSE

CU CUBIC

CU FT CUBIC FOOT

CU YD CUBIC YARD

DIA DIAMETER

DBL DOUBLE

DN DOWN

DS DOWNSPOUT

DWG DRAWING

DF DRINKING FOUNTAIN

EA EACH

ELECT ELECTRIC

EC ELECTRIC CONTRACTOR

EP ELECTRICAL PANEL BOARD

EL ELEVATION

ELEV ELEVATION

EQ EQUAL

EW EACH WAY

EXIST EXISTING

EXP EXPANSION

EB EXPANSION BOLT

EJ EXPANSION JOINT

EXT EXTERIOR

FE FIRE EXTINGUISHER

FT OR ' FEET

FIN FINISH

FD FLOOR DRAIN

FL FLOOR LINE

FLUOR FLUORESCENT

FTG FOOTING

FDN FOUNDATION

GALV GALVANIZED

GA GAUGE

GC GENERAL CONTRACTOR

GYP GYPSUM BOARD

H/AC HEATING/AIR CONDITIONING

HM HOLLOW METAL

HT HEIGHT

HR HOUR

HWSF HEAT-WELDED SHEET FLOORING

IN OR " INCH

JT JOINT

JST JOIST

LAM LAMINATE

LF LINEAR FOOT

MFR MANUFACTURER

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MIN MINIMUM

MISC MISCELLANEOUS

NOM NOMINAL

NO OR # NUMBER

O.C. ON CENTER

OPG OPENING

O.H. OPPOSITE HAND

PT PAINT

% PERCENT

PLAM PLASTIC LAMINATE

+/- PLUS OR MINUS

PVC POLYVINYL CHLORIDE

LBS OR # POUNDS

PSI POUNDS PER SQUARE INCH

PREFAB PREFABRICATED

PRELIM PRELIMINARY

PT PRESSURE TREATED

RAD RADIATOR

RBR RUBBER BASE

RE: REFER

REFRIG REFRIGERATOR

REINF REINFORCEMENT

REP REPRESENTATIVE

REQD REQUIRED

RD ROOF DRAIN

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

SQ FT SQUARE FOOT

STD STANDARD

STL STEEL

STRUCT STRUCTURE

SUSP SUSPENDED

SYS SYSTEM

TB TACKBOARD

TYP TYPICAL

VCT VINYL COMPOSITION TILE

VERIFY VERIFY

W/ WITH

W/O WITHOUT

WD WOOD

ARCHITECTURAL SYMBOLS LEGEND

A

C2

A100A

FEC

NORTH

AS-1000

AS-1000

DIMENSION LINE

DOOR OPENING/BORROWED LIGHT IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ROOM NAME AND NUMBER

COLUMN GRID

KEYNOTE

FIRE EXTINGUISHER CABINET

NORTH ARROW

DETAIL NUMBER

SECTION MARKER

PARTITION TYPE. RE: SHEET A-501A

1AS-1000 ELEVATION MARKER

DRAWING TITLE

1 1/2" = 1' - 0"

CORRIDOR

SHEET LOCATION

WINDOW TYPE

ELEVATION

AE100

A

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING ADJACENT CONSTRUCTION AND EQUIPMENT FROM DUST AND DAMAGE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN, REPAIR, REPLACE, OR PATCH ANY EXISTING CONSTRUCTION DAMAGED DURING THE CONSTRUCTION PROCESS AT NO ADDITIONAL EXPENSE TO THE VA. ANY DAMAGED AREAS SHALL BE RETURNED TO EQUAL OR BETTER CONDITION THAN THAT OF THE EXISTING CONSTRUCTION PRIOR TO DAMAGE.

DRAWINGS WERE PREPARED BASED ON INSPECTIONS OF THE SITE (BUILDING) AND INFORMATION GATHERED FROM EXISTING DRAWINGS.

THEY ARE INTENDED TO REPRESENT THE CONDITIONS OF THE SITE (BUILDING). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO

THE COR.

A CLEAN SITE SHALL BE MAINTAINED AT ALL TIMES. GC SHALL BE RESPONSIBLE FOR CLEANING DEBRIS FROM THE SITE.

CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR

INFECTION CONTROL. VERIFY EXACT LOCATIONS AND REQUIREMENTS WITH THE COR.

WORK MAY NEED TO BE PHASED AND/OR LIMITED TO OFF HOURS TO ACCOMMODATE CONTINUOUS NORMAL OPERATION OF THE FACILITY.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE

REQUIREMENTS IDENTIFIED IN THE DIVISION 1 SPECIFICATION "GENERAL REQUIREMENTS."

CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.

CONTRACTOR WILL FIELD VERIFY AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, LIFE SAFETY, AND SECURITY PROVISIONS PRIOR

TO PLACING BID AND COMMENCEMENT OF CONSTRUCTION.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY COR OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF

ANY COMPONENTS.

COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL

SYSTEM.

CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, AND DOOR REPAIR, ETC.

CONTRACTOR PARKING ON SITE IS LIMITED. CONTRACTOR TO COORDINATE VEHICLE PARKING WITH COR PRIOR TO CONSTRUCTION.

CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT

TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.

THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE

INSTALLED.

DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK, FURNISHING

SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.

LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO

ADDITIONAL COST.

ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS.

BEFORE CONTRACTOR PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL

NEW OR RELOCATED WORK IN THIS PROJECT.

ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.

SPACE FOR CONSTRUCTION MATERIAL DUMPSTERS ON SITE IS LIMITED. THE VA DOES NOT PROVIDE A DUMPSTER FOR THIS MATERIAL.

COORDINATE WITH COR FOR APPROVED DUMPSTER LOCATION.

ALL PIPING AND OTHER MECHANICAL ITEMS WHERE ASBESTOS INSULATION IS REMOVED MUST BE RE-INSULATED WITH MATERIALS

ACCORDING TO THE SPECIFICATIONS.

STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH COR PRIOR TO CONSTRUCTION.

NAME BRANDS USED WITHIN THE CONTRACT DOCUMENTS ARE NOT MEANT TO BE RESTRICTIVE, BUT ONLY TO INDICATE A BRAND THAT REFLECTS THE CHARACTERISTICS AND LEVEL OF QUALITY THAT WILL SATISFY THE GOVERNMENT'S NEEDS. THE SALIENT PHYSICAL, FUNCTIONAL, OR PERFORMANCE CHARACTERISTICS THAT "EQUAL PRODUCTS" MUST MEET ARE IDENTIFIED IN THE CONTRACT

DOCUMENTS.

SEE INTERIORS SHEET AI-101 FOR ALL CASEWORK ELEVATION MARKERS

THE ROOM NUMBERING SEQUENCE IS FOR CONSTRUCTION IDENTIFICATION ONLY.

FINAL ROOM NUMBERING SHALL BE CORRELATED WITH CURREST BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED DUE TO

DEMOLITION.

FINAL ROOM NUMBERING AND SIGNAGE SHALL BE APPROVED BY VA STAFF ON SITE.

ALL DOOR RETURNS 4" UNLESS NOTED OTHERWISE.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

GENERAL NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

THE ROOM NUMBERING SEQUENCE IS FOR

CONSTRUCTION IDENTIFICATION ONLY. FINAL ROOM

NUMBERING SHALL BE CORRELATED WITH CURRENT

BAS IDENTIFICATION POINTS THAT ARE NOT BEING USED

DUE TO DEMOLITION. FINAL ROOM NUMBERING AND

SIGNAGE SHALL EB APPROVED BY VA STAFF ON

SITE

N

T

C E

I L

TA

S SHEILA

001-016606

CD A R

S E

LYNN

T C

H I

T E

ILOF I L

E NO

I S

EXPIRES 11-30-20

HENSLEY

BAYSINGER

/1

/2

:0

:2

P

M

A-001

ARCHITECTURAL NOTES,

ABBREVIATIONS, AND SYMBOLS

1 28ZC

RELOCATE AND UPGRADE

OPERATING SUITES -

MARION, IL

MARION VAMC

MARION, IL 62959

11/13/2019

BID DOCUMENTS

657-50119-126

2, 38

MM

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

2A 2B

File details come from the government source that posted it. Updated .