This document is a Statement of Work (SOW) for updating wayfinding signage at Edward Hines Jr. VA Hospital and its Community Based Outpatient Clinics (CBOCs) in Illinois. The project involves removing obsolete signage and installing new wayfinding signs across 30+ buildings and multiple CBOC locations, with work to be completed in seven sequential phases over 450 calendar days. The base bid covers all sites, with two alternate bid options that progressively reduce the scope of work.

The project requires comprehensive signage replacement, adhering to VA Signage Design Standards, with specific requirements for infection control, site access, safety protocols, and documentation. The total project is divided into phases including site work, individual building signage updates, and CBOC locations, with simultaneous work permitted only in Phases 1 and 2. Key constraints include maintaining 24/7 medical center operations, coordinating work during specific hours, and following strict security, badging, and infection control procedures. The estimated construction period is 330 calendar days, with a pre-construction period of 75 days and a closeout period of 45 days.

View the file

Other files

File Type Posted
S06 36C25226B0001 0003.docx DOCX document
32 05 23 - Cement and Concrete for Exterior Improvements.pdf PDF
03 30 00 - Cast-In-Place Concrete.pdf PDF
S06 36C25226B0001 0002.docx DOCX document
S02 Solicitation 36C25226B0001 Final.docx DOCX document
1a. Hines VA Campus Site Plan.pdf PDF
1b. Hines Underground Utility Plan.pdf PDF
1g. Above Ceiling Entry and Wall Construction Permits.pdf PDF
1h. Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1m. Infection Control Barrier Sample.pdf PDF
1n. Hines COVID-19 Guidelines.pdf PDF
1o. No Smoking Policy 10-1-19.pdf PDF
1p. Emergency Contact List - Template.pdf PDF
8a. Building 12 Signage Legend.pdf PDF
8e. Building 200 Signage Legend.pdf PDF
8g. Building 221 Signage Legend.pdf PDF
12 Building 217 Signage Drawings-2.pdf PDF
18 Building 200 Signage Drawings-1.pdf PDF
23 Building 200 Signage Drawings-6.pdf PDF
24 Building 200 Signage Drawings-7.pdf PDF
30 Bldg 1 Signage Drawings-4.pdf PDF
38 Bldgs 100-Hoffman Drawings.pdf PDF
1c. Pre-Construction Checklist Rev 07.27.2021 V2.pdf PDF
1i. Hines Parking Designations.pdf PDF
2 Hines VA Campus Site Plan.pdf PDF
3 Infection Control Risk Assessement.pdf PDF
6 578-15-008 Specifications 112825.pdf PDF
8h. Building 228 Signage Legend.pdf PDF
11 Building 217 Signage Drawings-1.pdf PDF
13 Building 217 Signage Drawings-3.pdf PDF
25 Building 200 Signage Drawings-8.pdf PDF
26 Building 200 Signage Drawings-9.pdf PDF
34 Bldgs 16-18 Drawings.pdf PDF
35 Bldgs 20-48 Drawings.pdf PDF
37 CBOCs Drawings.pdf PDF
1d. Safety and Health During Construction Activities V2.pdf PDF
4 Interim Life Safety Measures.pdf PDF
5 Pre-construction Risk Assessment.pdf PDF
7 General Sheets of Drawings.pdf PDF
10 Buildings 12 128 Drawings.pdf PDF
14 Building 221 Signage Drawings.pdf PDF
17 Exterior Site Signage Drawings.pdf PDF
20 Building 200 Signage Drawings-3.pdf PDF
21 Building 200 Signage Drawings-4.pdf PDF
22 Building 200 Signage Drawings-5.pdf PDF
28 Bldg 1 Signage Drawings-2.pdf PDF
29 Bldg 1 Signage Drawings-3.pdf PDF
31 Bldg 1 Signage Drawings-5.pdf PDF
32 Bldg 1 Signage Drawings-6.pdf PDF
P07 WAGE DETERMINATION COOK IL20250009 11-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Update Wayfinding Signage on Hines Campus Project 578-15-008

December 1, 2025

Attachments:

1) Hines VA Documents for Construction

a) Hines VA Campus plan

b) Hines Underground Utility Plan

c) Pre-Construction Checklist Rev 07.27.2021

d) Safety and Health During Construction Activities

e) Cutting Welding and Other Hot Work

f) Dig Permit SOP Form

g) Above Ceiling Entry and Wall Construction Permits

h) Contractor Badging-Fingerprint Request Form 2025

i) Contractor Parking

j) OIT Horizontal Cable Requirements

k) Fire Protection Code Reviews

l) Asbestos Survey Glossary (when applicable)

m) Infection Control Barrier Sample

n) Hines COVID-19 Guidelines

o) No Smoking Policy 10-1-19

p) Emergency Contact List-Template

2) Hines VA Campus Plan

3) Infection Control Risk Assessment (ICRA)

4) Interim Life Safety Measures (ILSM)

5) Pre-Construction Risk Assessment (PCRA)

6) 578-15-008 Specifications

7) General Sheets of Drawings

8) 578-15-008 Signage Legends

a) Building 12 Signage Legend

b) Building 13 Signage Legend

c) Building 113 Signage Legend

d) Building 128 Signage Legend

e) Building 200 Signage Legend

f) Building 217 Signage Legend

g) Building 221 Signage Legend

h) Building 228 Signage Legend

i) Site Wayfinding and Building Signage Legend

j) Signage Legend for Buildings 1-230, CBOC’S

9) Buildings 13,113 Drawings

10) Buildings 12,128 Drawings

11) Building 217 Signage Drawing-1

12) Building 217 Signage Drawing-2

13) Building 217 Signage Drawing-3

14) Building 221 Signage Drawing

15) Building 228 Signage Drawing-1

16) Building 228 Signage Drawing-2

17) Exterior Site Signage Drawing

18) Building 200 Signage Drawing-1

19) Building 200 Signage Drawing-2

20) Building 200 Signage Drawing-3

21) Building 200 Signage Drawing-4

22) Building 200 Signage Drawing-5

23) Building 200 Signage Drawing-6

24) Building 200 Signage Drawing-7

25) Building 200 Signage Drawing-8

26) Building 200 Signage Drawing-9

27) Building 1 Signage Drawings-1

28) Building 1 Signage Drawings-2

29) Building 1 Signage Drawings-3

30) Building 1 Signage Drawings-4

31) Building 1 Signage Drawings-5

32) Building 1 Signage Drawings-6

33) Buildings 2-9 Drawings

34) Buildings. 16-18 Drawings

35) Buildings 20-48 Drawings

36) Buildings 203,220,230 Drawing

37) CBOCs’ Drawings

38) Buildings 100-Hoffman Drawings

References:

1. VA’s Technical Information Library (TIL)

2. Master Construction Specifications (PG-18-1)

3. Standard Details (PG-18-4)

4. Environmental Planning Guidance (PG-18-17)

5. 2011 Asbestos Survey for EHVAH (available on request)

6. 2013 Historic Preservation Plan for the EHVAH (available on request)

7. 2020 Statement of Conditions Survey for the EHVAH (available on request)

8. 2022 Facility Condition Assessment for the EHVAH (available on request)

A) Mission

The Engineering Service’s mission is to provide total oversight and management of the Environment of Care, as it pertains to the physical infrastructure and base plant operations, at Edward Hines Jr.VA Hospital (EHVAH). The VA's engineering efforts are ultimately aimed at improving the lives of Veterans, their families, visitors, and staff, by providing them with reliable, accessible, and efficient services.

B) Goals:

The goal of this project is to update the way-finding signage on the EHVAH main campus and all the EHVAH CBOCs by providing a guide for our Veterans, their families, visitors and staff to reach their desired destination. The way-finding signage should provide clear and easily understandable information that helps individuals orient themselves and make informed decisions guiding them to their desired destination.

C) Current Conditions:

The current conditions are a loose collection of several different signage systems overlapping one another. The Environmental Programs Service (EPS) survey conducted in February 2020 resulted in EHVAH receiving a Wayfinding deficiency notice. The Facility Condition Assessment (FCA) survey in 2022 found existing wayfinding exceeded its useful life, is in poor condition, and not in compliance with the current VA Signage Design Standards.

D) Justification:

The Environmental Programs Service (EPS) survey conducted in February 2020 resulted in EHVAH receiving a way-finding deficiency notice. The report identified numerous FCA deficiencies associated with way-finding all receiving a grade of D. The Record Numbers of those deficiencies are 166001, 363633, 42138, 42197, 42327, 38061, 363952, 42640, 42671, 42701, 161579, 363720, 363734, 38779, 42825, 42853, 42853, 42880, 161437 and 365110.

E) Objectives:

The primary objective is to update the interior and exterior way-finding signage on the EHVAH Main Campus and all the EHVAH CBOCs.

The objectives of this project are to:

1. Remove and dispose of all the obsolete way-finding signage, materials, and spoils in accordance with all local, state, and federal laws.

2. Install/replace all the existing way-finding signage in accordance with the VA Signage Design manual.

3. Install new way-finding signage in accordance with the project Specifications and drawings. Note: any variance from the specified locations in the drawings must be approved by the COR prior to installation.

All work conducted under this scope of work shall comply with the Department of Veterans Affairs Master Specifications and other Federal, State, and local requirements. The package shall cover all items as defined below.

F) Acronyms and Definitions:

The following is a listing of acronyms and/or definitions to terms that may be used in this document.

ABAASArchitectural Barriers Act Accessibility Standards
ACMAsbestos Containing Material
A/EArchitect and Engineer (firm)
AHUAir Handling Unit
BASBuilding Automation System
CBOCCommunity Based Outpatient Clinic
CCEConstruction Cost Estimate
CCDContract Completion Date
CLINContract Line-Item Number
COContracting Officer
CORContracting Officers Representative as delegated by the CO
CSContracting Specialist assigned by the CO
EPSEnvironmental Programs Service (EPS)
EHRMElectronic Healthcare Records Management
EHVAHEdward Hines Veterans Affairs Hospital
FCAFacilities Condition Assessment
GCGeneral Contractor (firm)
GLACGreat Lakes Acquisition Center
HEFPHealthcare Environment and Facilities Program
HVACHeating/Ventilation/Air Conditioning
IDIQIndefinite Delivery Indefinite Quantity
LFLinear or Lineal Feet
MATOCMultiple Award Task Order Contracting
MEPMechanical/Electrical/Plumbing
NTPNotice to Proceed
OITOffice of Information & Technology
PCACVHA Program Contracting Activity Central
PDTProject Delivery Team – Typically CO/CS, COR, and EHVAH staff
PIVPersonal Identity Verification
POPPeriod of Performance
QCMQuality Control Manager
RFIRequest for Information
SFSquare Feet
TABTesting and Balancing
TILTechnical Information Library
TOTask Order
TRTelecom Room
VADepartment of Veteran Affairs
VA-SEPSVA Space and Equipment Planning Systems
WAPWireless Access Point

G) Requirements

Where a conflict exists between the Statement of Work (SOW) requirements and the requirements of other associated contract documents, the SOW requirements shall prevail.

This SOW presumes the Contractor will not need access to the Hines LAN or any VA Sensitive Information to execute the contract.

The awarded Contractor will adhere to all codes, standards, guidelines, and design requirements found in the VA’s Technical Information Library (TIL) including but not limited to the following:

1) Pre-bid site visit:

a. A pre-bid site walk through is encouraged and should be coordinated by the CO. The intent of this walkthrough is to give the Contractor access to the project site so that an accurate evaluation of the project requirements and site assessment can be made.

b. The Contractor shall coordinate with the COR to schedule the site visit seven (7) calendar days prior to the requested date.

c. Exploratory demolition is permitted but must be coordinated with the COR.

2) RFI Submittals:

a. The Contractor shall submit any RFI’s resulting from the site visit within five (5) working days after the inspection to the CO.

b. Unless otherwise stated the Contractor shall allow the COR and CO ten (10) working days to respond to an RFI.

3) Infection Control Barrier (ICB):

a. Temporary construction partitions shall be smoke-tight and built of noncombustible materials that will not contribute to the development or spread of fire.

b. Barriers shall not obstruct access to emergency services and for fire, police, and other emergency forces.

c. The Contractor shall provide and install a rigid infection control panel system manufactured by Edge Guard out of Bement, Illinois or an approved equal. http://www.edge-guard.com/home.html. Salient details of the infection control barrier are:

i. The ICB must be fire-resistant.

ii. The barrier must be water resistant; capable of being cleaned and sanitized.

iii. Installation of the barrier shall not:

1. Generate dust outside the barrier.

2. Generate excess noise outside the barrier.

3. Generates excess fumes outside the barrier.

iv. Demobilization of the barrier shall not:

1. Generate dust outside the barrier.

2. Generate excess noise outside the barrier.

3. Generates excess fumes outside the barrier.

4. Require floor, wall, or ceiling repairs upon removal.

v. The barrier should be environmentally responsible.

1. The materials should be reusable.

2. The materials should not contribute to unnecessary waste to our landfills.

d. Fire-resistant plastic sheeting may be used to supplement the rigid infection control panel system. COR approval is required.

i. The Contractor shall submit an RFI requesting approval during the bid period.

e. Wood studs, plywood, OSB, particle board, pressboard, or other flammable materials are not allowed at Hines.

f. Manometers shall be installed on the ICB adjacent to every entrance of the work zone to monitor negative pressure within the work zone. See Attachment 1m.

g. All doors to rooms inside the work zone but directly impacted by the work shall have their doors shut and the perimeters taped to prevent the migration of dust and debris into these rooms.

h. Cover all sprinkler heads (daily), signs, data transmitters, and light fixtures. Cover the supply and return diffusers within the work zone to prevent the spread of dust and fumes to other areas outside the work zone.

i. Rigid infection control panel system and manometers are to be submitted and approved by the COR prior to installation.

j. The following is a manner acceptable to Hines Infection Control to maintain negative pressure inside an infection control barrier with no reasonable access to discharge air to the exterior.

i. Install a floor-to-ceiling infectious control barrier (ICB) meeting the fire-rating required.

ii. Cover all sprinkler heads (daily), signs, data transmitters, and light fixtures. Cover the supply and return diffusers within the work zone to prevent the spread of dust and fumes to other areas outside the work zone.

iii. Place the air scrubber inside the ICB with a HEPA filter. The air scrubber will draw air from inside the ICB.

iv. Place a flapper valve connection on the ICB near to the ceiling.

v. Route the filtered air from the scrubber via a collapsible duct to the flapper valve thus maintaining negative pressure inside the ICB.

vi. If the power should accidentally get cutoff, the flapper valve will swing close thereby maintaining the integrity of the ICB.

4) The Contractor shall post and maintain the final signed PCRA, ICRA, ILSM and Emergency Contact Information (when issued) at the entrance to the ICB for the duration of the project. See Attachment 1. The Contractor will update the postings when new documents are issued.

5) Equipment Lead time:

a. Equipment lead times shall be incorporated into the project schedule and used in conjunction with the baseline for the project start date.

b. The contractor shall make an informed bid submission by working with suppliers and considering all potential long-lead items involved with the project reasonably known or considered to impact the start, performance, and completion of the project.

c. For delays in the equipment delivery not caused by the government, the contractor shall bear the cost of temporary materials, equipment, labor, and services for the time between the end of the period of performance and the final installation of the contract’s specified materials and equipment.

6) EHVAH Permits:

a. Unless otherwise stated the Contractor shall submit for all required VA permits (i.e. above ceiling or dig) fourteen (14) calendar days prior to the event based on the approved project schedule with the COR.

7) Project Pay Applications:

a. Pay applications shall be initiated by the contractor in the form of a draft “pencil draw” submission to the COR.

i. Prior to submission the contractor will review the amounts, date of the application, the application number, and the purchase order (PO) for the project are correct.

ii. The COR may question the pencil draw and request revisions.

iii. Upon approval by the COR, the application will be reviewed by the CO.

iv. Upon approval by the CO, the application will be submitted into the electronic Invoice Payment Processing System (IPPS). Approval within IPPS can take days or sometime weeks to be processed.

b. All submitted project pay applications require certified payroll and waste report documents to be current with each pay submission.

i. Certified payroll documents shall be submitted to the COR weekly.

ii. Waste reports shall be submitted even when no waste has been produced. The contractor shall validate this by submitting a quantity of zero on the waste report.

iii. Approval of all invoices will require documents to be current.

c. With each invoice submission an updated, full schedule shall be submitted noting any changes in non-critical and critical paths, modifications approved, delays by the government, delays by the contractor, issuance dates for Letters of Concern and Letters of Cure, and other elements that impact on the project completion date.

d. Submission of a 3-week look-ahead schedule will not be accepted.

8) Work outside of normal business hours or weekends:

a. All work performed after hours or on weekends requires coordination with the COR and shall be requested fourteen (14) calendar days prior in writing or e-mail to the COR for approval.

b. No work shall take place without written or e-mail confirmation from the project COR.

9) Utility Shutdowns:

a. The Contractor shall provide twenty-one (21) calendar days’ advance notice for any planned utility shutdowns to all allow the station to notify staff/visitors and prepare contingency plans if necessary.

b. Failure to submit the shutdown requests in a timely manner is not justification for a claim of delay on the part of the government.

c. Planned utility shutdowns should be indicated on the project schedule.

10) Submittals and Shop Drawings:

a. Unless otherwise stated the Contractor shall provide shop drawings and equipment submittals for review and approval by the COR seven (7) calendar days prior to the start of construction.

b. No work shall be started prior to review and approval by the COR.

11) Certifications:

a. When applicable, the Contractor shall provide certifications for all personnel performing any welding and shall certify all welds prior to the start-up of any of the units.

b. These certifications shall be supplied to the COR and retained as a permanent record of the project folder.

c. Personnel certifications shall be provided to the COR prior to the start of construction.

d. All weld certifications shall be provided to the COR at the end of every work week when applicable.

12) OSHA Certification:

a. The Contractor shall have an OSHA certified site superintendent on site whenever any work is being performed.

b. A copy of the Superintendents OSHA 30hr certification shall be supplied to the COR prior to the start of any work and retained as part of the project folder.

c. All contractor employees and subcontractors must have a minimum of a 10hr OSHA certification.

13) EPA / IEPA Notification:

a. Pursuant to 40 CFR 61.145, written NESHAP notification is required to EPA at least 10 working days before the abatement or demolition is to begin.

b. A copy of this notification and acceptance shall be provided to the COR.

14) Post-Award meeting:

a. The meeting shall be coordinated by the COR and CS/CO.

b. The meeting shall take place after the Notice to Proceed has been issued but prior to the start of demolition/construction.

c. The Contractor shall schedule and attend a “Page-Turn” meeting in which the Designer of Record will be in attendance. The goal of this meeting is to clarify any confusion the Contractor may have regarding the contract documents in advance of commencing construction activities, delivery of project submittals, submission of the project schedule, the coordination of project phasing, etc.

H) Scope of Work:

The Scope of Work for this project includes all labor, management, materials, and equipment necessary to update all interior and exterior wayfinding signage on the Hines VA campus and all the Hines VA CBOCs. The contractor will purchase and install all Wayfinding signage and materials necessary to complete the installation. All measurements/dimensions are approximate and must be field verified by the contractor. The Buildings and sites included in this wayfinding project are Buildings 1, 2, 3, 4, 7, 8, 9, 12, 13, 16, 17, 18, 20, 21, 30, 33, 45, 48, 100, 113, 128, 200, 203, 217, 220, 221, 228, 229, 230, CBOCs in Aurora, LaSalle, Hoffman Estates, Oak Lawn, Kankakee and Joliet.

The Contractor shall submit shop drawings and get them approved by VA prior to starting each phase of the work in the contract. Shop drawings can be submitted according to phases. VA requires 30 days to review shop drawings for each of the phases. No construction work shall be started without approved shop drawings. Obsolete or old signs shall not be removed unless the new replacement sign is available at the time of installation. The contractor shall ensure they do not leave a space in mid-installation, for example, if the contractor removes a sign, they must finish the installation of the replacement sign before leaving that location.

The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval.

Any deviation from this scope of work requires the express authorization of the Contracting Officer. The Contracting Officer Representative (COR) does not hold the authority to authorize changes to this scope of work.

1) Continued Use – The Medical Center maintains operations 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2) Bids—The contractor shall submit bids for the following bid categories. The project may be awarded for the complete Base bid or for one or more of the alternate bids depending upon the availability of funds.

a. Base Bid: Hines exterior site signage, buildings 1, 2, 3, 4, 7, 8, 9, 12, 13, 16, 17, 18, 20, 21, 30, 33, 45, 48, 100, 113, 128, 200, 203, 217, 220, 221, 228, 229, 230, and CBOCs in Aurora, Lasalle, Hoffman Estates, Oaklawn, Kankakee and Joliet.

b. Alternate Bid 1: All the work in the Base bid minus the work in the work in the following Buildings 16, 20, 21, 30, 33, 48, 100, 203, 220, 229 and 230.

c. Alternate Bid 2: All the work in Alternate Bid 1 minus the work in CBOCs in Aurora, Lasalle, Hoffman Estates, Oaklawn, Kankakee and Joliet.

3) Phases – The project work will be performed in seven (7) phases. Phase 1 and Phase 2 work can be done simultaneously. However, no work can be done in subsequent phases unless the work in the previous phase is complete.

a. Phase 1 - Site work

b. Phase 2 - Buildings 217 and 221

c. Phase 3 - Building 200

d. Phase 4 - Buildings 12, 13, 113, 128, and 228

e. Phase 5 - Buildings 1, 2, 3, 4, 7, 8, 9, 12 and13

f. Phase 6 - Buildings 16, 17, 18, 20, 21, 30, 33, 45, 48, 100, 203, 220, 229 and 230

g. Phase 7 - CBOCs in Aurora, Lasalle, Hoffman Estates, Oaklawn, Kankakee and Joliet

4) All the work shall be performed in accordance with the contract documents and the Statement of Work.

a. Demolition:

1. Provide temporary infection control enclosure during demolition per specifications.

2. Maintain staff, patient, and visitor access to the building during demolition per specifications.

b. Exterior Installation:

1. Wherever necessary, provide temporary infection control enclosure during construction per specifications.

2. Maintain staff, patient, and visitor access to the buildings during construction per specifications.

3. Exterior signage shall be installed in the following order:

i. Wayfinding signs

ii. Building pedestals

iii. On buildings

4. For exterior work, restore adjacent landscaping to match exterior prior to completing of the work

c. Interior Installation:

1. Continue to provide temporary infection control enclosure during construction per specifications.

2. Maintain staff, patient, and visitor access to the buildings during construction per specifications.

3. Interior signage shall be installed in the following order:

i. Directories

ii. Wayfinding

iii. Individual rooms

4. Repair, patch and paint the surfaces where signs have been removed and not replaced. The paint color of the newly patched areas shall match the existing paint color.

5. The work in Surgery areas on the 2nd floor and in the basement of Building 200 shall be done only on off hours or weekends and shall be coordinated with the COR.

6. Work in building 228 shall be coordinated with the COR and the mental health team prior to commencement. The contractor shall provide a minimum 21-day notice prior to commencing work in this building.

I) Constraints

1) Work hours for EHVAH staff are from 7:30 am until 4:00 pm, Monday through Friday.

2) Photographs may be taken of the work performed at the jobsite. However, photographs containing patients and/or staff are a violation of both Patient and Hospital Privacy policies. Both violations are subject to penalties and dismissal. Permission from the EHVAH Public Affairs Officer (PAO) is required and should be coordinated with the project COR.

3) VHA Directive 1085 implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities.

4) Maximizing Use of American-Made Goods, Products, and Materials

a. The Buy American Act required the United States government to prefer U.S.-made products in its purchases.

b. It is the policy of the United States to buy American and to maximize, consistent with law, the use of goods, products, and materials produced in the United States.

c. Material purchases should adhere to this policy to the greatest extent possible.

5) The contractor badging process is a required security procedure of all VA stations. It is the responsibility of the general or prime contractors to notify their subcontractors of this requirement. All contracted workers visiting the jobsite will need to receive a contractor’s Flash badge. This is to be done before any construction or demolition work is started on the project. Failure to obtain and display the proper badge could result in the worker being removed from the station by Hines Police.

The procedure to follow is:

a. The Contractor shall have 2 weeks’ notice from award to Notice to Proceed (NTP) to on-board team members with the necessary badging.

b. The Contractor shall fill out Contractor Badging Form – See Attachment 1.

c. Two (2) forms are personal identification are needed. Valid (unexpired) forms of ID include:

1. Current Driver’s License. Real ID is required.

2. An original social security card (not laminated). Substitutes may include:

i. Current Passport

ii. Original birth certificate (not a copy) Additional forms of identification can be found on Page 2 of the Contractor Badging Form – See Attachment 1.

d. The Contractor shall coordinate with COR and bring the completed Contractor Badging Form to Mikel Jones (Bldg. 2, Rm 119) to coordinate for fingerprints (Phone: 708 202-8387, ext. 21322; Email: mikel.jones@va.gov).

e. Once the form is approved by Mikel Jones, contractors shall take a copy of the form to Human Resources located in Building 17 for fingerprinting. The hours for fingerprinting are 8:00 AM to 3:00 PM. The other copy will stay with Hines Engineering.

f. Upon a favorable fingerprint adjudication, the contractor will schedule an appointment with HR to receive a Flash badge. The link to schedule this appointment will be provided by Mikel Jones upon notification of successful fingerprint adjudication.

J) Tasks and Responsibilities

A pre-construction (kick-off) meeting between the Contracting Officer (CO) or Contracting Specialist (CS), the Contracting Officers Representative (COR), and key GC team members will be conducted to review project objectives, scope, deliverables, communication, site access, schedule, and responsibilities. During this meeting the Notice to Proceed (NTP) should be signed. After this meeting the awarded GC firm shall provide their services according to the approved project schedule.

1) Preconstruction Period: The Contractor shall provide the following:

a. Logistics Plan: A comprehensive narrative describing the chronological planned development of the project. The Logistics Plan includes an organizational chart, hourly rates, staging plan, description of means and methods, and hours of work.

b. Construction Security Plan: Defines both physical and administrative security.

c. Construction Phasing Plan: It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

d. Submittal Registry: The Submittal Registry shall include a listing of all documentation required for pre-approved submissions including shop drawings, technical data, product performance information, calculations, and samples.

e. Accident Prevention Plan: The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program.

f. Activity Hazard Analyses: AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and Activity Safety Analyses.

g. Construction Schedule: WBS schedule including start/end dates, duration, and sequencing, preferably in MS Project or Primavera format (include floats).

h. Schedule of Values: A detailed Breakdown for Payment, including design stages, work performed, and work invoiced per Progress Payment submission.

1. The Schedule of Value is a representative breakdown of the contractor’s firm, fixed-price bid. Each portion of the Schedule of Values represents the amount the government paid to the contractor for that portion of the work.

2. Because the contractor’s bid was fixed, so too is the Schedule of Values. It is not fluid and does not change after submission and approval. The Schedule of Values can only be modified through a bi-lateral agreement between the government and the contractor.

3. The government will utilize the Schedule of Values as a basis of negotiations for contract modifications. This is especially true when a credit is due to the government for all or measurable parts of certain portions of the firm, fixed-price contract.

i. Existing Conditions Survey: Before any work is started, the Contractor shall conduct a thorough survey with the COR of the buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report signed by both, to the Contracting Officer.

j. Infection Control Plan (ICP): Narrative description of the dust control and debris disposal process including disposal destination and methodology.

k. Quality Control Plan (QCP): Describes the methods by which the Contractor will ensure all work is being accomplished in accordance with specifications and this SOW.

l. Environmental Protection Plan: The Contractor shall meet with the COR to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection.

m. Document Submissions. All documents included as Attachments to this SOW that are required to be filled out and signed or jointly signed by the Contractor.

n. Demolition Debris Management Plan.

o. Certificates, Licenses, and Training Documents.

p. Obtain PIV badges.

q. RFI’s: Other than those resulting directly from demolition or construction.

2) Construction Period: Along with coordinating the construction of the project, the Contractor shall provide the following during construction services:

a. Display the signed PCRA, ICRA, ILSM and Emergency Contact Information in a location coordinated with the COR.

b. Submit RFI’s during construction as necessary.

c. Attending and running biweekly construction meetings.

1. Take notes and attendance, produce, and distribute minutes. Note – Failure to produce fair, unbiased meeting minutes will result CO disciplinary action.

2. Track and RFI’s, submittals, and modifications through various logs.

3. Request permits and shutdowns.

4. Request inspections, reviews, and punch list.

5. Address any obstacles and work to coordinate resolutions.

d. Attend site visits, field inspections, and punch list inspections as requested by the COR.

3) Construction Close-out Period:

a. The Contractor shall provide the following:

1. Inspection and Approval by the COR and/or the CO.

2. Final Approval and Beneficial Occupancy when applicable.

3. Warranties documents and O&M Manuals.

4. As-built drawings and record submittals.

5. Staff training when applicable.

6. Contractor Release of Claims.

7. All Waste Reports submitted per Safety and Health during Construction Activities.

8. Existing Conditions Re-survey.

b. The COR shall review the Contractor’s close-out submissions for thoroughness and conformance with the contract document requirements. The COR shall also review field-marked as-built drawings for conformance with final installations.

c. The COR shall utilize these as-built drawings and specifications from the Contractor and generate them as recorded drawings and specifications.

K) Deliverables:

1) The Contractor shall provide all submittals required by the Specifications Book.

L) Time Frames:

1) This project shall be completed within Four Hundred Fifty (450) calendar days once NTP is issued.

a. Phasing – This project shall be executed in seven (7) phases based upon the work locations. Work in each location shall be executed uninterrupted until complete. No work shall commence to the follow-on phase until the work in the prior phase has been completed. The only exception to this requirement is that Phases 1 and 2 to be done simultaneously.

i. Phase 1 - 60 calendar days.

ii. Phase 2 - 60 calendar days.

iii. Phase 3 - 90 calendar days.

iv. Phase 4 - 60 calendar days.

v. Phase 5 - 60 calendar days.

vi. Phase 6 - 30 calendar days.

vii. Phase 7 - 30 calendar days.

b. Pre-construction (kick-off) Meeting is when the Notice to Proceed (NTP) is signed.

c. Pre-Construction Period duration is NTP + 75 calendar days. Shop drawings for Phases 1 & 2 shall be submitted and get the approval from VA. Within this period, the Contractor shall provide all materials included under Tasks and Responsibilities and the following:

1. Logistics Plan.

2. Construction Security Plan.

3. Construction Phasing Plan.

4. Submittal Registry.

5. Accident Prevention Plan.

6. Activity Hazard Analyses.

7. Construction Schedule.

8. Schedule of Values.

9. Existing Conditions Survey.

10. Infection Control Plan.

11. Quality Control Plan.

12. Environmental Protection Plan.

13. Document Submissions.

14. Demolition Debris Management Plan.

15. Certificates, Licenses, and Training Documents.

16. Obtain PIV badges.

d. Construction Period - To be determined based upon the approved schedule for construction. The estimated construction period is three hundred thirty (330) calendar days with all product submittals to be delivered prior to the start of construction to the COR for review and approval. No demolition or construction shall be started without the review and approval from the COR for those items listed in the Pre-Construction Period unless authorized in writing by the COR or the CO.

e. Construction Closeout Period begins approximately four hundred five (405) days after NTP. The Contractor shall submit within 45 calendar days from EHVAH acceptance of the completed punch list items and commissioning reports (if applicable). Within this period the Contractor shall provide all materials included under Tasks and Responsibilities and the following:

1. Inspection and Approval by the COR and/or the CO.

2. Final Approval and Beneficial Occupancy when applicable.

3. Warranties documents and O&M Manuals.

4. As-built drawings and record submittals.

5. Staff training when applicable.

6. Contractor Release of Claims.

7. Waste Reports.

8. Existing Conditions Re-survey.

M) Performance Monitoring

The Government will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor such performance and ensure services are received. The Government representative will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor's performance.

N) Other Pertinent Information or Special Considerations.

1) All Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements as applicable. All licenses, permits, and welding certifications shall be kept current throughout the period of performance of the contract. The Contractor shall provide the Government copies of such certificates.

2) Per VA Information Security Program policy – VA Directive and Handbook 6500 and 6500.6, Appendix A, contractor storage, generation, transmission or exchanging of VA sensitive information during this construction project is not acceptable.

3) All work shall be scheduled to meet the requirements of EHVAH. All work shall be coordinated through the Contracting Officer. Local coordination shall be routed through the Contracting Officer’s Representative.

4) The Contractor shall provide to the Contracting Officer record of work certifications for all trade’s relative to this contract 5 calendar days prior to beginning work. Certifications shall include welders, pipe installers, machine operators, etc.

5) The Contractor is responsible for repairing any damages to existing utilities incurred during construction or demolition.

6) Utilities within the area and identified on existing drawings are not to be interpreted as the exact location, or as the only existing site conditions. The Contractor shall verify all existing conditions and proceed with caution around any anticipated obstructions.

7) Where any work disturbs the grass areas, sod, walls, ceilings, floors, windows, entrances or building structures, etc. or where new and old work join, the Contractor shall restore, repair, or refinish affected areas or surfaces to their original condition, or as existed before the commencement of this project. Upon completion of the contract, the Contractor shall deliver all work complete and undamaged. Any damage that may be caused by the Contractor or his work crews or subcontractors to any existing structure, grounds and utilities shall be repaired or replaced to their original condition.

8) Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the Contracting Officer. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure system-wide consistency. All work conducted under this scope of work shall comply with the Department of Veterans Affairs Master Specifications and all applicable state and federal regulations and codes.

O) Risk Control

1) Refer to the attached ICRA form.

P) Government Furnished Equipment (GFE)/Government Furnished Information (GFI):

1) GFI.

a. No additional information is intended to be supplied other than information that is requested by the Contractor.

Q) Point of Contact at the EHVAH:

1) Jake Kanuru Engineer, Project Planning Section Engineering Service Edward Hines Jr. VA Hospital 5000 S. Fifth Avenue Building 2, Room 121 Hines, IL 60141 Jake.kanuru@va.gov Phone: 708-202-8387 ext. 21149

FAX: 708-202-2167