This document is a VA Hospital Policy Memorandum from Hines, IL, dated March 27, 2013, addressing procedures for cutting, welding, and other hot work operations. The policy establishes strict safety guidelines for conducting hot work in non-designated areas, requiring a permit from the Safety Section for all such operations outside of specific designated areas like the Machine Repair Shop, Pipefitting Shop, and Boiler Plant.

Key requirements include obtaining a burn permit 1-2 days prior to work, ensuring fire safety precautions such as removing combustibles within 35 feet of the work area, having appropriate fire extinguishers on hand, and conducting a final inspection 30 minutes after work completion. Contractors and VA employees must follow detailed safety protocols, including training personnel on equipment operation, understanding fire risks, and complying with NFPA 51B standards. The policy applies to various hot work activities like cutting, welding, brazing, soldering, and grinding, with specific restrictions on performing such work in explosive atmospheres or areas without proper authorization.

View the file

Other files

File Type Posted
S06 36C25226B0001 0003.docx DOCX document
32 05 23 - Cement and Concrete for Exterior Improvements.pdf PDF
03 30 00 - Cast-In-Place Concrete.pdf PDF
S06 36C25226B0001 0002.docx DOCX document
S02 Solicitation 36C25226B0001 Final.docx DOCX document
1a. Hines VA Campus Site Plan.pdf PDF
1b. Hines Underground Utility Plan.pdf PDF
1g. Above Ceiling Entry and Wall Construction Permits.pdf PDF
1h. Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1m. Infection Control Barrier Sample.pdf PDF
1n. Hines COVID-19 Guidelines.pdf PDF
1o. No Smoking Policy 10-1-19.pdf PDF
1p. Emergency Contact List - Template.pdf PDF
8a. Building 12 Signage Legend.pdf PDF
8e. Building 200 Signage Legend.pdf PDF
8g. Building 221 Signage Legend.pdf PDF
12 Building 217 Signage Drawings-2.pdf PDF
18 Building 200 Signage Drawings-1.pdf PDF
23 Building 200 Signage Drawings-6.pdf PDF
24 Building 200 Signage Drawings-7.pdf PDF
30 Bldg 1 Signage Drawings-4.pdf PDF
38 Bldgs 100-Hoffman Drawings.pdf PDF
1d. Safety and Health During Construction Activities V2.pdf PDF
4 Interim Life Safety Measures.pdf PDF
5 Pre-construction Risk Assessment.pdf PDF
7 General Sheets of Drawings.pdf PDF
10 Buildings 12 128 Drawings.pdf PDF
14 Building 221 Signage Drawings.pdf PDF
17 Exterior Site Signage Drawings.pdf PDF
20 Building 200 Signage Drawings-3.pdf PDF
21 Building 200 Signage Drawings-4.pdf PDF
22 Building 200 Signage Drawings-5.pdf PDF
28 Bldg 1 Signage Drawings-2.pdf PDF
29 Bldg 1 Signage Drawings-3.pdf PDF
31 Bldg 1 Signage Drawings-5.pdf PDF
32 Bldg 1 Signage Drawings-6.pdf PDF
P09 578-15-008 SOW 2026 R2 120125.docx DOCX document
1c. Pre-Construction Checklist Rev 07.27.2021 V2.pdf PDF
1i. Hines Parking Designations.pdf PDF
2 Hines VA Campus Site Plan.pdf PDF
3 Infection Control Risk Assessement.pdf PDF
6 578-15-008 Specifications 112825.pdf PDF
8h. Building 228 Signage Legend.pdf PDF
11 Building 217 Signage Drawings-1.pdf PDF
13 Building 217 Signage Drawings-3.pdf PDF
25 Building 200 Signage Drawings-8.pdf PDF
26 Building 200 Signage Drawings-9.pdf PDF
34 Bldgs 16-18 Drawings.pdf PDF
35 Bldgs 20-48 Drawings.pdf PDF
37 CBOCs Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Hospital Policy Memorandum 578-03-001-089 (R-2) Hines, IL March 27, 2013

Cutting, Welding and Other Hot Work

Changes:

• Removed paragraph 2a (7) “Construction areas, small projects, and or emergency repair locations.

Education / Training:

• The Safety Officer will ensure review of changes by FMS staff and contractors affected.

Related Forms: None

KEYWORDS: welding, hot work, burn permits

VA Hospital Policy Memorandum 578-03-001-089 (R-2) Hines IL 60141 March 27, 2013

Cutting, Welding and Other Hot Work

1. PURPOSE: To establish policy and procedures for cutting, welding and other hot work operations in non-designated areas and to assure that all supervisors, employees, and contractors take proper precautions when any cutting, welding, or other hot work is to be accomplished.

2. POLICY:

a. Designated welding areas include the following Facilities Management Service shops/areas:

(1) Machine Repair Shop,

(2) Pipefitting Shop,

(3) Air Conditioning and Refrigeration Shop,

(4) Motor Transportation Shop,

(5) Biomedical Section Repair Area, and

(6) Boiler Plant.

b. In order to minimize the risk of fires during construction, alteration, demolition operations, or making repairs while performing hot work such as cutting, welding, thermit welding, brazing, soldering, grinding, thermal spraying, thawing pipe, or any other similar work, procedures and controls are hereby established to control all cutting and welding operations conducted in areas not specifically designated for this type of operation.

c. Cutting, welding, and other hot work shall NOT be permitted in the following areas:

(1) In the presence of explosive atmosphere (mixtures of flammable gases, vapors, liquids, or dust with air);

(2) In areas not authorized by the Safety Section; and

(3) In buildings equipped with a sprinkler system while the sprinkler system is impaired.

d. A cutting, welding, and other hot work permit shall be obtained from the Safety Section, located in Building 2, within 1-2 days prior to any and all cutting and welding (see Attachment A) in non-designated areas. The original, or a copy, must be immediately available while work is being done in those non-designated areas. A copy of the permit shall be retained in the files of the Safety Section.

2.

e. The Safety Officer, other designated fire safety personnel in the Safety section and FMS employees at/or above the section chief level shall have the authority to stop cutting, welding, and other hot work operations that are being accomplished without a permit and such operations that do not meet standards set forth in NFPA 51B.

f. Cutting, welding, and other hot work operations performed by outside contractors, i.e.

non-Hines VA employees, in non-designated areas on off tours (nights, weekends and holidays) MUST be directly supervised/observed by the project engineer even if a fire watch is not required.

3. RESPONSIBILITES:

a. The Safety Section is responsible for:

(1) providing oversight of the overall hazardous operations involving cutting and welding operations within the hospital complex, and

(2) authorizing cutting, welding, and other hot work operations in areas not specifically designed or approved for such processes

b. The Chief, Facilities Management Service is responsible for:

(1) ensuring that maintenance personnel are trained in proper welding, cutting and other hot work procedures and comply with the requirements of this policy, and

(2) ensuring that an individual from the requesting shop or department shall supply an individual for safety operations who is knowledgeable and capable of operating the fire extinguisher in their possession .in the event that a fire watch is required during operations in both designated and non-designated areas.

d. The contracting officer’s representative (COR)/project engineer is responsible for:

(1) assuring that all contractors follow the procedures in this policy, and

(2) requesting authorization, i.e. burn permit is secured for cutting, welding, and other hot work operations, prior to the initiation of work in non-designated areas, to assure conditions are safe;

(3) supervising/observing cutting, welding and other hot work operations done in non-designated areas during off tours (nights, weekends and holidays); and

(4) participating in any fire watches required for work being done by non-VA employees or ensuring that coverage can be provided by appropriate personnel in the Safety Section.

3.

e. Contractors are responsible for:

(1) Instructing their employees on this policy prior to the initiation of any cutting, welding or hot work, and

(2) Requesting authorization, i.e. burn permit for cutting, welding, and other hot work prior to the initiation of work;

(3) Ensuring that individuals involved in hot work operations shall be trained in the safe operation of their equipment and in the safe use of the process;

(4) Ensuring that individuals involved in hot work operations have an awareness of the inherent risks involved and understand the emergency procedures in the event of a fire;

(5) Ensuring the original/copy of the burn permit is available at the work site; and

(6) Ensuring that the original/copy of the burn permit is returned to the Safety Office upon for record keeping.

4. ACTIONS:

a. Upon issuance of cutting and welding permit, the name of the individual receiving the permit and the date and time of issuance shall be entered in the Safety Section Hot Work Permit Log. A copy of the permit shall be retained in the files of the Safety Section.

b. For all cutting, welding, and other hot work operations not in approved designated areas, the Safety Section will be notified at extension 24301 or extension 25614 at least 30 minutes prior to any operation. NOTE: If this work has been scheduled in advance for the off tours, the project engineer must be present during the work.

c. When work cannot be moved practically, the work area will be made fire safe by removing or covering combustibles within a range of possible sparks.

d. The area around any operation will be cleared of dust or lint to exceed the possible range of sparks by three (3) feet.

e. Wherever there are floor openings or cracks in the flooring that cannot be closed, precautions shall be taken so that no readily combustible materials on the floor below will be exposed to sparks which might drop through the floor. The same precautions shall be observed with regard to cracks or holes in walls, open doorways and open or broken windows.

f. Where combustible materials such as paper clippings, wood shavings, or textile fibers are on the floor, the floor shall be swept clean for a radius of 35 feet (10.7 m). Combustible floors shall be kept wet, covered with damp sand, or protected by fire-resistant shields. Where floors have been wet down, personnel operating arc welding or cutting equipment shall be protected from possible shock.

4.

g. When required based on the assessment of the Safety Section personnel (see Attachment A), the fire watch will be designed to have appropriate personnel present, as detailed above, with an approved fire extinguisher for the duration of the operation and for thirty (30) minutes after the operation is complete.

h. When cutting or welding overhead, an approved fire blanket will be placed below to cover the area affected. Note: The blanket will either be provided by the contractor or the VA employees doing the work.

i. Upon the completion of operation, an inspection will be made for any hot materials and areas by the fire watch individual before securing the area.

5. REFERENCES:

a. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2009 Edition

b. 29 CFR OSHA 1910.252(a)(2)(i) General Requirements: Welding, Cutting & Brazing

6. RESCISSION: Policy Memorandum 578-03-001-089 (R-1) Cutting, Welding, and Other Hot Work, dated March 13, 2010.

7. RECERTIFICATION: This Policy Memorandum will be re-certified on or before March 27,

8. FOLLOW-UP RESPONSIBILITY: Safety Section (001S)

Joan M. Ricard, FACHE Hospital Director

Attachments

Distribution: Hines Intranet Website and Service Chiefs/Service Line Managers via E-mail

5.

Policy Memorandum 578-03-001-089(R-2) March 27, 2013 Attachment A

PERMIT FOR CUTTING AND WELDING

WITH PORTABLE GAS OR ARC EQUIPMENT

Date

Building

Department Floor

Work to be done

Special precautions

The location where this work is to be done has been examined, necessary precautions taken, and permission is granted for this work. (See other side.)

Permit expires

Signed (Individual responsible for authorizing welding and cutting)

Time started Completed

FINAL CHECK-UP

Work areas and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.

Signed (Individual Responsible for Permit)

6.

ATTENTION

Before approving any cutting and welding permit, the fire safety officer/ appointee shall inspect the work area and confirm that precautions have been taken to prevent fire in accordance with

NFPA 51B.

PRECAUTIONS

Sprinklers in service Cutting and welding equipment in good repair

WITHIN 35 FT. OF WORK

Floors swept clean of combustibles Combustible floors wet down, covered with damp sand, metal or other shields No combustible material or flammable liquids Combustibles and flammable liquids protected with covers or guards All wall and floor openings covered Covers suspended beneath work to collect sparks

WORK ON WALLS OR CEILINGS

Construction non-combustible and without combustible covering Combustibles moved away from opposite side of wall

WORK ON ENCLOSED EQUIPMENT

(Tanks, containers, ducts, dust collectors, etc.)

Equipment cleaned of all combustibles Containers purged of flammable vapors

FINAL CHECK-UP

To be made 30 minutes after completion of any operation unless fire watch is provided.