This solicitation is for the construction of a water well system and associated infrastructure on Andersen Air Force Base in Guam. The scope of work includes six water wells, raw and treated water transmission lines, a water treatment plant, water storage reservoir, water transfer pump station, generator buildings, electrical buildings, and a power and communications system. Relevant details are a bid due date of August 5, 2021 and an estimated award date of September 2021. Pricing will be fixed-price. The solicitation is set aside for small business and was issued by the Department of the Navy Naval Facilities Engineering Command.

The document provides specifications for the required construction work. Key infrastructure to be built includes two well sites with generator buildings, the remainder with electrical buildings. Scope also includes a water treatment plant, reservoir, pump station, and transmission lines to supply water primarily to the Marine Corps Base on Guam.

View the file

Other files

File Type Posted
21R1339_AMD5.pdf PDF
21R1339 Note 11.pdf PDF
21R1339 Note 10.pdf PDF
21R1339_AMD4.pdf PDF
21R1339 Note 9.pdf PDF
21R1339_AMD3.pdf PDF
21R1339 Note 8.pdf PDF
21R1339_AMD2.pdf PDF
21R1339_AMD2_Drawings.pdf PDF
21R1339 Note 7.pdf PDF
21R1339 Note 6.pdf PDF
21R1339 Note 5.pdf PDF
21R1339_AMD1.pdf PDF
21R1339_AMD1_Drawings.pdf PDF
P103 SV Sign-in.pdf PDF
21R1339 Note 4.pdf PDF
21R1339 Note 3.pdf PDF
21R1339 Note 2.pdf PDF
21R1339 Note 1.pdf PDF
21R1339-RFP.pdf PDF
P-103 Water Well Field_DWGS.pdf PDF
21R1339-JA_Redacted.zip ZIP file
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Submittal

Specifications for P-103 Water Well Field

US NAVSUPACT Andersen Guam

Prepared For:

Commander, Naval Facilities Engineering Command, Pacific

Joint Base Pearl Harbor Hickam, Oahu, Hawaii

Prepared by:

HDR, Inc.

Contract No. N62742-17-D-0004 Task Order No. N6274218F0323

23 June 2021

HDR 10115861 / HNL 2018021

This page intentionally left blank

NAVFAC PACIFIC

WORK ORDER NO:

1371087

SPECIFICATIONS

For

P-103 WATER WELL FIELD

At the

US NAVSUPACT ANDERSEN GUAM

PREPARED BY:

Architectural: WTN ARCHITECTURE, INC.

Mechanical: MECHANICAL ENTERPRISES, INC.

Civil: HDR ENGINEERING, INC.; DUENAS, CAMACHO & ASSOCIATES Electrical: MK ENGINEERS, LTD Structural: DUENAS, CAMACHO & ASSOCIATES Fire Protection: COFFMAN ENGINEERS, INC.

Geotechnical: PACIFIC GEOTECHNICAL ENGINEERS, INC.

Environmental: ELEMENT ENVIRONMENTAL, LLC

Submitted By: _______________________________ Date: 23 June 2021 Francis T. Hino, Vice-President

APPROVED BY:

Specification: _________________________________________________ Mr. Clint Hashiba, P.E.

For Commander, NAVFAC Pacific: ________________________________________________

Mr. Evan A. Mizue, P.E.

Date: _______________________ cisssssssss T. Hino, Vice-Presi

APAPPAPAPAPPROVOVOVOVOOVOVOVO EDDDDDD BY::::

EVAN MIZUE

P-103 WATER WELL FIELD 1371087

US NAVSUPACT ANDERSEN GUAM

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 13.02 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (MRESS)

01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 61 14 AIR MONITORING

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 37 13 SHOTCRETE

DI VI SI ON 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 14 00 FLUID-APPLIED WATERPROOFING

07 27 36 SPRAY FOAM AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 08 - OPENI NGS

08 11 16 ALUMINUM DOORS AND FRAMES

08 34 19.10 20 ROLLING SERVICE DOORS

08 71 00 DOOR HARDWARE

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 EXTERIOR SIGNAGE

10 44 16 FIRE EXTINGUISHERS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL

SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 00 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 ELECTRICITY METERING

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

PROJECT TABLE OF CONTENTS Page 2

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 15 00 AGGREGATE SURFACING

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

DI VI SI ON 33 - UTI LI TI ES

33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 13 POTABLE WATER SUPPLY WELLS

33 16 13.16 WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK

33 40 00 STORM DRAINAGE UTILITIES

33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)

33 52 23.15 POL SERVICE PIPING WELDING

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 95 00 PROCESS CONTROL SYSTEMS

40 95 05 PROCESS AUTOMATION CONTROLLER

DI VI SI ON 43 - PROCESS GAS AND LI QUI D HANDLI NG, PURI FI CATI ON, AND STORAGE

EQUIPMENT

43 21 29 FLOW MEASURING EQUIPMENT POTABLE WATER

43 23 22 PUMPS: WATER, CENTRIFUGAL

43 24 27 PUMPS: WATER, VERTICAL TURBINE

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 30 00 WATER CHEMICAL FEED SYSTEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

GENERAL

1 G-001 17241414 TITLE SHEET, VICINITY MAP, AND LOCATION MAP

2 G-002 17241415 INDEX OF DRAWINGS - 1

3 G-003 17241416 INDEX OF DRAWINGS - 2

4 G-004 17241417 INDEX OF DRAWINGS - 3

5 G-005 17241418 LEGEND, ABBREVIATIONS, AND SYMBOLS

6 G-006 17241419 GENERAL NOTES

7 G-007 17241420 GENERAL LAYOUT AND SURVEY CONTROL DATA

8 G-008 17241421 BORINGS LOCATION SITE PLAN

9 G-009 17241422 BORING LOG LEGEND, UNIFIED SOIL CLASSIFICATION

SYSTEM, ROCK CLASSIFICATION SYSTEM

10 G-010 17241423 LOGS OF BORINGS - 1

11 G-011 17241424 LOGS OF BORINGS - 2

12 G-012 17241425 LOGS OF BORINGS - 3

13 G-013 17241426 LOGS OF BORINGS - 4

14 G-101 17241427 EROSION CONTROL PLAN

15 G-201 17241428 LIMITS OF CONSTRUCTION - 1

16 G-202 17241429 LIMITS OF CONSTRUCTION - 2

17 G-501 17241430 EROSION CONTROL DETAILS

17241431 NOT USED

17241432 NOT USED

CIVIL

18 CS101 17241433 WATER SYSTEM LAYOUT SCHEMATIC

19 CS102 17241434 FLOW DIAGRAM

20 CW101 17241435 OVERALL SITE PLAN

21 CW102 17241436 SITE AND GRADING PLAN - WELL NO. 1

22 CW103 17241437 SITE AND GRADING PLAN - WELL NO. 1 (DEDUCTIVE

ITEM 4)

23 CW104 17241438 SITE AND GRADING PLAN - WELL NO. 2

24 CW105 17241439 SITE AND GRADING PLAN - WELL NO. 3

25 CW106 17241440 SITE AND GRADING PLAN - WELL NO. 4

26 CW107 17241441 SITE AND GRADING PLAN - WELL NO. 5

27 CW108 17241442 SITE AND GRADING PLAN - WELL NO. 6

28 CW501 17241443 TYPICAL WELL SECTIONS

29 CW502 17241444 TYPICAL WELL PUMP DISCHARGE PIPING PLAN

AND SECTION

DOCUMENT 00 01 15 Page 1

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

30 CW503 17241445 TYPICAL WELL PUMP DISCHARGE PIPING SECTION

31 CW504 17241446 PUMP DISCHARGE DETAILS

32 CW505 17241447 FUEL PIPE TRENCH DETAILS

33 CW506 17241448 MISCELLANEOUS WELL DETAILS

34 CU100 17241449 GENERAL KEY PLAN - RAW WATER TRANSMISSION

LINE "A"

35 CU101 17241450 PLAN AND PROFILE - WATER LINE "A" STA 0+000

TO 0+150

36 CU102 17241451 PLAN AND PROFILE - WATER LINE "A" STA 0+150

TO 0+300

37 CU103 17241452 PLAN AND PROFILE - WATER LINE "A" STA 0+300

TO 0+450

38 CU104 17241453 PLAN AND PROFILE - WATER LINE "A" STA 0+450

TO 0+600

39 CU105 17241454 PLAN AND PROFILE - WATER LINE "A" STA 0+600

TO 0+750

40 CU106 17241455 PLAN AND PROFILE - WATER LINE "A" STA 0+750

TO 0+900

41 CU107 17241456 PLAN AND PROFILE - WATER LINE "A" STA 0+900

TO 1+050

42 CU108 17241457 PLAN AND PROFILE - WATER LINE "A" STA 1+050

TO 1+200

43 CU109 17241458 PLAN AND PROFILE - WATER LINE "A" STA 1+200

TO 1+350

44 CU110 17241459 PLAN AND PROFILE - WATER LINE "A" STA 1+350

TO 1+500

45 CU111 17241460 PLAN AND PROFILE - WATER LINE "A" STA 1+500

TO 1+650

46 CU112 17241461 PLAN AND PROFILE - WATER LINE "A" STA 1+650

TO 1+800

47 CU113 17241462 PLAN AND PROFILE - WATER LINE "A" STA 1+800

TO 1+950

48 CU114 17241463 PLAN AND PROFILE - WATER LINE "A" STA 1+950

TO 2+100

49 CU115 17241464 PLAN AND PROFILE - WATER LINE "A" STA 2+100

TO 2+250

50 CU116 17241465 PLAN AND PROFILE - WATER LINE "A" STA 2+250

TO 2+400

51 CU117 17241466 PLAN AND PROFILE - WATER LINE "A" STA 2+400

TO 2+550

52 CU118 17241467 PLAN AND PROFILE - WATER LINE "A" STA 2+550

TO 2+700

53 CU119 17241468 PLAN AND PROFILE - WATER LINE "A" STA 2+700

TO 2+850

54 CU120 17241469 PLAN AND PROFILE - WATER LINE "A" STA 2+850

TO 3+000

55 CU121 17241470 PLAN AND PROFILE - WATER LINE "A" STA 3+000

TO 3+150

56 CU122 17241471 PLAN AND PROFILE - WATER LINE "A" STA 3+150

TO 3+300

57 CU123 17241472 PLAN AND PROFILE - WATER LINE "A" STA 3+300

TO 3+450

58 CU124 17241473 PLAN AND PROFILE - WATER LINE "A" STA 3+450

TO END

59 CU140 17241474 GENERAL KEY PLAN - RAW WATER TRANSMISSION LINE

"A1" THRU "F"

60 CU141 17241475 PLAN AND PROFILE - WATER LINE "A1" AND WATER

DOCUMENT 00 01 15 Page 2

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

LINE "B"

61 CU142 17241476 PLAN AND PROFILE - WATER LINE "C" STA 0+000

TO 0+150

62 CU143 17241477 PLAN AND PROFILE - WATER LINE "C" STA 0+150

TO 0+300

63 CU144 17241478 PLAN AND PROFILE - WATER LINE "C" STA 0+300

TO END

64 CU145 17241479 PLAN AND PROFILE - WATER LINE "D" STA 0+000

TO END

65 CU146 17241480 PLAN AND PROFILE - WATER LINE "E" STA 0+000

TO END

66 CU147 17241481 PLAN AND PROFILE - WATER LINE "F" 0+000 TO END

67 CU150 17241482 GENERAL KEY PLAN - WATER DISTRIBUTION LINE "G"

68 CU151 17241483 PLAN AND PROFILE - WATER LINE "G" STA 0+000

TO 0+150

69 CU152 17241484 PLAN AND PROFILE - WATER LINE "G" STA 0+150

TO 0+300

70 CU153 17241485 PLAN AND PROFILE - WATER LINE "G" STA 0+300

TO 0+450

71 CU154 17241486 PLAN AND PROFILE - WATER LINE "G" STA 0+450

TO 0+600

72 CU155 17241487 PLAN AND PROFILE - WATER LINE "G" STA 0+600

TO 0+750

73 CU156 17241488 PLAN AND PROFILE - WATER LINE "G" STA 0+750

TO 0+900

74 CU157 17241489 PLAN AND PROFILE - WATER LINE "G" STA 0+900

TO 1+050

75 CU158 17241490 PLAN AND PROFILE - WATER LINE "G" STA 1+050

TO 1+200

76 CU159 17241491 PLAN AND PROFILE - WATER LINE "G" STA 1+200

TO END

77 CU165 17241492 GENERAL KEY PLAN - WATER TRANSFER LINE "H"

78 CU166 17241493 PLAN AND PROFILE - WATER LINE "H" STA 0+000

TO 0+150

79 CU167 17241494 PLAN AND PROFILE - WATER LINE "H" STA 0+150

TO 0+300

80 CU168 17241495 PLAN AND PROFILE - WATER LINE "H" STA 0+300

TO 0+450

81 CU169 17241496 PLAN AND PROFILE - WATER LINE "H" STA 0+450

TO 0+600

82 CU170 17241497 PLAN AND PROFILE - WATER LINE "H" STA 0+600

TO 0+750

83 CU171 17241498 PLAN AND PROFILE - WATER LINE "H" STA 0+750

TO 0+900

84 CU172 17241499 PLAN AND PROFILE - WATER LINE "H" STA 0+900

TO 1+050

85 CU173 17241500 PLAN AND PROFILE - WATER LINE "H" STA 1+050

TO 1+200

86 CU174 17241501 PLAN AND PROFILE - WATER LINE "H" STA 1+200

TO 1+350

87 CU175 17241502 PLAN AND PROFILE - WATER LINE "H" STA 1+350

TO END

88 CU176 17241503 PLAN AND PROFILE - TRANSFER WATER LINE "H1"

STA 0+000 TO 0+125

89 CU177 17241504 PLAN AND PROFILE - TRANSFER WATER LINE "H1"

STA 0+125 TO END

90 CU180 17241505 PLAN AND PROFILE - RELOCATED WATER LINE "R1"

DOCUMENT 00 01 15 Page 3

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

STA 0+000 TO END

91 CU500 17241506 MISCELLANEOUS DETAILS

92 CU501 17241507 TRENCH DETAILS

93 CU502 17241508 CONCRETE BLOCK AND CONCRETE JACKET DETAILS

94 CU503 17241509 CONCRETE BLOCK DETAILS - 1

95 CU504 17241510 CONCRETE BLOCK DETAILS - 2

96 CU505 17241511 VALVE DETAILS - 1

97 CU506 17241512 VALVE DETAILS - 2

98 CU507 17241513 BLOW-OFF ASSEMBLY DETAIL

99 CU508 17241514 CONNECTION SCHEMATICS

100 CI101 17241515 OVERALL WATER STORAGE RESERVOIR AND

TREATMENT/TRANSFER PUMP STATION SITE PLAN

101 CI102 17241516 OVERALL WATER STORAGE RESERVOIR AND

TREATMENT/TRANSFER PUMP STATION SITE PLAN

(DEDUCTIVE 3)

102 CI103 17241517 OVERALL WATER STORAGE RESERVOIR AND

TREATMENT/TRANSFER PUMP STATION GRADING PLAN

103 CI104 17241518 TREATMENT/TRANSFER PUMP STATION PLOT PLAN

104 CI105 17241519 OVERALL WATER STORAGE RESERVOIR AND

TREATMENT/TRANSFER PUMP STATION PIPING PLAN

105 CI106 17241520 OVERALL WATER STORAGE RESERVOIR AND

TREATMENT/TRANSFER PUMP STATION PIPING PLAN

(DEDUCTIVE 3)

106 CI107 17241521 PLAN AND PROFILE - DRAIN LINE "A" STA 0+000

TO END

107 CI201 17241522 PROFILE - CHLORINE, FIRE HYDRANT AND

EMERGENCY EYEWASH AND SHOWER LINE

108 CI401 17241523 WATER STORAGE RESERVOIR PIPING PLAN

109 CI402 17241524 WATER RESERVOIR SECTIONS 1

110 CI403 17241525 WATER RESERVOIR SECTIONS 2

111 CI404 17241526 WATER RESERVOIR SECTIONS 3

112 CI405 17241527 TREATMENT/TRANSFER PUMP STATION PIPING PLAN

113 CI406 17241528 TREATMENT/TRANSFER PUMP STATION SECTION 1

114 CI407 17241529 TREATMENT/TRANSFER PUMP STATION SECTION 2

115 CI408 17241530 TREATMENT/TRANSFER PUMP STATION SECTION 3

116 CI409 17241531 CHLORINATION ROOM PLAN AND SECTION

117 CI501 17241532 WATER METER VAULT DETAILS 1

118 CI502 17241533 WATER METER VAULT DETAILS 2

119 CI503 17241534 CHLORINE INJECTION VAULT DETAILS

120 CI504 17241535 CHAIN LINK FENCE DETAILS 1

121 CI505 17241536 CHAIN LINK FENCE DETAILS 2

122 CI506 17241537 MISCELLANEOUS CIVIL SITE DETAILS 1

123 CI507 17241538 MISCELLANEOUS CIVIL SITE DETAILS 2

124 CI508 17241539 MISCELLANEOUS CIVIL SITE DETAILS 3

125 CP100 17241540 GENERAL KEY PLAN - ROAD "A" THRU "D2"

126 CP101 17241541 PLAN AND PROFILE - ROAD "A" STA 0+000 TO 0+150

127 CP102 17241542 PLAN AND PROFILE - ROAD "A" STA 0+150 TO 0+300

128 CP103 17241543 PLAN AND PROFILE - ROAD "A" STA 0+300 TO 0+450

129 CP104 17241544 PLAN AND PROFILE - ROAD "A" STA 0+450 TO 0+600

130 CP105 17241545 PLAN AND PROFILE - ROAD "A" STA 0+600 TO END

131 CP106 17241546 PLAN AND PROFILE - ROAD "A1" STA 0+000 TO END

132 CP107 17241547 PLAN AND PROFILE - ROAD "B" STA 0+000 TO END

133 CP108 17241548 PLAN AND PROFILE - ROAD "C" STA 0+000 TO END

134 CP109 17241549 PLAN AND PROFILE - ROAD "D" STA 0+000 TO 0+160

135 CP110 17241550 PLAN AND PROFILE - ROAD "D" STA 0+160 TO 0+310

136 CP111 17241551 PLAN AND PROFILE - ROAD "D" STA 0+310 TO 0+450

137 CP112 17241552 PLAN AND PROFILE - ROAD "D" STA 0+450 TO 0+600

DOCUMENT 00 01 15 Page 4

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

138 CP113 17241553 PLAN AND PROFILE - ROAD "D" STA 0+600 TO 0+750

139 CP114 17241554 PLAN AND PROFILE - ROAD "D" STA 0+750 TO 0+900

140 CP115 17241555 PLAN AND PROFILE - ROAD "D" STA 0+900 TO 1+040

141 CP116 17241556 PLAN AND PROFILE - ROAD "D" STA 1+040 TO 1+200

142 CP117 17241557 PLAN AND PROFILE - ROAD "D" STA 1+200 TO 1+350

143 CP118 17241558 PLAN AND PROFILE - ROAD "D" STA 1+350 TO END

144 CP119 17241559 PLAN AND PROFILE - ROAD "D1" STA 0+000 TO END

145 CP120 17241560 PLAN AND PROFILE - ROAD "D2" STA 0+000 TO END

146 CP121 17241561 PLAN AND PROFILE - 762mm DRAIN LINE

147 CP501 17241562 ROAD DETAILS

148 CP502 17241563 TYPICAL ROAD SECTIONS

149 CP503 17241564 ROAD AND SWALE SECTION

150 CP504 17241565 DRAIN HEADWALL DETAILS

151 CG101 17241566 TREATMENT/TRANSFER PUMP STATION BUILDING

OVEREXCAVATION SECTIONS

152 CG102 17241567 GENERATOR AND ELECTRICAL BUILDING

OVEREXCAVATION SECTIONS

153 CG103 17241568 WATER STORAGE RESERVOIR OVEREXCAVATION SECTION

154 CA101 17241569 EMERGENCY ACCESS GATE SITE PLAN

155 CA501 17241570 DOUBLE SWING GATE CABLE REINFORCEMENT

DETAILS - 1

156 CA502 17241571 DOUBLE SWING GATE CABLE REINFORCEMENT

DETAILS - 2

17241572 NOT USED

17241573 NOT USED

17241574 NOT USED

17241575 NOT USED

17241576 NOT USED

17241577 NOT USED

17241578 NOT USED

17241579 NOT USED

17241580 NOT USED

17241581 NOT USED

STRUCTURAL

157 S-001 17241582 STRUCTURAL DESIGN CRITERIA AND GENERAL NOTES

158 S-002 17241583 REINFORCING SCHEDULE, NOTES, ABBREVIATIONS

AND LEGENDS

159 S-003 17241584 TYPICAL DETAILS

160 S-004 17241585 TYPICAL DETAILS

161 S-101 17241586 FOUNDATION PLAN - TREATMENT/TRANSFER PUMP

STATION BUILDING

162 S-102 17241587 ROOF FRAMING PLAN - TREATMENT/TRANSFER PUMP

STATION BUILDING

163 S-103 17241588 SECTIONS - TREATMENT/TRANSFER PUMP STATION

BUILDING

164 S-104 17241589 FOUNDATION AND SECTION - CONCRETE WATER STORAGE

TANK

165 S-201 17241590 FOUNDATION AND ROOF FRAMING PLAN - GENERATOR

BUILDING

166 S-202 17241591 SECTIONS AND DETAIL - GENERATOR BUILDING

167 S-301 17241592 FOUNDATION, ROOF FRAMING PLAN AND

SECTIONS - ELECTRICAL BUILDING

168 S-401 17241593 FOUNDATION PLAN AND SECTION - TRANSFORMER &

PRIMARY SWITCH ENCLOSURE

17241594 NOT USED

DOCUMENT 00 01 15 Page 5

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

17241595 NOT USED

17241596 NOT USED

ARCHITECTURAL

169 A-101 17241597 TREATMENT/TRANSFER PUMP STATION BUILDING FLOOR

PLAN

170 A-102 17241598 TREATMENT/TRANSFER PUMP STATION BUILDING PLANS

171 A-103 17241599 TREATMENT/TRANSFER PUMP STATION BUILDING EXTER

ELEVS AND SECTIONS

172 A-104 17241600 TREATMENT/TRANSFER PUMP STATION BUILDING EXTER

ELEVS AND SECTIONS

173 A-105 17241601 TREATMENT/TRANSFER PUMP STATION BUILDING

INTERIOR ELEVATIONS

174 A-106 17241602 TREATMENT/TRANSFER PUMP STATION BUILDING

INTERIOR ELEVATIONS

175 A-201 17241603 GENERATOR BUILDING PLANS

176 A-202 17241604 GENERATOR BUILDING SECTIONS AND EXTERIOR

ELEVATIONS

177 A-203 17241605 GENERATOR BUILDING INTERIOR ELEVATIONS

178 A-301 17241606 ELECTRICAL BUILDING PLANS AND BUILDING SECTIONS

179 A-302 17241607 ELECTRICAL BUILDING EXTERIOR AND INTERIOR

ELEVATIONS

180 A-401 17241608 TRANSFORMER & PRIMARY SWITCH ENCLOSURE FLOOR

PLAN, ELEV. & SECTION

181 A-501 17241609 DOOR AND LOUVER SCHEDULE

182 A-502 17241610 MISCELLANEOUS DETAILS

183 A-503 17241611 MISCELLANEOUS DETAILS

184 A-601 17241612 ROOM FINISH SCHEDULE & COLOR/MATERIAL FINISH

INDEX

17241613 NOT USED

17241614 NOT USED

17241615 NOT USED

FIRE PROTECTION

185 F-001 17241616 FIRE PROTECTION NOTES, SYMBOLS AND

ABBREVIATIONS

186 F-002 17241617 FIRE PROTECTION SITE PLAN PUMPING BUILDING

187 F-003 17241618 FIRE PROTECTION SITE PLAN GENERATOR BUILDING

188 F-004 17241619 FIRE PROTECTION CODE SUMMARY

189 F-005 17241620 FIRE PROTECTION LIFE SAFETY

190 F-006 17241621 FIRE PROTECTION LIFE SAFETY

191 F-101 17241622 GENERATOR BUILDING FLOOR PLAN - FIRE SPRINKLER

192 F-102 17241623 PUMP BUILDING FLOOR PLAN - FIRE SPRINKLER

193 F-103 17241624 GENERATOR BUILDING FLOOR PLAN - FIRE ALARM

194 F-104 17241625 PUMP BUILDING FLOOR PLAN - FIRE ALARM

195 F-501 17241626 FIRE PROTECTION DETAILS

196 F-601 17241627 FIRE PROTECTION SEQUENCE OF OPERATIONS

197 F-602 17241628 FIRE PROTECTION RISER DIAGRAM

17241629 NOT USED

17241630 NOT USED

17241631 NOT USED

DOCUMENT 00 01 15 Page 6

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

MECHANICAL

198 M-001 17241632 MECHANICAL GENERAL NOTES AND MECHANICAL LEGEND

199 M-002 17241633 OVERALL SITE PLAN

200 M-101 17241634 MECHANICAL PLAN - GENERATOR BUILDING PLAN

201 M-102 17241635 MECHANICAL PLAN - TREATMENT/TRANSFER PUMP

STATION BUILDING PLAN

202 M-103 17241636 MECHANICAL PLAN - TYPICAL ELECTRICAL BUILDING

PLAN

203 M-201 17241637 GENERATOR AND TREATMENT/TRANSFER PUMP STATION

BUILDING SECTION VIEW

204 M-300 17241638 MECHANICAL DETAILS

205 M-400 17241639 EQUIPMENT SCHEDULE

206 P-001 17241640 PLUMBING GENERAL NOTES AND LEGEND

207 P-101 17241641 PLUMBING PLAN - GENERATOR BUILDING PLAN

208 P-102 17241642 PLUMBING PLAN - TREATMENT/TRANSFER PUMP STATION

BUILDING PLAN

209 P-201 17241643 PLUMBING DIAGRAMS

210 P-300 17241644 PLUMBING DETAILS

211 MF-001 17241645 ABBREVIATIONS, LEGENDS, AND NOTES

212 MF-002 17241646 FLOW DIAGRAMS

213 MF-003 17241647 ISOMETRICS

214 MF-100 17241648 WELL NO.1 PLAN AND GENERATOR BUILDING

215 MF-101 17241649 WELL NO.2 PLAN AND TREATMENT BUILDING

216 MF-400 17241650 NOZZLE SCHEDULE

217 MF-401 17241651 MECHANICAL DETAILS

17241652 NOT USED

17241653 NOT USED

17241654 NOT USED

ELECTRICAL

218 E-001 17241655 ELECTRICAL SYMBOLS

219 E-002 17241656 ELECTRICAL NOTES AND SCHEDULE

220 E-003 17241657 ABBREVIATIONS

221 E-101 17241658 OVERALL SITE PLAN

222 E-102 17241659 SITE ELECTRICAL PLAN - 1

223 E-103 17241660 SITE ELECTRICAL PLAN - 2

224 E-104 17241661 SITE ELECTRICAL PLAN - 3

225 E-105 17241662 SITE ELECTRICAL PLAN - 4

226 E-106 17241663 SITE ELECTRICAL PLAN - 5

227 E-107 17241664 SITE ELECTRICAL PLAN - 6

228 E-108 17241665 SITE ELECTRICAL PLAN - 7

229 E-109 17241666 SITE ELECTRICAL PLAN - 8

230 E-110 17241667 SITE ELECTRICAL PLAN - 9

231 E-111 17241668 SITE ELECTRICAL PLAN - 10

232 E-112 17241669 SITE ELECTRICAL PLAN - 11

233 E-113 17241670 SITE ELECTRICAL PLAN - 12

234 E-114 17241671 SITE ELECTRICAL PLAN - 13

235 E-115 17241672 SITE ELECTRICAL PLAN - 14

236 E-116 17241673 SITE ELECTRICAL PLAN - 15

237 E-117 17241674 SITE ELECTRICAL PLAN - 16

238 E-118 17241675 SITE ELECTRICAL PLAN - 17

239 E-121 17241676 J-001B SITE ELECTRICAL PLAN - 1

240 E-122 17241677 J-001B SITE ELECTRICAL PLAN - 2

241 E-123 17241678 J-001B SITE ELECTRICAL PLAN - 3

DOCUMENT 00 01 15 Page 7

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

242 E-124 17241679 J-001B SITE ELECTRICAL PLAN - 4

243 E-125 17241680 J-001B SITE ELECTRICAL PLAN - 5

244 E-126 17241681 J-001B SITE ELECTRICAL PLAN - 6

245 E-127 17241682 J-001B SITE ELECTRICAL PLAN - 7

246 E-131 17241683 PUMP WELL No. 1 ELECTRICAL PLAN 247 E-132 17241684 PUMP WELL No. 1 ELECTRICAL PLAN -

DEDUCTIVE ITEM 1

248 E-133 17241685 PUMP WELL No. 2 ELECTRICAL PLAN 249 E-134 17241686 PUMP WELL No. 3 ELECTRICAL PLAN 250 E-135 17241687 PUMP WELL No. 4 ELECTRICAL PLAN 251 E-136 17241688 PUMP WELL No. 5 ELECTRICAL PLAN 252 E-137 17241689 PUMP WELL No. 6 ELECTRICAL PLAN 253 E-138 17241690 PUMP WELL No. 1 SITE LIGHTING PLAN 254 E-139 17241691 PUMP WELL No. 1 SITE LIGHTING PLAN -

DEDUCTIVE ITEM 1

255 E-140 17241692 PUMP WELL No. 2 SITE LIGHTING PLAN 256 E-141 17241693 PUMP WELL No. 3 SITE LIGHTING PLAN 257 E-142 17241694 PUMP WELL No. 4 SITE LIGHTING PLAN 258 E-143 17241695 PUMP WELL No. 5 SITE LIGHTING PLAN 259 E-144 17241696 PUMP WELL No. 6 SITE LIGHTING PLAN

260 E-201 17241697 MOTOR CONTROL CENTER ELEVATION

261 E-202 17241698 GENERATOR AND ELECTRICAL BUILDING TELECOM

SERVICE ENTRANCE ELEVATIONS

262 E-203 17241699 CABINET ELEVATIONS

263 E-204 17241700 PLC/TELEMETRY/SCADA CONTROL CABINET DETAILS -

PW-1 (PW-3, PW-4, PW-5 & PW-6 SIMILAR)

264 E-205 17241701 PLC/TELEMETRY/SCADA CONTROL CABINET DETAILS -

TREATMENT/TRANSFER PUMP STATION AND PW-2

265 E-401 17241702 TREATMENT/TRANSFER PUMP STATION BUILDING

ELECTRICAL PLAN

266 E-402 17241703 TREATMENT/TRANSFER PUMP STATION BUILDING

LIGHTING PLAN

267 E-403 17241704 TREATMENT/TRANSFER PUMP STATION BUILDING

TELECOM PLAN

268 E-404 17241705 TREATMENT/TRANSFER PUMP STATION BUILDING

ENLARGED ELECTRICAL EQUIPMENT PLAN

269 E-405 17241706 TREATMENT/TRANSFER PUMP STATION BUILDING

LIGHTNING PROTECTION PLAN

270 E-406 17241707 TREATMENT/TRANSFER PUMP STATION PUMP ROOM

ELECTRICAL PLAN

271 E-407 17241708 TREATMENT/TRANSFER PUMP STATION PUMP ROOM

INSTRUMENTATION & CONTROL PLAN

272 E-411 17241709 ELECTRICAL BUILDING ELECTRICAL AND LIGHTING

PLANS

273 E-412 17241710 ELECTRICAL BUILDING TELECOM PLAN - PW-3 SITE

274 E-413 17241711 ELECTRICAL BUILDING LIGHTNING PROTECTION PLAN -

PW-3 SITE

275 E-414 17241712 ELECTRICAL BUILDING ELECTRICAL AND LIGHTING

PLANS - PW-6 SITE

276 E-415 17241713 ELECTRICAL BUILDING TELECOM PLAN - PW-6 SITE

277 E-421 17241714 GENERATOR BUILDING ELECTRICAL AND LIGHTING

PLANS

278 E-422 17241715 GENERATOR BUILDING TELECOM PLAN

279 E-423 17241716 GENERATOR BUILDING (PW-1) ELECTRICAL ENLARGED

PLAN

280 E-424 17241717 GENERATOR BUILDING LIGHTNING PROTECTION PLAN

281 E-431 17241718 TELECOM ROOM ENLARGED PLANS

DOCUMENT 00 01 15 Page 8

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

282 E-441 17241719 SUBSTATION A ELECTRICAL PLAN

283 E-451 17241720 PUMP WELL No. 1 INSTRUMENTATION AND CONTROL

PLAN

284 E-452 17241721 PUMP WELL No. 2 INSTRUMENTATION AND CONTROL

PLAN

285 E-453 17241722 WATER STORAGE RESERVOIR INSTRUMENTATION PLAN

286 E-454 17241723 PUMP WELL No. 3 INSTRUMENTATION AND CONTROL

PLAN

287 E-455 17241724 PUMP WELL No. 4 INSTRUMENTATION AND CONTROL

PLAN

288 E-456 17241725 PUMP WELL No. 5 INSTRUMENTATION AND CONTROL

PLAN

289 E-457 17241726 PUMP WELL No. 6 INSTRUMENTATION AND CONTROL

PLAN

290 E-501 17241727 DUCT SECTION DETAILS

291 E-502 17241728 DUCT SECTION DETAILS

292 E-511 17241729 1800 x 3400 (6'x11') ELECTRIC MANHOLE DETAILS 293 E-512 17241730 1500 x 2100 (5'x7') ELECTRIC MANHOLE DETAILS 294 E-513 17241731 914 x 1524 (3' x 5') ELECTRIC HANDHOLE DETAILS

295 E-514 17241732 MISCELLANEOUS ELECTRICAL DETAILS

296 E-515 17241733 MANHOLE DETAILS

297 E-516 17241734 MISCELLANEOUS ELECTRICAL DETAILS

298 E-517 17241735 TYPICAL MANHOLE ENTRY DETAILS

299 E-518 17241736 MISCELLANEOUS ELECTRICAL DETAILS

300 E-519 17241737 MISCELLANEOUS ELECTRICAL DETAILS

301 E-520 17241738 TRANSFORMER AND MANHOLE DETAILS

302 E-521 17241739 CABLE TRAY DETAILS

303 E-522 17241740 CABLE RUNWAY DETAILS

304 E-523 17241741 MOUNTING DETAILS

305 E-524 17241742 MISCELLANEOUS DETAILS

306 E-525 17241743 GROUND BAR DETAILS

307 E-526 17241744 SUBSTATION 13.8KV SWITCHGEAR ARRANGEMENT

DIAGRAM - BLDG A

308 E-527 17241745 LIGHTNING PROTECTION DETAILS

309 E-531 17241746 LIGHT FIXTURE DETAILS

310 E-532 17241747 PROMENADE WALKWAY LIGHT DETAIL (TYPE "A")

311 E-541 17241748 TELECOM 1525 x 3220 PRECAST MAINTENANCE HOLE

DETAILS

312 E-542 17241749 TELECOM MAINTENANCE HOLE DETAIL

313 E-543 17241750 TELECOM MAINTENANCE HOLE DETAILS

314 E-544 17241751 MISCELLANEOUS DETAILS

315 E-545 17241752 TELECOM OUTLET DETAILS

316 E-546 17241753 RACK DETAILS

317 E-601 17241754 13.8KV PRIMARY DISTRIBUTION ONE-LINE DIAGRAM

318 E-602 17241755 ONE-LINE DIAGRAM - PW-1 SITE

319 E-603 17241756 PARTIAL TREATMENT/TRANSFER PUMP STATION AND

PW-2 SITE ONE-LINE DIAGRAM

320 E-604 17241757 PARTIAL TREATMENT/TRANSFER PUMP STATION AND

PW-2 SITE ONE-LINE DIAGRAM

321 E-605 17241758 ONE-LINE DIAGRAM - PW-3 SITE

322 E-606 17241759 WELL PUMP CONTROL SCHEMATIC DIAGRAM

323 E-607 17241760 TRANSFER PUMP CONTROL SCHEMATIC DIAGRAM

324 E-608 17241761 PLC/TELEMETRY/SCADA CONTROL CABINET POWER

DISTRIBUTION DIAGRAM - PW-1 (PW-3, PW-4, PW-5

& PW-6 SIMILAR)

325 E-609 17241762 PLC/TELEMETRY/SCADA CONTROL CABINET POWER

DISTRIBUTION DIAGRAM - TREATMENT/TRANSFER

DOCUMENT 00 01 15 Page 9

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

PUMP STATION AND PW-2

326 E-610 17241763 TYPICAL FUEL TANK SYSTEM SCHEMATIC DIAGRAM

327 E-621 17241764 FIBER OPTIC CABLE DISTRIBUTION DIAGRAM - AMI

328 E-622 17241765 FIBER OPTIC CABLE DISTRIBUTION DIAGRAM - SCADA

329 E-623 17241766 TELEMETERING & SUPERVISORY CONTROL SCHEMATIC

DIAGRAM PW-1 (PW-3, PW-4, PW-5, PW-6 SIMILAR)

330 E-624 17241767 TELEMETERING & SUPERVISORY CONTROL SCHEMATIC

DIAGRAM TREATMENT/TRANSFER PUMP STATION/PW-2

331 E-625 17241768 DIGITAL INPUT MODULE DETAIL

332 E-631 17241769 TELECOM OUTLET DIAGRAMS

333 E-641 17241770 ELECTRICAL MANHOLE DIAGRAMS - 1

334 E-642 17241771 ELECTRICAL MANHOLE DIAGRAMS - 2

335 E-643 17241772 ELECTRICAL MANHOLE DIAGRAMS - 3

336 E-644 17241773 ELECTRICAL MANHOLE DIAGRAMS - 4

337 E-645 17241774 ELECTRICAL MANHOLE DIAGRAMS - 5

338 E-646 17241775 ELECTRICAL MANHOLE DIAGRAMS - 6

339 E-647 17241776 ELECTRICAL MANHOLE DIAGRAMS - 7

340 E-648 17241777 ELECTRICAL MANHOLE DIAGRAMS - 8

341 E-649 17241778 ELECTRICAL MANHOLE DIAGRAMS - 9

342 E-650 17241779 ELECTRICAL MANHOLE DIAGRAMS - 10

343 E-651 17241780 ELECTRICAL MANHOLE DIAGRAMS - 11

344 E-652 17241781 J-001B ELECTRICAL MANHOLE DIAGRAMS - 1

345 E-653 17241782 J-001B ELECTRICAL MANHOLE DIAGRAMS - 2

346 E-654 17241783 J-001B ELECTRICAL MANHOLE DIAGRAMS - 3

347 E-655 17241784 J-001B ELECTRICAL MANHOLE DIAGRAMS - 4

348 E-656 17241785 J-001B ELECTRICAL MANHOLE DIAGRAMS - 5

349 E-657 17241786 J-001B ELECTRICAL MANHOLE DIAGRAMS - 6

350 E-658 17241787 J-001B ELECTRICAL MANHOLE DIAGRAMS - 7

351 E-659 17241788 J-001B ELECTRICAL MANHOLE DIAGRAMS - 8

352 E-660 17241789 TELECOM MAINTENANCE HOLE DIAGRAMS - 1

353 E-661 17241790 TELECOM MAINTENANCE HOLE DIAGRAMS - 2

354 E-662 17241791 TELECOM MAINTENANCE HOLE DIAGRAMS - 3

355 E-663 17241792 TELECOM MAINTENANCE HOLE DIAGRAMS - 4

356 E-664 17241793 TELECOM MAINTENANCE HOLE DIAGRAMS - 5

357 E-665 17241794 TELECOM MAINTENANCE HOLE DIAGRAMS - 6

358 E-666 17241795 TELECOM MAINTENANCE HOLE DIAGRAMS - 7

359 E-667 17241796 TELECOM MAINTENANCE HOLE DIAGRAMS - 8

360 E-668 17241797 TELECOM MAINTENANCE HOLE DIAGRAMS - 9

361 E-669 17241798 TELECOM MAINTENANCE HOLE DIAGRAMS - 10

362 E-670 17241799 TELECOM MAINTENANCE HOLE DIAGRAMS - 11

363 E-671 17241800 J-001B TELECOM MAINTENANCE HOLE DIAGRAMS - 1

364 E-801 17241801 PANEL SCHEDULES

365 E-802 17241802 PANEL SCHEDULES

17241803 NOT USED

17241804 NOT USED

17241805 NOT USED

17241806 NOT USED

17241807 NOT USED

17241808 NOT USED

17241809 NOT USED

17241810 NOT USED

17241811 NOT USED

17241812 NOT USED

PROCESS AND INSTRUMENTATION

366 Y-001 17241813 PROCESS AND INSTRUMENTATION DIAGRAM - GENERAL

DOCUMENT 00 01 15 Page 10

SHEET DRAWING NAVFAC

NO. NO. DWG NO. TITLE

367 Y-002 17241814 PROCESS AND INSTRUMENTATION DIAGRAM - TYPICAL

PRODUCTION WELL

368 Y-003 17241815 PROCESS AND INSTRUMENTATION DIAGRAM - TYPICAL

PRODUCTION WELL

369 Y-004 17241816 PROCESS AND INSTRUMENTATION DIAGRAM -

CHLORINATION SYSTEM

370 Y-005 17241817 PROCESS AND INSTRUMENTATION DIAGRAM - WATER

STORAGE RESERVOIR

371 Y-006 17241818 PROCESS AND INSTRUMENTATION DIAGRAM - TRANSFER

PUMP STATION

372 Y-007 17241819 PROCESS AND INSTRUMENTATION DIAGRAM - GENERATOR

373 Y-008 17241820 EQUIPMENT LIST

374 Y-009 17241821 MAJOR FIELD EQUIPMENT LIST

375 Y-010 17241822 I/O LIST - 1

376 Y-011 17241823 I/O LIST - 2

377 Y-012 17241824 CONTROL STRATEGY

17241825 NOT USED

17241826 NOT USED

17241827 NOT USED

-- End of Document --

DOCUMENT 00 01 15 Page 11

DOCUMENT 00 01 15 Page 12

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes constructing production water wells, water storage reservoir, treatment facility, transfer pumping system, raw water transmission lines, water distribution lines, water transfer lines, electrical lines and feeders, standby generators, supervisory control and data acquisition system, and incidental related work.

1.2.2 Location

The work is located at the Joint Region Marianas, Guam, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Buildings will be occupied in the area surrounding the project during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

SECTION 01 11 00 Page 1

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 calendar days prior to starting excavation work.

1.6 NCTS/telecomm/access control/IDS COORDINATION REQUIREMENTS

1.6.1 NCTS/telecomm/access control/IDS Contractor Access

Allow the NCTS/telecomm/access control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NCTS/telecomm/access control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NCTS/telecomm/access control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

1.7 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

SECTION 01 11 00 Page 2

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 State

"State" when used in reference to states of the United States also includes the Territory of Guam.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contract Personnel

Personnel List

Vehicle List

Statement of Acknowledgement Form SF 1413

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. Permission to interrupt any Activity roads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

d. The work under this contract requires special attention to the scheduling and coordination of vegetation disturbance/clearing.

Identify on the construction schedule where vegetation disturbance/clearing will occur at a minimum of 5 acre increments. The Contractor must coordinate vegetation disturbance/clearing work with the Contracting Officer and Government natural resources specialist to schedule Government removal of threatened and endangered (T&E) plant species. Currently, T&E plant species have only been salvaged within the test well areas.

e. The work under this contract requires special attention to the scheduling and coordination of initial (18-inches) subsurface and horizontal ground disturbing work. The Contractor must coordinate this

SECTION 01 14 00 Page 1 work with the contracting Officer to schedule a Government archaeological monitor to be on-site.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contract personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.4.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:

a. Present a letter or official document from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the

SECTION 01 14 00 Page 2

Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.4.1.2.2 DBIDS Eligibility Requirements

Throughout the year, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.

1.4.1.2.3 DBIDS Notification Requirements

Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

a. An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

b. There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.2 Working Hours

Regular working hours must consist of an 8 1/2 hour hour period between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.4.4 Contractor Vehicle Access to site

All vehicle access to the site for beddown/construction for pump station, reservoir and PW-2, will be via the current water well access gate located just inside the North Gate. The contractor must report to the North Gate Visitor Control Center, provide proper credentials and be issued a key to access the water well access gate. The gate will be closed when not in use.

SECTION 01 14 00 Page 3

Vehicles larger than a pick-up will be searched at the North Gate Commercial Vehicle Inspection Area. The key will be returned to the North Gate Visitor Control Center at the end of each work day.

For other areas not accessible through the current water well access gate, all vehicle access will be through the Northwest Field Gate. Coordinate access with the Contracting Officer.

1.4.5 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.4.6 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.

1.5 SECURITY REQUIREMENTS

1.5.1 Personnel List

Submit for approval, at least 21 calendar days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

a. Name

b. Date and place of birth

c. Citizenship

d. Home address

e. Social security number

f. Current pass expiration date

g. Naturalization or Alien Registration number or Temporary Non-Immigrant ID card

h. Passport number, place of issue, and expiration date

i. Guam Police clearance report for last six months

The request for personnel passes must be accompanied with the following

SECTION 01 14 00 Page 4 certification:

"I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."

Signature/Firm Name

1.5.1.1 Citizenship Requirements

Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.

1.5.2 Vehicle List

Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:

a. Make

b. Year

c. Model

d. License number

e. Registered owner

1.5.3 Passes

Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 calendar days.

1.5.3.1 Control

Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 14 00 Page 5

SECTION 01 20 00.00 20

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.2 EARNED VALUE REPORT

1.2.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule. Within 30 calendar days of Contract award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.

1.2.2 Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the

1.5 m line. Identify costs for the building(s), and include work out to the

1.5 m line. Work out to the 1.5 m line shall include construction encompassed within a theoretical line 1.5 m from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 1.5 m line.

1.2.3 Real Property Assets

Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer (RPAO) during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the Draft DD Form 1354.

The Contractor shall provide all the quantities and units of measure to represent the final constructed facility and include all associated cost.

Coordinate the Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.

SECTION 01 20 00.00 20 Page 1

Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work. Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer (RPAO).

Cost data accumulated under this section are required in the preparation of DD Form 1354.

1.2.4 Schedule Requirements for HVAC TAB

The field work Section 23 05 93 TESTING, ADJUSTING AND BALANCING shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Initial field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for oneinitial condition when the building is unoccupied.

d. Approval of Initial Report: On completion of the initial field work, the data is…