P-103 Water Well Field_Specifications.pdf
PDF 10 MB Posted
- Solicitation number
- N6274221R1339
About this file
This solicitation is for the construction of a water well system and associated infrastructure on Andersen Air Force Base in Guam. The scope of work includes six water wells, raw and treated water transmission lines, a water treatment plant, water storage reservoir, water transfer pump station, generator buildings, electrical buildings, and a power and communications system. Relevant details are a bid due date of August 5, 2021 and an estimated award date of September 2021. Pricing will be fixed-price. The solicitation is set aside for small business and was issued by the Department of the Navy Naval Facilities Engineering Command.
The document provides specifications for the required construction work. Key infrastructure to be built includes two well sites with generator buildings, the remainder with electrical buildings. Scope also includes a water treatment plant, reservoir, pump station, and transmission lines to supply water primarily to the Marine Corps Base on Guam.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1339_AMD5.pdf | ||
| 21R1339 Note 11.pdf | ||
| 21R1339 Note 10.pdf | ||
| 21R1339_AMD4.pdf | ||
| 21R1339 Note 9.pdf | ||
| 21R1339_AMD3.pdf | ||
| 21R1339 Note 8.pdf | ||
| 21R1339_AMD2.pdf | ||
| 21R1339_AMD2_Drawings.pdf | ||
| 21R1339 Note 7.pdf | ||
| 21R1339 Note 6.pdf | ||
| 21R1339 Note 5.pdf | ||
| 21R1339_AMD1.pdf | ||
| 21R1339_AMD1_Drawings.pdf | ||
| P103 SV Sign-in.pdf | ||
| 21R1339 Note 4.pdf | ||
| 21R1339 Note 3.pdf | ||
| 21R1339 Note 2.pdf | ||
| 21R1339 Note 1.pdf | ||
| 21R1339-RFP.pdf | ||
| P-103 Water Well Field_DWGS.pdf | ||
| 21R1339-JA_Redacted.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Submittal
Specifications for P-103 Water Well Field
US NAVSUPACT Andersen Guam
Prepared For:
Commander, Naval Facilities Engineering Command, Pacific
Joint Base Pearl Harbor Hickam, Oahu, Hawaii
Prepared by:
HDR, Inc.
Contract No. N62742-17-D-0004 Task Order No. N6274218F0323
23 June 2021
HDR 10115861 / HNL 2018021
This page intentionally left blank
NAVFAC PACIFIC
WORK ORDER NO:
1371087
SPECIFICATIONS
For
P-103 WATER WELL FIELD
At the
US NAVSUPACT ANDERSEN GUAM
PREPARED BY:
Architectural: WTN ARCHITECTURE, INC.
Mechanical: MECHANICAL ENTERPRISES, INC.
Civil: HDR ENGINEERING, INC.; DUENAS, CAMACHO & ASSOCIATES Electrical: MK ENGINEERS, LTD Structural: DUENAS, CAMACHO & ASSOCIATES Fire Protection: COFFMAN ENGINEERS, INC.
Geotechnical: PACIFIC GEOTECHNICAL ENGINEERS, INC.
Environmental: ELEMENT ENVIRONMENTAL, LLC
Submitted By: _______________________________ Date: 23 June 2021 Francis T. Hino, Vice-President
APPROVED BY:
Specification: _________________________________________________ Mr. Clint Hashiba, P.E.
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan A. Mizue, P.E.
Date: _______________________ cisssssssss T. Hino, Vice-Presi
APAPPAPAPAPPROVOVOVOVOOVOVOVO EDDDDDD BY::::
EVAN MIZUE
P-103 WATER WELL FIELD 1371087
US NAVSUPACT ANDERSEN GUAM
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 13.02 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (MRESS)
01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 61 14 AIR MONITORING
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 37 13 SHOTCRETE
DI VI SI ON 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 14 00 FLUID-APPLIED WATERPROOFING
07 27 36 SPRAY FOAM AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 08 - OPENI NGS
08 11 16 ALUMINUM DOORS AND FRAMES
08 34 19.10 20 ROLLING SERVICE DOORS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 EXTERIOR SIGNAGE
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL
SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 ELECTRICITY METERING
26 32 13.00 20 SINGLE OPERATION GENERATOR SETS
26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
PROJECT TABLE OF CONTENTS Page 2
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 15 00 AGGREGATE SURFACING
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
DI VI SI ON 33 - UTI LI TI ES
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 13 POTABLE WATER SUPPLY WELLS
33 16 13.16 WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK
33 40 00 STORM DRAINAGE UTILITIES
33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 POL SERVICE PIPING WELDING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 95 00 PROCESS CONTROL SYSTEMS
40 95 05 PROCESS AUTOMATION CONTROLLER
DI VI SI ON 43 - PROCESS GAS AND LI QUI D HANDLI NG, PURI FI CATI ON, AND STORAGE
EQUIPMENT
43 21 29 FLOW MEASURING EQUIPMENT POTABLE WATER
43 23 22 PUMPS: WATER, CENTRIFUGAL
43 24 27 PUMPS: WATER, VERTICAL TURBINE
DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT
46 30 00 WATER CHEMICAL FEED SYSTEMS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
GENERAL
1 G-001 17241414 TITLE SHEET, VICINITY MAP, AND LOCATION MAP
2 G-002 17241415 INDEX OF DRAWINGS - 1
3 G-003 17241416 INDEX OF DRAWINGS - 2
4 G-004 17241417 INDEX OF DRAWINGS - 3
5 G-005 17241418 LEGEND, ABBREVIATIONS, AND SYMBOLS
6 G-006 17241419 GENERAL NOTES
7 G-007 17241420 GENERAL LAYOUT AND SURVEY CONTROL DATA
8 G-008 17241421 BORINGS LOCATION SITE PLAN
9 G-009 17241422 BORING LOG LEGEND, UNIFIED SOIL CLASSIFICATION
SYSTEM, ROCK CLASSIFICATION SYSTEM
10 G-010 17241423 LOGS OF BORINGS - 1
11 G-011 17241424 LOGS OF BORINGS - 2
12 G-012 17241425 LOGS OF BORINGS - 3
13 G-013 17241426 LOGS OF BORINGS - 4
14 G-101 17241427 EROSION CONTROL PLAN
15 G-201 17241428 LIMITS OF CONSTRUCTION - 1
16 G-202 17241429 LIMITS OF CONSTRUCTION - 2
17 G-501 17241430 EROSION CONTROL DETAILS
17241431 NOT USED
17241432 NOT USED
CIVIL
18 CS101 17241433 WATER SYSTEM LAYOUT SCHEMATIC
19 CS102 17241434 FLOW DIAGRAM
20 CW101 17241435 OVERALL SITE PLAN
21 CW102 17241436 SITE AND GRADING PLAN - WELL NO. 1
22 CW103 17241437 SITE AND GRADING PLAN - WELL NO. 1 (DEDUCTIVE
ITEM 4)
23 CW104 17241438 SITE AND GRADING PLAN - WELL NO. 2
24 CW105 17241439 SITE AND GRADING PLAN - WELL NO. 3
25 CW106 17241440 SITE AND GRADING PLAN - WELL NO. 4
26 CW107 17241441 SITE AND GRADING PLAN - WELL NO. 5
27 CW108 17241442 SITE AND GRADING PLAN - WELL NO. 6
28 CW501 17241443 TYPICAL WELL SECTIONS
29 CW502 17241444 TYPICAL WELL PUMP DISCHARGE PIPING PLAN
AND SECTION
DOCUMENT 00 01 15 Page 1
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
30 CW503 17241445 TYPICAL WELL PUMP DISCHARGE PIPING SECTION
31 CW504 17241446 PUMP DISCHARGE DETAILS
32 CW505 17241447 FUEL PIPE TRENCH DETAILS
33 CW506 17241448 MISCELLANEOUS WELL DETAILS
34 CU100 17241449 GENERAL KEY PLAN - RAW WATER TRANSMISSION
LINE "A"
35 CU101 17241450 PLAN AND PROFILE - WATER LINE "A" STA 0+000
TO 0+150
36 CU102 17241451 PLAN AND PROFILE - WATER LINE "A" STA 0+150
TO 0+300
37 CU103 17241452 PLAN AND PROFILE - WATER LINE "A" STA 0+300
TO 0+450
38 CU104 17241453 PLAN AND PROFILE - WATER LINE "A" STA 0+450
TO 0+600
39 CU105 17241454 PLAN AND PROFILE - WATER LINE "A" STA 0+600
TO 0+750
40 CU106 17241455 PLAN AND PROFILE - WATER LINE "A" STA 0+750
TO 0+900
41 CU107 17241456 PLAN AND PROFILE - WATER LINE "A" STA 0+900
TO 1+050
42 CU108 17241457 PLAN AND PROFILE - WATER LINE "A" STA 1+050
TO 1+200
43 CU109 17241458 PLAN AND PROFILE - WATER LINE "A" STA 1+200
TO 1+350
44 CU110 17241459 PLAN AND PROFILE - WATER LINE "A" STA 1+350
TO 1+500
45 CU111 17241460 PLAN AND PROFILE - WATER LINE "A" STA 1+500
TO 1+650
46 CU112 17241461 PLAN AND PROFILE - WATER LINE "A" STA 1+650
TO 1+800
47 CU113 17241462 PLAN AND PROFILE - WATER LINE "A" STA 1+800
TO 1+950
48 CU114 17241463 PLAN AND PROFILE - WATER LINE "A" STA 1+950
TO 2+100
49 CU115 17241464 PLAN AND PROFILE - WATER LINE "A" STA 2+100
TO 2+250
50 CU116 17241465 PLAN AND PROFILE - WATER LINE "A" STA 2+250
TO 2+400
51 CU117 17241466 PLAN AND PROFILE - WATER LINE "A" STA 2+400
TO 2+550
52 CU118 17241467 PLAN AND PROFILE - WATER LINE "A" STA 2+550
TO 2+700
53 CU119 17241468 PLAN AND PROFILE - WATER LINE "A" STA 2+700
TO 2+850
54 CU120 17241469 PLAN AND PROFILE - WATER LINE "A" STA 2+850
TO 3+000
55 CU121 17241470 PLAN AND PROFILE - WATER LINE "A" STA 3+000
TO 3+150
56 CU122 17241471 PLAN AND PROFILE - WATER LINE "A" STA 3+150
TO 3+300
57 CU123 17241472 PLAN AND PROFILE - WATER LINE "A" STA 3+300
TO 3+450
58 CU124 17241473 PLAN AND PROFILE - WATER LINE "A" STA 3+450
TO END
59 CU140 17241474 GENERAL KEY PLAN - RAW WATER TRANSMISSION LINE
"A1" THRU "F"
60 CU141 17241475 PLAN AND PROFILE - WATER LINE "A1" AND WATER
DOCUMENT 00 01 15 Page 2
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
LINE "B"
61 CU142 17241476 PLAN AND PROFILE - WATER LINE "C" STA 0+000
TO 0+150
62 CU143 17241477 PLAN AND PROFILE - WATER LINE "C" STA 0+150
TO 0+300
63 CU144 17241478 PLAN AND PROFILE - WATER LINE "C" STA 0+300
TO END
64 CU145 17241479 PLAN AND PROFILE - WATER LINE "D" STA 0+000
TO END
65 CU146 17241480 PLAN AND PROFILE - WATER LINE "E" STA 0+000
TO END
66 CU147 17241481 PLAN AND PROFILE - WATER LINE "F" 0+000 TO END
67 CU150 17241482 GENERAL KEY PLAN - WATER DISTRIBUTION LINE "G"
68 CU151 17241483 PLAN AND PROFILE - WATER LINE "G" STA 0+000
TO 0+150
69 CU152 17241484 PLAN AND PROFILE - WATER LINE "G" STA 0+150
TO 0+300
70 CU153 17241485 PLAN AND PROFILE - WATER LINE "G" STA 0+300
TO 0+450
71 CU154 17241486 PLAN AND PROFILE - WATER LINE "G" STA 0+450
TO 0+600
72 CU155 17241487 PLAN AND PROFILE - WATER LINE "G" STA 0+600
TO 0+750
73 CU156 17241488 PLAN AND PROFILE - WATER LINE "G" STA 0+750
TO 0+900
74 CU157 17241489 PLAN AND PROFILE - WATER LINE "G" STA 0+900
TO 1+050
75 CU158 17241490 PLAN AND PROFILE - WATER LINE "G" STA 1+050
TO 1+200
76 CU159 17241491 PLAN AND PROFILE - WATER LINE "G" STA 1+200
TO END
77 CU165 17241492 GENERAL KEY PLAN - WATER TRANSFER LINE "H"
78 CU166 17241493 PLAN AND PROFILE - WATER LINE "H" STA 0+000
TO 0+150
79 CU167 17241494 PLAN AND PROFILE - WATER LINE "H" STA 0+150
TO 0+300
80 CU168 17241495 PLAN AND PROFILE - WATER LINE "H" STA 0+300
TO 0+450
81 CU169 17241496 PLAN AND PROFILE - WATER LINE "H" STA 0+450
TO 0+600
82 CU170 17241497 PLAN AND PROFILE - WATER LINE "H" STA 0+600
TO 0+750
83 CU171 17241498 PLAN AND PROFILE - WATER LINE "H" STA 0+750
TO 0+900
84 CU172 17241499 PLAN AND PROFILE - WATER LINE "H" STA 0+900
TO 1+050
85 CU173 17241500 PLAN AND PROFILE - WATER LINE "H" STA 1+050
TO 1+200
86 CU174 17241501 PLAN AND PROFILE - WATER LINE "H" STA 1+200
TO 1+350
87 CU175 17241502 PLAN AND PROFILE - WATER LINE "H" STA 1+350
TO END
88 CU176 17241503 PLAN AND PROFILE - TRANSFER WATER LINE "H1"
STA 0+000 TO 0+125
89 CU177 17241504 PLAN AND PROFILE - TRANSFER WATER LINE "H1"
STA 0+125 TO END
90 CU180 17241505 PLAN AND PROFILE - RELOCATED WATER LINE "R1"
DOCUMENT 00 01 15 Page 3
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
STA 0+000 TO END
91 CU500 17241506 MISCELLANEOUS DETAILS
92 CU501 17241507 TRENCH DETAILS
93 CU502 17241508 CONCRETE BLOCK AND CONCRETE JACKET DETAILS
94 CU503 17241509 CONCRETE BLOCK DETAILS - 1
95 CU504 17241510 CONCRETE BLOCK DETAILS - 2
96 CU505 17241511 VALVE DETAILS - 1
97 CU506 17241512 VALVE DETAILS - 2
98 CU507 17241513 BLOW-OFF ASSEMBLY DETAIL
99 CU508 17241514 CONNECTION SCHEMATICS
100 CI101 17241515 OVERALL WATER STORAGE RESERVOIR AND
TREATMENT/TRANSFER PUMP STATION SITE PLAN
101 CI102 17241516 OVERALL WATER STORAGE RESERVOIR AND
TREATMENT/TRANSFER PUMP STATION SITE PLAN
(DEDUCTIVE 3)
102 CI103 17241517 OVERALL WATER STORAGE RESERVOIR AND
TREATMENT/TRANSFER PUMP STATION GRADING PLAN
103 CI104 17241518 TREATMENT/TRANSFER PUMP STATION PLOT PLAN
104 CI105 17241519 OVERALL WATER STORAGE RESERVOIR AND
TREATMENT/TRANSFER PUMP STATION PIPING PLAN
105 CI106 17241520 OVERALL WATER STORAGE RESERVOIR AND
TREATMENT/TRANSFER PUMP STATION PIPING PLAN
(DEDUCTIVE 3)
106 CI107 17241521 PLAN AND PROFILE - DRAIN LINE "A" STA 0+000
TO END
107 CI201 17241522 PROFILE - CHLORINE, FIRE HYDRANT AND
EMERGENCY EYEWASH AND SHOWER LINE
108 CI401 17241523 WATER STORAGE RESERVOIR PIPING PLAN
109 CI402 17241524 WATER RESERVOIR SECTIONS 1
110 CI403 17241525 WATER RESERVOIR SECTIONS 2
111 CI404 17241526 WATER RESERVOIR SECTIONS 3
112 CI405 17241527 TREATMENT/TRANSFER PUMP STATION PIPING PLAN
113 CI406 17241528 TREATMENT/TRANSFER PUMP STATION SECTION 1
114 CI407 17241529 TREATMENT/TRANSFER PUMP STATION SECTION 2
115 CI408 17241530 TREATMENT/TRANSFER PUMP STATION SECTION 3
116 CI409 17241531 CHLORINATION ROOM PLAN AND SECTION
117 CI501 17241532 WATER METER VAULT DETAILS 1
118 CI502 17241533 WATER METER VAULT DETAILS 2
119 CI503 17241534 CHLORINE INJECTION VAULT DETAILS
120 CI504 17241535 CHAIN LINK FENCE DETAILS 1
121 CI505 17241536 CHAIN LINK FENCE DETAILS 2
122 CI506 17241537 MISCELLANEOUS CIVIL SITE DETAILS 1
123 CI507 17241538 MISCELLANEOUS CIVIL SITE DETAILS 2
124 CI508 17241539 MISCELLANEOUS CIVIL SITE DETAILS 3
125 CP100 17241540 GENERAL KEY PLAN - ROAD "A" THRU "D2"
126 CP101 17241541 PLAN AND PROFILE - ROAD "A" STA 0+000 TO 0+150
127 CP102 17241542 PLAN AND PROFILE - ROAD "A" STA 0+150 TO 0+300
128 CP103 17241543 PLAN AND PROFILE - ROAD "A" STA 0+300 TO 0+450
129 CP104 17241544 PLAN AND PROFILE - ROAD "A" STA 0+450 TO 0+600
130 CP105 17241545 PLAN AND PROFILE - ROAD "A" STA 0+600 TO END
131 CP106 17241546 PLAN AND PROFILE - ROAD "A1" STA 0+000 TO END
132 CP107 17241547 PLAN AND PROFILE - ROAD "B" STA 0+000 TO END
133 CP108 17241548 PLAN AND PROFILE - ROAD "C" STA 0+000 TO END
134 CP109 17241549 PLAN AND PROFILE - ROAD "D" STA 0+000 TO 0+160
135 CP110 17241550 PLAN AND PROFILE - ROAD "D" STA 0+160 TO 0+310
136 CP111 17241551 PLAN AND PROFILE - ROAD "D" STA 0+310 TO 0+450
137 CP112 17241552 PLAN AND PROFILE - ROAD "D" STA 0+450 TO 0+600
DOCUMENT 00 01 15 Page 4
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
138 CP113 17241553 PLAN AND PROFILE - ROAD "D" STA 0+600 TO 0+750
139 CP114 17241554 PLAN AND PROFILE - ROAD "D" STA 0+750 TO 0+900
140 CP115 17241555 PLAN AND PROFILE - ROAD "D" STA 0+900 TO 1+040
141 CP116 17241556 PLAN AND PROFILE - ROAD "D" STA 1+040 TO 1+200
142 CP117 17241557 PLAN AND PROFILE - ROAD "D" STA 1+200 TO 1+350
143 CP118 17241558 PLAN AND PROFILE - ROAD "D" STA 1+350 TO END
144 CP119 17241559 PLAN AND PROFILE - ROAD "D1" STA 0+000 TO END
145 CP120 17241560 PLAN AND PROFILE - ROAD "D2" STA 0+000 TO END
146 CP121 17241561 PLAN AND PROFILE - 762mm DRAIN LINE
147 CP501 17241562 ROAD DETAILS
148 CP502 17241563 TYPICAL ROAD SECTIONS
149 CP503 17241564 ROAD AND SWALE SECTION
150 CP504 17241565 DRAIN HEADWALL DETAILS
151 CG101 17241566 TREATMENT/TRANSFER PUMP STATION BUILDING
OVEREXCAVATION SECTIONS
152 CG102 17241567 GENERATOR AND ELECTRICAL BUILDING
OVEREXCAVATION SECTIONS
153 CG103 17241568 WATER STORAGE RESERVOIR OVEREXCAVATION SECTION
154 CA101 17241569 EMERGENCY ACCESS GATE SITE PLAN
155 CA501 17241570 DOUBLE SWING GATE CABLE REINFORCEMENT
DETAILS - 1
156 CA502 17241571 DOUBLE SWING GATE CABLE REINFORCEMENT
DETAILS - 2
17241572 NOT USED
17241573 NOT USED
17241574 NOT USED
17241575 NOT USED
17241576 NOT USED
17241577 NOT USED
17241578 NOT USED
17241579 NOT USED
17241580 NOT USED
17241581 NOT USED
STRUCTURAL
157 S-001 17241582 STRUCTURAL DESIGN CRITERIA AND GENERAL NOTES
158 S-002 17241583 REINFORCING SCHEDULE, NOTES, ABBREVIATIONS
AND LEGENDS
159 S-003 17241584 TYPICAL DETAILS
160 S-004 17241585 TYPICAL DETAILS
161 S-101 17241586 FOUNDATION PLAN - TREATMENT/TRANSFER PUMP
STATION BUILDING
162 S-102 17241587 ROOF FRAMING PLAN - TREATMENT/TRANSFER PUMP
STATION BUILDING
163 S-103 17241588 SECTIONS - TREATMENT/TRANSFER PUMP STATION
BUILDING
164 S-104 17241589 FOUNDATION AND SECTION - CONCRETE WATER STORAGE
TANK
165 S-201 17241590 FOUNDATION AND ROOF FRAMING PLAN - GENERATOR
BUILDING
166 S-202 17241591 SECTIONS AND DETAIL - GENERATOR BUILDING
167 S-301 17241592 FOUNDATION, ROOF FRAMING PLAN AND
SECTIONS - ELECTRICAL BUILDING
168 S-401 17241593 FOUNDATION PLAN AND SECTION - TRANSFORMER &
PRIMARY SWITCH ENCLOSURE
17241594 NOT USED
DOCUMENT 00 01 15 Page 5
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
17241595 NOT USED
17241596 NOT USED
ARCHITECTURAL
169 A-101 17241597 TREATMENT/TRANSFER PUMP STATION BUILDING FLOOR
PLAN
170 A-102 17241598 TREATMENT/TRANSFER PUMP STATION BUILDING PLANS
171 A-103 17241599 TREATMENT/TRANSFER PUMP STATION BUILDING EXTER
ELEVS AND SECTIONS
172 A-104 17241600 TREATMENT/TRANSFER PUMP STATION BUILDING EXTER
ELEVS AND SECTIONS
173 A-105 17241601 TREATMENT/TRANSFER PUMP STATION BUILDING
INTERIOR ELEVATIONS
174 A-106 17241602 TREATMENT/TRANSFER PUMP STATION BUILDING
INTERIOR ELEVATIONS
175 A-201 17241603 GENERATOR BUILDING PLANS
176 A-202 17241604 GENERATOR BUILDING SECTIONS AND EXTERIOR
ELEVATIONS
177 A-203 17241605 GENERATOR BUILDING INTERIOR ELEVATIONS
178 A-301 17241606 ELECTRICAL BUILDING PLANS AND BUILDING SECTIONS
179 A-302 17241607 ELECTRICAL BUILDING EXTERIOR AND INTERIOR
ELEVATIONS
180 A-401 17241608 TRANSFORMER & PRIMARY SWITCH ENCLOSURE FLOOR
PLAN, ELEV. & SECTION
181 A-501 17241609 DOOR AND LOUVER SCHEDULE
182 A-502 17241610 MISCELLANEOUS DETAILS
183 A-503 17241611 MISCELLANEOUS DETAILS
184 A-601 17241612 ROOM FINISH SCHEDULE & COLOR/MATERIAL FINISH
INDEX
17241613 NOT USED
17241614 NOT USED
17241615 NOT USED
FIRE PROTECTION
185 F-001 17241616 FIRE PROTECTION NOTES, SYMBOLS AND
ABBREVIATIONS
186 F-002 17241617 FIRE PROTECTION SITE PLAN PUMPING BUILDING
187 F-003 17241618 FIRE PROTECTION SITE PLAN GENERATOR BUILDING
188 F-004 17241619 FIRE PROTECTION CODE SUMMARY
189 F-005 17241620 FIRE PROTECTION LIFE SAFETY
190 F-006 17241621 FIRE PROTECTION LIFE SAFETY
191 F-101 17241622 GENERATOR BUILDING FLOOR PLAN - FIRE SPRINKLER
192 F-102 17241623 PUMP BUILDING FLOOR PLAN - FIRE SPRINKLER
193 F-103 17241624 GENERATOR BUILDING FLOOR PLAN - FIRE ALARM
194 F-104 17241625 PUMP BUILDING FLOOR PLAN - FIRE ALARM
195 F-501 17241626 FIRE PROTECTION DETAILS
196 F-601 17241627 FIRE PROTECTION SEQUENCE OF OPERATIONS
197 F-602 17241628 FIRE PROTECTION RISER DIAGRAM
17241629 NOT USED
17241630 NOT USED
17241631 NOT USED
DOCUMENT 00 01 15 Page 6
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
MECHANICAL
198 M-001 17241632 MECHANICAL GENERAL NOTES AND MECHANICAL LEGEND
199 M-002 17241633 OVERALL SITE PLAN
200 M-101 17241634 MECHANICAL PLAN - GENERATOR BUILDING PLAN
201 M-102 17241635 MECHANICAL PLAN - TREATMENT/TRANSFER PUMP
STATION BUILDING PLAN
202 M-103 17241636 MECHANICAL PLAN - TYPICAL ELECTRICAL BUILDING
PLAN
203 M-201 17241637 GENERATOR AND TREATMENT/TRANSFER PUMP STATION
BUILDING SECTION VIEW
204 M-300 17241638 MECHANICAL DETAILS
205 M-400 17241639 EQUIPMENT SCHEDULE
206 P-001 17241640 PLUMBING GENERAL NOTES AND LEGEND
207 P-101 17241641 PLUMBING PLAN - GENERATOR BUILDING PLAN
208 P-102 17241642 PLUMBING PLAN - TREATMENT/TRANSFER PUMP STATION
BUILDING PLAN
209 P-201 17241643 PLUMBING DIAGRAMS
210 P-300 17241644 PLUMBING DETAILS
211 MF-001 17241645 ABBREVIATIONS, LEGENDS, AND NOTES
212 MF-002 17241646 FLOW DIAGRAMS
213 MF-003 17241647 ISOMETRICS
214 MF-100 17241648 WELL NO.1 PLAN AND GENERATOR BUILDING
215 MF-101 17241649 WELL NO.2 PLAN AND TREATMENT BUILDING
216 MF-400 17241650 NOZZLE SCHEDULE
217 MF-401 17241651 MECHANICAL DETAILS
17241652 NOT USED
17241653 NOT USED
17241654 NOT USED
ELECTRICAL
218 E-001 17241655 ELECTRICAL SYMBOLS
219 E-002 17241656 ELECTRICAL NOTES AND SCHEDULE
220 E-003 17241657 ABBREVIATIONS
221 E-101 17241658 OVERALL SITE PLAN
222 E-102 17241659 SITE ELECTRICAL PLAN - 1
223 E-103 17241660 SITE ELECTRICAL PLAN - 2
224 E-104 17241661 SITE ELECTRICAL PLAN - 3
225 E-105 17241662 SITE ELECTRICAL PLAN - 4
226 E-106 17241663 SITE ELECTRICAL PLAN - 5
227 E-107 17241664 SITE ELECTRICAL PLAN - 6
228 E-108 17241665 SITE ELECTRICAL PLAN - 7
229 E-109 17241666 SITE ELECTRICAL PLAN - 8
230 E-110 17241667 SITE ELECTRICAL PLAN - 9
231 E-111 17241668 SITE ELECTRICAL PLAN - 10
232 E-112 17241669 SITE ELECTRICAL PLAN - 11
233 E-113 17241670 SITE ELECTRICAL PLAN - 12
234 E-114 17241671 SITE ELECTRICAL PLAN - 13
235 E-115 17241672 SITE ELECTRICAL PLAN - 14
236 E-116 17241673 SITE ELECTRICAL PLAN - 15
237 E-117 17241674 SITE ELECTRICAL PLAN - 16
238 E-118 17241675 SITE ELECTRICAL PLAN - 17
239 E-121 17241676 J-001B SITE ELECTRICAL PLAN - 1
240 E-122 17241677 J-001B SITE ELECTRICAL PLAN - 2
241 E-123 17241678 J-001B SITE ELECTRICAL PLAN - 3
DOCUMENT 00 01 15 Page 7
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
242 E-124 17241679 J-001B SITE ELECTRICAL PLAN - 4
243 E-125 17241680 J-001B SITE ELECTRICAL PLAN - 5
244 E-126 17241681 J-001B SITE ELECTRICAL PLAN - 6
245 E-127 17241682 J-001B SITE ELECTRICAL PLAN - 7
246 E-131 17241683 PUMP WELL No. 1 ELECTRICAL PLAN 247 E-132 17241684 PUMP WELL No. 1 ELECTRICAL PLAN -
DEDUCTIVE ITEM 1
248 E-133 17241685 PUMP WELL No. 2 ELECTRICAL PLAN 249 E-134 17241686 PUMP WELL No. 3 ELECTRICAL PLAN 250 E-135 17241687 PUMP WELL No. 4 ELECTRICAL PLAN 251 E-136 17241688 PUMP WELL No. 5 ELECTRICAL PLAN 252 E-137 17241689 PUMP WELL No. 6 ELECTRICAL PLAN 253 E-138 17241690 PUMP WELL No. 1 SITE LIGHTING PLAN 254 E-139 17241691 PUMP WELL No. 1 SITE LIGHTING PLAN -
DEDUCTIVE ITEM 1
255 E-140 17241692 PUMP WELL No. 2 SITE LIGHTING PLAN 256 E-141 17241693 PUMP WELL No. 3 SITE LIGHTING PLAN 257 E-142 17241694 PUMP WELL No. 4 SITE LIGHTING PLAN 258 E-143 17241695 PUMP WELL No. 5 SITE LIGHTING PLAN 259 E-144 17241696 PUMP WELL No. 6 SITE LIGHTING PLAN
260 E-201 17241697 MOTOR CONTROL CENTER ELEVATION
261 E-202 17241698 GENERATOR AND ELECTRICAL BUILDING TELECOM
SERVICE ENTRANCE ELEVATIONS
262 E-203 17241699 CABINET ELEVATIONS
263 E-204 17241700 PLC/TELEMETRY/SCADA CONTROL CABINET DETAILS -
PW-1 (PW-3, PW-4, PW-5 & PW-6 SIMILAR)
264 E-205 17241701 PLC/TELEMETRY/SCADA CONTROL CABINET DETAILS -
TREATMENT/TRANSFER PUMP STATION AND PW-2
265 E-401 17241702 TREATMENT/TRANSFER PUMP STATION BUILDING
ELECTRICAL PLAN
266 E-402 17241703 TREATMENT/TRANSFER PUMP STATION BUILDING
LIGHTING PLAN
267 E-403 17241704 TREATMENT/TRANSFER PUMP STATION BUILDING
TELECOM PLAN
268 E-404 17241705 TREATMENT/TRANSFER PUMP STATION BUILDING
ENLARGED ELECTRICAL EQUIPMENT PLAN
269 E-405 17241706 TREATMENT/TRANSFER PUMP STATION BUILDING
LIGHTNING PROTECTION PLAN
270 E-406 17241707 TREATMENT/TRANSFER PUMP STATION PUMP ROOM
ELECTRICAL PLAN
271 E-407 17241708 TREATMENT/TRANSFER PUMP STATION PUMP ROOM
INSTRUMENTATION & CONTROL PLAN
272 E-411 17241709 ELECTRICAL BUILDING ELECTRICAL AND LIGHTING
PLANS
273 E-412 17241710 ELECTRICAL BUILDING TELECOM PLAN - PW-3 SITE
274 E-413 17241711 ELECTRICAL BUILDING LIGHTNING PROTECTION PLAN -
PW-3 SITE
275 E-414 17241712 ELECTRICAL BUILDING ELECTRICAL AND LIGHTING
PLANS - PW-6 SITE
276 E-415 17241713 ELECTRICAL BUILDING TELECOM PLAN - PW-6 SITE
277 E-421 17241714 GENERATOR BUILDING ELECTRICAL AND LIGHTING
PLANS
278 E-422 17241715 GENERATOR BUILDING TELECOM PLAN
279 E-423 17241716 GENERATOR BUILDING (PW-1) ELECTRICAL ENLARGED
PLAN
280 E-424 17241717 GENERATOR BUILDING LIGHTNING PROTECTION PLAN
281 E-431 17241718 TELECOM ROOM ENLARGED PLANS
DOCUMENT 00 01 15 Page 8
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
282 E-441 17241719 SUBSTATION A ELECTRICAL PLAN
283 E-451 17241720 PUMP WELL No. 1 INSTRUMENTATION AND CONTROL
PLAN
284 E-452 17241721 PUMP WELL No. 2 INSTRUMENTATION AND CONTROL
PLAN
285 E-453 17241722 WATER STORAGE RESERVOIR INSTRUMENTATION PLAN
286 E-454 17241723 PUMP WELL No. 3 INSTRUMENTATION AND CONTROL
PLAN
287 E-455 17241724 PUMP WELL No. 4 INSTRUMENTATION AND CONTROL
PLAN
288 E-456 17241725 PUMP WELL No. 5 INSTRUMENTATION AND CONTROL
PLAN
289 E-457 17241726 PUMP WELL No. 6 INSTRUMENTATION AND CONTROL
PLAN
290 E-501 17241727 DUCT SECTION DETAILS
291 E-502 17241728 DUCT SECTION DETAILS
292 E-511 17241729 1800 x 3400 (6'x11') ELECTRIC MANHOLE DETAILS 293 E-512 17241730 1500 x 2100 (5'x7') ELECTRIC MANHOLE DETAILS 294 E-513 17241731 914 x 1524 (3' x 5') ELECTRIC HANDHOLE DETAILS
295 E-514 17241732 MISCELLANEOUS ELECTRICAL DETAILS
296 E-515 17241733 MANHOLE DETAILS
297 E-516 17241734 MISCELLANEOUS ELECTRICAL DETAILS
298 E-517 17241735 TYPICAL MANHOLE ENTRY DETAILS
299 E-518 17241736 MISCELLANEOUS ELECTRICAL DETAILS
300 E-519 17241737 MISCELLANEOUS ELECTRICAL DETAILS
301 E-520 17241738 TRANSFORMER AND MANHOLE DETAILS
302 E-521 17241739 CABLE TRAY DETAILS
303 E-522 17241740 CABLE RUNWAY DETAILS
304 E-523 17241741 MOUNTING DETAILS
305 E-524 17241742 MISCELLANEOUS DETAILS
306 E-525 17241743 GROUND BAR DETAILS
307 E-526 17241744 SUBSTATION 13.8KV SWITCHGEAR ARRANGEMENT
DIAGRAM - BLDG A
308 E-527 17241745 LIGHTNING PROTECTION DETAILS
309 E-531 17241746 LIGHT FIXTURE DETAILS
310 E-532 17241747 PROMENADE WALKWAY LIGHT DETAIL (TYPE "A")
311 E-541 17241748 TELECOM 1525 x 3220 PRECAST MAINTENANCE HOLE
DETAILS
312 E-542 17241749 TELECOM MAINTENANCE HOLE DETAIL
313 E-543 17241750 TELECOM MAINTENANCE HOLE DETAILS
314 E-544 17241751 MISCELLANEOUS DETAILS
315 E-545 17241752 TELECOM OUTLET DETAILS
316 E-546 17241753 RACK DETAILS
317 E-601 17241754 13.8KV PRIMARY DISTRIBUTION ONE-LINE DIAGRAM
318 E-602 17241755 ONE-LINE DIAGRAM - PW-1 SITE
319 E-603 17241756 PARTIAL TREATMENT/TRANSFER PUMP STATION AND
PW-2 SITE ONE-LINE DIAGRAM
320 E-604 17241757 PARTIAL TREATMENT/TRANSFER PUMP STATION AND
PW-2 SITE ONE-LINE DIAGRAM
321 E-605 17241758 ONE-LINE DIAGRAM - PW-3 SITE
322 E-606 17241759 WELL PUMP CONTROL SCHEMATIC DIAGRAM
323 E-607 17241760 TRANSFER PUMP CONTROL SCHEMATIC DIAGRAM
324 E-608 17241761 PLC/TELEMETRY/SCADA CONTROL CABINET POWER
DISTRIBUTION DIAGRAM - PW-1 (PW-3, PW-4, PW-5
& PW-6 SIMILAR)
325 E-609 17241762 PLC/TELEMETRY/SCADA CONTROL CABINET POWER
DISTRIBUTION DIAGRAM - TREATMENT/TRANSFER
DOCUMENT 00 01 15 Page 9
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
PUMP STATION AND PW-2
326 E-610 17241763 TYPICAL FUEL TANK SYSTEM SCHEMATIC DIAGRAM
327 E-621 17241764 FIBER OPTIC CABLE DISTRIBUTION DIAGRAM - AMI
328 E-622 17241765 FIBER OPTIC CABLE DISTRIBUTION DIAGRAM - SCADA
329 E-623 17241766 TELEMETERING & SUPERVISORY CONTROL SCHEMATIC
DIAGRAM PW-1 (PW-3, PW-4, PW-5, PW-6 SIMILAR)
330 E-624 17241767 TELEMETERING & SUPERVISORY CONTROL SCHEMATIC
DIAGRAM TREATMENT/TRANSFER PUMP STATION/PW-2
331 E-625 17241768 DIGITAL INPUT MODULE DETAIL
332 E-631 17241769 TELECOM OUTLET DIAGRAMS
333 E-641 17241770 ELECTRICAL MANHOLE DIAGRAMS - 1
334 E-642 17241771 ELECTRICAL MANHOLE DIAGRAMS - 2
335 E-643 17241772 ELECTRICAL MANHOLE DIAGRAMS - 3
336 E-644 17241773 ELECTRICAL MANHOLE DIAGRAMS - 4
337 E-645 17241774 ELECTRICAL MANHOLE DIAGRAMS - 5
338 E-646 17241775 ELECTRICAL MANHOLE DIAGRAMS - 6
339 E-647 17241776 ELECTRICAL MANHOLE DIAGRAMS - 7
340 E-648 17241777 ELECTRICAL MANHOLE DIAGRAMS - 8
341 E-649 17241778 ELECTRICAL MANHOLE DIAGRAMS - 9
342 E-650 17241779 ELECTRICAL MANHOLE DIAGRAMS - 10
343 E-651 17241780 ELECTRICAL MANHOLE DIAGRAMS - 11
344 E-652 17241781 J-001B ELECTRICAL MANHOLE DIAGRAMS - 1
345 E-653 17241782 J-001B ELECTRICAL MANHOLE DIAGRAMS - 2
346 E-654 17241783 J-001B ELECTRICAL MANHOLE DIAGRAMS - 3
347 E-655 17241784 J-001B ELECTRICAL MANHOLE DIAGRAMS - 4
348 E-656 17241785 J-001B ELECTRICAL MANHOLE DIAGRAMS - 5
349 E-657 17241786 J-001B ELECTRICAL MANHOLE DIAGRAMS - 6
350 E-658 17241787 J-001B ELECTRICAL MANHOLE DIAGRAMS - 7
351 E-659 17241788 J-001B ELECTRICAL MANHOLE DIAGRAMS - 8
352 E-660 17241789 TELECOM MAINTENANCE HOLE DIAGRAMS - 1
353 E-661 17241790 TELECOM MAINTENANCE HOLE DIAGRAMS - 2
354 E-662 17241791 TELECOM MAINTENANCE HOLE DIAGRAMS - 3
355 E-663 17241792 TELECOM MAINTENANCE HOLE DIAGRAMS - 4
356 E-664 17241793 TELECOM MAINTENANCE HOLE DIAGRAMS - 5
357 E-665 17241794 TELECOM MAINTENANCE HOLE DIAGRAMS - 6
358 E-666 17241795 TELECOM MAINTENANCE HOLE DIAGRAMS - 7
359 E-667 17241796 TELECOM MAINTENANCE HOLE DIAGRAMS - 8
360 E-668 17241797 TELECOM MAINTENANCE HOLE DIAGRAMS - 9
361 E-669 17241798 TELECOM MAINTENANCE HOLE DIAGRAMS - 10
362 E-670 17241799 TELECOM MAINTENANCE HOLE DIAGRAMS - 11
363 E-671 17241800 J-001B TELECOM MAINTENANCE HOLE DIAGRAMS - 1
364 E-801 17241801 PANEL SCHEDULES
365 E-802 17241802 PANEL SCHEDULES
17241803 NOT USED
17241804 NOT USED
17241805 NOT USED
17241806 NOT USED
17241807 NOT USED
17241808 NOT USED
17241809 NOT USED
17241810 NOT USED
17241811 NOT USED
17241812 NOT USED
PROCESS AND INSTRUMENTATION
366 Y-001 17241813 PROCESS AND INSTRUMENTATION DIAGRAM - GENERAL
DOCUMENT 00 01 15 Page 10
SHEET DRAWING NAVFAC
NO. NO. DWG NO. TITLE
367 Y-002 17241814 PROCESS AND INSTRUMENTATION DIAGRAM - TYPICAL
PRODUCTION WELL
368 Y-003 17241815 PROCESS AND INSTRUMENTATION DIAGRAM - TYPICAL
PRODUCTION WELL
369 Y-004 17241816 PROCESS AND INSTRUMENTATION DIAGRAM -
CHLORINATION SYSTEM
370 Y-005 17241817 PROCESS AND INSTRUMENTATION DIAGRAM - WATER
STORAGE RESERVOIR
371 Y-006 17241818 PROCESS AND INSTRUMENTATION DIAGRAM - TRANSFER
PUMP STATION
372 Y-007 17241819 PROCESS AND INSTRUMENTATION DIAGRAM - GENERATOR
373 Y-008 17241820 EQUIPMENT LIST
374 Y-009 17241821 MAJOR FIELD EQUIPMENT LIST
375 Y-010 17241822 I/O LIST - 1
376 Y-011 17241823 I/O LIST - 2
377 Y-012 17241824 CONTROL STRATEGY
17241825 NOT USED
17241826 NOT USED
17241827 NOT USED
-- End of Document --
DOCUMENT 00 01 15 Page 11
DOCUMENT 00 01 15 Page 12
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes constructing production water wells, water storage reservoir, treatment facility, transfer pumping system, raw water transmission lines, water distribution lines, water transfer lines, electrical lines and feeders, standby generators, supervisory control and data acquisition system, and incidental related work.
1.2.2 Location
The work is located at the Joint Region Marianas, Guam, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Buildings will be occupied in the area surrounding the project during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00 Page 1
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 calendar days prior to starting excavation work.
1.6 NCTS/telecomm/access control/IDS COORDINATION REQUIREMENTS
1.6.1 NCTS/telecomm/access control/IDS Contractor Access
Allow the NCTS/telecomm/access control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NCTS/telecomm/access control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NCTS/telecomm/access control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
1.7 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
SECTION 01 11 00 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 State
"State" when used in reference to states of the United States also includes the Territory of Guam.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contract Personnel
Personnel List
Vehicle List
Statement of Acknowledgement Form SF 1413
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. Permission to interrupt any Activity roads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
d. The work under this contract requires special attention to the scheduling and coordination of vegetation disturbance/clearing.
Identify on the construction schedule where vegetation disturbance/clearing will occur at a minimum of 5 acre increments. The Contractor must coordinate vegetation disturbance/clearing work with the Contracting Officer and Government natural resources specialist to schedule Government removal of threatened and endangered (T&E) plant species. Currently, T&E plant species have only been salvaged within the test well areas.
e. The work under this contract requires special attention to the scheduling and coordination of initial (18-inches) subsurface and horizontal ground disturbing work. The Contractor must coordinate this
SECTION 01 14 00 Page 1 work with the contracting Officer to schedule a Government archaeological monitor to be on-site.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contract personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.4.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:
a. Present a letter or official document from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the
SECTION 01 14 00 Page 2
Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.4.1.2.2 DBIDS Eligibility Requirements
Throughout the year, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
1.4.1.2.3 DBIDS Notification Requirements
Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
a. An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
b. There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.4.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours must consist of an 8 1/2 hour hour period between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.4.4 Contractor Vehicle Access to site
All vehicle access to the site for beddown/construction for pump station, reservoir and PW-2, will be via the current water well access gate located just inside the North Gate. The contractor must report to the North Gate Visitor Control Center, provide proper credentials and be issued a key to access the water well access gate. The gate will be closed when not in use.
SECTION 01 14 00 Page 3
Vehicles larger than a pick-up will be searched at the North Gate Commercial Vehicle Inspection Area. The key will be returned to the North Gate Visitor Control Center at the end of each work day.
For other areas not accessible through the current water well access gate, all vehicle access will be through the Northwest Field Gate. Coordinate access with the Contracting Officer.
1.4.5 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.4.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.
1.5 SECURITY REQUIREMENTS
1.5.1 Personnel List
Submit for approval, at least 21 calendar days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Name
b. Date and place of birth
c. Citizenship
d. Home address
e. Social security number
f. Current pass expiration date
g. Naturalization or Alien Registration number or Temporary Non-Immigrant ID card
h. Passport number, place of issue, and expiration date
i. Guam Police clearance report for last six months
The request for personnel passes must be accompanied with the following
SECTION 01 14 00 Page 4 certification:
"I hereby certify that all personnel on this list are either born U.S.
citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."
Signature/Firm Name
1.5.1.1 Citizenship Requirements
Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.
1.5.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
1.5.3 Passes
Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 calendar days.
1.5.3.1 Control
Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 14 00 Page 5
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.2 EARNED VALUE REPORT
1.2.1 Data Required
This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule. Within 30 calendar days of Contract award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.2.2 Schedule Instructions
Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the
1.5 m line. Identify costs for the building(s), and include work out to the
1.5 m line. Work out to the 1.5 m line shall include construction encompassed within a theoretical line 1.5 m from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 1.5 m line.
1.2.3 Real Property Assets
Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer (RPAO) during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the Draft DD Form 1354.
The Contractor shall provide all the quantities and units of measure to represent the final constructed facility and include all associated cost.
Coordinate the Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.
SECTION 01 20 00.00 20 Page 1
Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work. Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer (RPAO).
Cost data accumulated under this section are required in the preparation of DD Form 1354.
1.2.4 Schedule Requirements for HVAC TAB
The field work Section 23 05 93 TESTING, ADJUSTING AND BALANCING shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.
b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.
c. Initial field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for oneinitial condition when the building is unoccupied.
d. Approval of Initial Report: On completion of the initial field work, the data is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .