21R1339 Note 4.pdf
PDF 180 KB Posted
- Solicitation number
- N6274221R1339
About this file
This document provides answers to pre-proposal questions for solicitation number N6274221R1339. The solicitation is for the construction of a water well system to supply water to Marine Corps Base Guam, including two generator buildings, electrical buildings at other well sites, raw water transmission lines, water treatment, water storage, water transfer pump facility, and a treated water transmission line. The document answers sixteen questions by clarifying details on drawings and specifications that will be revised in a forthcoming amendment, such as confirming dimensions, clarifying what drawings and sections correctly depict exterior wall details for HVAC units, and specifying the number of reducers and strainers in piping schematics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1339_AMD5.pdf | ||
| 21R1339 Note 11.pdf | ||
| 21R1339 Note 10.pdf | ||
| 21R1339_AMD4.pdf | ||
| 21R1339 Note 9.pdf | ||
| 21R1339_AMD3.pdf | ||
| 21R1339 Note 8.pdf | ||
| 21R1339_AMD2.pdf | ||
| 21R1339_AMD2_Drawings.pdf | ||
| 21R1339 Note 7.pdf | ||
| 21R1339 Note 6.pdf | ||
| 21R1339 Note 5.pdf | ||
| 21R1339_AMD1.pdf | ||
| 21R1339_AMD1_Drawings.pdf | ||
| P103 SV Sign-in.pdf | ||
| 21R1339 Note 3.pdf | ||
| 21R1339 Note 2.pdf | ||
| 21R1339 Note 1.pdf | ||
| 21R1339-RFP.pdf | ||
| P-103 Water Well Field_Specifications.pdf | ||
| P-103 Water Well Field_DWGS.pdf | ||
| 21R1339-JA_Redacted.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice No. 4
20 August 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-21-R-1339
FY18 MCON P-103 WATER WELL FIELD US NAVSUPACT ANDERSEN, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
12. Ref. Drawing Sheet 164 of 377, S-104. Foundation Plan. Drawing S-104 foundation plan indicated the outline of interior column. Please provide the detail.
ANSWER: Drawing S-104 will be revised. The callout “Outline of interior columns” will be revised to “outline of interior columns of the pre-engineered concrete tank.” See forthcoming amendment.
13. Ref. Drawing Sheet 167 of 377, S-301. Section C1. Sheet 178 of 377, A-301. Building Section-Electrical Building Detail B. Drawing S-104 “Section C1” and A-301 “Building Section-Electrical Building Detail B” shows different detail exterior wall for the HVAC outside unit. Please confirm which section is correct.
ANSWER: Drawing A-301, Section B will be revised to match Drawing S-301. See forthcoming amendment.
14. Ref. Drawing Sheet 213 of 377, MF-003. Isometrics. On the drawing MF-003, the Isometric View of the piping associated with T-102 Day Tank shows four 15 x 10 reducers while the callout indicates the reducers are in placed in eight locations. Please confirm which information is correct.
ANSWER: There are eight (8) 25 x 10 reducers, four (4) reducers for Day Tank T-102 and four (4) reducers for Day Tank T-202. Drawing MF-003 will be revised. See forthcoming amendment.
15. Ref. Drawing Sheet 213 of 377, MF-003. Isometrics. On the drawing MF-003, the Isometric View of the piping associated with T-102 Day Tank shows one basket strainer while the callout indicates that there are two. Please confirm which information is correct.
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
258 MAKALAPA DRIVE, SUITE 100
JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134
ANSWER: There are two (2) basket strainers, one (1) basket strainer on the supply line to Generator Fuel Transfer Supply Pump P-101 and one (1) basket strainer on the supply line to Generator Fuel Transfer Supply Pump P-201. Drawing MF-003 will be revised. See forthcoming amendment.
16. Ref. Drawing Sheet 210 of 377, P-300. Emergency Eyewash and Shower Detail. On the drawing P-300, a portion of the called-out dimension of the concrete pad is missing. Please confirm if the correct size is 762mm x 457mm x 203mm.
ANSWER: Size of the concrete pad is 762mm x 457mm x 203mm. See forthcoming amendment.
End of Notice