21R1339 Note 4.pdf

PDF 180 KB Posted

Attached to
FY18 MCON P-103 Water Well Field, US NAVSUPACT ANDERSEN, GUAM
Solicitation number
N6274221R1339
Issued by

About this file

This document provides answers to pre-proposal questions for solicitation number N6274221R1339. The solicitation is for the construction of a water well system to supply water to Marine Corps Base Guam, including two generator buildings, electrical buildings at other well sites, raw water transmission lines, water treatment, water storage, water transfer pump facility, and a treated water transmission line. The document answers sixteen questions by clarifying details on drawings and specifications that will be revised in a forthcoming amendment, such as confirming dimensions, clarifying what drawings and sections correctly depict exterior wall details for HVAC units, and specifying the number of reducers and strainers in piping schematics.

View the file

Other files

File Type Posted
21R1339_AMD5.pdf PDF
21R1339 Note 11.pdf PDF
21R1339 Note 10.pdf PDF
21R1339_AMD4.pdf PDF
21R1339 Note 9.pdf PDF
21R1339_AMD3.pdf PDF
21R1339 Note 8.pdf PDF
21R1339_AMD2.pdf PDF
21R1339_AMD2_Drawings.pdf PDF
21R1339 Note 7.pdf PDF
21R1339 Note 6.pdf PDF
21R1339 Note 5.pdf PDF
21R1339_AMD1.pdf PDF
21R1339_AMD1_Drawings.pdf PDF
P103 SV Sign-in.pdf PDF
21R1339 Note 3.pdf PDF
21R1339 Note 2.pdf PDF
21R1339 Note 1.pdf PDF
21R1339-RFP.pdf PDF
P-103 Water Well Field_Specifications.pdf PDF
P-103 Water Well Field_DWGS.pdf PDF
21R1339-JA_Redacted.zip ZIP file
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice No. 4

20 August 2021

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-21-R-1339

FY18 MCON P-103 WATER WELL FIELD US NAVSUPACT ANDERSEN, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

12. Ref. Drawing Sheet 164 of 377, S-104. Foundation Plan. Drawing S-104 foundation plan indicated the outline of interior column. Please provide the detail.

ANSWER: Drawing S-104 will be revised. The callout “Outline of interior columns” will be revised to “outline of interior columns of the pre-engineered concrete tank.” See forthcoming amendment.

13. Ref. Drawing Sheet 167 of 377, S-301. Section C1. Sheet 178 of 377, A-301. Building Section-Electrical Building Detail B. Drawing S-104 “Section C1” and A-301 “Building Section-Electrical Building Detail B” shows different detail exterior wall for the HVAC outside unit. Please confirm which section is correct.

ANSWER: Drawing A-301, Section B will be revised to match Drawing S-301. See forthcoming amendment.

14. Ref. Drawing Sheet 213 of 377, MF-003. Isometrics. On the drawing MF-003, the Isometric View of the piping associated with T-102 Day Tank shows four 15 x 10 reducers while the callout indicates the reducers are in placed in eight locations. Please confirm which information is correct.

ANSWER: There are eight (8) 25 x 10 reducers, four (4) reducers for Day Tank T-102 and four (4) reducers for Day Tank T-202. Drawing MF-003 will be revised. See forthcoming amendment.

15. Ref. Drawing Sheet 213 of 377, MF-003. Isometrics. On the drawing MF-003, the Isometric View of the piping associated with T-102 Day Tank shows one basket strainer while the callout indicates that there are two. Please confirm which information is correct.

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

258 MAKALAPA DRIVE, SUITE 100

JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134

ANSWER: There are two (2) basket strainers, one (1) basket strainer on the supply line to Generator Fuel Transfer Supply Pump P-101 and one (1) basket strainer on the supply line to Generator Fuel Transfer Supply Pump P-201. Drawing MF-003 will be revised. See forthcoming amendment.

16. Ref. Drawing Sheet 210 of 377, P-300. Emergency Eyewash and Shower Detail. On the drawing P-300, a portion of the called-out dimension of the concrete pad is missing. Please confirm if the correct size is 762mm x 457mm x 203mm.

ANSWER: Size of the concrete pad is 762mm x 457mm x 203mm. See forthcoming amendment.

End of Notice