This is a solicitation for a design-build construction project to build a water well system at Andersen Air Force Base in Guam. The project includes constructing water well sites equipped with generator or electrical buildings, raw water transmission lines, water treatment, water storage, a water transfer pump facility, and power and communications systems. A treated water transmission line will also be built. The solicitation seeks to construct these water infrastructure improvements to supply water primarily to the Marine Corps Base on Guam. The Navy is the contracting agency for this opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1339_AMD5.pdf | ||
| 21R1339 Note 11.pdf | ||
| 21R1339 Note 10.pdf | ||
| 21R1339_AMD4.pdf | ||
| 21R1339 Note 9.pdf | ||
| 21R1339_AMD3.pdf | ||
| 21R1339 Note 8.pdf | ||
| 21R1339_AMD2.pdf | ||
| 21R1339_AMD2_Drawings.pdf | ||
| 21R1339 Note 7.pdf | ||
| 21R1339 Note 6.pdf | ||
| 21R1339 Note 5.pdf | ||
| 21R1339_AMD1_Drawings.pdf | ||
| P103 SV Sign-in.pdf | ||
| 21R1339 Note 4.pdf | ||
| 21R1339 Note 3.pdf | ||
| 21R1339 Note 2.pdf | ||
| 21R1339 Note 1.pdf | ||
| 21R1339-RFP.pdf | ||
| P-103 Water Well Field_Specifications.pdf | ||
| P-103 Water Well Field_DWGS.pdf | ||
| 21R1339-JA_Redacted.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. N6274221R1339 Amendment No. 0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SOLICITATION, OFFER AND AWARD (SF1442)
Deleted pages 3 through 5 and replace with the attached pages 3 through 5.
DOCUMENT 00100, INSTRUCTIONS TO OFFERORS
PARA 1.1 NUMBER OF COPIES/TIME OF RECEIPT
Subpara a. Line 2. Delete “23 September 2021” and insert “7 October 2021” Subpara b. Line 2. Delete “23 September 2021” and insert “7 October 2021” Subpara c. Line 2. Delete “24 September 2021” and insert “8 October 2021”
SPECIFICATIONS
PROJECT TABLE OF CONTENTS
Add (New Section) Section 06 10 00 ROUGH CARPENTRY.
Section 31 31 16.13 CHEMICAL TERMITE CONTROL
SECTION 01 33 00 – SUBMITTAL PROCEEDURES
Remove Replace with
Submittal Register for Sections 02 61 13 thru 46 30 00 in its entirety.
Submittal Register for Sections 02 61 13 thru 46 30 00.
SECTION 28 31 70 – INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
Paragraph 2.9.1.1 Fire Alarm Speakers in its entirety.
2.9.1.1 Horns
Horns must be surface-mounted, with the matching mounting backbox surface mounted vibrating type suitable for use in an electrically supervised circuit. Horns must produce a sound rating of at least 85 dBA at 3.1 meters.
Horns used in exterior locations must be specifically listed or approved for outdoor use and be provided with metal housing and protective grilles.
SECTION 31 11 00 – CLEARING AND GRUBBING
Reference DODI 4150.07 (2008; Change 1-2017) DOD Pest Management Program
DODI 4150.07 (2019) DOD Pest Management Program
DRAWINGS
All drawings are re-issued to remove “UNCLASSIFIED//FOR OFFICIAL USE ONLY” from all sides of the drawing border.
The following drawings supersede previously issued drawings bearing the same number and title:
RFP No. N6274221R1339
DRAWING
NUMBER
NAVFAC
DRAWING
NUMBER
DESCRIPTION
S-104 17241589 Revise Structural Design Criteria. Delete notes. Revise Tank Parameter Schedule. Revise callout for interior column on Foundation Plan.
A-103 17241599 Delete interior wall insulation.
A-301 17241606 Revise wall footing.
A-503 17421611 Add reinforcing fabric on surface of gutter and around conduit.
A-601 17241612 Add signage schedule, mounting location, and signage details.
F-001 17241616 Revise Automatic Sprinkler System Notes 1, 9, and 12. Revise Fire Alarm Note 1. Revise symbols and descriptions.
F-004 17241619 Revise applicable codes.
F-103 17241624 Revise fire alarm plan.
F-104 17241625 Revise fire alarm plan.
F-602 17241628 Delete fire alarm speakers and replace with horns.
MF-003 17241647 Revise fitting callouts for Day Tank T-102 and Day Tank T-202.
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE
FOR
RFP NO. N62742-21-R-1339
FY18 MCON P-103 WATER WELL FIELD,
US NAVSUPACT ANDERSEN, GUAM
RFP N62742-21-R-1339
SF1442 Continued
Amendment No. 0001
ITEM
NO.
DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
0001 BASE ITEM
0001AA
BASE ITEM: The basis for SLIN 0001AA is the price for the entire work for NAVFAC Work Order Number 1371087 complete and in accordance with the drawings and specifications, including the work specified in CLIN 0002 through CLIN 0005 but excluding the work in SLINs 0001AB-0001AD.
1.00
Lump Sum
0001AB The basis for SLIN 0001AB for drilling additional exploratory holes in accordance with Section 31
23 00.00 20 EXCAVATION
AND FILL
Meters
@ $_____/Meter
0001AC The basis for SLIN 0001AC is for furnishing, handling, transporting, storing, mixing, and injecting grouting materials in accordance with Section 31 23 00.00 20
EXCAVATION AND FILL
Cubic Meter
(CM)
@ $_______/CM
0001AD MEC/MPPEH. The basis for SLIN 0001AD is the price to perform full clearance ahead of construction for Munitions and Explosives of Concern (MEC) / Material Potentially Presenting an Explosive hazard (MPPEH) to a Target of Interest of 20mm projectile. (see Note 9 below).
Total CLIN 0001 (Total of SLINs 0001AA, 0001AD)
0002 DEDUCTIVE ITEM NO. 1
The basis for Deductive Item No. 1 is to remove Well No. 5 and associated work which includes remove Raw Water Transmission Line
FOR
RFP NO. N62742-21-R-1339
Amendment No. 0001
“D”, remove Coral Access Road “C”, remove electrical distribution, site lighting, and telecom distribution associated with Well No. 5.
0003 DEDUCTIVE ITEM NO. 2
The basis for Deductive Item No. 2 is to remove Well No. 3 and associated work which includes remove portion of Raw Water Transmission Line “A”, remove portion of Coral Access Road “D”, remove electrical distribution, site lighting, and telecom distribution associated with Well No. 3.
0004 DEDUCTIVE ITEM NO. 3
The basis for Deductive Item No. 3 is the price difference for reducing the water storage reservoir volume from 1.89 Mega-Liter to
0.76 Mega Liter. Provide
two 0.38 Mega-Liter water storage reservoirs in lieu of two 0.97 Mega-Liter water storage reservoirs.
0005 DEDUCTIVE ITEM NO. 4
The basis for Deductive Item No. 4 is the price difference for removal of the generator building at Well No. 1 and replace with electrical building; remove Water Distribution Line “G”, fuel trench and fuel tank.
Notes:
1. See Document 00202 for the Price Evaluation.
2. A firm-fixed-price is required for all line items. The following NAVFAC Language applies:
FOR
RFP NO. N62742-21-R-1339
Amendment No. 0001
ALL OR NOTHING OFFERS - Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION in Document 00100 is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
3. The Offeror SHALL include a price for ALL CLINs.
4. Multiple awards will not be made.
5. It is the Government’s objective to award CLIN 0001, without utilizing CLIN 0002, CLIN 0003, CLIN 0004, and CLIN 0005 (listed in order of priority), within the Military Construction funds available. For purposes of evaluating CLINS 0002, 0003, 0004, and 0005, the following will apply:
a. All offers will be evaluated on the basis of the same deductive items.
b. The low offeror is the offeror that offers the lowest aggregate amount for CLIN 0001, minus those deductive items that provide the most features within the fund available for award.
c. The list of priorities in the price schedule is used only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if—
(i) It is in the best interest of the Government;
(ii) Funds are available at the time of award; and
(iii) The low offeror's price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.
6. The proposed price for CLIN 0001 minus the deductive item CLIN 0002, CLIN 0003, CLIN 0004, and CLIN 0005 (as applicable) will form the basis of evaluation noted in Document 00202.
7. In the event there is a difference between a unit price (s) and the extended total(s), the unit price(s) will be held to be the intended offer and the total(s) recomputed accordingly. If an offer provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
8. Payment for SLIN 0001AB through AC shall be for actual quantities only. The unit prices will be used to adjust the contract price for any increase or decrease in the estimated quantities subject to FAR 52.211-18, Variations in Estimated Quantity.
9. Price for SLIN 0001AD shall cover all costs to perform Full Clearance Ahead of Construction for MEC/MPPEH in accordance with section 01 57 19.03, including but not limited to all costs associated with the MEC/UXO response team. The MEC/UXO response team shall consist of a minimum of nine (9) personnel: a Senior UXO Supervisor, a UXO Safety Officer/Quality Control Specialist, a UXO Technician III, and six (6) UXO Technicians II/I.
10. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the Contracting Officer and to MARAD via email. MARAD email: Cargo.MARAD@dot.gov (attn.: MIL team). In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 56 PAGES
P-103 WATER WELL FIELD, US NAVSUPACT ANDERSEN GUAM
02 61 13 SD-03 Product Data
1.2 GWork Plan
3.9 GClosure Report
SD-06 Test Reports
3.4Confirmation Sampling and
Analysis
3.6.1 GSampling of Stored Excess
Material
3.6.2 GSampling Liquid
3.1Exposure Assessment Data
02 61 14 SD-06 Test Reports
3.1Air Sampling Data
SD-07 Certificates
1.4Certified Industrial Hygienist
1.6Ambient Air Sampling Plan
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
AMD 0001
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 56 PAGES
03 30 00 2.4.4Joint Sealants
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.5Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Biodegradable Form Release
Agent
1.6.3.1Pumping Concrete
1.6.3.2Finishing Plan
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.12.2.3 GCompressive Strength Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 56 PAGES
03 30 00 3.12.2.5Unit Weight of Structural
Concrete
3.12.2.4Air Content
3.12.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.4Joint Sealants
2.4.1Curing Compound
03 30 53 SD-02 Shop Drawings
1.4Installation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 56 PAGES
03 30 53 2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
3.1.4.3Batching and Mixing Equipment
3.2Conveying and Placing Concrete
2.2.8Formwork
2.3Mix Design Data
2.3Ready-Mix Concrete
2.4.1Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3Concrete Mixture Proportions
3.8.3Compressive Strength Testing
3.8.3Slump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
1.4.1CPG for recycled materials or appropriate Waiver Form
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 56 PAGES
03 30 53 2.4.1Curing Compound
03 37 13 SD-06 Test Reports
1.6Preconstruction Testing
1.7 GTesting During Construction
2.1.3Aggregate
2.1.4Water
2.3 GMixture Proportions
1.7.6 GRepair Of Shotcrete
3.9 GRepair Of Shotcrete
SD-07 Certificates
1.5 GQualifications
2.1.1Cement
2.1.2Supplementary Cementitious
Materials
2.1.5 GAdmixtures
2.1.6 GFibers
2.1.7Reinforcement
2.1.8Curing Materials
1.6.1 GTesting Agency
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.5 GBollards/Pipe Guards
2.6 GAngles and Plates
2.7 GRoof Hatches
SD-03 Product Data
2.7 GRoof Hatches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 56 PAGES
05 50 13 2.1 SRecycled Content
2.2 GCertified Mill
05 51 33 SD-02 Shop Drawings
2.2Ladders
SD-03 Product Data
2.2Ladders
2.2.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1Fabrication Drawings
3.2Stainless Steel Hardware
3.2Stainless Steel Shapes, Plates, Bars and Strips
SD-03 Product Data
2.2.1Stainless Steel Plates, Shapes, and Bars
2.2.2Stainless Steel Tubing
2.2.4Stainless Steel Railings and
Handrails
1.2.1Anchorage and Fastening
Systems
SD-07 Certificates
1.4.1Welding Procedures
1.4.2Welder Qualification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 56 PAGES
05 52 00 SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.1.1 SCertified Sustainably Harvested
Plywood for Other Uses
1.7Preservative Treatment
SD-10 Operation and Maintenance
Data
3.2Take-back Program
07 14 00 SD-03 Product Data
2.1 GFluid-Applied Membrane
2.2 GMembrane Primer
2.8 GElastomeric Sheet
3.3 GSolvent
3.4.1 GMoisture Meter
2.7 GBond Breaker
SD-11 Closeout Submittals
1.6Warranty
3.6Information Card
3.5Instructions To Government
Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 56 PAGES
07 27 36 SD-01 Preconstruction Submittals
1.7.1 GQualification of Manufacturer
1.7.2 GQualification of Installer
1.8 GQuality Control Plan
1.8 GSafety Plan
1.6.1 GFire Prevention Plan
1.6.2 GRespirator Plan
SD-02 Shop Drawings
1.4Spray Foam Air Barrier
1.8 GFoam Air Barrier System
1.4.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GPrimers, Adhesives, and Mastics
2.4 GSealants
1.4.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
2.1.6 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-06 Test Reports
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
1.7.1 GQualification of Manufacturer
1.7.2 GQualification of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 56 PAGES
07 27 36 2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.5.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.4.1 GThermal Barrier
2.2 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
3.3.2Daily Work Record
07 60 00 SD-02 Shop Drawings
2.1.1 GExposed Sheet Metal
3.1.11 GDownspouts
2.1.1 GGravel Stops and Fasciae
3.1.12 GFlashing at Roof Penetrations
and Equipment Supports
SD-08 Manufacturer’s Instructions
3.5 GQuality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 56 PAGES
07 84 00 1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
08 11 16 SD-02 Shop Drawings
1.4.1Door and Frame Assembly
SD-03 Product Data
1.4.1Door and Frame Assembly
SD-04 Samples
1.4.2Finish Samples
SD-08 Manufacturer’s Instructions
1.4.1Door and Frame Assembly
1.4.3Adjustments, Cleaning, and
Maintenance
08 34 19.10 20 SD-02 Shop Drawings
2.1 GRolling service doors
SD-03 Product Data
2.1 GRolling service doors
SD-08 Manufacturer’s Instructions
2.1Rolling service doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 56 PAGES
08 34 19.10 20 SD-10 Operation and Maintenance
Data
2.1Rolling service doors
08 71 00 SD-02 Shop Drawings
1.4 GHardware Schedule
2.2.4 GKeying System
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.4 GHardware Schedule
SD-11 Closeout Submittals
1.5.1Key Bitting
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1Metal Support Systems
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 56 PAGES
09 22 00 2.1Metal Support Systems
09 29 00 SD-03 Product Data
2.1.4Accessories
2.1.1Gypsum Board
2.1.2 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 65 00 SD-03 Product Data
2.2Adhesives
2.1Wall Base
2.4Wall Base
SD-04 Samples
2.1Wall Base
2.4Wall Base
SD-07 Certificates
2.1 SIndoor Air Quality for Wall Base
2.2 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.1Installation
09 90 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 56 PAGES
09 90 00 3.8Piping Identification
SD-03 Product Data
2.1Coating
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.4.1.2 GQualification Testing
1.11.5.1 GQualification Testing
SD-08 Manufacturer’s Instructions
3.5.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
10 14 00.10 SD-02 Shop Drawings
3.1Approved Detail Drawings
SD-03 Product Data
3.1Installation
1.2Exterior Signage
1.2.1Wind Load Requirements
SD-04 Samples
1.2Exterior Signage
SD-10 Operation and Maintenance
Data
3.1.2Protection and Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 56 PAGES
10 44 16 SD-01 Preconstruction Submittals
2.1.1 GManufacturer's Data
SD-02 Shop Drawings
2.1.1 GFire Extinguishers
Part 2 GWall Brackets
SD-03 Product Data
2.1.1 GFire Extinguishers
Part 2 GWall Brackets
3.2.1 GReplacement Parts List
SD-07 Certificates
2.1.1 GFire Extinguishers
2.1.1 GManufacturer's Warranty with
Inspection Tag
21 13 13 SD-01 Preconstruction Submittals
1.2.3Quality Control Fire Protection
Engineer (QCFPE)
1.4.2.1Sprinkler System Designer
1.4.2.2Sprinkler System Installer
SD-02 Shop Drawings
1.4.1.1Shop Drawing
SD-03 Product Data
2.2.1Pipe
2.3.1.2Fittings
2.3.4Valves
2.3.5Riser Check Valves
2.8.5Relief Valves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 56 PAGES
21 13 13 2.7Sprinklers
2.3.3Pipe Hangers and Supports
2.4.1Sprinkler Alarm Switch
2.4.2Valve Supervisory (Tamper)
Switch
2.6Fire Department Connection
2.5Backflow Prevention Assembly
2.8.6Air Vent
2.5.1Hose Valve
2.3.3Seismic Bracing
2.1.2Nameplates
SD-05 Design Data
2.3.3Seismic Bracing
1.2.1.2Hydraulic Calculations
SD-06 Test Reports
3.7.1Test Procedures
SD-07 Certificates
3.7.2.1Verification of Compliant
Installation
3.7.2.2Request for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9Operating and Maintenance
(O&M) Instructions
1.6Spare Parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 56 PAGES
21 13 13 SD-11 Closeout Submittals
3.9As-built drawings
22 00 00 SD-03 Product Data
2.4Fixtures
SD-06 Test Reports
3.5Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.5.1Plumbing System
23 00 00 SD-03 Product Data
2.9.2.1Registers and Grilles
2.9.3Louvers
2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
2.10.1.3Centrifugal Type Power Wall
Ventilators
SD-06 Test Reports
3.10 GPerformance Tests
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.12.2Operation and Maintenance
Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 56 PAGES
23 00 00 SD-10 Operation and Maintenance
Data
3.12.1 GOperation and Maintenance
Manuals
2.10.1.2In-Line Centrifugal Fans
2.10.1.3 GCentrifugal Type Power Wall
Ventilators
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.2Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.2 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
3.8Anchor Bolts
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.8 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Design Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 56 PAGES
23 05 93 1.6.1.1 GTAB Design Review Report
1.5.8.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.8.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
1.5.8.4 GTAB Related HVAC Submittals
1.5.6 GTAB Procedures
1.5.6 GCalibration
1.3.2 GSystems Readiness Check
1.5.9 GTAB Execution
SD-06 Test Reports
1.5.3.2 GPrerequisite HVAC Work
Checkout List
1.6.1 GPrerequisite HVAC Work
Checkout List
1.5.2.3 GCertified TAB Report
1.5.9.3 GCertified TAB Report
1.5.10.1 GTAB Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 56 PAGES
23 05 93 SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Submittal and Work
Schedule
1.6.1 GTAB Submittal and Work
Schedule
1.5.3.2 GTAB Pre-Field Engineering
Report
1.6.1.2 GTAB Pre-Field Engineering
Report
1.5.5 GInstrument Calibration
Certificates
3.6 GTAB Procedures Summary
3.6 GAdvance Notice of TAB Field
Work
1.5.8.1 GTAB Firm
1.3.2 GDesign Review Report
1.6.1 GAdvanced Notice for TAB Field
Work
1.5.3.2 GPrerequisite HVAC Work Check
Out List
1.6.1 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 56 PAGES
23 07 00 2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Equipment Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GEquipment Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
3.1.1 GDisplay Samples
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GEquipment Insulation Systems
23 09 53.00 20 SD-02 Shop Drawings
1.7.1 GControl System Diagrams
1.7.2 GLadder Diagram
1.7.3 GOperating Parameters
1.7.5 GSequence of Operation
1.7.6 GArrangement Drawing
1.7.4 GWiring Diagram
SD-03 Product Data
2.2 GThermostats
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 56 PAGES
23 09 53.00 20 1.9.6 GCalibration Adjustment And
Commissioning Reports
1.9.5 GSite Testing Procedures
3.3.5 GPerformance Verification Test
SD-07 Certificates
3.3.4 GCertification of Completion
SD-08 Manufacturer’s Instructions
3.4.1 GTraining Course Documentation
SD-10 Operation and Maintenance
Data
1.9.7 GSpace Temperature Control
System
SD-11 Closeout Submittals
3.5 GQualified Service Organization
List
23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-Assembled Refrigerant
Piping
1.4.2Control System Wiring Diagrams
SD-03 Product Data
2.1Air Conditioners
2.1.1 SEnergy Star Label for
Split-System Type Air Conditioners
2.2Filters
2.1.8Thermostats
1.5Refrigerant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 56 PAGES
23 81 00.00 20 2.5Refrigerant Piping and
Accessories
2.3Coatings for Finned Tube Coils
SD-06 Test Reports
2.7.1Salt-Spray Tests
3.6.3Start-Up and Initial Operational
Tests
SD-07 Certificates
1.4.6Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
2.1Air Conditioners
2.2Filters
2.1.8Thermostats
2.5Refrigerant Piping and
Accessories
SD-10 Operation and Maintenance
Data
2.1Air Conditioners
2.2Filters
2.1.8Thermostats
SD-11 Closeout Submittals
1.4.4Posted Operating Instructions
3.4Air Filters
25 05 11 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 56 PAGES
25 05 11 3.1.6.1 GWireless Communication
Request
3.1.3.2 GDevice Account Lock Exception
Request
3.9 GMultiple IP Connection Device
Request
1.9.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.9.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
3.1.4.1 GUser Interface Banner Schedule
1.7.2 GNetwork Communication Report
1.7.5 GCybersecurity Riser Diagram
1.7.3 GControl System Inventory Report
1.7.1 GCybersecurity Interconnection
Schedule
SD-03 Product Data
1.7.6 GControl System Cybersecurity
Documentation
SD-06 Test Reports
1.4.1 GWireless Communication Test
Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 56 PAGES
25 05 11 1.8 GSoftware Licenses
1.6.1 GCybersecurity Representative's
Certification Of Qualifications
SD-11 Closeout Submittals
3.5.2.2.5 GPassword Summary Report
1.7.4 GSoftware Recovery And
Reconstitution Images
3.2.2.1 GDevice Audit Record Upload
Software
25 08 11.00 20 SD-01 Preconstruction Submittals
1.8.1 G CIOAuthorization Strategy Plan
SD-05 Design Data
3.1.2.1 G CIOControl System Security Controls
3.1.2.3 G CIOSecurity Plan
3.1.2.4 G CIOPorts, Protocols, And Services
Management Registration Form
SD-06 Test Reports
3.1.3.3 G CIOACAS Vulnerability Reports
3.1.3.5 G CIOSecurity Technical
Implementation Guide Checklists
3.1.3.4 G CIOSCAP Report
3.1.3.7 G CIOISSE Checklist (Step 3)
3.1.4.3 G CIOISSE Checklist (Step 4)
SD-07 Certificates
1.7.1 G CIOInformation Assurance Technical
Level II/Security Plus
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 56 PAGES
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 12 19.10 SD-02 Shop Drawings
1.5.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.7.1 GAcceptance Checks and Tests
SD-07 Certificates
2.2.2.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
2.8.1 GTransformer Test Schedule
2.8.2 GDesign Tests
2.8.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6.1 GTransformer(s)
26 13 00 SD-02 Shop Drawings
1.5.1 GSwitchgear Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 56 PAGES
26 13 00 1.5.3 GElectronic Overcurrent Control
Curves
1.6.1 GHigh-Firepoint Fluid Insulated
Pad-mounted Switchgear
2.1 GHigh-Firepoint Fluid Insulated
Pad-mounted Switchgear
2.2 GInsulated High-Voltage
Connectors
2.3 GSurge Arresters
SD-06 Test Reports
3.4.1 GAcceptance Checks and Tests
SD-07 Certificates
1.5.2 GPaint Coating System
SD-09 Manufacturer’s Field
Reports
2.5.1 GSwitchgear design and production
tests
SD-10 Operation and Maintenance
Data
1.6.1 GHigh-Firepoint Fluid Insulated
Pad-mounted Switchgear
2.1 GHigh-Firepoint Fluid Insulated
Pad-mounted Switchgear
26 20 00 SD-02 Shop Drawings
2.12Panelboards
2.14Transformers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 56 PAGES
26 20 00 2.17Motor control centers
2.27Wireways
3.1.8.1Marking strips
SD-03 Product Data
2.11Receptacles
2.12.3Circuit breakers
2.9Switches
2.14Transformers
2.13Enclosed circuit breakers
2.15Motor controllers
2.16Manual motor starters
2.21.3Grounding Busbar
2.28Surge protective devices
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.5Grounding system test
3.5.3Transformer tests
3.5.4Ground-fault receptacle test
SD-07 Certificates
2.10Fuses
SD-09 Manufacturer’s Field
Reports
2.30.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1Electrical Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 56 PAGES
26 27 14.00 20 SD-02 Shop Drawings
1.4.1 GInstallation Drawings
SD-03 Product Data
2.1.4 GElectricity meters
2.1.3 GCurrent transformer
2.1.2 GPotential transformer
2.2 Gcommunications
3.1.1 GConfiguration Software
SD-06 Test Reports
3.2.1 GAcceptance checks and tests
3.2.2 GSystem functional verification
3.2.1 GBuilding meter installation sheet, per building
3.2.1 GCompleted meter installation
schedule
3.2.1 GCompleted meter data schedule
2.1.1 GMeter configuration template
3.2.1 GMeter configuration report
SD-10 Operation and Maintenance
Data
1.5.1 GElectricity Meters and
Accessories
SD-11 Closeout Submittals
3.2.2 GSystem functional verification
26 32 13.00 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 56 PAGES
26 32 13.00 20 1.5.1.1 GEngine-Generator Set and
Auxiliary Equipment
1.5.1.2 GAuxiliary Systems
SD-03 Product Data
1.3.1 GEngine-Generator Set Data
1.3.2 GEngine-Generator Set
Efficiencies
1.3.3 GDiesel Engine Data
1.3.4 GGenerator and Exciter Data
2.1 GDiesel Engine-Generator Set
2.2 GAuxiliary Systems and Equipment
2.2.7 GRemote Control Panel and Alarm
Annunciator
SD-05 Design Data
1.3.5 GCapacity Calculations for
Engine-Generator Set
1.3.6 GCalculations for Brake Mean
Effective Pressure
1.3.7 GCapacity Calculations For
Batteries
1.3.8 GTurbocharger Load Calculations
SD-06 Test Reports
3.5.1Acceptance Checks and Tests
3.5.2Functional Acceptance Tests
3.4.5Functional Acceptance Test
Procedure
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 56 PAGES
26 32 13.00 20 SD-07 Certificates
1.5.2Vibration Isolation System
1.5.3Fuel System
3.3Start-Up Engineer
3.6.1Instructor's
2.1.1.2Diesel Engine Emission Limits
SD-09 Manufacturer’s Field
Reports
2.6.1Engine Tests
2.6.2Generator Tests
2.6.3Assembled Engine-Generator Set
Tests
SD-10 Operation and Maintenance
Data
2.1Diesel Engine-Generator Set
2.2Auxiliary Systems and Equipment
3.4.4Preliminary Assembled Operation and Maintenance Manuals
SD-11 Closeout Submittals
1.8.2Posted Operating Instructions
3.6.2Training Plan
26 36 23.00 20 SD-02 Shop Drawings
1.4.2Automatic Transfer Switch
Drawings
SD-03 Product Data
2.1Automatic Transfer Switches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 56 PAGES
26 36 23.00 20 SD-06 Test Reports
3.3.1Acceptance Checks and Tests
3.3.2Functional Acceptance Tests
SD-07 Certificates
1.4.1Proof of Listing
SD-10 Operation and Maintenance
Data
2.1Automatic Transfer Switches
26 41 00 SD-02 Shop Drawings
1.4.1.1Overall lightning protection system
1.4.1.2Each major component
SD-06 Test Reports
1.4.3Lightning Protection and
Grounding System Test Plan
3.5.1Lightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3Lightning Protection System
Installers Documentation
1.4.2Component UL Listed and
Labeled
1.4.4Lightning protection system inspection certificate
3.1.1Roof manufacturer's warranty
26 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 56 PAGES
26 51 00 1.5.1Luminaire Drawings
SD-03 Product Data
2.2Luminaires
2.4Light Sources
2.3Drivers
1.6.1LED Luminaire Warranty
1.5.2Luminaire Design Data
2.5.2Timeswitch
2.6.1LED Emergency Drivers
SD-06 Test Reports
1.5.3LED Luminaire - IES LM-79 Test
Report
1.5.4LED Light Source - IES LM-80
Test Report
1.5.5LED Light Source - IES TM-21
Test Report
1.5.8.3Energy Efficiency
SD-07 Certificates
1.6.1.1Luminaire Useful Life Certificate
26 56 00 SD-01 Preconstruction Submittals
1.5.2Photometric Plan
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1Luminaire Drawings
1.5.1.2Poles
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 56 PAGES
26 56 00 2.2LED Luminaires
2.2 SEnergy Star Label for LED
Luminaire Product
2.2.2Luminaire Light Sources
2.2.3Luminaire Power Supply Units
(Drivers)
2.3.2Time Switch
2.3.1Photocell
2.4.1Concrete Poles
2.5Brackets
SD-05 Design Data
1.5.3Design Data for Luminaires
SD-06 Test Reports
1.5.4LED Luminaire - IES LM-79 Test
Report
1.5.5LED Light Source - IES LM-80
Test Report
3.2Operating Test
SD-07 Certificates
1.7.1Luminaire Useful Life Certificate
SD-08 Manufacturer’s Instructions
2.4.1Concrete Poles
SD-10 Operation and Maintenance
Data
1.8Operational Service
27 10 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 56 PAGES
27 10 00 1.6.1.1Telecommunications drawings
1.6.1.2Telecommunications Space
Drawings
SD-03 Product Data
2.3Telecommunications cabling
2.4.5Patch panels
2.5Telecommunications outlet/connector assemblies
2.4.2Equipment support frame
2.4.3Connector blocks
SD-06 Test Reports
3.5.1Telecommunications cabling testing
SD-07 Certificates
1.6.2.1Telecommunications Contractor
1.6.2.2Key Personnel
1.6.2.3Manufacturer Qualifications
1.6.3Test plan
SD-09 Manufacturer’s Field
Reports
2.10.1Factory reel tests
SD-10 Operation and Maintenance
Data
1.10.1Telecommunications cabling and pathway system
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 56 PAGES
27 10 00 1.10.2Record Documentation
28 31 70 SD-01 Preconstruction Submittals
1.3.2Quality Control Fire Protection
Engineer (QCFPE)
1.8.2.1Fire alarm system designer
1.8.2.2Supervisor
1.8.2.3Technician
1.8.2.4Installer
1.8.2.5Test Technician
1.7Fire Alarm System Site-Specific
Software Acknowledgement
SD-02 Shop Drawings
1.8.1.3Nameplates
2.2.4Instructions
1.8.1.4Wiring Diagrams
1.8.1.5System Layout
1.8.1.6Notification Appliances
1.8.1.7Initiating devices
1.8.1.8Battery Power
SD-03 Product Data
2.3Fire Alarm Control Unit (FACU)
2.4Manual Stations
2.5Smoke Detectors
2.6Carbon monoxide detector
2.7Addressable Interface Devices
2.8Addressable Control Modules
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 56 PAGES
28 31 70 1.8.1.6Notification Appliances
2.11.1Batteries
2.11.2Battery Chargers
2.12Surge Protective Devices
2.12Alarm Wiring
3.3.4Back Boxes and Conduit
3.3.2Terminal Cabinets
2.14Automatic Fire Alarm
Transmitters
2.14.1Radio Transmitter and Interface
Panels
2.16Environmental Enclosures or
Guards
3.10.3Document Storage Cabinet
SD-05 Design Data
1.8.1.9Voltage Drop Calculations
1.8.1.8Battery Power Calculations
SD-06 Test Reports
3.6.1Test Procedures
SD-07 Certificates
3.6.2.1Verification of Compliant
Installation
3.6.2.2Request for Government Final
Test
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 56 PAGES
28 31 70 3.8Operation and Maintenance
(O&M) Instructions
3.9Instruction…