Attachment_J2(I)_-_Site_Assessment_for_Building_Demolition_Sample_Task.docx

DOCX document 25 KB Posted

Attached to
Construction, Maintenance, Environmental & Testing Services (COMETS) Federal contract opportunity
Solicitation number
NNC17ZFD015R
Issued by
National Aeronautics and Space Administration Glenn Research Center

About this file

Attachment J.2(I) - Site Assessment for Building Demolition Sample Task

View the file

Other files for this federal contract opportunity

Other files attached to Construction, Maintenance, Environmental & Testing Services (COMETS), newest first.
File Type Posted
COMETS_Source_Selection_Statement.pdf PDF
COMETS_RFP-_Q&As_(2).docx DOCX document
COMETS_RFP-_Q&As.docx DOCX document
Attachment_J2(L)(4)_-_Cost_Summary_Template_(Amended).xlsx XLSX spreadsheet
Attachment_J1(A)(1)_-_GLPR_8553_1D.pdf PDF
Attachment_J1(D)(4)_-_GRC_Accounting_Calendar_Template.xlsx XLSX spreadsheet
Attachment_J2(I)_-_Site_Assessment_for_Building_Demolition_Sample_Task.docx DOCX document
Attachment_J1(A)(2)_-_GLWI-FE-8550.pdf PDF
SF-33_for_COMETS_RFP.pdf PDF
Attachment_J2(L)(2)_-_Cognizant_Audit_Office_Template.xlsx XLSX spreadsheet
Attachment_J2(J)_-_NASA_GRC-150_Environmental_Checklist.pdf PDF
Attachment_J2(L)(1)_-_Business_Systems_Reviews_and_Status_Information_Template.xlsx XLSX spreadsheet
Attachment_J1(D)(3)_-_GRC_533_Template.xlsx XLSX spreadsheet
Attachment_J1(E)_-_Quality_Assurance_and_Surveillance_Plan_(QASP).docx DOCX document
Attachment_J1(C)_-_Wage_Determination_2015-4727.pdf PDF
Attachment_J1(D)(2)_-_GRC_533_Baseline_Template.xlsx XLSX spreadsheet
Attachment_J1(D)(1)_-_GRC_533_Supplemental_Cost_Report_Template.xlsx XLSX spreadsheet
Attachment_J2(M)_-_Client_Authorization_Letter_(CAL).docx DOCX document
NNC17ZFD015R_-_RFP_for_COMETS.docx DOCX document
Attachment_J1(B)_-_Government_Furnished_Property.xlsx XLSX spreadsheet
Attachment_J1(D)(5)_-_GRC_Contractor_Headcount_Report_Template.xlsx XLSX spreadsheet
Attachment_J2(K)_-_Drawing_(for_Sample_Task).pdf PDF
Attachment_J2(L)(3)_-_Price_Summary_Template.xlsx XLSX spreadsheet
Attachment_J2(L)(4)_-_Cost_Summary_Template.xlsx XLSX spreadsheet
Attachment_J1(A)_-_Statement_of_Work.docx DOCX document
Attachment_J2(N)_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
COMETS_Industry_Day_Attendees_(5-22-2017).xlsx XLSX spreadsheet
Industry_Day_Presentation_for_COMETS_(5-22-2017).pptx PPTX presentation
COMETS_Industry_Day_Registration_Form.docx DOCX document
NNC17ZFD015R-_COMETS_Industry_Day_Event_Information.docx DOCX document
Attachment_J2(M)_-_Client_Authorization_Letter_(CAL).docx DOCX document
Attachment_J1(D)(2)_-_GRC_533_Baseline_Template.xlsx XLSX spreadsheet
Attachment_J1(E)_-_Quality_Assurance_and_Surveillance_Plan_(QASP).docx DOCX document
NNC17ZFD015R_-_Draft_RFP_Cover_Letter.pdf PDF
Attachment_J1(C)_-_Wage_Determination_2015-4727.pdf PDF
Attachment_J2(L)(2)_-_Cognizant_Audit_Office_Template.xlsx XLSX spreadsheet
Attachment_J1(D)(5)_-_GRC_Contractor_Headcount_Report_Template.xlsx XLSX spreadsheet
Attachment_J1(A)(1)_-_GLPR_8553_1D.pdf PDF
Attachment_J1(A)(2)_-_GLWI-FE-8550.pdf PDF
Attachment_J2(L)(4)_-_Cost_Summary_Template.xlsx XLSX spreadsheet
NNC17ZFD015R_-_DRAFT_RFP_for_COMETS.docx DOCX document
Attachment_J1(D)(1)_-_GRC_533_Supplemental_Cost_Report_Template.xlsx XLSX spreadsheet
Attachment_J1(A)_-_Statement_of_Work.docx DOCX document
Attachment_J1(D)(3)_-_GRC_533_Template.xlsx XLSX spreadsheet
Attachment_J2(L)(3)_-_Price_Summary_Template.xlsx XLSX spreadsheet
Attachment_J2(L)(1)_-_Business_Systems_Reviews_and_Status_Information_Template.xlsx XLSX spreadsheet
Attachment_J2(N)_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
Attachment_J1(B)_-_Government_Furnished_Property.xlsx XLSX spreadsheet
Attachment_J1(D)(4)_-_GRC_Accounting_Calendar_Template.xlsx XLSX spreadsheet
Attachment_J2(J)_-_NASA_GRC-150_Environmental_Checklist.pdf PDF
Show all 50

Construction, Maintenance, Environmental & Testing Services (COMETS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction, Maintenance, Environmental, & Testing Services (COMETS) Attachment J.2(I)

Construction, Maintenance, Environmental, & Testing Services (COMETS)

Attachment J.2(I) – Site Assessment for Building Demolition Sample Task

1.0 Introduction & Building Specifications

NASA GRC will be demolishing a 1950’s vintage research and testing facility with an existing underground jet fuel storage tank. The NEPA evaluation has determined that the potential for asbestos, lead based paint, mercury containing devices, light bulbs, ballasts, and contaminated soils exists. NASA GRC is committed to the safe deconstruction and appropriately handling of all waste materials and requires a site assessment to achieve that goal.

The facility details are as follows:

· Space and function: 10,000 sq. ft. single story building consisting of four test cells, a large shop space, mechanical room, conference room, three offices, and restrooms.

· Surrounding Site: The surrounding site consists of a combination green space and asphalt pavement parking. The underground storage tank is adjacent to the facility under the parking area.

· Fuel Tank: A 7,000 gallon jet fuel underground storage tank is on the site and to be removed when the building is demolished.

· Structural System and facade: This building is a structural steel building with a Concrete Masonry Unit (CMU) and stand glazing exterior façade. Interior room partitions are metal studs and drywall.

· Roofing system: The existing roof is a 3-ply built up roof membrane on 3 inches of insulation with a corrugated metal deck. The installation date and manufacture is unknown.

· Mechanical HVAC: The HVAC system is forced air with roof mounted equipment with insulated, ducted supply and returns. Central campus steam and chilled water are utilized in the building for the institutional heating and cooling needs.

· Mechanical Plumbing: The interior domestic water distribution piping is copper and the sanitary plumbing is cast iron.

· Electrical details: The electrical power distribution system within the building consists of 120 volt power only. Light bulbs and fixtures are all fluorescents, except the fixtures in the shop space are metal halide.

· Foundations: The foundation system is a cast in place shallow mat concrete foundation.

The demolition of this facility will be implemented through a traditional design-bid-build delivery method. The Government will contract an Architecture-Engineering (A/E) Firm to design the demolition of the facility. The building will remain occupied and active until demolition begins. The site assessment provided under this statement of work shall be complete and contain all the required information to permit the demolition of the building.

2.0 Site Assessment Scope of Work:

THE OFFEROR IS NOT TO PERFORM ANY OF THE WORK OR PRODUCE ANY DELIVERABLES FOR THE SAMPLE TASK AS DESCRIBED BELOW. EXPECTED RESPONSE TO THIS SAMPLE TASK IS OUTLINED IN SECTION L OF THE RFP.

The work described below shall be conducted in a manner that complies with all applicable environmental, health, and safety laws, regulations, and NASA standards. The site assessment shall include:

· Development of a site-specific health and safety plan for the execution of the work effort.

· Perform all necessary sampling and analysis to assess all hazardous materials to determine appropriate handling and disposal requirements for building demolition.

· Obtain utility clearances for sampling effort (excavation manual is included for reference).

· Conduct engineering surveys of sample locations.

· All sampling shall be taken in accordance with applicable regulations and industry standards.

· Laboratory analysis shall be performed by a certified laboratory with all necessary Chain of Custody Documentation.

· A final laboratory analysis report shall be prepared and submitted for review.

· Evaluate sampling data against regulatory standards.

· Restore and repair sampling site locations as required.

· Deliver final site assessment report.

· Determine all regulatory permits and authorizations required for building demolition and underground storage tank removal.