RFP Number : NIHOF2016102
- 1 -
RFP TABLE OF CONTENTS
NOTICE TO OFFERORS
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
b. NOTICE OF 8(a) COMPETITIVE SET-ASIDE
c. NAICS CODE AND SIZE STANDARD
d. TYPE OF CONTRACT AND NUMBER OF AWARDS
e. PRE-PROPOSAL CONFERENCE
f. BRAND NAME OR EQUAL
g. COMMITMENT OF PUBLIC FUNDS
h. COMMUNICATIONS PRIOR TO CONTRACT AWARD
i. RELEASE OF INFORMATION
j. PREPARATION COSTS
k. SERVICE OF PROTEST
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Evaluation of Proposals
4. Potential Award Without Discussions
5. Standards for Privacy of Individually Identifiable Health Information
6. Privacy Act - Treatment of Proposal Information
7. Notice of Buy American Act Requirement--Construction Materials Under Trade Agreements
8. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Evaluation
- 2 -
c. ADDITIONAL INFORMATION
1. Qualifications of the Offeror
SECTION M - EVALUATION FACTORS FOR AWARD
2. GENERAL
- 3 -
NOTICE TO OFFERORS
This solicitation is being processed under a Partnership Agreement (PA) between the Department of Health and Human Services (HHS) and the Small Business Administration (SBA), under which the SBA has delegated to HHS, authority to enter into 8(a) contracts directly with eligible 8(a) firms. The PA implements innovative and effective methodology designed to streamline the acquisition process for awards under the 8(a) program. The Office of Research Facilities is a designated pilot agency under the PA.
Any solicitation and subsequent awards processed under the referenced PA, the Office of Research Facilities will make the award directly to the 8(a) firm. SBA will not be a signatory to the award resulting from this solicitation.
SBA will, however, retain responsibility for 8(a) certification, administer other eligibility related issues under the 8(a) program, and be available to 8(a) firms for counseling and assistance.
If you have any questions pertaining to this PA, please contact Mr. Wayne Berry at (301) 496-9639 .
HHS/SBA PA (OCTOBER 23, 2012 until amended)
Servicing Small Business Administration Field Office
To facilitate communications, it is requested that the 8(a) participant submitting this offer/bid provide the following information regarding the firm's cognizant servicing Small Business Administration (SBA) office.
Servicing SBA Office North Carolina District Office
Address 6302 Fariview Road, Suite 300
Charlotte, NC 28210-2227
Cognizant SBA Business Opportunity Specialist's Name Joe Ann Shaeffers
Phone 704-344-6563
- 4 -
PART I - THE SCHEDULE
THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.
ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE
CONTRACT AWARD.
THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS
INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE
TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
- 5 -
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
This Multiple Award Task Order Contract (MATOC) for repair, renovation, and maintenance with Design-Build capabilities is intended to provide rapid response to remediation of real property (e.g. maintenance/repair/minor construction situations relating, but not limited to, mechanical, plumbing, structural, electrical, HVAC, architectural, civil, instrumentation, security and safety areas of Government facilities) in a cost effective manner.
ARTICLE B.2. PRICES/COSTS
a. This is a Multiple Award Indefinite-Delivery Indefinite-Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $25,000 (minimum) nor more than a total of $65,000,000 (maximum) for successful performance of this contract.
b. The prices set forth in this ARTICLE will cover the contract period 09/01/2017 through 08/31/2022.
c. The Government will compete and award Task Orders based on the work described in SECTION C of this contract.
d. Ordering procedures are described in The TASK ORDER PROCEDURE Article in SECTION G of this contract.
ARTICLE B.3. OPTION PRICES
a. Unless the Government exercises its option pursuant to the option clause referenced in ARTICLE I.3. ADDITIONAL CONTRACT CLAUSES, or ARTICLE I.4.
ADDITIONAL FAR CONTRACT CLAUSES INCLUDED IN FULL TEXT, this contract consists only of the Base Period specified in the Statement of Work as defined in SECTIONS C and F, for the price set forth in ARTICLE B.2. of this contract.
b. Pursuant to FAR Clause 52.217-9 set forth in ARTICLE I.4. ADDITIONAL FAR CONTRACT CLAUSES INCLUDED IN FULL TEXT of this contract, the Government may, by unilateral contract modification, require the Contractor to perform the Option Period(s) specified in the Statement of Work as defined in SECTIONS C and F of this contract. If the Government exercises this/these option(s), notice must be given before the expiration date of the contract. Specific information regarding the time frame for this notice is set forth in the OPTION PROVISION Article in SECTION H of this contract. The total maximum amount as identified in ARTICLE B.2.
PRICES/COSTS, will not change, though the Contractor will be eligible for task order awards within that option period.
c. At the time of each option exercise, the Government will incorporate updated Wage Determinations as necessary. The Wage Determinations that will be used will be the most current Wage Determinations at the time of the option exercise. All future task order pricing will utilize the updated Wage Determinations. Any existing task orders with periods of performances that end after the option period begins will continue to use the Wage Determination that was included at the time of award of the individual task order.
ARTICLE B.4. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award.
- 6 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. DESCRIPTION-SPECIFICATION-WORKSTATEMENT-STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated 10/02/2015, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein shall be submitted in electronic format. The contractor shall provide weekly progress reports via email to the COR identified on the individual task order. If the contractor has multiple task orders, each individual task order will require a separate weekly progress report.
All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Helpful Resources."
All paper/hardcopy documents/reports submitted under this contract shall be printed or copied, double-sided, on at least 30 percent post-consumer fiber paper, whenever practicable, in accordance with FAR 4.302(b).
ARTICLE C.3. NIH LOCATIONS
Task orders under this contract will be performed at the NIH Research Triangle Park, NC location.
http://www.hhs.gov/web/508/index.html
- 7 -
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked, and shipped in accordance with Government specifications in the individual task orders. At a minimum for all task orders, all deliverables shall be marked with the contract number, task order number, project number, and contractor name. The contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
- 8 -
SECTION E - INSPECTION AND ACCEPTANCE
a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
b. For the purpose of this SECTION, The COR identified on the individual task order is the authorized representative of the Contracting Officer.
c. Inspection and acceptance will be performed at:
National Institutes of Health Research Triangle Park Campus 111 T.W. Alexander Drive Research Triangle Park, NC 27709 or At the location identified in the individual task order.
d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.
FAR Clause 52.246-12, Inspection of Construction (August 1996).
- 9 -
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
a. The period of performance of this contract shall be from 09/01/2017 through 08/31/2022.
b. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:
Option Option Period Option Year 1 09/01/2018 - 08/31/2019 Option Year 2 09/01/2019 - 08/31/2020 Option Year 3 09/01/2020 - 08/31/2021 Option Year 4 09/01/2021 - 08/31/2022
ARTICLE F.2. FAR 52.211-10 Commencement, Prosecution, and Completion of Work
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to
(a) commence work under this contract within seven (7) calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the completion date stated on the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/comp/far/index.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is not applicable to this contract.
52.242-17, Government Delay of Work (April 1984).
ARTICLE F.4. FAR 52.247-34 FOB Destination
F.O.B. Destination (Nov 1991)
(a) The term "f.o.b. destination," as used in this clause, means --http://www.acquisition.gov/comp/far/index.html
- 10 -
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight."
When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall --
(1)
(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of Clause)
- 11 -
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
will be identified on each individual task order.
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The alternate COR is responsible for carrying out the duties of the COR only in the event that the COR can no longer perform his/her duties as assigned.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; or (5) otherwise change any terms and conditions of this contract.
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, 352.237-75 (December 2015)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.
(End of Clause)
The following individuals are considered to be essential to the work being performed hereunder:
Name Title
Project Manager
Project Superintendent
ARTICLE G.3. ON-SITE CONTRACTOR ACCESS TO GOVERNMENT PROPERTY
The Contractor shall be held responsible for Government Property, regardless of dollar value, when:
The contract requires contractor personnel to be located on a Government site or installation;
The property utilized by contractor personnel is incidental to the place of performance; and, The property used by the contractor remains accountable to the Government
- 12 -
Responsibility includes physical presence, proper use and handling, normal maintenance, and reporting loss, damage or destruction.
Responsibility for government property shared by two or more contractors or located in space shared by two or more contractors, shall be determined and documented by the contractors involved. In cases where the parties cannot reach agreement on shared responsibility, the matter will be referred to the NIH Property Officer for resolution.
ARTICLE G.4. TASK ORDER PROCEDURE
This contract provides for the issuance of Task Orders on a negotiated basis as follows:
a. General
Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.
No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
b. Requesting Task Order Proposals.
The Contracting Officer or a designated official may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.
Generally, the TORFP will include, but is not limited to, the following:
1. Statement of Work;
2. Reporting Requirements and Deliverables (if applicable);
3. Proposal Due Date and how to deliver Proposals;
4. Period of Performance of Task Order;
5. Evaluation Factors for Award (if other than Price and Past Performance on previous task orders, with Price being more important than Past Performance)
All contract clauses contained in this contract shall be incorporated in the TORFP and the resultant task order. If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.
Contractors are not required to propose on all TORFPs. Those eligible Contractors that decide not to submit a proposal shall advise the Contracting Officer, in writing, of their intention not to submit a proposal on or before the closing date and time established in the TORFP. An election not to propose on a given TORFP will not negatively affect or prohibit a Contractor from competing on future TORFPs. While electing not to propose on an individual TORFP does not affect competing on future TORFPs, if a Contractor regularly chooses not to propose on task orders, that Contractor's next option period may not be exercised.
c. Competitive Ordering Process.
1. All Contractors will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of this contract unless otherwise specified in the proposed task order.
- 13 -
2. Contractors will be provided an adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part 16.
3. Price will be an evaluation criteria in all task orders. The Contractor will provide their best price for the individual task order in their initial proposal. There are no pre-established labor rates, etc. included within the contract. The Contractor will utilize the Task Order Pricing Template when providing their price for each individual task order. The Contractor shall provide the following for each line item identified on the Task Order Pricing Template: material quantity, units, unit cost and total cost; equipment total cost (and an explanation of what equipment will be utilized); direct labor hours, rates, and total dollars. Additionally, the Contractor shall include task order management hours, rates, and total dollars; overhead; G&A; Profit: and Bond cost on the Task Order Pricing Template. The Government will provide a Task Order Pricing Template for each task order with the TORFP filled in with the categories of work that are anticipated. If the Contractor identifies other categories of work that were not identified (other than administrative), the Contractor shall request clarification from the Government prior to submitting a proposal. If the category of work is to be subcontracted, the Contractor may be required to provide back-up documentation for that work. The back-up documentation will be the multiple quotations received by the offeror, or an explanation as to why there were not multiple quotations received. The Contractor is not required to provide the backup documentation for subcontractors unless it is requested by the Government during negotiations. (this evaluation criteria is applicable to all task orders).
4. The Government may include evaluation criteria in the TORFP other than price and past performance (e.g. Design-Build Task Order), the following includes a list of potential evaluation criteria (this list is not all encompassing):
• Understanding of the requirements;
• Experience and capability on similar tasks;
• Technical approach, methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies.
• Procedures for assuring quality of work, products, and deliverables;
• Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);
• Staffing plan with skill levels and level of effort for each individual proposed;
• References to evaluate past performance on previous contracts/task orders not awarded under the
MATOC
d. Evaluation and Award of Task Order Proposals
The Government will evaluate the Task Order proposals against the requirements of the TORFP.
Specifically, price, past performance on previous task orders, and any other factors specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, price will be more important than past performance. However, each TORFP will specify how the award decision will be made.
Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor whose proposal is most advantageous to the government
The Contracting Officer will notify all MATOC contractors of the selection decision in writing (via e-mail).
e. Fair Opportunity
- 14 -
1. In accordance with FAR 16.505(b)(1)(i), each awardee will be given a fair opportunity to be considered for each order issued over $3,000 unless the following exception(s) apply:
i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.
iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
iv. It is necessary to place an order to satisfy a minimum guarantee.
2. All awardees will be given a fair opportunity to be considered in accordance with the FAR as follows:
i. For orders exceeding $3,000 up to the simplified acquisition threshold, in accordance with FAR 16.505(b)(1)(ii);
ii. For orders exceeding the simplified acquisition threshold up to $5 Million, in accordance with 16.505(b)(1)(iii); and,
iii. For orders exceeding $5 Million, in accordance with FAR 16.505(b)(1)(iv).
ARTICLE G.5. EQUITABLE ADJUSTMENTS DUE TO CHANGES
a. The Contractor shall submit a proposal for all changes in the work within 10 days from the effective date of the change order or request for proposal. With each proposal for a change involving an increase or decrease in the amount of the contract, the Contractor shall submit separately an itemized breakdown that will include but not be limited to the following:
1. Material quantities and unit price. (Separated into trades)
2. Labor Costs (Separate into labor classifications and hourly rates)
3. Construction Equipment
4. Workmen's Compensation
5. Overhead
6. Profit
7. Employment taxes under FICA, FUTA and SUTA
8. Bond (Prime Contractor only)
9. Sales Tax
10. Direct Performance Time of Change
11. Impact on Schedule, if any.
12. Impact Costs, if any.
b. In considering proposals for changes involving added work, omitted work, or any combination thereof, estimates will be checked in detail by the NIH, utilizing unit prices where specified or agreed upon, with the view of arriving at equitable adjustments.
- 15 -
c. When the necessity to proceed with a change does not allow sufficient time to properly check a proposal, or because of failure to reach an agreement, NIH Contracting Officer may direct the Contractor to proceed immediately with the work.
d. Proposals and breakdown should be submitted as promptly as possible, but in no event later than 10 days.
e. All proposals shall be submitted in accordance with the requirements of FAR 15.8. Should a proposal cost exceed $700,000 for a change, certified cost or pricing data should be submitted on SF1411 in a format which satisfies the requirements of FAR 15.804-6. When certified cost or pricing data are required, the contractor shall submit an executed Certificate of Current Cost or Pricing Data as soon as practicable after price agreement is reached.
f. Allowable overhead, profit, and percentages are given at the end of this paragraph. These percentages shall be limited to three tiers only and shall be considered to include, but not limited to, all insurance other than FICA, FUTA, SUTA and Workmen's Compensation, field and office supervisors and assistants, use of small tools, incidental job burdens, and general office expense. Incidental job burdens include, but are not limited to, review and coordination, and estimating and expediting relative to contract changes that are associated with field and office supervision.
No percentages for overhead and profit shall be allowed on FICA, FUTA or SUTA. The percentages for overhead and profit to be allowed by NIH may vary according to the nature, extent, and complexity of work involved, but in no case shall exceed the following:
The percentages of overhead to be allowed by the Contracting Officer will be 10% for all contract changes performed by prime contractor personnel and 5% for all contract change work performed by subcontract personnel.
The percentage for profit to be allowed by NIH will vary according to the nature, risk, extent, and complexity of work involved, but in no case shall exceed 10%. Percentages for overhead and profit will be as follows:
Overhead Profit To subcontractors and/or to the Contractor for work performed with his own forces 10% 1% - 10%
To Contractor on work performed by other than his own forces... 5% 1% - 5%
The percentage of profit is to be negotiated. The burden is on the contractor to propose and justify to the Government the percentage of profit to be paid on each modification to the contract.
On proposals involving both increases and decreases in the amount of the contract, overhead and profit will be allowed on the net increases only. On net decreases, corresponding overhead and profit will be deducted.
When change proposals are not submitted with a Time Impact Analysis, it is mutually agreed that the particular change order, modification, delay or Contractor request does not require an extension of the contract time (or milestone).
g. The percentages in (f) above are the maximums that will be paid. The burden is on the contractor to propose and justify to Government the percentages paid on each modification to the contract.
h. Any proposal for delay and impact costs that is not submitted with 7 calendar days prior to the completion date identified on the individual task order will not be considered. This requirement is in addition to the scheduling updates required for construction of the project. If there are circumstances which prevent the contractor from ascertaining delay for impact during this time, a status update including, but not limited to, and explanation as to why the contractor cannot yet know the extent of the impact and a critical path analysis shall be submitted within
- 16 -this time and at 3 day intervals thereafter with the final proposal due date for any impact as close of business (COB) one business day prior to the completion date identified in the task order. If this is not done, a claim for delay will not be considered unless special circumstances are shown. This requirement is necessary to enable the Government to respond to any claims for delay in light of conditions then current and take any necessary action within the period of performance of the task order.
ARTICLE G.6. INVOICE SUBMISSION
a. Invoice Instructions for NIH Fixed-Price Type Contracts, NIH(RC)-2, are attached and made part of this contract.
The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
E-Mail: ORFOAInvoice3Way@mail.nih.gov
(Note: Do not send e-mail correspondence to this address)
Failure to send invoices to both addresses simultaneously may result in the invoice being delayed or rejected.
CHECKING THE STATUS OF INVOICES
Vendors may check the status of their invoice in the following ways:
- IPPCustomerSupport@fms.treas.gov (Registration is required)
- Call the Chief, Accounts Payable Section, OFM (301) 496-6088
HOW TO EMAIL IN THE INVOICE TO OFFICE OF ACQUISITIONS
NOTE: VENDORS MUST ALSO MAIL AN ORIGINAL TO THE OFFICE OF FINANCIAL
MANAGEMENT
1. Please scan your invoice along with the necessary backup documentation (not to exceed 30MB) as one single attachment.
2. Save your invoice attachment in the following format: YourVendorName_Invoice number (e.g., if your Vendor name is AE Construction Inc. and you are submitting Invoice 123456, Save your invoice attachment as 'AE Construction_Invoice 123456')
Note: Please do not use special characters such as (#$%*&!) when saving your attachment.
mailto:IPPCustomerSupport@fms.treas.gov
- 17 -
3. Send an email with your invoice attached (invoice and all supporting backup as one attachment) to our invoice processing email distribution mailbox: ORFOAInvoice3Way@mail.nih.gov In the subject line of your email, please use the same format 'YourVendorName_Invoice number'. (e.g., AE Construction_Invoice 12345)
4. You will receive an automated email reply confirming that our Invoice processing received your invoice for processing. If you do not receive an email notification within 24 hours, it indicates that we did not receive your invoice for processing. In which case double check (1) that your email contained the scanned attachment of your invoice and that (2) you sent it to our inbox at ORFOAInvoice3Way@mail.nih.gov. Only resend an invoice if you have not received an email confirmation within 24 hours. If you have any questions or concerns please call the Intake Center at 301-402-0878.
INVOICE REQUIREMENTS
1. Name and Address of the Vendor (use information from Line #7 of OF 347)
2. Name of the Office of Acquisitions (Office of Research Facilities)
3. Invoice Date
4. Unique Invoice Number which can only be used one time regardless of the number of contracts or orders held by an organization (or business unit identified by a separate DUNS or DUNS+4 number), regardless if the invoices are being issued out of separate locations
5. NIH contract award number and, if applicable, order number
6. Requisition Number, Line Item number
7. Vendor Identification Number (VIN)
8. Identify " 3- Way Match"
9. Contracting Officer's name
10. Project Officer's name
11. Description, quantity, unit of measure, unit price, and extended unit price of supplies or services.
Use the exact description from the contract, otherwise payment may be delayed or rejected
12. Name and mailing address for payment purposes. Use the ACH information on record.
13. Name, title, telephone number, and mailing address of person to be notified in the event of a defective invoice
14. DUNS number or DUNS+4 that identifies the Contractor's name and address exactly as stated on the face page of the contract.
15. Schedule of Values (for construction projects)
16. Work Request Number
17. Include other documents as required by contract
b. Inquiries regarding payment of invoices shall be directed to the designated billing office, (301) 496-6088.
- 18 -
ARTICLE G.7. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS
a. The Government encourages the contractor to pay small business subcontractors along an accelerated timetable to the maximum extent practicable. The Government recommends payment to small business subcontractors within 15 days of receipt of proper documentation.
b. Include the substance of this article, include this paragraph (b), in all subcontracts with small business concerns.
c. This policy does not modify the application or operation of the Prompt Payment.
ARTICLE G.8. GOVERNMENT PROPERTY
If this RFP will result in the acquisition or use of Government Property provided by the contracting agency or if the Contracting Officer authorizes in the preaward negotiation process, the acquisition of property (other than real property), this ARTICLE will include applicable provisions and incorporate the HHS Publication, entitled, "HHS Contracting Guide for Contract of Government Property," which can be found at:
http://www.hhs.gov/hhsmanuals/logisticsmanual/Appendix Q_HHS Contracting Guide.pdf.
Government Property will be addressed on individual task orders as applicable.
ARTICLE G.9. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
a. Contractor Performance Evaluations
Interim and final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The final performance evaluation will be prepared at the time of completion of work. In addition to the final evaluation, interim evaluation(s) will be prepared each year prior to exercising the option.
Interim and final evaluations will be provided to the Contractor as soon as practicable after completion of the evaluation. The Contractor will be permitted thirty days to review the document and to submit additional information or a rebutting statement. If agreement cannot be reached between the parties, the matter will be referred to an individual one level above the Contracting Officer, whose decision will be final.
Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
b. Electronic Access to Contractor Performance Evaluations
Contractors may access evaluations through a secure Web site for review and comment at the following address:
http://www.cpars.gov
c. Task Order Past Performance Evaluations
Task Orders valued at $650,000 or more will receive an evaluation in CPARs for that specific task order.
For task orders valued at less than $650,000:
- If a contractor believes that their performance on an individual task order should be documented as better than satisfactory then the contractor shall provide a written request via email, with applicable documentation, to the Contracting Officer (CO) and Contracting Officer's Technical Representative (COR) for the task order within 30 calendar days after contract completion date of the task order. The CO and COR will review the information and determine if the Government agrees with the assessment. If the Government does not agree with the assessment the Government will provide an explanation, along with documentation, within 30 calendar days after receipt of the written request. The contractor will then have 30 calendar days after receipt of the response from the Government to provide additional information and a response. After the http://www.hhs.gov/hhsmanuals/logisticsmanual/Appendix%20Q_HHS%20Contracting%20Guide.pdf http://www.cpars.gov
- 19 -receipt of the additional information, the CO will make a final determination. Based on the final determination by the CO, the file will be documented accordingly and the evaluation of the individual task order will be incorporated into the overall contract past performance in CPARS for the contractor.
- If the Government believes that the performance on an individual task order should be documented as less than satisfactory, then the COR shall provide a written request, with applicable documentation, to the Contracting Officer for review within 30 calendar days after contract completion date of the task order. If the CO concurs, the information will be provided to the contractor. The contractor shall have 30 calendar days to provide information which shows that the rating of less than satisfactory is not warranted or an explanation as to what happened on the particular task order along with what steps it has taken to ensure that the less than satisfactory performance will be corrected for future task orders. After the receipt of the additional information, the CO will make a final determination. Based on the final determination by the CO, the file will be documented accordingly and the evaluation of the individual task order will be incorporated into the overall contract past performance in CPARS for the contractor.
- If there is no request received by the contractor or the Government for an individual task order, the individual task order performance will be determined as Satisfactory for all areas.
The information pertaining to individual task order evaluations will be utilized by the Government when preparing the overall interim/final CPARs evaluation for the contract.
- 20 -
SECTION H - SPECIAL CONTRACT REQUIREMENTS
ARTICLE H.1. HUMAN SUBJECTS
It is hereby understood and agreed that research involving human subjects shall not be conducted under this contract, and that no material developed, modified, or delivered by or to the Government under this contract, or any subsequent modification of such material, will be used by the Contractor or made available by the Contractor for use by anyone other than the Government, for experimental or therapeutic use involving humans without the prior written approval of the Contracting Officer.
ARTICLE H.2. NEEDLE DISTRIBUTION
The Contractor shall not use contract funds to carry out any program of distributing sterile needles or syringes for the hypodermic injection of any illegal drug.
ARTICLE H.3. ACKNOWLEDGEMENT OF FEDERAL FUNDING
The Contractor shall clearly state, when issuing statements, press releases, requests for proposals, bid solicitations and other documents describing projects or programs funded in whole or in part with Federal money: (1) the percentage of the total costs of the program or project which will be financed with Federal money; (2) the dollar amount of Federal funds for the project or program; and (3) the percentage and dollar amount of the total costs of the project or program that will be financed by nongovernmental sources.
ARTICLE H.4. DISSEMINATION OF FALSE OR DELIBERATELY MISLEADING INFORMATION
The Contractor shall not use contract funds to disseminate information that is deliberately false or misleading.
ARTICLE H.5. OPTION PROVISION
Unless the Government exercises its option pursuant to the Option Clause set forth in ARTICLE I.3., the contract will consist only of the Base Period of the Statement of Work as defined in Sections C and F of the contract. Pursuant to FAR Clause 52.217-9, Option to Extend the Term of the Contract set forth in ARTICLE I.3. of this contract, the Government may, by unilateral contract modification, require the Contractor to perform additional options set forth in the Statement of Work and also defined in Sections C and F of the contract. If the Government exercises this option, notice must be given at least 30 days prior to the expiration date of this contract, and the price of the contract will be increased as set forth in the OPTION PRICES Article in SECTION B of this contract.
ARTICLE H.6. INFORMATION AND PHYSICAL ACCESS SECURITY
A. HHS-Controlled Facilities and Information Systems Security
a. To perform the work specified herein, Contractor personnel are expected to have routine (1) physical access to an HHS-controlled facility; (2) physical access to an HHS-controlled information system; (3) access to sensitive HHS data or information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
b. To gain routine physical access to an HHS-controlled information system, and/or access to sensitive data or information, the Contractor and its employees shall comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; Office of Management and Budget Memorandum (M-05-24); and Federal Information Processing Standards Publication (FIPS PUB) Number 201; and with the personal identity verification and investigations procedures contained in the following documents:
- 21 -
1. HHS Information Security Program Policy ( http://www.hhs.gov/read/irmpolicy/121504.html)
2. HHS Office of Security and Drug Testing, Personnel Security/Suitability Handbook, dated February 1, 2005 ( http://www.hhs.gov/ohr/manual/pssh.pdf)
3. HHS HSPD-12 Policy Document, v. 2.0 ( http://www.whitehouse.gov/sites/default/files/omb/assets/ omb/memoranda/fy2005/m05-24.pdf)
4. Information regarding background checks/badges ( http://idbadge.nih.gov/background/index.asp)
c. Position Sensitivity Levels:
This contract will entail the following position sensitivity levels:
[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).
[ ] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).
[X] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).
d. The personnel investigation procedures for Contractor personnel require that the Contractor prepare and submit background check/investigation forms based on the type of investigation required. The minimum Government investigation for a non-sensitive position is a National Agency Check and Inquiries (NACI) with fingerprinting. More restricted positions - i.e., those above non-sensitive, require more extensive documentation and investigation.
The Contractor shall submit a roster, by name, position, e-mail address, phone number and responsibility, of all staff (including subcontractor staff) working under the contract who will develop, have the ability to access and/or maintain a Federal Information System(s). The roster shall be submitted to the Contracting Officer's Representative (COR), with a copy to the Contracting Officer, within 14 calendar days after the effective date of the contract. The Contracting Officer shall notify the Contractor of the appropriate level of suitability investigations to be performed. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at: http://ocio.nih.gov/docs/public/Suitability-roster.xls.
Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.
All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract.
Contractors may begin work after the fingerprint check has been completed.
e. Investigations are expensive and may delay performance, regardless of the outcome of the investigation.
Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.
http://www.hhs.gov/read/irmpolicy/121504.html http://www.hhs.gov/ohr/manual/pssh.pdf http://www.whitehouse.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-24.pdf http://idbadge.nih.gov/background/index.asp http://ocio.nih.gov/docs/public/Suitability-roster.xls http://ocio.nih.gov/docs/public/Suitability-roster.xls
- 22 -
f. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).
g. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
h. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.
i. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.
ARTICLE H.7. ACCESS TO NATIONAL INSTITUTES OF HEALTH (NIH) ELECTRONIC MAIL
All Contractor staff that have access to and use of NIH electronic mail (e-mail) must identify themselves as contractors on all outgoing e-mail messages, including those that are sent in reply or are forwarded to another user. To best comply with this requirement, the Contractor staff shall set up an e-mail signature ("AutoSignature") or an electronic business card ("V-card") on each Contractor employee's computer system and/or Personal Digital Assistant (PDA) that will automatically display "Contractor" in the signature area of all e-mails sent.
ARTICLE H.8. TASK ORDER/DELIVERY ORDER CONTRACT OMBUDSMAN
In accordance with FAR 16.505(b)(5), the following individual has been designated as…