Statement of Work Task Order C104415
Building 105 Conference Room VAV Addition National Institute of Environmental Health Sciences
Research Triangle Park, NC COR: Kyle Hawkins
Date: October 12, 2016
This Scope of Work details requirements for a construction only project to provide and install a new variable air volume (VAV) terminal unit including all controls, piping and ductwork modifications. The Contractor is to provide all services for review of existing conditions; preparation of required submittals; and construction in accordance with this Statement of Work and contract requirements.
I. GENERAL:
A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functionality of the existing facility as required.
B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP).
C. The Contractor shall provide a Collateral Duty Safety Officer for execution of the work required in this task order.
D. The Contractor shall provide all project management personnel necessary per their approved task order specific quality control and safety plans to properly oversee the construction of this project. Project Manager, Quality Control Manager, and Superintendent roles may be performed by the same individual as deemed appropriate by the Contractor for this task order provided the designated personnel are qualified and meet the requirements set forth in the Contractor’s approved Site Specific Safety Plan and Site Specific Quality Control Plan. The Contractor shall provide for review and acceptance the resume and qualifications of any key personnel performing the tasks identified above that have not been previously approved by the Government.
E. The Contractor designated Quality Control Manager’s sole responsibility shall be the day-to-day on-site management and direction of the Quality Control Program. The Quality Control Manager shall not engage in the production of any work related project.
F. The attached submittal register (Attachment A) details the minimum number of items to be submitted for Government review and acceptance. The updated submittal register shall include submission dates coordinated with the construction schedule.
OCTOBER 12, 2016 2 of 4 7TTask Order C104415
The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package.
G. Within 10 calendar days of task order NTP the Contractor shall provide an updated submittal register and preliminary schedule for approval.
H. Within 20 calendar days of task order NTP the Contractor shall provide a detailed construction schedule identifying all major and minor features of work including all closeout documentation required in Section IV of this SOW. The schedule shall be updated and submitted with each pay request.
I. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun.
Planned periods of inactivity should be limited to a maximum of 5 consecutive working days. To avoid unexpected material delivery delays ALL material shall be on the job site or stored locally and readily available. A preparatory inspection may not be scheduled until the material is made available for inspection. No work shall be performed without a preparatory inspection.
II. CONSTRUCTION:
A. The Contractor shall construct the project in accordance with the 2008 NIH Design Requirements Manual for Biomedical Laboratories and Animal Research Facilities and in accordance with the FMB-RTP Engineering Standards and Material Requirements (Revision F).
B. The Contractor shall comply with the quality control requirements for construction in accordance with the Contractor’s Quality Control Plan and approved task order specific supplements.
C. The Contractor shall comply with the safety requirements for construction in accordance with the Contractor’s Accident Prevention Plan and approved task order specific supplements.
D. Work Restrictions: All work will need to be coordinated with the building operations contractor. Access will need to be maintained to employee lockers located in the breakroom during construction. Dust barriers shall be provided to keep any construction dust/debris from collecting on employee lockers during construction.
III. SCOPE OF WORK
OCTOBER 12, 2016 3 of 4 7TTask Order C104415
A. The Contractor shall provide and install one new variable air volume (VAV) terminal box with hot water re-heat to supply air to the Building 105 conference room. Refer to Attachment B for location and installation details. The Contractor shall appropriately size the VAV box for the airflow shown in Attachment B.
a. VAV terminal box shall be Enviro-Tec model SDR-WC to match existing VAV boxes. Boxes shall be selected with elastomeric closed-cell-foam insulation instead of standard fiberglass insulation.
B. The Contractor shall provide and install all hot water piping necessary to install the new VAV box according to attachment C.
C. The Contractor shall perform all ductwork modifications necessary to install the new VAV box as shown in attachment B. The Contractor shall provide new flex ductwork from the point of connection to new ductwork to the terminal devices above the breakroom.
D. The Contractor shall revise the existing building automation system (BAS) controls as necessary to install the new VAV box. The existing BAS is the Johnson Controls (JCI) Metasys platform. All install control devices and graphics modifications shall be compatible with this system and shall be installed by a technician qualified to perform work on the JCI Metasys platform. The existing BAS as-built drawings are provided as attachment D.
E. The Contractor shall provide and install all necessary cabling, conduit, and pneumatic tubing necessary to tie the new VAV box into the existing BAS.
F. The Contractor shall remove and replace the existing fiberglass pipe insulation on the chilled water line feeding the air handling unit above the breakroom. The new insulation shall be 1 ½” elastomeric closed cell foam insulation. Insulation shall be replaced from the interior wall of the breakroom to the ceiling decking above the breakroom.
G. Prior to the start of construction, the Contractor shall submit at minimum the material indicated on the attached submittal register (Attachment A) and in accordance with Specification 01 33 00: SUBMITTAL PROCEDURES.
H. All equipment shall have a warranty period of at least 1 calendar year(s) from the beneficial occupancy date.
IV. CLOSE-OUT REQUIREMENTS
A. In addition to standard requirements provided in the contract base specifications additional services are required for close-out and completion of this task order.
OCTOBER 12, 2016 4 of 4 7TTask Order C104415
B. New Equipment Data Worksheets: The Contractor shall complete the ‘New
Equipment Submission Worksheet Template’ (included as an attachment in the base contract) whenever new equipment is installed. This data will be used to replace or add new equipment to real property equipment lists and schedule preventative maintenance tasks. In addition, the contractor shall return to the Project Officer any existing equipment identification tags found on existing equipment so the equipment can be revised on real property equipment lists. New equipment identification tags will be issued to the Contractor for placement on the new equipment. Equipment tag checks will become part of the Pre-Final Inspection.
C. Operation and Maintenance Manuals. The Contractor shall provide 5 copies in hard copy format of Operation and Maintenance manuals for all the new equipment.
The hard copies shall be bound in a three-ring binder or other approved format. The Contractor shall also provide the Operation and Maintenance manuals in electronic format.
D. Tags for Warranted Equipment: The tag for equipment shall be provided in accordance with the referenced ‘FMB-RTP Engineering Standards and Material Requirements’ document.
E. Field Red-lines: The Contractor shall maintain a record of the changes that have occurred during construction via red pen corrections on the drawings included as part of the SOW. This in no way allows construction changes to the SOW. Personnel performing the redlining shall review and verify the changes with the NIH/ORF Contracting Officer’s Representative. A copy of the red-line drawings is to be submitted to the Contracting Officer’s Representative at or before the prefinal inspection.
F. Metasys: The Contractor shall update the Metasys graphics/user views. The Contractor shall provide .pdf files of as-builts, along with hard copies to be inserted in hard bound as-built sets. The Contractor shall update the NIEHS master as-built set on the NIEHS ADX server.
V. ATTACHMENTS
A. Submittal Register B. C104415 – 1610M101 – Mechanical Work Plan C. C104415 – 1610P101 – Plumbing Work Plan D. BAS As-Built Drawings E. FMB-NC Engineering Standards and Material Requirements (Revision F)
Attachment [#]
SECTION
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION OF ITEM SUBMITTED
- P R
E C
O N
S U
B M
IT
T
A
LS
- S H
O P
D R
A W
IN
G
S
- P R
O D
U C
T D
A T
A
- S A
M P
LE
S
- D E
S
IG
N D
A T
A
- T E
S T
R E
P O
R T
S
- C E
R T
IF
IC
A T
E S
- M F
R S
IN
S
T R
U C
T
IO
N S
- M F
R S
F
IE
LD
R
E P
O R
T
- O
M D
A T
A
- C
LO
S E
O U
T S
U B
M
IT
T A
LS
F
IO
F
O R
IN
F
O R
M A
T
IO
N O
N
LY
G A
G
O V
E R
N M
E N
T A
P P
R O
V E
D
D A
D
E S
IG
N
E R
O F
R E
C O
R D
A P
P R
O V
A L
D A
G
A
D T
R
D
IV
IS
IO
N O
F T
E C
H N
IC
A
L R
E S
O U
R C
E S
D R
D
E S
IG
N
E R
O F
R E
C O
R D
H S
B
H E
A
LT
H A
N D
S A
F E
T Y
O S
B
S E
C U
R
IT
Y
P O
P
R O
JE
C
T O
F F
IC
E
R
A E
A
R C
H
IT
E C
T
E N
G
IN
E E
R
Schedule X X X
Task Order QC Plan X X X
Task Order APP Supplement X X X
Activity Hazard Analysis X X X X
Schedule of Values X X X
Safety Data Sheets X X X X
VAV Box Equipment X X X
Duct Materials X X X X
Insulation X X X
Electrical Materials X X X
BAS Controls Drawings and Materials X X X
New Equipment Data Worksheet X X X
O&M Manuals X X X
Equipment Warranty Tag X X X Field Red-lines X X X
TITLE AND LOCATION
SUBMITTAL REGISTER FORM C104415
CONTRACT NUMBER TASK ORDER NUMBER
Building 105 Conference Room VAV Addition, NIEHS, RTP, NC
CLASSIFICATION REVIEWING OFFICETYPE OF SUBMITTAL
D
IN
R ai l
DIN Rail
21280127
Drawing Title
Joel MarshRobert ToddRyan Staton
Johnson Controls, Inc.
633-104 Hutton St.
Raleigh, NC 27606 Phone: 919-743-3500 Fax: 919-743-3591
RTU-VAV-105/HX-HTHW-105 PD
001.05
Project Title
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Panel Details
NIEHS Building 105 Office AHU Replacement Research Triangle Park, NC
2 Minor corrections. 02/16/12 TO
C A U T I O N
R E C E P T A C L E
I S
A L W A Y S
H O T
P S
-1
D
IN
R ai l
30.00
42.00
DIN Rail
FIRE-SR
1- 1/
2" W
IR
E
D U
C T
(L O
W V
O
LT
AG
E
30.00
42.00
A
PS-2
FE
CIOM
PS-3
FC
BUS+-R
FHLD ES
24 VAC
C O M H O T
NCE
1- 1/
2" W
IR
E
D U
C T
(L O
W V
O
LT
AG
E
15V
IN 1
ICOM 1
IN 2
ICOM 2
15V
IN 3
ICOM 3
IN 4
ICOM 4
15V
IN 5
ICOM 5
IN 6
ICOM 6
IN 7
ICOM 8
OUT 1
OCOM 1
OUT 2
OCOM 2
OUT 3
OCOM 3
OUT 4
OCOM 4
OUT 5
OCOM 5
OUT 6
OCOM 6
OUT 7
OCOM 7
OUT 8
OCOM 8
OUT 9
OCOM 9
FC/SA -
FC/SA COM
FC SHD SA PWR
FC/SA +
FC/SA -
FC/SA COM
24 VAC
24 VAC
24VAC COM
24VAC COM
FC/SA +
ICOM 7
IN 8
TB-IOM-1 1-1/2" WIRE DUCT (MIXED)
1-1/2" WIRE DUCT (MIXED)
1-1/2" WIRE DUCT
1-1/2" WIRE DUCT (MIXED)
1-1/2" WIRE DUCT
DIN RailMA-EP CLG-EP RHT-EP HWS-EP
CIRCUIT BREAKER
N G
H
PS-4
TB-1
DIS
B C
D E
F G
HIJ
K
L
M
N O P Q
R
Y
X
Z
S20ISO-1
TB-NCE
IN 11
ICOM 11
IN 12
ICOM 12
IN 13
ICOM 13
IN 14
ICOM 14
IN 15
ICOM 15
IN 16
ICOM 16
IN 17
ICOM 18
ICOM 17
IN 18
15V
IN 1
ICOM 1
IN 2
ICOM 2
15V
IN 3
ICOM 3
IN 4
ICOM 4
15V
IN 5
ICOM 5
IN 6
ICOM 6
IN 7
ICOM 8
ICOM 7
IN 8
15V
IN 9
ICOM 10
ICOM 9
IN 10
15V
OUT 1
OCOM 1
OUT 2
OCOM 2
OUT 3
OCOM 3
OUT 4
OCOM 4
OUT 5
OCOM 5
OUT 6
OCOM 6
OUT 7
OCOM 7
OUT 8
OCOM 8
OUT 9
OCOM 9
OUT 10
OCOM 10
OUT 11
OCOM 11
OUT 12
OCOM 12
OUT 13
OCOM 13
OUT 14
OCOM 14
OUT 15
OCOM 15
FC +
FC -
FC COM
24 VAC
24 VAC
24VAC COM
24VAC COM
SHD
SA PWR
FC +
FC -
FC COM
SA -
SA COM
SA +
NETGEAR SF-CR
PFILT-DPT
UP
DA-SPT
UP
CLL-SR
R-3
SR-SR
2" W
IR
E
D U
C T
(P N
EU
M
A
TI
C
1- 1/
2" W
IR
E
D U
C T
(H
IG
H V
O
LT
AG
E
S
T
U
V
WRF-CR
CLG-CR
SF-CR
AA
BB
Designation # Part Number Description Panel Devices:
PANEL 1 PAN-ENC3042WDP 30X42X9.25 ENCLOSURE SOLID DOOR PERFORATED SUB-PAN
DIS 1 MS-DIS1710-0 REMOTE MOUNT DISPLAY FOR FIELD EQUIPMENT CONTROLLE
MA-EP, CLG-EP,
RHT-EP, HWS-EP
4 EPC2G E-P, OVR, GAGE, NO BLEED, 0-5/0-10 (ACT)
IOM 1 MS-IOM4711-0 17 PT IOM W/ 6 UI 2 BI 3 BO 2 AO 4 CO 24 VAC AND S
NCE 1 MS-NCE2560-0 33-POINT, NETWORK CONTROL ENGINE, 32 MS/TP DEVICE
SYS-RESET-LOCAL,
SYS-STOP-LOCAL,
SYS-START-LOCAL
3 MP130B10 PB, oi l tight, momentary, 1NO, black (ABB)
RF-STS-PL,
SF-STS-PL
2 CL502G PL, oi l tight, 24VAC, LED, green (ABB)
SYS-ALARM-PL 1 CL502R PL, oi l tight, 24VAC, LED, red (ABB)
PS-1 1 PAN-PWRSP PANEL POWER SUPPLY 96VA
PS-2, 3 2 PAN-96VAXFR-U PANEL TRANSFORMER KIT-UL
PS-4 1 PS5R-A24 Power supply, 24VDC, 7.5W, DIN (IDEC)
4 RH2B-UAC24-L DPDT,10A,HC=24 VAC,
4 SH2B-05 DPDT RELAY BASE FOR RH2B
G 1 G-2010-11 AIR GAGE"0-30#/0-200KPA
ISO 1 PV607-2 Isolation va lve, 1/8x1/8NPT, 200ps i (Kele)
2 BAM END STOP
1 FEM6 END PLATE
25 M4/6 TERMINAL BLOCKN, 6MM
2 BAM END STOP
1 FEM6 END PLATE
48 M4/6 TERMINAL BLOCKN, 6MM
2 BAM END STOP
1 FEM6 END PLATE
81 M4/6 TERMINAL BLOCKN, 6MM
Bill of Materials
FIRE-SR, CLL-SR,
R-3, SR-SR
TB-1
TB-IOM
TB-NCE
Tag ID Width Height Background
Color Letter Color
Line 1 Line 2
Tag ID Width Height Background
Color Letter Color
Line 1 Line 2
O 1 1/2 Black White CLG-EP P 1 1/2 Black White RHT-EP
B 3 1 Black White SYS-START Q 1 1/2 Black White HWS-EP C 3 1 Black White SYS-STOP R 1 1/2 Black White FIRE-SR D 3 1 Black White SF RUN STATUS S 1 1/2 Black White CLL-SR E 3 1 Black White RF RUN STATUS T 1 1/2 Black White R-3 F 3 1 Black White SYS-ALARM U 1 1/2 Black White SR-SR G 3 1 Black White SYS-RESET V 1 1/2 Black White SF-CR H 1 1/2 Black White PS-1 W 1 1/2 Black White RF-CR I 1 1/2 Black White PS-2 X 1 1/2 Black White TB-1 J 1 1/2 Black White PS-3 Y 1 1/2 Black White TB-NCE-1 K 1 1/2 Black White NCE Z 1 1/2 Black White TB-IOM-1 L 1 1/2 Black White IOM AA 1 1/2 Black White CLG-CR M 1 1/2 Black White PS-4 BB 1 1/2 Black White SF-CR N 1 1/2 Black White MA-EP
C:\Project\2012\21280127\[Panel Labels.xlsx]
NCE-105-01, RTU-105-VAV, & 105-HWS
SERVING OFFICES & BREAKROOM
WhiteBlack25A
BLDG-SP
UP
21280127
Drawing Title
Joel MarshRobert ToddRyan Staton
Johnson Controls, Inc.
633-104 Hutton St.
Raleigh, NC 27606 Phone: 919-743-3500 Fax: 919-743-3591
REFERENCE DRAWING
RTU-VAV-105/HX-HTHW-105 PS
001.06
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Point Schedule
NIEHS Building 105 Office AHU Replacement Research Triangle Park, NC
Connection Description Alarm Report Delay Low Limit High Limit Normal State Priority
RTU-105-VAV.AHU-OP-STATE --- AHU OPERATIONAL STATE --- --- --- --- ---
RTU-105-VAV.BLDG-SP-STPT --- BUILDING STATIC PRESSURE SETPOINT --- --- --- --- --- RTU-105-VAV.CLG-COIL-TMP-STPT --- COOLING COIL TEMPERATURE SETPOINT --- --- --- --- ---
RTU-105-VAV.CLG-CTRL-STS --- COOLING CONTROL STATUS --- --- --- --- ---
RTU-105-VAV.CLG-VLV-FLUSH-POS --- COOLING VALVE FLUSH POSITION --- --- --- --- --- RTU-105-VAV.DA-SP-STPT --- DISCHARGE AIR STATIC PRESSURE SETPOINT --- --- --- --- ---
RTU-105-VAV.ECON-DIS-TEMP --- ECONOMIZER DISABLE TEMP --- --- --- --- ---
RTU-105-VAV.ECON-ENA-TEMP --- ECONOMIZER ENABLE TEMP --- --- --- --- ---
RTU-105-VAV.ECON-MODE --- ECONOMIZER MODE --- --- --- --- ---
RTU-105-VAV.ECON-STS --- ECONOMIZER STATUS --- --- --- --- ---
RTU-105-VAV.MAD-OP-STATE --- MIXED AIR DAMPER OPERATIONAL STATE --- --- --- --- ---
RTU-105-VAV.MAD-RAMPRATE --- MIXED AIR DAMPER RAMP RATE --- --- --- --- ---
RTU-105-VAV.MA-TMP-STPT --- MIXED AIR TEMPERATURE SETPOINT --- --- --- --- ---
RTU-105-VAV.OA-DPR-MIN-POS --- OUTSIDE AIR DAMPER MINIMUM POSITION --- --- --- --- ---
RTU-105-VAV.OCC-OVERRIDE --- OCCUPANCY OVERRIDE --- --- --- --- ---
RTU-105-VAV.OCC-SCHEDULE --- OCCUPANCY SCHEDULE --- --- --- --- ---
RTU-105-VAV.RA-HUM-STPT --- RETURN AIR HUMIDITY SETPOINT --- --- --- --- ---
RTU-105-VAV.RF-ALARM --- RETURN FAN ALARM 10 --- --- Normal 70 RTU-105-VAV.RF-ALARM-REF-DEL --- RETURN FAN ALARM REFERENCE DELAY --- --- --- --- --- RTU-105-VAV.RHT-COIL-TMP-STPT --- REHEAT COIL TEMPERATURE SETPOINT --- --- --- --- ---
RTU-105-VAV.RHT-OP-STS --- REHEAT OPERATIONAL STATUS --- --- --- --- ---
RTU-105-VAV.RHT-VLV-FLUSH-POS --- REHEAT VALVE FLUSH POSITION --- --- --- --- --- RTU-105-VAV.RTU-HOA-ALARM --- ROOF TOP UNIT IS IN HAND ALARM 10 --- --- Normal 70 RTU-105-VAV.SF-ALARM --- SUPPLY FAN ALARM 10 --- --- Normal 70 RTU-105-VAV.SF-ALARM-REF-DEL --- SUPPLY FAN ALARM REFERENCE DELAY --- --- --- --- --- RTU-105-VAV.SYS-RESET --- SYSTEM ALARM, LOCAL START/STOP RESET --- --- --- --- ---
RTU-105-VAV.TUNING-RESET --- APPLICATION TUNING RESET --- --- --- --- ---
RTU-105-VAV.UNIT-ENABLE --- UNIT ENABLE COMMAND --- --- --- --- ---
RTU-105-VAV.UNOCC-CLG-STPT --- UNOCCUPIED COOLING SETPOINT --- --- --- --- ---
RTU-105-VAV.UNOCC-HTG-STPT --- UNOCCUPIED HEATING SETPOINT --- --- --- --- ---
RTU-105-VAV.UNOCC-SAT-TIME --- UNOCCUPIED MINIMUM SATISFIED TIME --- --- --- --- ---
RTU-105-VAV.UNOCC-STS --- UNOCC STATUS --- --- --- --- ---
RTU-105-VAV.UNOCC-TMP-DIFF --- UNOCC TEMPERATURE DIFFERENTIAL --- --- --- --- ---
RTU-105-VAV.VAV-1-RM-TMP --- P114-116 ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-2-RM-TMP --- P101 ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-3-RM-TMP --- P103-104 ROOM TEMPERATURE --- --- --- --- ---
Connection Description Alarm Report Delay Low Limit High Limit Normal State Priority
RTU-105-VAV.VAV-4-RM-TMP --- P107-109 ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-5-RM-TMP --- P105 ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-6-RM-TMP --- P106-106A ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-7-RM-TMP --- P119 ROOM TEMPERATURE --- --- --- --- ---
RTU-105-VAV.VAV-OCC-BROADCAST --- VAV OCCUPANCY BROADCAST --- --- --- --- ---
RTU-105-VAV.MA-DPR AO OUT12 MIXED AIR DAMPER --- --- --- --- ---
RTU-105-VAV.SF-VFD-OUT AO OUT13 SUPPLY FAN OUTPUT --- --- --- --- ---
RTU-105-VAV.RF-VFD-OUT AO OUT14 RETURN FAN OUTPUT --- --- --- --- ---
RTU-105-VAV.CLG-VLV AO OUT15 COOLING VALVE --- --- --- --- ---
RTU-105-VAV.RHT-VLV AO OUT9 REHEAT VALVE --- --- --- --- ---
RTU-105-VAV.SF-STS BI IN11 SUPPLY FAN STATUS 0 --- --- On 70 RTU-105-VAV.RF-STS BI IN12 RETURN FAN STATUS 0 --- --- On 70 RTU-105-VAV.CLG-P-STS BI IN13 COOLING PUMP STATUS 10 --- --- On 70 RTU-105-VAV.SYS-RESET-LOCAL BI IN14 SYSTEM ALARM RESET FROM PANEL --- --- --- --- --- RTU-105-VAV.CLL-STS BI IN15 COIL LOW LIMIT STATUS 10 --- --- Normal 70 RTU-105-VAV.105-AREA-FIRE BI IN16 DISCHARGE AIR SMOKE ALARM 10 --- --- Normal 70
RTU-105-VAV.SYS-START-LOCAL BI IN17 SYSTEM START FROM PANEL --- --- --- --- ---
RTU-105-VAV.SYS-STOP-LOCAL BI IN18 SYSTEM STOP FROM PANEL --- --- --- --- ---
RTU-105-VAV.SF-SS BO OUT1 SUPPLY FAN COMMAND --- --- --- --- ---
RTU-105-VAV.RF-SS BO OUT2 RETURN FAN COMMAND --- --- --- --- ---
RTU-105-VAV.CLG-P-SS BO OUT3 COOLING PUMP COMMAND (ALWAYS ON) --- --- --- --- ---
RTU-105-VAV.SYS-ALARM-PL BO OUT4 SYSTEM ALARM PILOT LIGHT --- --- --- --- ---
RTU-105-VAV.SF-STS-PL BO OUT5 SUPPLY FAN STATUS PILOT LIGHT --- --- --- --- ---
RTU-105-VAV.RF-STS-PL BO OUT6 RETURN FAN STATUS PILOT LIGHT --- --- --- --- ---
RTU-105-VAV.DA-TMP UI IN1 DISCHARGE AIR TEMPERATURE 300 72 --- 70
RTU-105-VAV.OA-TMP UI IN10 OUTSIDE AIR TEMPERATURE --- --- --- --- ---
RTU-105-VAV.RA-TMP UI IN2 RETURN AIR TEMPERATURE --- --- --- --- ---
RTU-105-VAV.MA-TMP UI IN3 MIXED AIR TEMPERATURE 30 45 --- 70
RTU-105-VAV.CLG-COIL-TMP UI IN4 COOLING COIL TEMPERATURE 600 40 70 --- 70
RTU-105-VAV.DA-SP UI IN5 DISCHARGE AIR STATIC PRESSURE 600 0.5 5 --- 70
TU-105-VFD.BLDG-SP UI IN5 BUILDING STATIC PRESSURE 0 1 --- 70
RTU-105-VAV.DA-HUM UI IN6 DISCHARGE AIR HUMIDITY --- --- --- --- ---
RTU-105-VAV.PRE-FILTER-DP UI IN7 PREFILTER DIFFERENTIAL PRESSURE 60 1.5 --- 70
RTU-105-VAV.RA-HUM UI IN8 RETURN AIR HUMIDITY 0 70 --- 70
RTU-105-VAV.RHT-COIL-TMP UI IN9 REHEAT COIL TEMPERATURE 0 40 70 --- 70
Item System Service Qty. Code Number Valve Family Configuration Fail Position
Inlet Pipe Size (in)
Valve Size
(in) Medium
Flow (gpm or lbs/hr)
Design Delta P
(psi)
Valve Delta P
(psi)
Design Coefficient
(Cv)
Valve Coefficient
(Cv)
Design Close Off
(psi)
Valve Close Off
(psi) Trim Material Connection Code Number Actuator Control 1 RTU-1 Cooling 1 VG7842RT+823E01 Globe Valve 3-Way Normal Position 2 1-1/2 Water 44.60 5.0 2.4 20.0 28.9 36.0 58.0 Brass Threaded MP823E001 (Pilot) 9-13psi (63-91kPa) PROP 2 RTU-1 Heating 1 VG7842LT+3008D Globe Valve 3-Way Normal Position 1-1/4 3/4 Water 10.60 5.0 2.1 4.7 7.3 30.0 41.0 Brass Threaded V-3000-8011 4-8psi (28-56kPa) PROP 3 HX-1 High Temp HW 1 MK78TP-100-CS/PTTSCNH5B5R500R0E Globe Valve 2-Way Valve Closed 1-1/4 1 Water 13.00 5.0 5.0 11.5 5.4 400.0 450.0 Stainless Steel Flanged M55 3-15psi PROP 4 VAV-1 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 3.90 5.0 4.2 1.7 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP 5 VAV-2 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 1.80 5.0 0.9 0.8 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP 6 VAV-3 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 1.00 5.0 0.3 0.4 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP 7 VAV-4 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 2.70 5.0 2.0 1.2 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP 8 VAV-5 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 1.00 5.0 0.3 0.4 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP 9 VAV-6 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 2.60 5.0 1.8 1.1 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP
10 VAV-7 Reheat 1 VG1841AE+923GGA Ball Valve 3-Way Normal Position 3/4 1/2 Water 1.30 5.0 0.5 0.6 1.9 30.0 200.0 Brass Threaded VA9203-GGA-2Z 0-10VDC PROP
Valve Information
Comments
Actuator InformationTag
Sele ct
21280127
Drawing Title
Joel MarshRobert ToddRyan Staton
Johnson Controls, Inc.
633-104 Hutton St.
Raleigh, NC 27606 Phone: 919-743-3500 Fax: 919-743-3591
REFERENCE DRAWING
RTU-VAV-105/HX-HTHW-105 VS
001.07
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Schedule - Damper & Valves
NIEHS Building 105 Office AHU Replacement Research Triangle Park, NC
Code Number Diameter or
W (in) H (in) Diameter or
W (in.) H (in.) Area (ft²) 1 RTU-1 Outside Air 1 Furnished with unit Rectangular Opposed Normally Closed 48 15 48 15 5.00 1 D-4073-1 8-13psi (56-91kPa) PROP Yes 2 RTU-1 Relief Air 1 Existing damper Rectangular Opposed Normally Closed 34 16 34 16 3.78 1 D-4073-1 8-13psi (56-91kPa) PROP Yes 3 RTU-1 Return Air 1 Existing damper Rectangular Opposed Normally Open 34 16 34 16 3.78 1 D-4073-2 8-13psi (56-91kPa) PROP Yes
Field Mtd
ActuatorBlade/Frame Type Code No.
Damper InformationTag
Service TypeSystem CommentsShape/Blade Fail Position
Duct Size
Actuator Information
Actuator ControlItem Qty.
Damper Size
Bearing/SealsQty.
Se lect
ZN-TMP
SA ADD(199)
Discharge Air from Air Handling Unit
N C
VMA
DA-TMP
DA-VP
NON-FAN POWERED VAV BOXES WITH REHEAT
24VAC
sourced from RTU-
VAV-105 control panel PS-2 and 3.
ON
Address:
See Room Schedule
+15
IN
ICOM
U N
IVE
R
S A
L
SA PWR
COM
FC EOL
SA
BU
S
IN
SHLD
COM
FC
BU
S
OUT1
OCOM1
OUT2
OCOM2
OUT3
OCOM3
B
IN
AR
Y
OUT4
OCOM4
OUT5
OCOM5
C O
N
FI
G U
R
AB
LE
HOT
COM
HI
(Red)
LO
SE
N
S O
R
MANUAL
OVERRIDE
THE END OF LINE SWITCHIS
SET ON VAV-1.
PNEUMATIC TUBING
(DIFFERENTIAL PRESSURE)
DA-VP FOR SUP-FLOW
21280127
Drawing Title
Joel MarshRobert ToddRyan Staton
Johnson Controls, Inc.
633-104 Hutton St.
Raleigh, NC 27606 Phone: 919-743-3500 Fax: 919-743-3591
REFERENCE DRAWING
Terminal Unit Flow Diagram
002.01
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VAV with Reheat and Setpoint
[VAV RH SP]
NIEHS Building 105 Office AHU Replacement Research Triangle Park, NC
All sensors have local display and setpoint capability.
5 FT
Min.
TO NEXT
DEVICE
FROM LAST
DEVICE
MS/TP
MS/TP
DA-TMP
HWS
HWR
NO
CN C
H C
HTG-O
V+
V-
24V
C
HTG-VLV
10Vdc
ZN-Tmp Sensor
FC Bus FC Bus
SA Bus
Power sourced from RTU-VAV-105 control panel.
3 or 4 VAV boxes per 96VA transformer.
ZN-T #6/22,T
DA-TMP #2/18,T/S
HTG-O #4/22,T
PWR #2/16
B i l l o f M a t e r i a l
T a g Q u a n t i t y P a r t N o D e s c r i p t i o n
Fi el d Devi ces:
DA-T 7 T E-635GV-2 DUCT PROBE T EM PERAT URE SENSOR, 1K PLAT INUM SENS
HT G-O 7 HT G-O Val ve - See Val ve Schedul e
VM A 7 M S-VM A1620-0 VAV CT RL/ ACT / DP.HT G.FAN
ZN-T W/ SP 7 CBLNET WORKB100 Networ k sensor cabl e, Cat3, 100f t (Ani xter )
7 NS-BT B7001-0 T EM P, WALL, 3" X4.5" . SET PT , M OD JACK. DISPLAY
Sequence of Operation
VAV Flow Control: The unit shall maintain zone set-points by controlling the airflow through one of the following:
1. Occupied:
a. When the zone temperature is 1 deg F (adj.) greater than the set-point(T-STAT-STPT), the zone damper shall modulate between the minimum occupied airflow (OCC-MIN-FLOW- STPT adj.) and the maximum cooling airflow (OCC-MAX-FLOW-STPT adj.) until the zone is satisfied.
b. When the zone temperature is between the plus or minus 1 deg F (adj) from the set-point, the zone damper shall maintain the minimum required zone ventilation (adj.).
c. When the zone temperature is 1 deg F (adj.) less than the set-point, the controller shall modulate open the reheat control valve to maintain a leaving air temperature of 95 deg F (adj.). On a continued fall in zone temperature, the zone damper shall modulate between the minimum airflow (adj.) and the maximum airflow while maintaining a leaving air temperature of (DA-TMP) 95 deg F (adj.) until the zone is satisfied.
2. Unoccupied:
a. When the zone is unoccupied the zone damper shall control to its minimum unoccupied airflow (adj.).
b. When the zone temperature is 1 deg F (adj.) greater than the setpoint, the zone damper shall modulate between the minimum unoccupied airflow (UNOCC-MIN-FLOW-STPT adj.)
and the maximum cooling airflow (UNOCC-MAX-FLOW-STPT adj.) until the zone is satisfied.
c. When the zone temperature is 1 deg F (adj.) less than the set-point, the controller shall modulate open the reheat control valve to maintain a leaving air temperature of 95 deg F (adj.). On a continued fall in zone temperature, the zone damper shall modulate between the minimum airflow (adj.) and the maximum airflow while maintaining a leaving air temperature of 95 deg F (adj.) until the zone is satisfied.
3. Discharge Air Temperature: The controller shall monitor the discharge air temperature.
21280127
Drawing Title
Joel MarshRobert ToddRyan Staton
Johnson Controls, Inc.
633-104 Hutton St.
Raleigh, NC 27606 Phone: 919-743-3500 Fax: 919-743-3591
REFERENCE DRAWING
Terminal Unit Point Schedule
002.02
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
[VAV RH SP]
NIEHS Building 105 Office AHU Replacement Research Triangle Park, NC
DETAIL NS101 NET STAT WITH PHONE JACK
FIXED ADDRESS=199
CONTROLLER
SENSOR PLUG
SENSOR 6-Pin
PHONE PLUG
(JACK J1)
CABLE WITH AN RJ-12 CONNECTOR
ON EACH END
61 61
Terminal 1 is to the extreme left as you face the Jack opening, Tab Notch down.
J1
J2
J1
JACK J2 IS FOR
COMMISIONING TOOLS.
THERMOSTAT CIRCUIT BOARD
DETAIL V131 TEMPERATURE SENSOR INPUT
RTD
Temperature Element
IN#
ICOM#
VMA16xx
DETAIL V250 0 (2)-10VDC OUTPUT to M9104-
GGA-2S AND VA9104-GGA-2S
24VAC Com
Add Jumper from 24VAC Com to only one OCOM# per Transformer
24VAC Hot
VMA16xx
OUT#
OCOM#
2 Red
1 Black
3 Gray
Factory Set
DA, 0-10V
Mode
In DA mode, a minimum control signal drives the actuator to the full Counterclockwise (CCW) position, and a maximum control signal drives the actuator to the full Clockwise (CW) position. For Reverse Acting (RA) operation, a minimum control signal drives the actuator to the full CW position and a maximum signal drives the actuator to the full CCW position.
To change the factory settings (DA, 0-10 V), remove the actuator cover and adjust the switches on the circuit board
DC 2-10V+ RA
DC 0-10VDA +
Y
Connection Description Alarm Report Delay Low Limit High Limit Normal State Priority
EICM-SUP-BOX-RHT-ENA --- REHEAT IS AVAILABLE --- --- --- --- ---
EICM-SUP-BOX-RHT-FLUSH-POS --- REHEAT FLUSH POSITION --- --- --- --- ---
EICM-T-STAT-OCC-MODE --- OCCUPANCY STATUS DISPLAY --- --- --- --- ---
OCC-CLG MAX FLOW --- OCCUPIED COOLING MAXIMUM FLOW --- --- --- --- ---
OCC-CLG MIN FLOW --- OCCUPIED COOLING MINIMUM FLOW --- --- --- --- ---
OCC-OVERRIDE --- OCCUPANCY OVERRIDE --- --- --- --- ---
OCC-SCHEDULE --- OCCUPANCY SCHEDULE --- --- --- --- ---
SUP-BOX-AUTOCAL-SS --- SUPPLY BOX AUTOCALIBRATE START STOP --- --- --- --- ---
SUP-BOX-AUTOCAL-STS --- SUPPLY BOX AUTOCAL STATUS --- --- --- --- ---
SUP-BOX-DA-TMP-STPT --- SUPPLY BOX DISCHARGE AIR TEMP SETPOINT --- --- --- --- ---
SUP-BOX-FLOW --- SUPPLY BOX FLOW --- --- --- --- ---
SUP-BOX-FLOW-STPT --- SUPPLY BOX FLOW SETPOINT --- --- --- --- ---
SUP-BOX-MODE --- SUPPLY BOX SYSTEM MODE --- --- --- --- ---
SUP-BOX-OCC-STS --- SUPPLY BOX OCCUPANCY STATUS --- --- --- --- ---
SUP-BOX-STATE --- SUPPLY BOX OPERATIONAL STATE --- --- --- --- ---
SUP-BOX-TUNING-RESET --- SUPPLY BOX TUNING RESET --- --- --- --- ---
T-STAT-STPT --- ZONE TEMP SETPOINT --- --- --- --- ---
SUP-BOX-DPR-OUT BO1-Int,BO2-Int SUPPLY BOX DAMPER --- --- --- --- ---
SUP-BOX-RHT-VLV CO OUT4 SUPPLY BOX REHEAT VALVE --- --- --- --- ---
T-STAT NetSensor ZONE TEMPERATURE 10 67 77 --- 70
SUP-BOX-DA-TMP UI IN1 SUPPLY BOX DISCHARGE AIR TEMPERATURE --- --- --- --- ---
| Statement of Work - C104415 (1) |
| 7TTask Order C104415 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The Contractor shall provide a Collateral Duty Safety Officer for execution of the work required in this task order. |
| D. The Contractor shall provide all project management personnel necessary per their approved task order specific quality control and safety plans to properly oversee the construction of this project. Project Manager, Quality Control Manager, and Sup... |
| E. The Contractor designated Quality Control Manager’s sole responsibility shall be the day-to-day on-site management and direction of the Quality Control Program. The Quality Control Manager shall not engage in the production of any work related pro... |
| F. The attached submittal register (Attachment A) details the minimum number of items to be submitted for Government review and acceptance. The updated submittal register shall include submission dates coordinated with the construction schedule. The... |
| G. Within 10 calendar days of task order NTP the Contractor shall provide an updated submittal register and preliminary schedule for approval. |
| H. Within 20 calendar days of task order NTP the Contractor shall provide a detailed construction schedule identifying all major and minor features of work including all closeout documentation required in Section IV of this SOW. The schedule shall be... |
| I. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2008 NIH Design Requirements Manual for Biomedical Laboratories and Animal Research Facilities and in accordance with the FMB-RTP Engineering Standards and Material Requirements (Rev... |
| B. The Contractor shall comply with the quality control requirements for construction in accordance with the Contractor’s Quality Control Plan and approved task order specific supplements. |
| C. The Contractor shall comply with the safety requirements for construction in accordance with the Contractor’s Accident Prevention Plan and approved task order specific supplements. |
| D. Work Restrictions: All work will need to be coordinated with the building operations contractor. Access will need to be maintained to employee lockers located in the breakroom during construction. Dust barriers shall be provided to keep any cons... |
| III. SCOPE OF WORK |
| A. The Contractor shall provide and install one new variable air volume (VAV) terminal box with hot water re-heat to supply air to the Building 105 conference room. Refer to Attachment B for location and installation details. The Contractor shall ap... |
| a. VAV terminal box shall be Enviro-Tec model SDR-WC to match existing VAV boxes. Boxes shall be selected with elastomeric closed-cell-foam insulation instead of standard fiberglass insulation. |
| B. The Contractor shall provide and install all hot water piping necessary to install the new VAV box according to attachment C. |
| C. The Contractor shall perform all ductwork modifications necessary to install the new VAV box as shown in attachment B. The Contractor shall provide new flex ductwork from the point of connection to new ductwork to the terminal devices above the br... |
| D. The Contractor shall revise the existing building automation system (BAS) controls as necessary to install the new VAV box. The existing BAS is the Johnson Controls (JCI) Metasys platform. All install control devices and graphics modifications sh... |
| E. The Contractor shall provide and install all necessary cabling, conduit, and pneumatic tubing necessary to tie the new VAV box into the existing BAS. |
| F. The Contractor shall remove and replace the existing fiberglass pipe insulation on the chilled water line feeding the air handling unit above the breakroom. The new insulation shall be 1 ½” elastomeric closed cell foam insulation. Insulation shal... |
| G. Prior to the start of construction, the Contractor shall submit at minimum the material indicated on the attached submittal register (Attachment A) and in accordance with Specification 01 33 00: SUBMITTAL PROCEDURES. |
| H. All equipment shall have a warranty period of at least 1 calendar year(s) from the beneficial occupancy date. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. In addition to standard requirements provided in the contract base specifications additional services are required for close-out and completion of this task order. |
| B. New Equipment Data Worksheets: The Contractor shall complete the ‘New Equipment Submission Worksheet Template’ (included as an attachment in the base contract) whenever new equipment is installed. This data will be used to replace or add new equi... |
| C. Operation and Maintenance Manuals. The Contractor shall provide 5 copies in hard copy format of Operation and Maintenance manuals for all the new equipment. The hard copies shall be bound in a three-ring binder or other approved format. The Contrac... |
| D. Tags for Warranted Equipment: The tag for equipment shall be provided in accordance with the referenced ‘FMB-RTP Engineering Standards and Material Requirements’ document. |
| E. Field Red-lines: The Contractor shall maintain a record of the changes that have occurred during construction via red pen corrections on the drawings included as part of the SOW. This in no way allows construction changes to the SOW. Personnel pe... |
| F. Metasys: The Contractor shall update the Metasys graphics/user views. The Contractor shall provide .pdf files of as-builts, along with hard copies to be inserted in hard bound as-built sets. The Contractor shall update the NIEHS master as-built set... |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. C104415 – 1610M101 – Mechanical Work Plan |
| C. C104415 – 1610P101 – Plumbing Work Plan |
| D. BAS As-Built Drawings |
| E. FMB-NC Engineering Standards and Material Requirements (Revision F) |
| Attachment A - C104415 Submittal Register |
| Sheet1 |
| Drawings - C104415 |
| Attachment B - C104415 - 1610M101 |
| Attachment C - C104415 - 1610P101 |
| Attachment D - BAS As-Built Drawings |