Attachment_2_-_FMB-RTP_ESMR-_Revision_F.pdf
PDF 4 MB Posted
- Attached to
- Multiple Award Task Order Contract
- Solicitation number
- NIHOF2016102
About this file
Attachment 2 - FMB-RTP ESMR - Rev F
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Research Facilities
Facilities Management Branch-RTP
Engineering Standards and Material Requirements
Revision F
April 19, 2016
FMB-RTP ENGINEERING STANDARDS AND MATERIAL REQUIREMENTS REVISION E
4-19-2016 Page 2
REVISION/CHANGE RECORD
CHANGE
NO. DATE DESCRIPTION/TOPICS AFFECTED
Revision F 4/11/2016
• Use of wood in facility
• Caulking in Animal Areas
• F-Module ceiling painting standard
• Non-Animal Area laboratory flooring standard updated
• Use of Manual Dampers on dual duct and VAV terminal units
• BSC ductwork type updated
• Use of stainless steel duct in Humidification systems
• Means of providing maintenance removal of motors and equipment over 50lbs
• Threaded rod and pipe hanger lengths
• Insulated piping labeling standard updated
• Various updated in the BAS section to include updating the Alarm
Notification table
• GPR standard updated
• Location of eyewashes in laboratories updated
• Used of stainless steel emergency showers
• Hydro connection most commonly ½” connection
• Electrical (Normal & Emergency) and Data Raceway standard
• Size of panels and use of Main breakers
• Appendix B: Fume Hood Testing Criteria
• Appendix C: BSC Installation Standard
• Appendix D: Control Panel Lights & Buttons
• Appendix E: Electrical Labeling Standard
Revision E 5/28/2015
• AutoCAD Version (2015)
• Four additional layers on common base layer name list
• Laboratory water purification (Hydro) requirements and details
• Sink material requirement 316 stainless steel
• Details on emergency eyewash installation location
• Details on laboratory gas turret spacing
• Use of fume hood base cabinets restricted to corrosion-resistant lined steel casework
• Fume hood utilities limited to vacuum only
• Dimensions for laboratory casework peninsulas
• Dimensions for reagent shelving length
• Numerous NIEHS specific requirements for casework
• Figures for communications outlets
• Figure for quad and communications outlets under desk
• Interior and exterior painting standard and Fed. Std. paint colors
• Figure for ceiling penetration locations for air distribution
• Various BAS section clarifications including Figure for information required on inside of control equipment panel
• Ethernet color coding table
4-19-2016 Page 3
• Standard ceiling opening locations for air distribution
• Typical laboratory raceway labeling
• Training is required for non-standard equipment installations
Revision D
8/6/2014
• Complete revision of the document; therefore changes were not tracked. Title was changed to FMB-RTP Engineering Standards and Material Requirements.
Revision C 12/9/2013 • Modified pressure gauge and thermometer specifications.
• Modified pipe and valve labeling standard.
Revision B 6/24/2013 • Added clarification on drawing standards and added new 6-port telecommunication outlet installation specifications.
Revision A 5/21/2013
• Changed logo on title sheet
• Included labeling requirements
• Corrected drawing sheet sizes
• Removed drawing standards that no longer apply
• Added sash lock and ventilation requirements to fume hood standard
• Included exceptions for piping used for Hydro connections and
Everpure filter systems
• Added color coding requirements for BAS
Basic 7/12/2012 • FMB-RTP basic release of site specific changes and additions to the NIH Design Requirements Manual.
*Note: Minor typos, clarifications, and changes not captured in revision log.*
4-19-2016 Page 4
TABLE OF CONTENTS
SECTION PAGE
SECTION 1: ADMINISTRATION
SECTION 1-1: PLAN OF THE MANUAL
SECTION 1-12: SPECIAL REQUIREMENTS & PROCEDURES
SECTION 3: CIVIL ENGINEERING & SITE DEVELOPMENT
SECTION 3-2: SITE UTILITIES
SECTION 3-3: SITE IMPROVEMENTS
SECTION 4: ARCHITECTURE
SECTION 4-1: GENERAL ARCHITECTURE
SECTION 4-2: EXTERIOR ARCHITECTURAL ELEMENTS
SECTION 4-3: INTERIOR ARCHITECTURAL ELEMENTS
SECTION 4-4: INTERIOR FINISHES
SECTION 4-5: CASEWORK AND EQUIPMENT
SECTION 6: HVAC
SECTION 6-1: HVAC PERFORMANCE CONSIDERATIONS
SECTION 6-2: AIR-HANDLING SYSTEMS
SECTION 6-3: PIPING SYSTEMS
SECTION 7: BUILDING AUTOMATION SYSTEM
SECTION 7-0: BAS AT NIEHS
SECTION 8: PLUMBING
SECTION 8-1 PLUMBING PERFORMANCE CONSIDERATIONS
SECTION 8-2 PLUMBING FIXTURES
SECTION 8-3 WATER SYSTEMS
SECTION 8-4: HIGH PURITY WATER SYSTEMS
SECTION 8-6: DRAINAGE SYSTEMS
SECTION 8-7: BUILDING STORM DRAINAGE SYSTEMS
SECTION 8-8: COMPRESSED-GAS SYSTEMS
SECTION 8-9: CENTRAL VACUUM
SECTION 8-10: NATURAL GAS/FUEL GAS SYSTEMS
SECTION 9: FIRE PROTECTION
SECTION 9-1: FIRE PROTECTION PERFORMANCE CONSIDERATIONS
SECTION 9-2: FIRE SUPPRESSION SYSTEMS
SECTION 9-3: FIRE PROTECTIVE SIGNALING SYSTEMS
SECTION 10: ELECTRICAL
SECTION 10-2: SITE ELECTRICAL
SECTION 10-3: NORMAL POWER
SECTION 10-5: EMERGENCY POWER
SECTION 10-6: POWER QUALITY
SECTION 10-7: WIRING METHODS AND OTHER REQUIREMENTS
SECTION 10-8: LIGHTING
SECTION 11: TELECOMMUNICATIONS
SECTION 11-2: TELECOMMUNICATIONS/LAN CLOSET/ROOM CONSTRUCTION CRITERIA
SECTION 11-3: CABLE MANAGEMENT
SECTION 11-4: SITE UTILITY STRUCTURES
SECTION 11-5: AUDIO VISUAL (AV) REQUIREMENTS
4-19-2016 Page 5
SECTION 11-6: ANTENNA, COMMUNICATIONS DEVICES & MISCELLANEOUS REQUIREMENTS
APPENDIX A STANDARD LABORATORY PLANS AND ELEVATIONS
USING THE STANDARD LABORATORY PLANS AND ELEVATIONS
STANDARD LABORATORY EXAMPLE
FREQUENTLY ASKED QUESTIONS (AND ANSWERS) ABOUT BUILDING 101 LABORATORIES
STANDARD LABORATORY PLANS AND ELEVATIONS
SCIENTIFIC EQUIPMENT PURCHASE GUIDELINES
APPENDIX B STANDARD FUME HOOD SPECIFICATION
APPENDIX C BSC INSTALLATION STANDARD
APPENDIX D CONTROL PANELS STANDARD LIGHTS AND BUTTONS
APPENDIX E ELECTRICAL EQUIPMENT NAMING AND LABELING
ABBREVIATIONS
ELECTRICAL EQUIPMENT NAMING:
ELECTRICAL EQUIPMENT LABELING:
LABEL TYPES AND EXAMPLES:
LIST OF FIGURES
Figure 1: Drawing Title Block Example Figure 2: A - Drawing File Path Example Figure 3: B - Drawing Information/Sheet Number Example Figure 4: C - Title Example Figure 5: D - Contractor And Building Information Example Figure 6: E - Revision Block Example Figure 7: F - Seal Block Example Figure 8: G - Logo Block Example Figure 9: Typical 6 Foot Fume Hood Detail Figure 10: Standard Ceiling Opening Locations foR Air Distribution Figure 11: Example Warranted Equipment Tag Figure 12: Domestic Cold Water Pipe Labeling Example Figure 13: Example Controller Label Figure 14: Information for Control Equipment Panel Figure 15: Example Sensor Label Figure 16: Typical Graphic Example for AHU-VAV-A0 Figure 17: Typical Graphic Example for A009 Figure 18: Typical Animal AHU Temperature Userview Example for C012 Figure 19: Typical Dual Duct Lab Supply AHU Userview Example for AHU-DD-C-L-1 Figure 20: Typical Lab Auxiliary AHU Userview Example for AUX-DD-CL-1 Figure 21: Typical Lab Exhaust AHU Userview Example for EF-DD-C-L-1 Figure 22: Typical Variable Frequency Drive Userview Example for Building 101, Module B Basement Radiator System Pump 1 Figure 23: Typical Laboratory Userview Example for Laboratory C126 Figure 24: Typical Animal Room Userview Example for Animal Room C012 Figure 25: Typical Environmental Room Userview Example for Bld 101, Module C, 4th Floor
4-19-2016 Page 6
Figure 26: Typical Animal Room Supply AHU Userview Example for AHU-TRH-C-AN-1 Figure 27: Typical Animal Room Exhaust Fan Userview Example for EF-C-AN-1 & EF-C-AN-S 107 Figure 28: Typical VAV Air Handling Unit Userview Example for AHU-VAV-A-AD-1 Figure 29: Penetration Locations for Standard Utilities Figure 30: Hydro Ball Valve Requirements Figure 31: Hydro Quad Receptacle Requirements Figure 32: Typical Electrical Distribution Single Line ..................... Error! Bookmark not defined.
Figure 33: Typical Laboratory Raceway Labeling Figure 34: Typical Laboratory Raceway Junction Box .................... Error! Bookmark not defined.
Figure 35: Example MCC Identification Figure 36: Example 6-Port Communications Outlet Figure 37: Quad Receptacles and Communications in Peninsula Desks Figure 38: Single Module Laboratory Plan Figure 39: Double Module Laboratory Plan Figure 40: Triple Module Laboratory Plan Figure 41: Quad Module Laboratory Plan Figure 42: Standard Laboratory Elevation – A Figure 43: Standard Laboratory Elevation – B Figure 44: Standard Laboratory Elevation – C Figure 45: Standard Laboratory Elevation – D Figure 46: Standard Laboratory Elevation – E Figure 47: Standard Laboratory Elevation – F ............................... Error! Bookmark not defined.
Figure 48: Standard Laboratory Elevation – G Figure 49: Standard Laboratory Elevation – H ............................... Error! Bookmark not defined.
Figure 50: Typical Stock Casework Examples
LIST OF TABLES
Table 1: Discipline and Description of Detail Requirements Table 2: Discipline Designators & Modifiers Table 3: General Layer Categories Table 4: Contour Layer Assignments Table 5: Text Height: Decimal Table 6: Text Height: English Table 7: Text Height: Arch. Scale Table 8: Common Base Layer Name List Table 9: APWA Uniform Color Code Table 10: Abbreviated Summary of Approved Materials for Utility Service Table 11: Exhibit X4-2-A DRM Sealant Table Table 12: Building101, 595C Paint Colors and Locations Table 13: Building102, 595C Paint Colors and Locations Table 14: Building103, 595C Paint Colors and Locations Table 15: Building104, 595C Paint Colors and Locations Table 16: Building105, 595C Paint Colors and Locations
4-19-2016 Page 7
Table 17: Building106, 595C Paint Colors and Locations Table 18: Building107, 595C Paint Colors and Locations Table 19: Building108, 595C Paint Colors and Locations Table 20: Building109, 595C Paint Colors and Locations Table 21: Gate Entrance, 595C Paint Colors and Locations Table 22: Traffic Circle, 595C Paint Colors and Locations Table 23: Fed. Std. 595C Color Samples Table 24: Exhibit X6-2-B Minimum Duct Construction Standards Table 25: Duct Seal and Leakage Classes Table 26: Pipe Stencil and Marking Sizes Table 27: Federal Standard Number 595 Colors Table 28: Exhibit X6-3-A Pipe Service, Service Designation, Color Code, Material, Fittings and Joints Table 29: Exhibit X6-3-B Pipe Material Type Designation and Material Specifications Table 30: Exhibit X6-3-C Pipe Fitting Type and Fitting Specification Table 31: Exhibit X6-3-D Pipe joint Type Designation and Joint Specifications Table 32: Exhibit X6-4-A Pipe Insulation Material and Specifications Table 33: Exhibit X6-4-B Piping insulation Minimum Thickness Table 34: Insulation Thickness for Cold Equipment Table 35: Insulation Thickness for Hot Equipment Table 36: Insulation Thickness and Density for Supply and Outdoor Air Ductwork Table 37: Alarm Type, Report Delay, Priority, and Distribution Table 38: Point Labeling Standards for Analog Inputs (AI) Table 39: Point Labeling Standards for Analog Outputs (AO) Table 40: Point Labeling Standards for Binary Inputs (BI) Table 41: Point Labeling Standards for Binary Outputs (BO) Table 42: Point Labeling Standards for Calculated Values (AV or MO) Table 43: Exhibit X8-3-B Water Distribution System Pipe Sizing Table 44: Exhibit X8-6-A Minimum Waste Piping Diameters Table 45: Exhibit X8-6-C Condensate Line Sizing Table 46: Distribution Panel Sizing Table 47: Color Coding for Wire Insulation Table 48: Color Coding for Junction Box Cover Table 49: Lighting Level Requirements Table 50: Ethernet Color Coding
4-19-2016 Page 8
SECTION 1: ADMINISTRATION
SECTION 1-1: PLAN OF THE MANUAL
1-1-00
A. Manual Organization
The intent of this document is to summarize important minimum materials requirements as mandated by the NIH Design Requirements Manual (DRM) and to incorporate site-specific requirements for construction of new facilities as well as improvements, alterations, and major repairs to existing facilities on the NIEHS campus. The organization of this document is intended to mirror that of the DRM. Not all sections and/or subsections from the DRM have been included in this document; but they are still requirements. Tables, figures, paragraphs, and lines of text with a vertical revision line in the left margin indicate a site-specific requirement that differs from the NIH DRM.
There is a revision line to the left of this paragraph. Double underline indicates text that is new to this revision (figures and tables will not be underlined.)
The NIH DRM can be found online at:
http://orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilitiesDesi gnPoliciesandGuidelines/Pages/DesignRequirementsManualPDF.aspx
The Facilities Management Branch-Research Triangle Park (FMB-RTP) Engineering Standards and Material Requirements reflect and document the minimum standards and material requirements for construction and design work at the National Institute of Environmental Health Sciences, Research Triangle Park, North Carolina (NIEHS, RTP, NC) campus. The work of both construction and design contractors shall adhere to this document. Contractors are encouraged to propose superior or alternate materials or methods; however, all deviations must be pre-approved by National Institutes of Health/Office of Research Facilities (NIH/ORF) and shall be considered a variance.
Contractors shall comply with the latest issues of all construction codes, ordinances, and standards (federal, state, local, etc.) which govern and have jurisdiction. If conflicts occur in the requirements established by these publications, the most stringent shall govern. All federal, state, and local requirements apply. Contractors shall, without additional expense to the Government, be responsible for obtaining any necessary approvals of plans and specifications from state, county, and city authorities (such as fire marshal, building inspectors, etc.) in connection with the development of construction permits and licenses.
The appendix of this document provides supplemental guidelines and information for contractors and customers involved with laboratory renovations. The intent of the appendix is not to mirror the appendix of the DRM.
E. Effective Date This manual is effective May 28, 2014 or date on which it is added to contract documents.
http://orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilitiesDesignPoliciesandGuidelines/Pages/DesignRequirementsManualPDF.aspx http://orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilitiesDesignPoliciesandGuidelines/Pages/DesignRequirementsManualPDF.aspx
4-19-2016 Page 9
SECTION 1-12: SPECIAL REQUIREMENTS & PROCEDURES
1-12-00 A. CAD Drawings
1. General. Construction drawings shall convey to contractor, manufacturer, or fabricator the information necessary for accomplishing the required work. It is essential that the drawings be accurate and explicit. All elements of work shall be properly coordinated to ensure that there are no conflicts between disciplines on drawings or in specifications. They are also used to avoid duplication of information on the drawings and in the specifications.
a. The information shown on the drawings must be sufficient for satisfactory completion of the project.
b. Permanent survey control points, showing station grid coordinates, shall be shown on the drawings for all new construction on NIEHS property. Where possible, building column lines shall be shown.
c. The Contractor shall utilize the standard drawing border provided by the Government. All sheets shall have the standard drawing border.
d. When applicable, complete finish, door, and fixture schedules shall be included on the drawings.
e. Do not combine disciplines on drawings. There shall be only one discipline on one sheet, except on very small jobs where approved and directed by the Government.
f. Final design drawings shall be signed, sealed, and dated.
g. The contractor shall comply with the latest issues of all construction codes, ordinances, and standards (Federal, state, local, etc.) which govern and have jurisdiction. If conflicts occur in the requirements established by these publications, the most stringent shall govern. The current jurisdictional status of NIEHS government-owned or leased facilities is “proprietorial”, not exclusive. All federal, state, and local requirements apply.
2. Order of Drawings. The main purpose of the recommended sequence for the drawing sheets is to provide a simple logical guide for assembling graphic components. This system is designed to be flexible to compensate for differences in both project complexity and size. The sequence of the sheets is to align with the order of construction and go from a general to detailed level of design description.
3. Hardcopy sheet order. The hard copy drawing sheets for a project shall follow the organization shown below. Depending on the size and scope of a drawing set, drawing sets may be numbered and bound in a single set or by subsets. All subsets may not apply or more detailed groupings may be required depending on the scope, size, and complexity of the project.
Drawings shall be arranged in the following order:
4-19-2016 Page 10
A. General (G) (title sheet/ index of drawings/ symbols and abbreviations).
B. Civil (C) (plot and/or vicinity plans and utility plans).
C. Landscape (L).
D. Architectural (A) (including interior design).
E. Structural (S) (including foundation plan).
F. Fire Protection (F).
G. Plumbing (P).
H. Mechanical (M) (such as heating, ventilation, and air-conditioning).
I. Electrical (E).
4. Drawing File Names. Drawing files shall be named by the following eight character conventions. First two characters shall be the last two digits of the year in which the project is created, the second two digits shall be the project drawing number assigned by the COR, the next character shall be the discipline (i.e. A-Architectural, E-Electrical, C-Civil, P-Plumbing, M-Mechanical), and the last three characters shall be the sheet number.
Project Drawing No. Discipline Sheet No.
4 Characters 1 Character 3 Characters
EXAMPLE:
1234 M 001
PROJECT # (TO BE ASSIGNED BY NIH COR), MECHANICAL, SHEET 1
5. Scale. All site plans, plot plans, floor plans, contour maps, and other drawings of this type shall be drawn to scale. Actual drawing scale will be determined at plot and by the initial drawing setup. Use standard engineering/architectural scales in all cases. Scales shall be selected so that the drawing provides the most detailed and decipherable drawing graphic possible. All floor plans shall have a graphic scale and a north arrow.
6. Text Height Defaults. Text height defaults are based on scale. Table 5: Text Height: Decimal, Table 6: Text Height: English, Table 7: Text Height: Arch. Scale indicates the default text height for each scale available for each of the disciplines. These values also represent NIH’s text height requirements for notes, dimension text, etc.
7. Format. In addition to the signed PDF files; electronic files shall be provided that are directly readable by the AutoCAD 2015 without conversion. Before a file is placed on the delivery media the following steps shall be performed, if applicable:
a. Remove all extraneous graphics and drawing entities existing outside the drawing border.
b. Zoom the drawing to the extents of the drawing area.
c. Ensure that no external reference files (X-Refs) or non-AutoCAD software packages are referenced in the drawing or required for viewing/editing.
d. Ensure that the only font type used in the drawing is ARIAL.SHX.
e. Ensure that the drawing can be plotted using the extents plot routine without the need for additional manipulation. This includes maintaining the
4-19-2016 Page 11 layer state used in all submitted plots. Consequently, there shall be a separate drawing file for every plotted sheet submitted for the project.
f. Include any standard sheets (i.e., abbreviation sheets, standard symbol sheets, etc.) necessary for a complete project.
g. Ensure that the file names comply with the eight-character file naming requirements outlined in this manual.
h. Disks may contain compressed or zipped files only if they are self-extracting in nature. Otherwise, only AutoCAD drawings in *.dwg format will be accepted. Similarly, a single file cannot be spanned across multiple disks unless it is self-extracting.
8. Delivery Media. The preferred type of delivery media for data exchange depends both on the hardware/software platforms utilized in creating a drawing/data file and the size of the file. Generally, digital data sets larger than 9 megabytes (MB) should be furnished via compact disk-read only memory (CD-ROM) or DVD.
9. External Label. When exchanging digital media, an external label shall contain, at a minimum, the following information:
a. Format and version (e.g., Microsoft Windows XP) of the operating system on which the media was created and the software used to create it (e.g.
AutoCAD 2016).
b. The sequence number in the following format:
Disk N of T where N = disk sequence number and T= the total number of disks.
c. The project description, project number (contract number and task order number), construction request number, COR, and date.
10. Transmittal Sheet. A transmittal sheet shall accompany the media containing, at a minimum, the following information:
a. The same information included on the external label of each CD and the file names and descriptions for each file.
b. The instructions for restoring/transferring the files from the media, if required.
c. Certification that the delivery media is free of known computer viruses.
11. Drawing Sizes. Full drawing sheet size for FMB-RTP is 24” x 36”, unless otherwise specified by the Contracting Officer’s Representative (COR). Where a larger sheet size is desirable, 30” x 42” is available, but approval must be obtained from the COR. Typical A/E projects (contract documents) will be prepared on 24” x 36” size sheets, with 11” x 17” available for half size drawings and 8½” x 11” allowable with COR permission.
12. Project Title. Use the project title provided by the COR.
13. Title Block. Use the NIH, FMB-RTP Standard title blocks provided by the COR.
Fill out per descriptions and figures below. These have been standardized with the local standard layers. Where Johnson Controls, Inc. drawings are included
4-19-2016 Page 12 for reference only by the designer in a project, drawings shall be included in the drawing set and with the NIH, FMB-RTP standard title block. Use of up to two Johnson Controls, Inc. drawings per full size sheet is allowed as long as text and figures are legible at half size.
FIGURE 1: DRAWING TITLE BLOCK EXAMPLE
A. DRAWING FILE PATH. Dynamically updated complete file paths of the drawing location shall be included on the side of the drawing outline.
FIGURE 2: A - DRAWING FILE PATH EXAMPLE
4-19-2016 Page 13
B. DRAWING INFORMATION. The initials of the designer, the drawer, and the checker shall be listed in capital letters. The file name of the individual drawing file shall be listed next to “FILE NAME”. The drawing number/discipline/sheet number convention described previously shall be used on all drawings in the “DRAWING NO.” section. The total sheet number shall be the total number of drawings for all sections.
FIGURE 3: B - DRAWING INFORMATION/SHEET NUMBER EXAMPLE
C. TITLES. The “PROJECT TITLE” shall be listed as it appears on the contract award document. The “DRAWING TITLE” shall be a title that uniquly describes the information on the current sheet and shall not be repeated for other drawing sheets. The titles shall be aligned to the left.
FIGURE 4: C - TITLE EXAMPLE
4-19-2016 Page 14
D. CONTRACTOR AND BUILDING INFORMATION. The information shall be filled in, where applicable, for each line of text. The text shall be aligned to the left. Where the prompt does not apply to a project, fill in “N/A”. ‘CONS.
WORK’ refers to the consultant’s internal project number. ‘WRK REQ.
NO.’ refers to the construction request number provided in the project statement of work.
FIGURE 5: D - CONTRACTOR AND BUILDING INFORMATION EXAMPLE
4-19-2016 Page 15
E. REVISION BLOCK. As revisions to a drawing sheet occur, revisions shall be marked both in the central part of the drawing and in the revision block.
The mark letter shall increase in alphebetical order for pre-construction drawings. The mark number shall increase in numerical order starting at 1 for revisions after construction. Once construction drawings are issued, all pre-construction revisions are deleted in the revision block.
FIGURE 6: E - REVISION BLOCK EXAMPLE
F. SEAL BLOCK. Final drawings shall be signed and sealed. Where more than one seal is required on a sheet, the logo space may be used. The license number and name must be clearly legible. The firm license number shall be provided where required by the Board.
FIGURE 7: F - SEAL BLOCK EXAMPLE
4-19-2016 Page 16
G. LOGO BLOCK. This space may be used for prime and sub contractor logos.
FIGURE 8: G - LOGO BLOCK EXAMPLE
14. Line Characteristics. Although monotone line work is not contractually improper, drawings employing varied line widths substantially improve their readability.
Most commercial CAD plotters provide an extensive variety of line widths.
A. Color: One reason to use color in CAD drawings is to improve the clarity of the drawing on a computer monitor. However, in AutoCAD applications, color is also used to delineate individual layers and/or define the line thicknesses of drawing elements on the final (plotted) drawing sheet.
Note: For this standard, specific colors and line widths are assigned (standardized) to individual layers and shall not be changed for the master electronic as-builts.
15. Conventions and Symbols. Conventions and symbols must be clearly identified on the drawings and consistently used throughout.
16. Lettering. NIH/NIEHS uses AutoCAD’s Arial font as the standard text font for all basic text entities on a contract drawing. No other font type is permitted on a contract drawing. The Arial font provides the maximum readability and transportability of text entities between CAD drawings.
A. Plotting. Printers and plotters are controlled by files called pen tables or feature tables. These files (tables) convert line thicknesses in an electronic file to line thicknesses on a paper drawing. Properly apply the pen tables based on the printer/plotter used to produce high quality drawings.
17. Layering. NIH/NIEHS uses a modified Construction Specifications Institute (CSI) Master Format for assigning layers in CAD drawings. Refer to Table 8: Common Base Layer Name List to see a list of layers. A layer script file and layer linetype file can be provided upon request. These layers are the only ones that shall be used in the master electronic as-built files.
4-19-2016 Page 17
18. Ownership. The Government, for itself and such others as it deems appropriate, will have unlimited rights to all information and materials furnished to the government and documentation thereof, reports and listings, and all other items pertaining to the work and services pursuant to this agreement including any copyright. Unlimited rights under this contract are rights to use, duplicate, or disclose data, and information, in whole or in part in any manner and for any purpose whatsoever without compensation to or approval from the Contractor.
The Government will at all reasonable times have the right to inspect the work and will have access to and the right to inspect the work and will have access to and the right to make copies of the above-mentioned items. All digital files and data, and other items generated under this contract, shall become the property of the Government.
19. As-Built Drawing Procedure. The As-Built Drawing Procedure contains the steps that a contractor must perform when adding to or editing the master electronic drawings for the NIEHS facility located in Research Triangle Park, NC as a part of a project. A contractor must make these changes when a project affects architectural, mechanical, electrical, etc. aspects of the NIEHS facility so that the drawings stay up-to-date and changes from various projects are incorporated into a single master electronic drawing.
A. Contractor Requests Current Drawings.
This step is appropriate when the contractor has made substantial progress in the project and is ready to integrate the project changes with the master electronic drawings. The contractor is to contact the Contracting Officer’s Representative (COR) for the project drawings. The contractor must specify which Building/Module/Floor location(s) is required for the changes and which project number/description the modifications are for. The contractor may not use drawings provided for design for this purpose, as the file has likely been updated.
B. Contractor Receives Current Drawings.
The COR will reply to a request for current electronic drawings by emailing the files to the contractor. These electronic files have been standardized so that the number and property of AutoCAD layer names, layer colors, linetypes, and layer descriptions remain constant (Table 8: Common Base Layer Name List). Note that the plot colors may vary from the electronic CAD file colors. Once the COR sends a contractor a file, no other contractors will have access to that file until the modifications are complete and determined to be accurate.
C. Contractor Makes Modifications to Drawings.
The contractor can now edit the drawings to integrate the project changes.
Integrate all architectural, mechanical, electrical, plumbing, fire protection, structural etc. changes and additions into the file. Also, remove any objects that were demolished as part of the project. The contractor may only use the existing layers/linetypes and may not delete any layers from the drawings. If a contractor has a question regarding which layer to put an item on, he/she must contact the PO. In instances where an object has a corresponding NIEHS standard block (ex. duct accessories or electrical
4-19-2016 Page 18 symbols), the matching NIEHS standard block must be used. The contractor may not make any changes unrelated to the project specified in the request. The contractor may not leave any trace of referenced files (xrefs) in the drawing. Verify the electronic as-built match field conditions.
Save the file in AutoCAD 2013 format. Use the original file name for submitted files.
D. Send to COR.
The contractor can now send the electronic drawings to the COR through email (or CD if necessary). The contractor must include which Building/Module/Floor location(s) they are attaching and the project number/description.
E. COR Will Review Drawings.
The COR will now review the drawings for accuracy. The COR will reject the files if they find any errors, omissions, or standardization changes. The contractor will then need to address or make changes for any inaccuracies.
F. COR Will Accept Drawings.
The COR will notify the contractor once the electronic submissions are acceptable.
20. Level of Detail for Master Electronic As-Builts. The master electronic asbuilts shall document details of additions or alterations to the facility. See Table 1 for guidance.
4-19-2016 Page 19
TABLE 1: DISCIPLINE AND DESCRIPTION OF DETAIL REQUIREMENTS
4-19-2016 Page 20
TABLE 2: DISCIPLINE DESIGNATORS & MODIFIERS
DESIGNATION DISCIPLINE
G - GENERAL
C - CIVIL/SITE
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURAL
I - INTERIORS
F - FIRE PROTECTION
P - PLUMBING/PIPING
M - MECHANICAL HVAC
E - ELECTRICAL
TABLE 3: GENERAL LAYER CATEGORIES
LAYER NUMBER Category
00000 CONTOUR (NON-CSI)
01000 FIELD ENGINEERING
02000 SITEWORK
03000 CONCRETE
04000 MASONRY
05000 METALS
06000 WOOD & PLASTICS
07000 THERMAL & MOISTURE PROTECTION
08000 DOORS & WINDOWS
09000 FINISHES
10000 SPECIALTIES
11000 EQUIPMENT
12000 FURNITURE
13000 SPECIAL CONSTRUCTION
14000 CONVEYING SYSTEMS
15000 MECHANICAL
16000 ELECTRICAL
20000 REFERENCE
TABLE 4: CONTOUR LAYER ASSIGNMENTS
LAYER ELEVATION
00001 ELEVATIONS ONLY DIVISIBLE BY 1.0
00002 ELEVATIONS DIVISIBLE BY 2.0
00005 ELEVATIONS DIVISIBLE BY 5.0
00010 ELEVATIONS DIVISIBLE BY 10.0
4-19-2016 Page 21
TABLE 5: TEXT HEIGHT: DECIMAL
DECIMAL SCALE DEFAULT TEXT HEIGHT
1X 0.1 2X 0.2 4X 0.4 8X 0.8 12X 1.2 16X 1.6 24X 2.4 32X 3.2 48X 4.8 64X 6.4 96X 9.6 128X 12.8 192X 19.2 256X 25.6
TABLE 6: TEXT HEIGHT: ENGLISH
ENGLISH SCALE TEXT HEIGHT
1"=5’ 0’ 6" 1"=10’ 1’ 0" 1"=20’ 2’ 0" 1"=30’ 3’ 0" 1"=40’ 4’ 0" 1"=50’ 5’ 0" 1"=60’ 6’ 0" 1"=80’ 8’ 0" 1"=100’ 10’ 0" 1"=200’ 20’ 0" 1"=250’ 25’ 0" 1"=300’ 30’ 0" 1"=400’ 40’ 0" 1"=500’ 50’ 0"
TABLE 7: TEXT HEIGHT: ARCH. SCALE
Arch.
Scale
Default Text Height Approx. Height
1/32"=1’ 3’ 2-13107/32768" 3’ 2-3/8" 1/16"=1’ 1’ 7-3277/16384" 1’ 7-3/16" 3/32"=1’ 1’ 0-13107/16384" 1’ 0-13/16" 1/8"=1’ 0’ 9-19661/32768" 0’ 9-5/8"
4-19-2016 Page 22
3/16"=1’ 0’ 6-13107/32768" 0’ 6-3/8" 1/4"=1’ 0’ 4-13107/16384" 0’ 4-13/16" 3/8"=1’ 0’ 3-3277/16384" 0’ 3-3/16" 1/2"-1’ 0’ 2-13107/32768" 0’ 2-3/8" 3/4"=1’ 0’ 1-19661/32768" 0’ 1-5/8" 1"=1’ 0’ 1-3277/16384" 0’ 1-3/16" 1-1/2"=1’ 0’ 0-13107/16384" 0’ 0-13/16" 3"=1’ 0’ 0-13107/32768" 0’ 0-3/8" 6"=1’ 0’ 0-3277/16384" 0’ 0-3/16" 12"=1’ 0’ 0-3277/32768" 0’ 0-1/8"
TABLE 8: COMMON BASE LAYER NAME LIST
LAYER NAME
00001_ELEVATIONS_DIVISIBLE_BY_1
00002_ELEVATIONS_DIVISIBLE_BY_2
00005_ELEVATIONS_DIVISIBLE_BY_5
00010_ELEVATIONS_DIVISIBLE_BY_10
01050_SURVEY_GRID
01051_PROPERTY_LINE
01052_TRACT
01053_EASEMENT
01190_ENVIRONMENTAL
02276_RETAINING_WALL
02280_SOIL_BORING
02300_EARTHWORK
02463_WOOD_PILES
02516_PARKING_LOT
02531_SANITARY_SEWER_PIPING
02555_GAS_DISTRIBUTION_SYSTEMS
02582_MEDIUM_VOLTAGE_UNDERGROUND_POWER_DISTRIBUTION
02585_WOOD_UTILITY_POLES
02610_PIPE_CULVERTS
02635_STORM_SEWERAGE
02640_MANHOLES_COVERS
02645_FIRE_HYDRANT
02741_PAVING
02770_PONDS_RESERVOIRS
02810_IRRIGATION_SYSTEM
02825_CHAIN_LINK_FENCES_AND_GATES
02880_MONUMENT
4-19-2016 Page 23
02920_LANDSCAPING
03011_GRAVEL
03012_SAND
03100_SIDEWALK
03200_WIRE_MESH_RE-BAR
03300_CAST-IN-PLACE_CONCRETE
03413_PRECAST_CONCRETE
03601_CATALYZED_METALLIC_GROUT
03650_FOUNDATION
04200_BRICK_MASONRY
04225_CONCRETE_MASONRY_UNITS
04400_STONE
05090_WELDING_STRUCTURAL
05096_WELDING_ALUMINUM_CONSTRUCTION
05120_STRUCTURAL_STEEL
05210_STEEL_JOISTS
05310_STEEL_DECKS
05400_COLD_FORMED_METAL_FRAMING
05500_METAL_FABRICATIONS
05510_METAL_STAIRS
05520_HANDRAILS_AND_RAILINGS
05700_ORNAMENTAL_METAL
06060_FIBERBOARD
06100_CARPENTRY
06182_STRUCTURAL_GLUE-LAMINATED_TIMBER
06190_PRE-FAB_JOIST_TRUSS
06400_CABINETS
07100_DAMPPROOFING_AND_WATERPROOFING
07220_INSULATION
07400_SHINGLES_ROOFING_AND_SIDING_PANELS
07420_EXTERIOR_WALL
07467_STEEL_SIDING
07500_MEMBRANE_ROOFING
07511_ASPHALT_BUILT-UP_ROOFING
07530_EPDM_ROOF_MEMBRANE
07550_MODIFIED_BITUMINOUS_MEMBRANE_ROOFING
07600_FLASHING_AND_SHEET_METAL
07800_FIRE_AND_SMOKE_PROTECTION_MATERIAL
07920_JOINT_SEALANTS
08110_DOORS_AND_FRAMES
4-19-2016 Page 24
08510_WINDOWS
08600_SKYLIGHTS
08805_GLASS_AND_GLAZING
08900_GLAZED_CURTAIN_WALLS
09130_CEILING
09200_INTERIOR_WALL
09210_GYPSUM_PLASTER
09212_FIREPROOFING_PLASTER
09310_CERAMIC_TILE_QUARRY_TILE_AND_PAVER_TILE
09330_QUARRY_TILE
09510_ACOUSTICAL_CEILINGS
09630_STONE_AND_BRICK_FLOORING
09650_RESILIENT_FLOORING
09675_HEAVY_DUTY_EPOXY_FLOORING
09680_CARPET
09720_WALL_COVERINGS
09920_ARCHITECTURAL_PAINTING
09960_HIGH-PERFORMANCE_COATINGS
09970_COATINGS_FOR_STEEL
10100_VISUAL_DISPLAY_BOARDS
10160_TOILET_COMPARTMENTS
10275_ELEVATED_FLOOR_SYSTEM
10350_FLAGPOLES
10500_LOCKERS
10523_FIRE_EXTINGUISHERS_AND_HOSES
10600_PARTITIONS
10800_TOILET_BATH_AND_LAUNDRY_ACCESSORIES
11025_FIRE_INSULATED_RECORD_VAULT_DOORS
11120_VENDING_EQUIPMENT
11161_DOCK_LEVELERS
11400_FOOD_SERVICE_EQ
11600_LABORATORY_EQ
12303_STEEL_AND_WOOD_CASEWORK
12485_ENTRANCE_AND_FLOOR_MATS
12490_WINDOW_TREATMENT
12495_HORIZONTAL_LOUVER_BLINDS
12600_FURNITURE
13100_LIGHTNING_PROTECTION_SYSTEMS
13110_CATHODIC_PROTECTION
13121_PRE-ENGINEERED_BUILDINGS
4-19-2016 Page 25
13210_ELEVATED_STEEL_WATER_TANK
13215_FIBERGLASS-REINFORCED_POLYESTER_STORAGE_TANK
13412_INSTRUMENTATION
13701_VIDEO_SURVEILLANCE
13704_SECURITY_ACCESS_SYSTEM
13803_PROGRAMMABLE_CONTROLLERS
13852_FIRE-ALARM_SYSTEMS
13854_GAS_DETECTION_SYSTEMS
13930_FIRE_SPRINKLER_SYSTEMS
13930_FIRE_SPRINKLER_SYSTEMS_INTERSTITIAL
13960_CARBON_DIOXIDE_EXTINGUISHING_SYSTEMS
14210_ELEVATORS
14600_HOISTS_AND_CRANES
15003_GENERAL_MECHANICAL_PROVISIONS
15050_BASIC_MECHANICAL_MATERIALS_AND_METHODS
15055_WELDING_MECHANICAL
15072_VIBRATION_ISOLATION_FOR_AIR_CONDITIONING_EQUIPMENT
15083_DUCT_INSULATION
15085_PIPING_INSULATION
15102_PLUMBING
15106_FERROUS_PIPE_AND_FITTINGS
15107_PLASTIC_PIPE_AND_FITTINGS
15108_STAINLESS_STEEL_PIPE_AND_FITTINGS
15110_VALVES
15119_SELF-CONTAINED_CONTROL_AND_RELIEF_VALVES
15120_PIPING_SPECIALTIES
15125_STEAM_TRAPS
15126_STEAM_PIPING_5LBS
15126_STEAM_PIPING_20LBS
15126_STEAM_PIPING_60LBS
15130_STEAM_SUPPLY
15130_STEAM_RETURN
15131_STEAM_SUCTION
15135_PUMPS
15145_DEMIN_WATER
15146_FEED_WATER
15181_CONDENSER_WATER_PIPING
15183_CHILLED_WATER_PIPING_SUPPLY
15183_CHILLED_WATER_PIPING_RETURN
15185_REFRIGERATION_PIPING_AND_SPECIALTIES
4-19-2016 Page 26
15186_CONDENSATE_PUMPS
15187_CONDENSATE_DRAIN
15187_CONDENSATE_RETURN
15187_PUMPED_CONDENSATE
15187_CONDENSATE
15187_HUMIDIFIED_STEAM
15187_STEAM_VENT
15189_CHEMICAL_WATER_TREATMENT
15195_NATURAL_GAS_SYSTEMS
15211_LOW-PRESSURE_COMPRESSED_AIR_SYSTEMS
15212_HIGH-PRESSURE_COMPRESSED_AIR_SYSTEMS
15214_LABORATORY_GAS_CO2
15214_LABORATORY_GAS_N2
15214_LABORATORY_GAS_Ar
15214_LABORATORY_GAS_O2
15216_GLYCOL_SUPPLY
15216_GLYCOL_RETURN
15218_VACUUM_SYSTEMS
15225_CHEMICAL-WASTE_DRAINAGE_SYSTEMS
15240_MEDICAL_GAS
15250_LABORATORY_AIR
15310_GLASS_DISTILLED_WATER
15320_TIN_DISTILLED_WATER
15350_FILTERED_WATER_SUPPLY
15350_FILTERED_WATER_RETURN
15410_PLUMBING_FIXTURES
15444_SAFETY_SHOWER_AND_EYEWASH_STA
15445_SUMP_PUMPS_AND_SUMP_BASINS
15455_DRINKING_FOUNTAIN_WATER_COOLER
15491_FUEL_OIL
15492_FUEL_GAS
15494_FUEL_LIQUID
15510_BOILERS
15520_COLD_WATER_DOMESTIC_RETURN
15520_COLD_WATER_DOMESTIC_SUPPLY
15520_COLD_WATER_LAB_SUPPLY
15550_HIGH_TEMP_HOT_WATER_RETURN
15550_HIGH_TEMP_HOT_WATER_SUPPLY
15560_HOT_WATER_DOMESTIC_SUPPLY
15560_HOT_WATER_180_SUPPLY
4-19-2016 Page 27
15560_HOT_WATER_180_RETURN
15560_HOT_WATER_SUPPLY
15560_HOT_WATER_RETURN
15560_HOT_WATER_LAB_SUPPLY
15560_HOT_WATER_LAB_RETURN
15560_HOT_WATER_PREHEAT_SUPPLY
15560_HOT_WATER_PREHEAT_RETURN
15560_HOT_WATER_REHEAT_SUPPLY
15560_HOT_WATER_REHEAT_RETURN
15560_HOT_WATER_RAD_SUPPLY
15560_HOT_WATER_RAD_RETURN
15570_SOFTENER_WATER
15580_WASTE
15610_REFRIGERATION_COMPRESSORS
15625_CHILLED_WATER_AIR_CONDITIONING
15626_WATER_CHILLERS
15675_AIR-COOLED_CONDENSERS
15700_HEATING_VENTILATION_AIR_CONDITIONING_SYSTEMS
15720_AIR_HANDLING_UNITS
15725_AIR_HANDLING
15736_AIR_CONDITIONING_UNITS
15740_HEAT_PUMPS
15762_AIR_COILS
15764_FAN-COIL_UNITS
15765_FAN-COIL_PIPING_SUPPLY
15765_FAN-COIL_PIPING_RETURN
15766_UNIT_HEATERS
15767_ELECTRIC_RESISTANCE_HEATING
15768_DUCT_HEATERS
15815_LOW_PRESSURE_DUCTWORK
15818_FLEX_DUCTWORK
15830_FANS
15835_CONVECTORS_RADIATORS
15840_AIR_TERMINAL_UNITS
15852_DIFFUSERS
15855_VENTS
15865_FILTERS
15877_FUME_EXHAUST_EQUIPMENT
15885_AIR_CLEANING_EQUIPMENT
15902_CONTROL_SYSTEMS
4-19-2016 Page 28
15942_REGISTERS_GRILLES
15950_MECH_CONTROLS_INSTRUMENTATION_TESTING_&_ADJUSTING_THERMOSTATS
16003_GENERAL_ELECTRICAL_PROVISIONS
16050_BASIC_ELECTRICAL_MATERIALS_AND_METHODS
16065_SECONDARY_GROUNDING
16121_FIBER_OPTIC_CABLE_AND_OUTLETS
16124_MEDIUM_VOLTAGE_CABLE
16130_RACEWAYS_CONDUITS
16135_CABLE_TRAYS
16145_STANDARD_WIRING_SYSTEMS
16200_POWER_GENERATOR
16225_MOTORS
16275_TRANSFORMERS
16288_SURGE_ARRESTERS
16305_OVERHEAD_MEDIUM-VOLTAGE_WIRING
16315_MEDIUM_VOLTAGE_OVERHEAD_POWER_DISTRIBUTION
16325_LOAD-BREAK_SWITCHES_&_DISCONNECT_SWITCHES
16345_MOTOR_CONTROL
16365_PRIMARY_UNIT_SUBSTATION
16366_SECONDARY_UNIT_SUBSTATION
16390_GROUNDING_DEVICES
16425_VARIABLE_FREQUENCY_CONTROLLERS
16435_AUTOMATIC_TRANSFER_SWITCHES
16445_SWITCHGEAR_ASSEMBLIES
16446_PANELBOARDS_CONTROL_PANELS_ELEC_PANELS_CIRCUIT_BREAKERS
16495_MEDIUM_VOLTAGE_FUSES
16511_LIGHTS
16512_HIGH_INTENSITY_DISCHARGE_(HID)_LUMINARIES
16522_FLOOD_LIGHTING
16524_ROADWAY_LIGHTING
16529_PHOTO_CONTROL_DEVICES
16535_EMERGENCY_LIGHTING
16536_EXIT_LIGHTING
16700_COMMUNICATION_AND_COMMUNICATION_OUTLETS
16720_COMPUTER
16720_ALARM_DETECTION_SYSTEM
16821_PUBLIC_ADDRESS_AND_MUSIC_EQUIPMENT
20000_NORTH_ARROW_AND_DRAWING_SCALE
20200_PHANTOM_LINE
20500_LEADERS_AND_LEADER_TEXT
4-19-2016 Page 29
20700_MISCELLANEOUS
20710_GRID
Defpoints
GROS
GROS$
GROS$TXT
RM
RM$
RM$TXT
FN
FN-FREE
FN-PART
HL-TEMP
RMTC
RMTC$
RMTC$TXT
EQ
EQ_TEXT
1-13-20 Information B. Training
The contractor shall provide training for non-standard equipment installation. The contractor shall consult with the COR to determine which, if any, of the equipment is considered standard. The contractor shall submit classroom and field instructions in the operation and maintenance of systems equipment where required by the technical provisions. These services must be directed by the contractor, using the manufacturer’s factory-trained personnel or qualified representatives. The COR shall be given 14 calendar days written notice of scheduled instructional services. Instructional materials belonging to the manufacturer or vendor, such as lists, static exhibits, and visual aids, must be made available to the Government. All training should be recorded and published in electronic format to the COR.
4-19-2016 Page 30
SECTION 3: CIVIL ENGINEERING & SITE DEVELOPMENT
SECTION 3-2: SITE UTILITIES
3-2-00 Identification of Underground Utilities: For all new, repaired, or altered underground utilities greater than 10 feet in length, the Contractor shall install detectable marking tape 8” below grade unless otherwise directed by the Engineer or Contracting Officer’s Representative.
Detectable Marking Tape: Permanent, appropriately colored, continuous-printed magnetic tape intended for direct-burial service not less than 6 inches wide by 4 mils thick. The tape shall read “CAUTION: BURIED INSTALLATION BELOW”. Tape color shall conform to the APWA Uniform Color Code.
APWA Uniform Color Code: The American Public Works Association encourages public agencies, utilities, contractors, other associations, manufacturers and all others involved in excavation to adopt the APWA Uniform Color Code, using ANSI standard Z535.1 Safety Colors for temporary marking and facility identification.
TABLE 9: APWA UNIFORM COLOR CODE
Safety Color Utility or Application White Proposed Excavation Pink Temporary Survey Markings Red Electric Power Lines, Cables, Conduit and Lighting Cable Yellow Gas, Oil, Steam, Petroleum or Gaseous Materials Orange Communication, Alarm or Signal Lines, Cables or Conduit Blue Potable Water Green Sewers and Drain Lines Purple Reclaimed Water, Irrigation and Slurry Lines
B. Profiles Underground utilities: Cover shall be a minimum of 18 in.
3-2-20 A. Utility Service:
The table below provides an abbreviated summary of approved materials.
TABLE 10: ABBREVIATED SUMMARY OF APPROVED MATERIALS FOR UTILITY SERVICE
Utility
Minimum
Size
Material
Storm Drain 12 in. RCP or Ductile Iron1 Sanitary Sewer 6 in. PVC SDR 35, SDR 26, or Schedule 40, or Epoxy line ductile
4-19-2016 Page 31 iron1. Select as required for application and loading Domestic Water 6 in. Cement Lined Ductile Iron1 Chilled Water >= 6 in. Steel Extra Heavy Seamless, weld joint Chilled Water < 6 in. Steel Schedule 40 Seamless weld High Temperature Hot Water
>= 6 in. Steel Extra Heavy Seamless, weld joint
High Temperature Hot Water
< 6 in. Steel Schedule 40, weld joint
Natural Gas N/A Polyethylene fusion joint Electrical >= 1 in. PVC Schedule 40 Rigid
Note:
1. Polyethylene Encasement of Ductile Iron Pipe: All buried ductile iron pipe shall be encased with either 8-mil linear low density polyethylene or 4-mil high density cross-laminated polyethylene. Material requirements shall meet ANSI/AWWA C105/A21.5 Standard. Care shall be taken so that material completely encases the pipe and prevent contact between pipe and surrounding soil. Sufficient slack shall be provided in contouring to prevent stretching the polyethylene where it bridges irregular surfaces. Overlaps and ends shall be secured with adhesive tape or plastic tie straps to hold the polyethylene in place until backfilling operations are completed. Any cuts, tears, punctures, or damage shall be repaired.
SECTION 3-3: SITE IMPROVEMENTS
3-3-10 A. Parking and Paving B. Sidewalks, Curbs and Gutters:
Sidewalks: Optimum sidewalk width is 72 in., with 60 in. as the minimum. All sidewalks shall be exposed aggregate.
Curbs and Curbs/Gutters: The concrete design mix shall be a maximum of 4 in. slump, 3000 psi, 6% to 10% air entrainment. Contractor shall remove surface mortar in 8-24 hours.
B.3 Material Exclusions for Common Pedestrian Sidewalk Areas Subject to Use by Snow Removal Equipment:
The following materials are not permitted on any NIH projects because of maintenance requirements or safety concerns:
• Cobblestones.
• Asphalt hex pavers on asphalt base.
• Pavers on plastic blocks.
• Granite, brick, or slate on concrete base.
4-19-2016 Page 32
SECTION 4: ARCHITECTURE
SECTION 4-1: GENERAL ARCHITECTURE
4-1-00 No wood shall be used in facility construction
SECTION 4-2: EXTERIOR ARCHITECTURAL ELEMENTS
4-2-10 B. Thermal and Moisture Protection:
B.6 Joint Sealants:
Joint sealants shall be applied throughout for thermal and moisture protection as architectural practice dictates, and as required for fire stopping penetrations per industry standards. See Table 11 for pest management sealant requirements.
TABLE 11: EXHIBIT X4-2-A DRM SEALANT TABLE
Group Description Non-Lab Sealants
BSL-2
Sealants Comments
Doors: Seal all penetrations in doors N/S N/S Seal all door hinge plates
(not at pin) to include piano hinges
N/S N/S
Seal door frame and wall board interface.
JS-4 JS-4
Seal view panel frames (around glass whether or not gasketed)
N/S N/S
Seal around lock sets N/S N/S Seal around all sides of latch boxes installed within frames N/S N/S
Seal door thresholds to the floor and around the threshold
JS-1 JS-1
Seal door protection plates and tapered door guards to doors
N/S N/S
Seal gaps around door magnet latch at head of door and frame
N/S N/S
Cabinetry/ Shelving:
Seal openings in the base of tables where the support feet mount to the table
N/S JS-4
Seal openings in table legs N/S JS-4
4-19-2016 Page 33
Group Description Non-Lab Sealants
BSL-2
Sealants Comments where the support feet mount to the floor
Seal all cabinets where they contact dissimilar materials and where they contact one another
N/S JS-4 Cabinets need to be closed boxes
Seal all counter tops where they contact with dissimilar material
N/S JS-4 Depends on finish
Seal around all shelf support brackets where they contact the shelves and are mounted to the walls
N/S N/S This is for specialty shelving used in laboratories.
Seal tops and bottoms of all wall mounted shelving brackets
N/S JS-4 A plug shall be sealed
Seal all gaps and openings in racks
N/S N/S For ABSL-3 equipment, typically stainless steel racks in aquatic rooms
Seal covers between shelf standards
N/S N/S
Seal peninsula shelving support at countertop and at ceiling
N/S JS-4
Walls/ Floors/ Ceilings:
Seal around all wall guards, bumpers, and rails
N/S JS-4 Brackets/fasteners shall be installed tight to wall.
Seal all penetrations on the top and bottom of slab
JS-6 JS-6 To include but not limited to HVAC, plumbing, and electrical penetrations, and like penetrations through interstitial space.
Seal around all corner guards
N/S JS-4 Brackets/fasteners shall be installed tight to wall.
Seal around all door bumpers
N/S N/S Brackets/fasteners shall be installed tight to wall.
Seal top of trim strip and sheet flooring at wall
N/S N/S Recommend feathering epoxy cove base to flat surface, e.g. not at grout line
Seal top of cove base N/S JS-4 Seal bottom of cove base N/S JS-4 Seal all ceiling access panels
(whether or not 100% gasketed)
N/S N/S
Seal the perimeter of all N/S JS-4
4-19-2016 Page 34
BSL-2
Sealants Comments suspended acoustical ceiling frames at the wall juncture
Seal all interior window frames (including gasketed areas)
N/S JS-4 Sealant shall be sloped to promote cleaning
Seal around wall and ceiling, surface-mounted cover plates and surface-mounted mounting plates
N/S JS-4 This applies to exposed mounted brackets. The use of sealant at these brackets is as follows: 1) If the bracket or wall mounted fixture is easily removable, then sealant is not required,
2) If the brackets are permanently affixed to wall, then joints shall be sealed. Each bracket shall be examined for requirement of sealant on a case by case basis.
Seal all around floor surface-mounted mounting plates
N/S JS-1 This applies to exposed mounted brackets. The use of seal at these brackets is as follows: 1) If the bracket or floor mounted fixture is easily removable, then sealant is not required,
2) If the brackets are permanently affixed to floor, then joints shall be sealed. Each bracket shall be examined for requirement of seal on a case by case basis.
Seal all around floor surface-mounted cover plates
N/S JS-4
Seal and cap the tops of all CMU walls
N/A N/A Vivarium areas only; recommend sheet rock (Seal with JS-4) or CMU cap block
Seal around all cap strips on the top edge of cove base
N/S N/S
Seal baseboard molding, at the top bottom and terminate at door frame
N/S JS-4
Seal control joints in walls N/S JS-4 Seal control joints in ceilings N/S JS-4 Seal control joints in floors JS-1 JS-1 Not visible to room - beneath floor Seal all crash rails, guard rails stand offs, and door rollers mounting brackets
N/S JS-4
Seal joints between walls of dissimilar materials
JS-4 JS-4
4-19-2016 Page 35
BSL-2
Sealants Comments
Seal space in wall penetrations, including inside sleeves, collars, and surrounding construction
JS-6 JS-6 Where stuff mineral wool is applied, use fire stop and spray over with JS-6.
HVAC: Seal all duct work that penetrates the wall envelope
N/S JS-4
Seal all diffusers/grill joints in hard ceilings
N/S JS-4
Plumbing: Hot water line insulation shall be wrapped in aluminum and the seams and ends of the insulation sealed
N/S JS-7 This applies for steam lines (e.g.
autoclaves).
Seal at vacuum pass-through N/S JS-4 Seal all cracks in foam rubber water line insulation
N/S JS-4
All flat escutcheon plates and support standoff brackets for animal water systems shall be sealed all around
N/S JS-4
Seal plumbing to surface where a gap of .24 in. to .35
in. of less exists
N/S JS-4
Seal all plumbing escutcheon and cover plates at the wall and pipe junctions
N/S JS-4
Seal around sprinkler collars N/S JS-4 Seal all piping that penetrates the wall envelope
N/S JS-4
Electrical: Seal electrical conduit to surface where a gap of .24
in. to .35 in. or less exists
N/S JS-4
Conduit shall be sealed tight to wall or ceiling surfaces;
(raceway)
N/S JS-4 Sealant is required on both sides of surface mounted conduit.
Seal the perimeter of all electrical panels
N/S * N/S * Panelboards in BSL2 spaces do not require sealing - if…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .