15405.doc

DOC document 58 KB Posted

Attached to
RML Autoclave Replacement Project
Solicitation number
NIHOF2008061
Issued by

About this file

Specifications cont.

View the file

Other files

File Type Posted
Specification Index.doc DOC document
01310 Proj Mngmt Coor 3.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
Standard Form 25.pdf PDF
SF 1413.pdf PDF
01140 Work Restrictions 3.doc DOC document
01320 Const Prog Doc 3.doc DOC document
01731 Cutting Patching 3.doc DOC document
15401.doc DOC document
15841.doc DOC document
15055.doc DOC document
09721 Stonhard.doc DOC document
16110.doc DOC document
01100 Summary 1.doc DOC document
01700 Execution Requirements 3.doc DOC document
16120.doc DOC document
MT7 Wage Determination.htm HTM file
15450.doc DOC document
Standard Form 25a.pdf PDF
07-734-Cover 1.xls XLS spreadsheet
A1-0.pdf PDF
16130.doc DOC document
NIH Form 2582.rtf RTF text file
15703.doc DOC document
16000.doc DOC document
15000.doc DOC document
15992.doc DOC document
A0-0.pdf PDF
01420 References 3.doc DOC document
01400 Quality Requirements 3.doc DOC document
15100.doc DOC document
A1-1.pdf PDF
07920 FULL ADG JOINT SEALANTS Aug 02 1.doc DOC document
01500 TEMP FACILITIES CONTROL 3 .doc DOC document
15250.doc DOC document
01230 Options.DOC DOC document
01330 SUBMTL PROCEDURES 3.doc DOC document
M2-0.pdf PDF
M1-1.pdf PDF
01600 ADG PROD REQUIREMENTS 3.doc DOC document
M1-0.pdf PDF
15090.doc DOC document
16140.doc DOC document
SF 1442 Autoclave Replacement Project.pdf PDF
15060.doc DOC document
NIS.dwg DWG drawing
M0-1.pdf PDF
E1-0.pdf PDF
11605 Equipment.doc DOC document
09960 High Performance Coatings 1.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96-620

00-32 07-733 07-743

SECTION 15405 - SOIL, WASTE AND DRAIN PIPING SYSTEMS

PART 1 GENERAL

1.1

WORK INCLUDED

A.

This Section governs modifications to the sanitary sewer piping system.

1.2

CODE COMPLIANCE

A.

The work shall be in accordance with the requirements of the State Plumbing Code and the local plumbing codes and regulations.

B.

Where more stringent requirements are specified herein, then the work shall comply with the specified requirements.

1.3

SUBMITTAL DATA

A.

See SECTION 15000 for general submittal requirements.

B.

Provide manufacturer's literature for all products specified in this Section which will be installed under this project.

PART 2 PRODUCTS

2.1

PIPING

A.

Aboveground Piping

1.

Non-buried piping and piping above floor slab shall be one of the following:

a.

Service weight (SV) cast iron soil pipe, bell and spigot fittings with premolded rubber joint gaskets as specified in paragraph 2.1 A, above. Neoprene couplings may be used where in compliance with State and local codes.

b.

Type DWV copper pipe and fittings with joints soldered with 50/50 solder.

2. At Contractor's option, No-Hub mechanical joint piping may be used as permitted by the Montana State Plumbing Code and local regulations.

3. Type DWV copper shall be used where space does not permit cast iron pipe.

PART 3 EXECUTION

3.1

PIPING

A.

Soil Pipe Joints

1.

Joints in cast iron soil pipe and fittings without hubs shall be made using a mechanical compression-type coupling consisting of a neoprene collar, stainless steel band with transverse corrugations and not less than four stainless steel clamps with stainless steel setscrews all assembled to provide a positive seal, and shall conform to Standard 310 of the Cast Iron Soil Pipe Institute.

B.

Joints for steel and copper to be in accord with Section 15060.

3.2

INSTALLATION

A.

Slope 1/4" per foot where possible and not less than 1/8" per foot.

B.

Changes in direction made with appropriate fittings. Long bends used where possible.

C.

Plumbing System Vents

1.

All fixtures vented.

2.

Horizontal vents sloped up not less than 1/8" per foot.

3.3

TESTING

A.

General

1.

Piping to be tested before it is covered up or built-in. Leaks to be repaired and test repeated until system is approved.

2.

Any damage occurring as result of testing, leaks, etc., shall be corrected at this Contractor's expense.

END OF SECTION 15405

PACKAGE M OUTBUILDING RENOVATION NIH-NIAID RML HAMILTON, MT

SOIL, WASTE AND DRAIN PIPING SYSTEMS 15405-2

RML AUTOCLAVE REPLACEMENT ( NIH-NIAID RML ( HAMILTON, MT

SOIL, WASTE AND DRAIN PIPING SYSTEMS 15405-2