01140 Work Restrictions 3.doc

DOC document 31 KB Posted

Attached to
RML Autoclave Replacement Project
Solicitation number
NIHOF2008061
Issued by

About this file

Specifications cont.

View the file

Other files

File Type Posted
Specification Index.doc DOC document
01310 Proj Mngmt Coor 3.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
Standard Form 25.pdf PDF
SF 1413.pdf PDF
01320 Const Prog Doc 3.doc DOC document
01731 Cutting Patching 3.doc DOC document
15401.doc DOC document
15841.doc DOC document
15055.doc DOC document
09721 Stonhard.doc DOC document
16110.doc DOC document
01100 Summary 1.doc DOC document
01700 Execution Requirements 3.doc DOC document
16120.doc DOC document
MT7 Wage Determination.htm HTM file
15450.doc DOC document
Standard Form 25a.pdf PDF
07-734-Cover 1.xls XLS spreadsheet
A1-0.pdf PDF
16130.doc DOC document
NIH Form 2582.rtf RTF text file
15703.doc DOC document
16000.doc DOC document
15000.doc DOC document
15992.doc DOC document
A0-0.pdf PDF
01420 References 3.doc DOC document
01400 Quality Requirements 3.doc DOC document
15100.doc DOC document
A1-1.pdf PDF
07920 FULL ADG JOINT SEALANTS Aug 02 1.doc DOC document
01500 TEMP FACILITIES CONTROL 3 .doc DOC document
15250.doc DOC document
01230 Options.DOC DOC document
01330 SUBMTL PROCEDURES 3.doc DOC document
M2-0.pdf PDF
M1-1.pdf PDF
01600 ADG PROD REQUIREMENTS 3.doc DOC document
M1-0.pdf PDF
15090.doc DOC document
16140.doc DOC document
SF 1442 Autoclave Replacement Project.pdf PDF
15060.doc DOC document
NIS.dwg DWG drawing
M0-1.pdf PDF
E1-0.pdf PDF
11605 Equipment.doc DOC document
09960 High Performance Coatings 1.doc DOC document
01770 ADG CLOSE OUT PROCEDURES 3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-811

07-743

SECTION 01140 - WORK RESTRICTIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including Sections A through M of the Contract and other Division 1 Specification Sections, apply to this Section.

B. Related Sections:

1. Refer to Section, “Construction Security Requirements” for security procedures.

1.2 USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to the areas delineated on the floor plans.

2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

c. Keep access to the South and East sides of Building 23 clear at all times.

3. The fresh air intakes for the buildings in the Quad are on the east side of the service road between Buildings A and 5; and Buildings 13, 13B and 16. The Contractor is advised that he is required to keep traffic in this area limited to actual ongoing work. Idling of motors for inactive equipment will not be allowed.

B. Hours of work: Refer to Section H of the Contract.

1.3 SECURITY

A. All contractors, suppliers and vendors are subject to search upon entering the Rocky Mountain Laboratories Facility. This includes vehicles, packages, boxes, etc.

1. Two forms of identification will be required for all personnel.

2. A photo identity badge must be worn in plain view while on the RML grounds.

3. Visitors and those without a photo ID Badge will be escorted while on site.

4. Vendors, and suppliers must have paperwork showing what is being delivered and to whom before they will be allowed to enter the facility.

5. All construction delivery trucks must be met at the perimeter gate by an authorized Project Manager, superintendent, etc. and be escorted to their delivery site.

6. All storage units and the inside of these vehicles are subject to inspection.

B. Security measures may be lessened or heightened as National Alert Levels change.

1.4 OCCUPANCY REQUIREMENTS

A. Full Government Occupancy: Government will occupy site and existing building during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's operations.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01140

AUTOCLAVE REPLACEMENT ( NIH-NIAID RML ( HAMILTON, MT

WORK RESTRICTIONS 01140 - 2