15401.doc

DOC document 58 KB Posted

Attached to
RML Autoclave Replacement Project
Solicitation number
NIHOF2008061
Issued by

About this file

Specifications cont.

View the file

Other files

File Type Posted
Specification Index.doc DOC document
01310 Proj Mngmt Coor 3.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
Standard Form 25.pdf PDF
SF 1413.pdf PDF
01140 Work Restrictions 3.doc DOC document
01320 Const Prog Doc 3.doc DOC document
01731 Cutting Patching 3.doc DOC document
15841.doc DOC document
15055.doc DOC document
09721 Stonhard.doc DOC document
16110.doc DOC document
01100 Summary 1.doc DOC document
01700 Execution Requirements 3.doc DOC document
16120.doc DOC document
MT7 Wage Determination.htm HTM file
15450.doc DOC document
Standard Form 25a.pdf PDF
07-734-Cover 1.xls XLS spreadsheet
A1-0.pdf PDF
16130.doc DOC document
NIH Form 2582.rtf RTF text file
15703.doc DOC document
16000.doc DOC document
15000.doc DOC document
15992.doc DOC document
A0-0.pdf PDF
01420 References 3.doc DOC document
01400 Quality Requirements 3.doc DOC document
15100.doc DOC document
A1-1.pdf PDF
07920 FULL ADG JOINT SEALANTS Aug 02 1.doc DOC document
01500 TEMP FACILITIES CONTROL 3 .doc DOC document
15250.doc DOC document
01230 Options.DOC DOC document
01330 SUBMTL PROCEDURES 3.doc DOC document
M2-0.pdf PDF
M1-1.pdf PDF
01600 ADG PROD REQUIREMENTS 3.doc DOC document
M1-0.pdf PDF
15090.doc DOC document
16140.doc DOC document
SF 1442 Autoclave Replacement Project.pdf PDF
15060.doc DOC document
NIS.dwg DWG drawing
M0-1.pdf PDF
E1-0.pdf PDF
11605 Equipment.doc DOC document
09960 High Performance Coatings 1.doc DOC document
01770 ADG CLOSE OUT PROCEDURES 3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96-620

00-32 07-733 07-743

SECTION 15401 - DOMESTIC WATER SYSTEM AND NON-POTABLE WATER SYSTEM

PART 1 GENERAL

1.1

WORK INCLUDED

A.

This section governs the materials and installation of the domestic and industrial hot and cold water systems.

1.2

SUBMITTAL DATA

A.

See SECTION 15000 for general submittal requirements.

B.

Provide submittal data for any materials or equipment specified in this Section as listed on the Submittal Schedule (see SECTION 15000) and any special or additional data as requested by the Contracting Officer.

C.

Submit complete manufacturer's literature, O&M Manuals and installation instructions for water heaters, pumps, heat trace cable and other equipment so noted. Shop drawings on pipe, fittings, flues, etc., are not required.

1.3

BACKFLOW PREVENTION

A.

Provide anti-siphon and backflow prevention devices on any equipment capable of backflow into the domestic water system. This includes faucets with hose threads and equipment with any supply pipe opening below the water line of the fixture. If not specified or noted on the drawings, such devices to be as approved by the State Board of Health.

PART 2 PRODUCTS

2.1

PIPING

A.

Interior Cold and Hot Water Pipe

1.

Type K hard temper copper pipe with solder joint fittings.

2.

Solder shall be 95/5 tin/antimony composition. Self-fluxing solder shall not be used.

2.2

SHOCK ARRESTORS

A.

Arrestors shall be Shoktrol stainless steel bellows type water hammer arrestor or approved equal, Plumbing and Drainage Institute (PDI) size ‘B’. See plans or description hereinafter for locations.

PART 3 EXECUTION

3.1

PIPE

A.

Slope all piping for proper air relief and drainage.

B.

Make adequate provisions for pipe expansion. Anchor, block and brace pipe to prevent movement from water surges and hammer.

C.

Install a shock arrestor on each cold water supply to each autoclave. Arrestors shall be PDI size ‘B.’

D.

Cleaning

1.

Flush system to the satisfaction of the project officer.

2.

Disinfect any new or affected domestic water supply piping. After disinfecting, flush chlorine residue out of the system and fill with fresh water.

E.

Testing

1.

Test piping system before connecting to existing systems, before applying insulation and before concealing.

2.

Items not designed to take test pressures must be isolated from the line during testing.

3.

Test the system by applying a hydrostatic pressure of 100 psi held for 1/2 hour without any drop in pressure or other indication of leakage.

4.

Leaks shall be repaired and the test repeated until all systems prove tight.

END OF SECTION 15401

PACKAGE M OUTBUILDING RENOVATION NIH-NIAID RML HAMILTON, MT

DOMESTIC WATER SYSTEM & NON-POTABLE 15401-2

RML AUTOCLAVE REPLACEMENT ( NIH-NIAID RML ( HAMILTON, MT

DOMESTIC WATER SYSTEM AND NON-POTABLE WATER SYSTEM 15401-2

File details come from the government source that posted it. Updated .