09960 High Performance Coatings 1.doc

DOC document 62 KB Posted

Attached to
RML Autoclave Replacement Project
Solicitation number
NIHOF2008061
Issued by

About this file

Specifications cont.

View the file

Other files

File Type Posted
Specification Index.doc DOC document
01310 Proj Mngmt Coor 3.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
Standard Form 25.pdf PDF
SF 1413.pdf PDF
01140 Work Restrictions 3.doc DOC document
01320 Const Prog Doc 3.doc DOC document
01731 Cutting Patching 3.doc DOC document
15401.doc DOC document
15841.doc DOC document
15055.doc DOC document
09721 Stonhard.doc DOC document
16110.doc DOC document
01100 Summary 1.doc DOC document
01700 Execution Requirements 3.doc DOC document
16120.doc DOC document
MT7 Wage Determination.htm HTM file
15450.doc DOC document
Standard Form 25a.pdf PDF
07-734-Cover 1.xls XLS spreadsheet
A1-0.pdf PDF
16130.doc DOC document
NIH Form 2582.rtf RTF text file
15703.doc DOC document
16000.doc DOC document
15000.doc DOC document
15992.doc DOC document
A0-0.pdf PDF
01420 References 3.doc DOC document
01400 Quality Requirements 3.doc DOC document
15100.doc DOC document
A1-1.pdf PDF
07920 FULL ADG JOINT SEALANTS Aug 02 1.doc DOC document
01500 TEMP FACILITIES CONTROL 3 .doc DOC document
15250.doc DOC document
01230 Options.DOC DOC document
01330 SUBMTL PROCEDURES 3.doc DOC document
M2-0.pdf PDF
M1-1.pdf PDF
01600 ADG PROD REQUIREMENTS 3.doc DOC document
M1-0.pdf PDF
15090.doc DOC document
16140.doc DOC document
SF 1442 Autoclave Replacement Project.pdf PDF
15060.doc DOC document
NIS.dwg DWG drawing
M0-1.pdf PDF
E1-0.pdf PDF
11605 Equipment.doc DOC document
01770 ADG CLOSE OUT PROCEDURES 3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04-436 07-743

SECTION 09960 ‑ HIGH‑PERFORMANCE COATINGS

PART 1 ‑ GENERAL

1.1

RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including Sections A through M of the Contract and other Division 1 Specification Sections, apply to this Section.

1.2

SUMMARY

A.

This Section includes surface preparation and field application of high‑performance coating systems to items and surfaces scheduled. Designated EP for walls and ceilings.

B.

Related Sections include the following:

1.

Division(9 Section "Painting" for general field painting.

1.3

DEFINITIONS

A.

Standard coating terms defined in ASTM(D(16 apply to this Section.

B.

Gloss ranges used in this Section include the following:

1.

High gloss refers to high‑sheen finish with a gloss range more than 65 when measured at a 60‑degree meter.

C.

Environments: The following terms are used in Part(2 of this Section to distinguish between different corrosive exposures:

1.

"Severe environments" are highly corrosive industrial atmospheres with sustained exposure to high humidity and condensation and with frequent cleaning using strong chemicals. Environments with heavy concentrations of strong chemical fumes and frequent splashing and spilling of harsh chemical products are severe environments.

1.4

SUBMITTALS

A.

Product Data: For each coating system indicated. Include primers.

1.

Material List: An inclusive list of required coating materials. Indicate each material and cross‑reference the specific coating, finish system, and application. Identify each material by manufacturer's catalog number and general classification.

2.

Manufacturer's Information: Manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each material specified.

B.

Certification by manufacturer that products supplied comply with requirements indicated that limit the amount of VOCs in coating products.

C.

Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for each type of finish‑coat material indicated.

1.

After color selection, Contracting Officer will furnish color chips for surfaces to be coated.

E.

Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of Contracting Officers and Governments, and other information specified.

1.5

QUALITY ASSURANCE

A.

Applicator Qualifications: Engage an experienced applicator who has completed high‑performance coating system applications similar in material and extent to those indicated for Project and whose work has a record of successful in‑service performance.

B.

Source Limitations: Obtain primers and undercoat materials for each coating system from the same manufacturer as the finish coats.

1.6

DELIVERY, STORAGE, AND HANDLING

A.

Deliver materials to Project site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label with the following information:

1.

Name or title of material.

2.

Product description (generic classification or binder type).

3.

Manufacturer's stock number and date of manufacture.

4.

Contents by volume, for pigment and vehicle constituents.

5.

Thinning instructions.

6.

Application instructions.

7.

Color name and number.

8.

Handling instructions and precautions.

B.

Store materials not in use in tightly covered containers in a well‑ventilated area at a minimum ambient temperature of 45 deg(F. Maintain containers used in storage in a clean condition, free of foreign materials and residue.

1.

Protect materials from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and applying coatings.

1.7

PROJECT CONDITIONS

A.

Apply coatings only when temperature of surfaces to be coated and surrounding air temperatures are between 45 and 95 deg(F.

B.

Do not apply coatings in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5(deg(F above the dew point; or to damp or wet surfaces.

1.

Allow wet surfaces to dry thoroughly and attain temperature and conditions specified before proceeding with or continuing coating operation.

2.

Work may continue during inclement weather only if areas and surfaces to be coated are enclosed and temperature within the area can be maintained within limits specified by manufacturer during application and drying periods.

PART 2 ‑ PRODUCTS

2.1

MANUFACTURERS

A.

Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products indicated in the coating system descriptions.

C.

Manufacturers' Names: The following manufacturers are referred to in the coating system descriptions by shortened versions of their names shown in parenthesis:

1.

Carboline Company (Carboline).

2.

DuPont Company, High Performance Coatings (DuPont).

3.

ICI Dulux Paints; Devoe Coatings (ICI).

4.

International Protective Coatings; Courtaulds Coatings (International).

5.

Moore: Benjamin Moore & Co. (Moore).

6.

Pittsburgh Paint; PPG Industries, Inc. (PPG).

7.

Rust‑Oleum Corporation (R‑O).

8.

Sherwin Williams; Industrial and Marine Coatings (S‑W).

2.2

COATINGS MATERIALS, GENERAL

A.

Material Compatibility: Provide primers, undercoats, and finish‑coat materials that are compatible with one another and substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

B.

Material Quality: Provide manufacturer's highest grade of the various high‑performance coatings specified. Materials not displaying manufacturer's product identification are not acceptable.

1.

Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions.

C.

VOC Classification: Provide high‑performance coating materials, including primers, undercoats, and finish‑coat materials, that have a VOC classification of 450 g/L or less.

2.3

COLORS

A.

Colors: As selected by Contracting Officer to match existing walls.

2.4

INTERIOR HIGH‑PERFORMANCE COATING SYSTEMS

A.

Gypsum wallboard: Provide the following finish systems over interior gypsum wallboard surfaces:

1.

Severe Environment (High‑Gloss Finish): One finish coat over an intermediate coat and a primer.

a.

Primer: Epoxy primer applied at spreading rate recommended by manufacturer.

1) Carboline: 893 2‑Component, High Build Epoxy Primer.

2) DuPont: 25P High Solids Epoxy Mastic.

3) ICI: Devran 224HS High Build Epoxy.

4) International: Intergard 251 Thin Film Polyamide Epoxy Rust Inhibitive Primer.

5) Moore: M33/M34 Polyamide Epoxy Metal Primer.

6) PPG: 97‑14XX Series Pitt‑Guard DTR Polyamide Epoxy Coating.

7) R‑O: 9100 System Labor Saver High Performance Epoxy.

8) S‑W: Promar 200 Latex Primer

9) Tnemec: 27 F. C. Typoxy Polyamide Epoxy.

b.

Intermediate Coat: Epoxy applied at spreading rate recommended by manufacturer to achieve a dry film thickness of 2.0 to 5.0 mils.

1) Carboline: 890 2‑Component Epoxy.

2) DuPont: Corlar 26P HB DTM High Build Epoxy Enamel.

3) ICI: Devran 224HS High Build Epoxy.

4) International: Intermediate coat not required.

5) Moore: M36/M38 Polyamide Epoxy Semi‑Gloss Coating.

6) PPG: 97‑1XXX Series Aquapon Polyamide‑Epoxy Coating.

7) R‑O: Intermediate coat not required.

8) S‑W: Tile Clad High Solids B62Z Series/B60ZZ70.

9) Tnemec: Series 84 H. S. Epoxy.

c.

Topcoat: High‑gloss epoxy applied at spreading rate recommended by manufacturer to achieve a dry film thickness of 2.0 to 5.0 mils, unless otherwise indicated.

1) Carboline: 890 2‑Component Epoxy.

2) DuPont: Corlar 26P HB DTM High Build Epoxy Enamel.

3) ICI: Devthane 250 Direct‑to Metal (DTM) Gloss Epoxy.

4) International: Intergard 607 HS High Build Gloss Polyamine Epoxy Finish at 8.0‑mil dry film thickness.

5) Moore: M36/M37 Polyamide Epoxy Gloss Coating.

6) PPG: 97‑1XXX Series Aquapon Polyamide‑Epoxy Coating.

7) R‑O: 9100 System Labor Saver High Performance Epoxy at 5.0‑ to 8.0‑mil dry film thickness.

8) S‑W: Tile Clad High Solids B62Z Series/B60ZZ70.

9) Tnemec: Series 84 H. S. Epoxy.

PART 3 ‑ EXECUTION

3.1

EXAMINATION

A.

With Applicator present, examine substrates and conditions under which high‑performance coatings will be applied, for compliance with coating application requirements.

1.

Apply coatings only after unsatisfactory conditions have been corrected and surfaces to receive coatings are thoroughly dry.

2.

Start of application is construed as Applicator's acceptance of surfaces within that particular area.

B.

Coordination of Work: Review other Sections in which primers or other coatings are provided to ensure compatibility of total systems for various substrates. On request, furnish information on characteristics of specified finish materials to ensure compatible primers.

1.

If a potential incompatibility of primers applied by others exists, obtain the following from the primer Applicator before proceeding:

a.

Confirmation of primer's suitability for expected service conditions.

b.

Confirmation of primer's ability to be top coated with materials specified.

2.

Notify Contracting Officer about anticipated problems before using the coatings specified over substrates primed by others.

3.2

PREPARATION

A.

General: Remove plates, machined surfaces, and similar items already in place that are not to be coated. If removal is impractical or impossible because of size or weight of item, provide surface‑applied protection before surface preparation and coating.

1.

After completing coating operations, reinstall items that were removed; use workers skilled in the trades involved.

B.

Cleaning: Before applying high‑performance coatings, clean substrates of substances that could impair bond of coatings. Remove oil and grease before cleaning.

1.

Schedule cleaning and coating application so dust and other contaminates from cleaning process will not fall on wet, newly coated surfaces.

C.

Surface Preparation: Clean and prepare surfaces to be coated according to manufacturer's written instructions for each substrate condition and as specified.

1.

Gypsum Substrates: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Smoothly sand surfaces exposed to view and dust off.

D.

Material Preparation: Carefully mix and prepare coating materials according to manufacturer's written instructions.

1.

Maintain containers used in mixing and applying coatings in a clean condition, free of foreign materials and residue.

2.

Stir materials before applying to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into the material. Remove film and, if necessary, strain coating material before using.

3.

Use only the type of thinners approved by manufacturer and only within recommended limits.

E.

Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of the same material are to be applied. Tint undercoats to match color of finish coat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.

3.3

APPLICATION

A.

General: Apply high‑performance coatings according to manufacturer's written instructions.

1.

Use applicators and techniques best suited for the material being applied.

2.

Do not apply high‑performance coatings over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to forming a durable coating film.

3.

Coating colors, surface treatments, and finishes are indicated in the coating system descriptions.

4.

Provide finish coats compatible with primers used.

5.

The term "exposed surfaces" includes areas visible when permanent or built‑in fixtures, convector covers, grilles, covers for finned‑tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.

a.

Coat surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation, coat surfaces behind permanently fixed equipment or furniture with prime coat only.

b.

Coat back sides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.

B.

Scheduling Coating: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for coating as soon as practicable after preparation and before subsequent surface deterioration.

1.

The number of coats and film thickness required is the same regardless of application method.

a.

Do not apply succeeding coats until previous coat has cured as recommended by manufacturer.

b.

Where manufacturer's written instructions require sanding, sand between applications to produce a smooth, even surface.

c.

Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until coating has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and application of another coat does not cause undercoat to lift or lose adhesion.

2.

If undercoats or other conditions show through final coat, apply additional coats until cured film has a uniform coating finish, color, and appearance. Give special attention to edges, corners, crevices, welds, exposed fasteners, and similar surfaces to ensure that they receive a dry film thickness equivalent to that of flat surfaces.

C.

Application Procedures: Apply coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions.

1.

Brush Application: Use brushes best suited for material applied and of appropriate size for the surface or item being coated.

a.

Apply primers and first coats by brush unless manufacturer's written instructions permit using roller or mechanical applicators.

b.

Brush out and work brush coats into surfaces in an even film.

c.

Eliminate cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Neatly draw glass lines and color breaks.

2.

Rollers: Use rollers of carpet, velvet back, or high‑pile sheep's wool as recommended by manufacturer for the material and texture required.

3.

Spray Equipment: Use mechanical methods to apply coating if permitted by manufacturer's written instructions and governing regulations.

a.

Use spray equipment with orifice size recommended by manufacturer for material and texture required.

b.

Apply each coat to provide the equivalent hiding of brush‑applied coats.

c.

Do not double back with spray equipment building‑up film thickness of two coats in one pass, unless recommended by manufacturer.

D.

Minimum Coating Thickness: Apply each material no thinner than manufacturer's recommended spreading rate. Provide total dry film thickness of the entire system as recommended by manufacturer.

E.

Prime Coats: Before applying finish coats, apply a prime coat of material, as recommended by manufacturer, to material required to be coated or finished that has not been prime coated by others.

1.

Recoat primed and sealed substrates if there is evidence of suction spots or unsealed areas in first coat, to ensure a finish coat with no burn‑through or other defects caused by insufficient sealing.

F.

Completed Work: Match approved Samples for color, texture, and coverage. Remove, refinish, or recoat work that does not comply with specified requirements.

3.4

CLEANING

A.

Cleanup: At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

1.

After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

3.6

PROTECTION

A.

Protect work of other trades, whether being coated or not, against damage from coating operation. Correct damage by cleaning, repairing, replacing, and recoating, as approved by Contracting Officer, and leave in an undamaged condition.

1.

Provide "Wet Paint" signs to protect newly coated finishes. After completing coating operations, remove temporary protective wrappings provided by others to protect their work.

2.

At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces. Comply with procedures specified in PDCA(P1.

END OF SECTION 09960

RML AUTOCLAVE REPLACEMENT ( NIH-NIAID RML ( HAMILTON, MT

HIGH‑PERFORMANCE COATINGS 09960 ‑ 8

File details come from the government source that posted it. Updated .