ADG 96‑620 A
07-743
SECTION 09721 ‑ EPOXY QUARTZ FLOORING & WALL
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Sections A through M of the Contract and other Division 1 Specification Sections, apply to this Section.
1.2 DESCRIPTION OF WORK
A.
This Section describes a single source (manufacturer and applicator), anti‑microbial epoxy quartz flooring for this project further defined as systems:
1.
SPC, Floors and Base
2.
SPC‑1, Gypsum Board walls and Ceilings
1.3 RELATED SECTIONS INCLUDE THE FOLLOWING:
A.
Division 7 Section, “Joint Sealants”
1.4 SYSTEM DESCRIPTION
A.
SPC features multi‑colored quartz aggregate set in a clear epoxy matrix and sealed with a non‑ reflective urethane topcoat.
B.
SPC‑1 is a high performance, high solids epoxy glaze coating designed for vertical surfaces.
C.
The SPC system shall have the following performance properties:
1.
Electrical Conductivity
Electrically non‑conductive.
2.
Bond Strength, ASTM D‑4541
400 psi (100% Concrete failure).
3.
Flammability, D‑635
Self extinguishing.
4.
Water Absorption, ASTM C‑413
.2%
5.
Surface Hardness D‑2240
85‑90 (Shore D).
6.
Indentation, MIL D‑3134F
None.
7.
Compressive Strength, ASTM‑C579, 7
10,000.
days, psi
8.
Tensile Strength, ASTM‑C‑307, psi
1,750
9.
Flexural Strength, ASTM‑C‑580, psi
4,000
10.
Thermal Coefficient of Expansion,
3.5 x 10‑5
ASTM‑C‑531, in/in/(F
D.
The SPC‑1 system shall have the following performance properties:
1.
Bond Strength, ASTM D‑4541
400 psi (100% Concrete failure).
2.
Flammability, D‑635
Self extinguishing.
3.
Surface Hardness D‑2240
80‑85 (Shore D).
4.
Compressive Strength, ASTM‑C579,7
N/A days, psi
5.
Tensile Strength, ASTM‑C‑307, psi
N/A
6.
Flexural Strength, ASTM‑C‑580, psi
N/A
7.
Impact Resistance
Exceeds 40 in‑lbs VSC & 70 in‑ lbs VSD
8.
Abrasion Resistance
0.08 gr max weight loss
9.
Heat resistance
140 degree F / 60 degree C
E.
Chemical Resistant Epoxy for Seal Coat and Gloss Finish Aliphatic Urethane
F.
The epoxy shall have the following chemical resistance as determined by continuous immersion testing:
E—Excellent (up to 7 days)
G—Good (up to 24 hours)
SS—Recommended for splash and spillage
*—May cause slight stain or discoloration
Epoxy Urethane Acetic Acid, 10%
SS
E
Acetic Acid, 50%
SS
SS
Acetone
SS
E
Aluminum Chloride E G
Aluminum Nitrate E G
Ammonium Hydroxide, 28%
SS
G
Benzoic E G
Butyric Acid, 10%
SS
SS
Calcium Chloride 30% E E
Calcium Hypochlorite, 20% E G
Chlorine, Wet and Dry
SS
SS
Chromic Acid, 10%
SS
SS
Citric Acid, 10% E E
Citric Acid, 30% E E
Clorox®, full strength
SS
E
Diethyl Phthalate E G
Ethyl Alcohol, 95%
SS
G
Ethyl Glycol E E
Formaldehyde 37%
SS
SS
Formic Acid, <10%
SS
G
Formic Acid, >10%
SS
G
Gasoline E E
Glycerin E E
Hydraulic Fluid E E
Hydrochloric Acid, 10% E E
Hydrochloric Acid, 37% G E
Hydrogen Peroxide, 6%
SS
SS
Isopropyl Alcohol
SS
E
JP‑4 Jet Fuel E E
Lactic Acid, <20% E E
Lactic Acid, >20%
SS
E
Malice Acid, <10%
SS
E
Methanol
SS
E
Methyl Ethyl Ketone (MEK)
SS
E
Methyl Isobutyl Ketone (MIBK)
SS
E
Mineral Spirits E E
Motor Oil E E
Nitric Acid, 10% E E
Nitric Acid, 30%
SS
E
Oleic Acid E E
Oxalic Acid, 10% G E
Phenol, <10%
SS
SS
Phosphoric Acid, 10% E G
Phosphoric Acid, 50% E G
Phosphoric Acid, 85%
SS
G
Potassium Hydroxide E E
Potassium Permanganate, 25%
SS
Silver Nitrate, 10%
SS
Skydrol A500 E E
Sodium Hydroxide, 30% E E
Sodium Hydroxide, 50% E E
Sodium Hypochlorite, 15%
SS
E
Sulfuric Acid, 10% E E
Sulfuric Acid, 30% E E
Sulfuric Acid, up to 98%
SS
E
Tannic Acid G E
Tartaric Acid G
SS
Toluene
SS
E
Triacetin G
Trichloroethane G
SS
Trichloroethylene G
SS
Trisodium Phosphate E E
Turpentine G E
Urea E
Urine E E
Xylene G E
Zinc Chloride E G
1.5 SUBMITTALS
A.
Product Data—Submit manufacturer's product data on specific products of the Flooring System, including physical properties and performance properties.
B.
Applicator's Qualification Letter—Furnish list of at least three (3) projects using material specified or similar for this project that applicator has installed during the past five years. Include the following:
1. Project name.
2. Flooring system.
3. Square footage of flooring installed.
4. Contact name with Owner address and phone number.
5. Resumes of key project personnel, including supervisors and technicians.
C.
Submit EPA registration number for the anti‑microbial ingredient used in the cage wash system.
Include Acute Oral LD‑50 Toxicity in rats and statement that ingredient contains no arsenic, phenol or heavy metals, and complies with USDA requirements.
D.
Warranty—Finish manufacturer's written single source warranty covering material and labor on work for period of one year after installation, warranting against loss of (coloration) bond and wear‑ through to concrete substrate through normal wear and tear for an animal facility.
1.6 QUALITY ASSURANCE
A.
Manufacturer's Qualifications
1.
Obtain Epoxy Quartz Flooring System materials from a single manufacturer with a minimum of two (2) years of experience providing materials of the type specified in this section.
2.
The Epoxy Quartz Flooring System manufacturer shall provide a representative who will instruct the applicator's crew on the proper techniques of applying the Epoxy Quartz Flooring System at the site for installation of the sample area.
B.
Contractor Qualifications—Installation shall be performed by a seamless flooring contractor with a minimum of five (5) years of experience in the application of the type of system as specified in this section, and shall be approved by the manufacturer of the Epoxy Quartz Flooring System. The contractor's key personnel, including the field supervisor and technicians, shall have not less than three (3) years experience.
C.
Floor Thickness Verification—At the Contracting Officer's direction, and under his supervision, the Contractor shall take one (1) random core per 1,000 sq. ft. through the floor to the substrate, prior to applying the seal coat, to verify proper flooring thickness. The cores shall be removed and replaced by the installing Contractor, in a manner that does not affect the integrity of the overall floor.
D.
Certification — Upon the completion of each section of floor, a representative of the contractor will certify in writing the amount of square footage and the number of gallons of 100% solid epoxy resin, excluding coved base, primers and sealers that have been used in that section of floor.
E.
Samples Area — After approval of submittals, install a sample of the flooring and base in a single room (to be assigned by the Contracting Officer) to establish the quality to be provided throughout the project. No further installation may be done until the sample area is reviewed and approved by the Contracting Officer.
1.7 MATERIAL DELIVERY, HANDLING AND STORAGE
A.
Primary system materials shall be delivered in the manufacturer's undamaged, unopened containers. Each container shall be clearly marked with the following:
1. Product name
2. Manufacturer's name
3. Component designation (A or B, etc.)
4. Ratio of component mixture
5. Date of manufacture or "allowable use" date
B.
Store materials in accordance with manufacturer's instructions, with seals and labels in tact and legible. Maintain temperatures within the required range. Do not use materials which have been stored for a longer period of time than the manufacturer's maximum recommended shelf life.
1.8 JOB CONDITIONS
A.
The applicator's and manufacturer's representative shall visit the job site prior to beginning the application of the Epoxy Quartz Flooring System to evaluate the extent of repairs required. Testing shall also be done to verify that the moisture content of the slab does not exceed that as recommended by the manufacturer. The contractor and manufacturer's representative shall certify acceptance of the substrate.
1.
Examine substrate before application of finish. Surface shall be flush, true to plane and line, and level within specified tolerances.
B.
The applicator shall exercise care during surface preparation and system application to protect surrounding substrates and surfaces, as well as in place equipment. The applicator shall use his discretion as to the physical means and methods used for preparation and protection. Any costs incurred for resultant damage from negligence or inadequate protection shall be the sole responsibility of the applicator.
C.
During material application, care shall be exercised to comply with the temperature and humidity limitations of the materials used as defined by the manufacturer. The system shall not be installed if the substrate or air temperature is less than 65( F or if relative humidity is more than 85%.
PART 2 ‑ PRODUCTS
2.1
APPROVED MANUFACTURER
A.
In order to establish the desired quality and performance of the Epoxy Quartz Flooring System, the specification is based on products as manufactured by STONHARD of Richmond, Ca. 94804 [510] 231‑8930 as follows:
1.
SPC — Stonclad GS "steel trowel applied" is a nominal 1/4" flooring system with 4 inch high tapered base with 3/4 inch radius cove (floor to wall) and 1/2 inch radius cove at corners (wall to wall). [trowel applied] Apply Stoncoat GS 4 epoxy [4 mil] and slip resistance texture and a finish coat of GS 6 urethane [2 mil] with anti microbial AM 9 additive.
3.
SPC‑1 Stonglaze VSC on drywall walls is a 25 mil wall covering system. Apply by roller in three coats.
B.
Equivalent products by other manufacturers will be considered, subject to the requirements of Section 01605 and Special Provisions 104D of this Section.
1.
Approved Equals:
Cheminert K by Dexo Tex
TPM 115 by General Polymer
2.2
MATERIALS
A.
Materials used shall comply with USDA requirements for use in food preparation areas.
B.
Aggregate used as mineral filler admixture shall be special ceramic coated quartz in color or colors to be selected by the Owner's representative from manufacturer's standard colors.
C.
Thermo‑setting epoxy resin type binder shall be 100% non‑volatile product.
D.
Leveling, Sloped and Fill Underlayment — Use product and installation methods equal to:
Seamless Technologies, Inc.—Seam Tek( Under Top E
Properties shall meet or exceed the following:
Compressive Strength
ASTM C‑579
8,000 Psi (55.16 MPa)
Tensile Strength
ASTM C‑307
2,000 psi (13.79 MPa)
Flexural Strength
ASTM D‑580
3,200 psi (22.06 MPa)
Flexural Modulus
ASTM C‑580
2.5 x 10.8 Bond Strength
ACI 403
350 psi (2.41 MPa)
100% Concrete failures
Flammability
ASTM D‑635
Self Extinguishing
Electrical Conductivity
Non‑conductive
Water Absorption
ASTM D‑570
.5%
Surface Hardness
ASTM D‑2240
80‑85 (Shore D)
Indentation
MIL D‑3134F
.25 Max.
Impact Resistance
MIL D‑3134F
16 ft.‑lbs. (21.7 J) no cracking, chipping, delamination
Thermal Coefficient of
ASTM D‑531
16 x 10.8 in/in/(F
Lineal Expansion
(28.8 x 10.8 cm/cm/(C)
PART 3 ‑ EXECUTION
3.1
INSPECTION
A.
Examine areas to receive the work for defects which will affect the execution of the work and for deviations beyond allowable tolerances.
B.
Start work when defects have been corrected.
3.2
SURFACE PREPARATION
A.
Protect adjacent surfaces from staining or damage caused by installation.
B.
Prepare concrete by means of vacuum blasting, removing all contaminating or bond breaking substances, including but not limited to dust, laitance, curing compounds, coatings, sealers, oil and grease. All spilled or deteriorated concrete shall be mechanically removed by scabbling or chipping hammers. Acid etching or other chemical preparation is not acceptable.
C.
Joint and Crack Repair
1.
Rout, saw out or rake out cracks and non‑expansion joints after surface preparation, and fill with STI semi‑rigid epoxy. Filled cracks or joints shall have fiberglass cloth or flexible urethane "Band aid" applied over them to further inhibit cracks from telegraphing through epoxy.
D.
Sloped floor area, to receive cementitious fill shall be built‑up from concrete slab with epoxy underlayment system. Level areas shall meet flatwork concrete level and flatness tolerances. Sloped areas shall slope in uniform planes to low points as indicated. Tolerance shall be 1/8 inch maximum deflection in 10 feet.
3.3
APPLICATION
A.
General
1.
Apply each component of the Epoxy Quartz Flooring System in strict compliance with manufacturer's written installation instructions, including mixing and application methods, recoat windows, cure times and environmental restrictions. System shall be applied directly over all treated joints and cracks. The system can NOT have any pinholes.
2.
Manufacturer's representative shall be present during installation of sample area.
B.
Epoxy Cove Base—Cove base shall be tapered 1/8 inch thick at the top and 1/4 inch thick at the bottom and shall be applied before floor surfaces. Shall have a feathered upper terminating edge of the cove base Mix 100% solids thixotropic epoxy resin and granules as recommended by the manufacturer. Apply this mixture over the primed vertical substrate using a 3/4 inch radius cove base tool. Bottom of cove shall have temporary screed matching flooring thickness to prevent unevenness where subsequent floor application meets cove. Seeded cove base will not be accepted.
3.4
CURING, CLEANING AND PROTECTION
A.
Cure all flooring materials in compliance with manufacturer's directions, taking care to prevent contamination during stages of the application and prior to completion of curing process.
B.
Protect Flooring from damage and wear during other phases of the construction operation using temporary covering as recommended by the manufacturer. Remove temporary covering just prior to final inspection.
C.
Clean Flooring just prior to final inspection, using materials and procedures suitable to the system manufacturer.
END OF SECTION 09721
RML AUTOCLAVE REPLACEMENT • NIH‑NIAID RML • HAMILTON, MT
EPOXY QUARTZ FLOORING & WALL 09721 ‑ 7