NEPA 554-27-117 Concrete and Civil Repairs - GEMS review.pdf

PDF 19 MB Posted

Attached to
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation number
36C25926Q0826
Issued by

About this file

This file is a Statement of Work (SOW) and supporting documents for concrete and civil site repairs at the Rocky Mountain Regional Veterans Affairs Medical Center (RMRVAMC) in Aurora, Colorado (Project Number 554-27-117).

The primary objective is to conduct repair and replacement of concrete sidewalks, curbs, and drainage systems across the RMRVAMC campus to remedy improper drainage issues causing water intrusion into service levels and basements. The scope encompasses 52 distinct repair items including sidewalk leveling, curb repairs, sidewalk additions, drainage installation, and concrete patching across multiple locations. The contractor must coordinate with the Contracting Officer's Representative (COR) prior to commencing work and provide all necessary labor, equipment, materials, and expertise. The contract includes mandatory requirements for a 30-hour OSHA-certified Competent Person on-site at all times, submission of a site-specific safety plan and activity hazard analysis, compliance with VA drawings and specifications, adherence to NFPA 99 and 101 codes, and implementation of Infection Control Risk Assessment (ICRA) Level II protocols. The period of performance is 60 calendar days from Notice to Proceed, with normal business hours restricted to Monday-Friday, 0730-1600 hours, excluding federal holidays. All contractor personnel require PIV badges and background clearance. The contractor assumes full liability for property damage and must maintain quality control through daily cleanup, damage reporting within two working days, and VA acceptance of all completed work. Supporting documents include environmental compliance procedures, hazardous material spill response protocols, and pollution prevention standards applicable to construction activities at the federal healthcare facility.

View the file

Other files

File Type Posted
36C25926Q0826 0002.pdf PDF
36C25926Q0826 0003.pdf PDF
Attachment H - 00CG352.pdf PDF
Attachment G - ACAD-DVAMC Off SIte Irrigation Plan.pdf PDF
Concrete RFIs Responses.pdf PDF
Attachment B - Repair List 11226_01.xlsx XLSX spreadsheet
Specifications 554-27-117 Conduct Concrete and Civil Repairs v1.pdf PDF
Attachment J - Overall site vault plan.pdf PDF
Attachment B - Repair List 11226.xlsx XLSX spreadsheet
Attachment F - Self-compacting fill.pdf PDF
554-27-117 Concrete Repair Signing sheet.pdf PDF
Site Visit Meeting Doc.docx DOCX document
36C25926Q0826 0001.pdf PDF
36C25926Q0826.pdf PDF
Specifications 554-27-117 Conduct Concrete and Civil Repairs.pdf PDF
Past Performance Questionnaire_Blank.docx DOCX document
Self-Performed and Subcontracted Worksheet.docx DOCX document
Attachment A - 00LS100 - Repair map.pdf PDF
Attachment C - Emergency Planter Plan.pdf PDF
Attachment B - Repair List.pdf PDF
ICRA 554-27-117 - Concrete and Civil Repairs - Only For Bidding.pdf PDF
Attachment E - Sidewalk Standard Detail.pdf PDF
S22-LOS Certification 852.219-75 JAN 2023 DEVIATION.docx DOCX document
Prime and Sub Contractor Construction Breakdown.xlsx XLSX spreadsheet
Attachment D - Conceptual rebounding bollard repair.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .