Attachment J - Overall site vault plan.pdf

PDF 11 MB Posted

Attached to
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation number
36C25926Q0826
Issued by

About this file

This document is an Overall Site Vault Plan for the Replacement Medical Center facility at the Eastern Colorado Health Care System in Aurora, Colorado (Project Number 554-501). The plan, dated October 23, 2023, was prepared as of September 15, 2025, and is maintained by the Office of Construction and Facilities Management within the Department of Veterans Affairs.

The site plan illustrates the locations of utility vaults and infrastructure systems across eleven buildings and three parking facilities. The plan employs a color-coded legend identifying new and existing utilities including electrical, sanitary, storm drain, communication, gas, water, steam, cold water return, and fiber optic systems. The document includes a Tank Capacity Schedule that lists eleven designated tanks with corresponding building locations, invert elevations at both building and tank locations, and storage capacities ranging from 15,000 to 50,000 gallons. Key facilities depicted include the Energy Center (ENC), Inpatient Building North (IBN), Inpatient Building South (IBS), Diagnostic and Treatment (DAT), Research (RES), three Clinic Buildings (CBN, CBC, CBS), two parking facilities (PSN, PVN, PVS), and Fisher House. The plan provides vault designation numbers and identifies the locations of fire hydrants, telecom junctions, manholes, and various utility connections throughout the site, serving as the authoritative as-built conditions reference for facility infrastructure management.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

EN5A

E

EN5B

EEN4B

E

EN4A

E

EN2A

E EN2B

E

EE1B

E

EE1A

EEE2B

E EE4B

E

EE5B

E

EE4A

E

EE5A

E

EE6B

E

EN3A

E

EN3B

E EN1A

E EN1B

E

EW1A E

EW1B

E

EW2A

E

EW2B

E

EW3B

E

EW3A E

EW4A

E

EW4B

E

EC6A

E

EC6B

E EC5BE

EC5A

E

EC4BE

EC4A

E

EC3B

E

EC3A

E

EC2B

E

EC2A

EEC1B

E

EC1A

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

SSSS

S

S

S S

S S

S

S

S

S

S S

SSS

S

S

D

D

D

D

D

D

D

D D D D D

D D

D

D

D D D D

D D D

D

D

D

D D D

D

D

D

D

D D

D

D

D

D

D

D

D

D

D

D D

D

MFD

MFD

MFD

D

MFD

D

D

D

MFD

COM VATC-9

COM

VATC-10

COM

VATC-11

COM

VATC-12

COM

VATC-15

COM

VATC-16

COM

VATC-17

COM

VATC-18

COM

EXISTING VAULT U2

COM

VATC-19

COM

VATC-1

COM

VATC-2

COM

VATC-3

COM

VATC-4

COM

VATC-30

COM

VATC-29

COM

COM

VATC-14

T

T

COM

NEW VAULT R1

T

W W

W W

W

W

W

W

E

E

E

E

E

EE2A

E

XXXX

S

S

S S

S

S

S

S

S

S

S S

S

S

S

S

S S

S

S

ENERGY

CENTER

(ENC)

INPATIENT

BUILDING

NORTH

(IBN)

INPATIENT

BUILDING

SOUTH

(IBS)

DIAGNOSTIC AND

TREATMENT

(DAT)

RE

SE

AR

CH

(R

ES

CLINIC

BUILDING

SOUTH

(CBS)

CLINIC

BUILDING

CENTRAL

(CBC)

CLINIC

BUILDING

NORTH

(CBN)

PARKING

VISITOR

NORTH

(PVN)

PARKING

STAFF

NORTH

(PSN)

PARKING VISITOR

SOUTH (PVS)

FISHER

HOUSE

(FISHER)

PRRTP

E

TH

P

LA

CE

N FITZSIMONS PKWY

E

CO

LF

AX

A

VE

N WHEELING ST

N FITZSIMONS PKWY

COM

E

E

E

S S

06-EN

C

-2

05-IBN

-106-EN

C -1

-IB

N -2

04-IBS-1

04-IBS-2

10-C

BN

-1

09-C

BC

-1

03-DAT-2

03-D

AT-1

-R

ES

-1

COM

TV

D

S

W

MFD

FO

E T

COM

VATC-XX

E

XXXX

T

NEW UTILITIES EXISTING UTILITIES

ELECTRICAL

SANITARY

STORM DRAIN

COMMUNICATION

GAS

WATER

SYMBOLS

FLARED END SECTION

INLET

MANHOLES

VAULTS

TELECOM JUNCTION

FIRE HYDRANTSSTEAM

COLD WATER RETURN

FIBER

TELECOM

FITTINGS

VALVE

E

FENCE

SS

CATV

SEWER MANHOLE

NGAS MANHOLE

PROPERTY LINE

02-RES-1

03-DAT-1

03-DAT-2

04-IBS-1

04-IBS-2

05-IBN-1

05-IBN-2

06-ENC-1

06-ENC-2

09-CBC-1

10-CBN-1

RESEARCH - 2 - B

DIAGNOTIS & TESTING - 3 - F/D

DIAGNOTIS & TESTING - 3 - F/D

INPATIENT BUILDING SOUTH - 4 - H

INPATIENT BUILDING SOUTH - 4 - H

INPATIENT BUILDING NORTH - 5 - K

INPATIENT BUILDING NORTH - 5 - K

ENERGY CENTER - 6 - L

ENERGT CENTER - 6 - L

CLINICAL BUILDING CENTRAL - 9 - E

CLINICAL BUILDING NORTH - 10 - A

EAST

EAST

SOUTH

EAST

WEST

NORTH

SOUTH

NORTH**

NORTH

NORTH

NORTH

5376.33 5374.47 5379.97 5373.46 5375.79

5371.20*** 5375.16 5368.50 5368.50 5373.53 5373.42

5374.99 5373.13 5378.71 5372.28 5374.61 5369.76 5374.00 5366.16 5366.48 5372.35 5372.24

30,000 35,000 50,000 15,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000

DESIGNATION BUILDING TANK LOCATION INVERT @

BLDG

INVERT @

TANK

CAPACTIY

(GAL)

* LOCATIONS ARE RELATIVE TO BUILDING LOCATION

** NORTHERNMOST LOCATION

*** REFER TO DIVERSION MANHOLE DTL 2/00.CU.751

**** REFER TO PLUMBING PLANS FOR SANITARY ROUTING INVERTS AND INFORMATION.

TANK CAPACITY SCHEDULE

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

9/

/2

8:

:5

AM

C :\U se rs

\V H

AE

C

H W illi Se a\ O ne D riv e

- D ep ar tm en t o f V et er an s Af fa irs

\D oc um en ts \E

S-

SI

T

PL

AN

V

AU

LT

C

AR

TO

O

N D

R

AW

IN

G

_V H

AE

C

H W illi Se a.

rv t

9/15/2025 8:47:52 AM

00.ES.1000

OVERAL SITE VAULT PLAN

10/23/23

1" = 50'-0"1 OVERALL SITE VAULT PLAN

File details come from the government source that posted it. Updated .