Attachment J - Overall site vault plan.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25926Q0826
About this file
This document is an Overall Site Vault Plan for the Replacement Medical Center facility at the Eastern Colorado Health Care System in Aurora, Colorado (Project Number 554-501). The plan, dated October 23, 2023, was prepared as of September 15, 2025, and is maintained by the Office of Construction and Facilities Management within the Department of Veterans Affairs.
The site plan illustrates the locations of utility vaults and infrastructure systems across eleven buildings and three parking facilities. The plan employs a color-coded legend identifying new and existing utilities including electrical, sanitary, storm drain, communication, gas, water, steam, cold water return, and fiber optic systems. The document includes a Tank Capacity Schedule that lists eleven designated tanks with corresponding building locations, invert elevations at both building and tank locations, and storage capacities ranging from 15,000 to 50,000 gallons. Key facilities depicted include the Energy Center (ENC), Inpatient Building North (IBN), Inpatient Building South (IBS), Diagnostic and Treatment (DAT), Research (RES), three Clinic Buildings (CBN, CBC, CBS), two parking facilities (PSN, PVN, PVS), and Fisher House. The plan provides vault designation numbers and identifies the locations of fire hydrants, telecom junctions, manholes, and various utility connections throughout the site, serving as the authoritative as-built conditions reference for facility infrastructure management.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
EN5A
E
EN5B
EEN4B
E
EN4A
E
EN2A
E EN2B
E
EE1B
E
EE1A
EEE2B
E EE4B
E
EE5B
E
EE4A
E
EE5A
E
EE6B
E
EN3A
E
EN3B
E EN1A
E EN1B
E
EW1A E
EW1B
E
EW2A
E
EW2B
E
EW3B
E
EW3A E
EW4A
E
EW4B
E
EC6A
E
EC6B
E EC5BE
EC5A
E
EC4BE
EC4A
E
EC3B
E
EC3A
E
EC2B
E
EC2A
EEC1B
E
EC1A
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
SSSS
S
S
S S
S S
S
S
S
S
S S
SSS
S
S
D
D
D
D
D
D
D
D D D D D
D D
D
D
D D D D
D D D
D
D
D
D D D
D
D
D
D
D D
D
D
D
D
D
D
D
D
D
D D
D
MFD
MFD
MFD
D
MFD
D
D
D
MFD
COM VATC-9
COM
VATC-10
COM
VATC-11
COM
VATC-12
COM
VATC-15
COM
VATC-16
COM
VATC-17
COM
VATC-18
COM
EXISTING VAULT U2
COM
VATC-19
COM
VATC-1
COM
VATC-2
COM
VATC-3
COM
VATC-4
COM
VATC-30
COM
VATC-29
COM
COM
VATC-14
T
T
COM
NEW VAULT R1
T
W W
W W
W
W
W
W
E
E
E
E
E
EE2A
E
XXXX
S
S
S S
S
S
S
S
S
S
S S
S
S
S
S
S S
S
S
ENERGY
CENTER
(ENC)
INPATIENT
BUILDING
NORTH
(IBN)
INPATIENT
BUILDING
SOUTH
(IBS)
DIAGNOSTIC AND
TREATMENT
(DAT)
RE
SE
AR
CH
(R
ES
CLINIC
BUILDING
SOUTH
(CBS)
CLINIC
BUILDING
CENTRAL
(CBC)
CLINIC
BUILDING
NORTH
(CBN)
PARKING
VISITOR
NORTH
(PVN)
PARKING
STAFF
NORTH
(PSN)
PARKING VISITOR
SOUTH (PVS)
FISHER
HOUSE
(FISHER)
PRRTP
E
TH
P
LA
CE
N FITZSIMONS PKWY
E
CO
LF
AX
A
VE
N WHEELING ST
N FITZSIMONS PKWY
COM
E
E
E
S S
06-EN
C
-2
05-IBN
-106-EN
C -1
-IB
N -2
04-IBS-1
04-IBS-2
10-C
BN
-1
09-C
BC
-1
03-DAT-2
03-D
AT-1
-R
ES
-1
COM
TV
D
S
W
MFD
FO
E T
COM
VATC-XX
E
XXXX
T
NEW UTILITIES EXISTING UTILITIES
ELECTRICAL
SANITARY
STORM DRAIN
COMMUNICATION
GAS
WATER
SYMBOLS
FLARED END SECTION
INLET
MANHOLES
VAULTS
TELECOM JUNCTION
FIRE HYDRANTSSTEAM
COLD WATER RETURN
FIBER
TELECOM
FITTINGS
VALVE
E
FENCE
SS
CATV
SEWER MANHOLE
NGAS MANHOLE
PROPERTY LINE
02-RES-1
03-DAT-1
03-DAT-2
04-IBS-1
04-IBS-2
05-IBN-1
05-IBN-2
06-ENC-1
06-ENC-2
09-CBC-1
10-CBN-1
RESEARCH - 2 - B
DIAGNOTIS & TESTING - 3 - F/D
DIAGNOTIS & TESTING - 3 - F/D
INPATIENT BUILDING SOUTH - 4 - H
INPATIENT BUILDING SOUTH - 4 - H
INPATIENT BUILDING NORTH - 5 - K
INPATIENT BUILDING NORTH - 5 - K
ENERGY CENTER - 6 - L
ENERGT CENTER - 6 - L
CLINICAL BUILDING CENTRAL - 9 - E
CLINICAL BUILDING NORTH - 10 - A
EAST
EAST
SOUTH
EAST
WEST
NORTH
SOUTH
NORTH**
NORTH
NORTH
NORTH
5376.33 5374.47 5379.97 5373.46 5375.79
5371.20*** 5375.16 5368.50 5368.50 5373.53 5373.42
5374.99 5373.13 5378.71 5372.28 5374.61 5369.76 5374.00 5366.16 5366.48 5372.35 5372.24
30,000 35,000 50,000 15,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000
DESIGNATION BUILDING TANK LOCATION INVERT @
BLDG
INVERT @
TANK
CAPACTIY
(GAL)
* LOCATIONS ARE RELATIVE TO BUILDING LOCATION
** NORTHERNMOST LOCATION
*** REFER TO DIVERSION MANHOLE DTL 2/00.CU.751
**** REFER TO PLUMBING PLANS FOR SANITARY ROUTING INVERTS AND INFORMATION.
TANK CAPACITY SCHEDULE
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R
ES
D
AT
IB
S
IB
N
EN
C
C
LC
C
BN
C
BC
C
BS
PS
N
PV
N
PV
S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
9/
/2
8:
:5
AM
C :\U se rs
\V H
AE
C
H W illi Se a\ O ne D riv e
- D ep ar tm en t o f V et er an s Af fa irs
\D oc um en ts \E
S-
SI
T
PL
AN
V
AU
LT
C
AR
TO
O
N D
R
AW
IN
G
_V H
AE
C
H W illi Se a.
rv t
9/15/2025 8:47:52 AM
00.ES.1000
OVERAL SITE VAULT PLAN
10/23/23
1" = 50'-0"1 OVERALL SITE VAULT PLAN