This document is a facilities remediation scope of work identifying 52 mapped deficiency locations and required repair actions at a campus facility. The remediation focuses on concrete sidewalk and curbing repairs, drainage improvements, and safety enhancements to address damage from snow removal operations, water intrusion, settlement, and general wear.
Primary remediation categories include: sidewalk repairs (leveling sunken sections, patching chunks, replacing damaged pads) at 23 locations; curbing repairs (patching, painting, or replacement) at 16 locations; drainage system improvements including French drain replacement with 4" and 6" drain lines, catch basin installation, and drainage pad construction to address water intrusion issues at four major locations totaling approximately 700 square feet; and safety/accessibility enhancements including widening sidewalks around a cell tower pole (35-40 sf), adding sidewalk extensions to chapel loop access points (approximately 2,100 combined sf), installing rebounding safety bollards with landscape wall reconstruction, and installing concrete planters at emergency entrance. Additional work includes sink pit remediation (230 cubic yards of fill), concrete pad slope correction, and removal of landscape fill with concrete topping at multiple locations. All sidewalk and drainage repairs must withstand the weight of standard skid-steer equipment. The document references Attachment C for planter configuration and Attachment D for conceptual bollard placement details. Total concrete repair and replacement work spans approximately 3,500+ square feet across the project scope.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .