RFI Round 3 Clarifications-FINAL 23 12 20.pdf

PDF 65 KB Posted

Attached to
SOLICITATION NOTICE FY24 NCR Construction IDIQ
Solicitation number
NCRFY24SolicitationConstructionIDIQ
Issued by

About this file

This document contains clarifications to questions received in response to a solicitation for an indefinite delivery/indefinite quantity construction contract in the National Capital Region. Offerors are required to submit past performance questionnaires or Contractor Performance Assessment Reporting System records for two out of five projects listed under the prior experience evaluation factor. Clarification is provided that the past performance rating requirement applies only to rated categories, and a past performance questionnaire would not be disqualified if an evaluator left categories blank that were not applicable to the project. The document also includes guidance on using Form D to list qualifications of an architectural/engineering firm subcontractor and clarifies where to submit pricing for certain repair line items.

View the file

Other files

File Type Posted
Solicitation Amendment 47PM0123R0023_0010-executed 24 01 09.pdf PDF
Solicitation Amendment 47PM0123R0023_0009-executed 24 01 05.pdf PDF
Bid Form_version 8_2024 01 05 .xlsx XLSX spreadsheet
GSA WNRC-Geotechnical Report-20210621.pdf PDF
UNIT PRICING SHEET for SEED WNRC RET WALL.xlsx XLSX spreadsheet
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual 2312 20.pdf PDF
Solicitation Amendment 47PM0123R0023_0008-executed 23 12 20.pdf PDF
RFI Clarifications - IDIQ 2024 - Round 2 RFI.pdf PDF
Site Visit Attendee List 23 10 17.pdf PDF
Solicitation Amendment 47PM0123R0023_0007-executed 23 12 19.pdf PDF
Solicitation Amendment 47PM0123R0023_0006-executed 23 12 11 .pdf PDF
MDE Stamped Plans - WNRC Ret Wall Replacement GSA-Site Plans-2022-02-23.pdf PDF
Solicitation Amendment 47PM0123R0023_0005-executed 23 12 01.pdf PDF
SOW 2023 12 1_rev.pdf PDF
Bid Form version 7_23 12 01.xlsx XLSX spreadsheet
22-SF-0088 - MDE Final Approval - WNRC Ret Wall Replacement GSA.pdf PDF
055213 Pipe and Tube Railings.pdf PDF
RFI Response 23 12 01.pdf PDF
Solicitation Amendment 47PM0123R0023_0004-executed 23 11 28.pdf PDF
Solicitation Amendment 47PM0123R0023_0003 .pdf PDF
Form D - Subcontractor Relationships Form v2 23 11 07.docx DOCX document
Form E-IDIQ Management Plan V1 23 11 07.docx DOCX document
Form B - Prior Experience Form v2 23 11 07.docx DOCX document
Form C - Key Personnel Form v2 23 11 07.docx DOCX document
The Solicitation v2 23 11 07.pdf PDF
Solicitation Amendment 47PM0123R0023_0002-executed 23 10 30.pdf PDF
NCR Pre-Proposal Conference Presentation 10 16 2023v1.pdf PDF
Solicitation Amendment 47PM0123R0023_0001-executed 23 10 16 .pdf PDF
Virtual Site Visit Attendees 23 10 16.pdf PDF
Form D - Subcontractor Relationships Form v1 23 10 12.docx DOCX document
47PM0123R0023 SF1442 v1 23 10 12.pdf PDF
Form B - Prior Experience Form v1 23 10 12.docx DOCX document
Form C - Key Personnel Form v1 23 10 12.docx DOCX document
Wage Determination MD20230054 23 09 01.pdf PDF
Offeror Representations and Certifications Form 23 10 05.pdf PDF
SEED SOW 23 02 16.pdf PDF
GSA Form 527.pdf PDF
Site Visit Authorization Request (VAR) Template.xlsx XLSX spreadsheet
Pre-Proposal Request for Information (RFI) Template.xlsx XLSX spreadsheet
The Solicitation 23 10 05.pdf PDF
SF1442 47PM0123R0023 .pdf PDF
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual.pdf PDF
Form F - Socio Economic Status Form.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Drawings .pdf PDF
Form E-IDIQ Management Plan.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Specifications.pdf PDF
Price Proposal Pricing Bid Form.xlsx XLSX spreadsheet
The Agreement 23 10 05.pdf PDF
Form A - Past Performance Form.docx DOCX document
Form C - Key Personnel Form.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# RFI Government Response

Answer to Question 71 in round 1 of Q&A stated that “A subcontract agreement for an A/E firm is required.” Further clarifications indicate only form D is required. Answers in this round indicate offerors should review

Factor 4 of the RFP that has qualification requirements for the A/E. Since there is no place on Form D to list A/E qualifications, how will GSA going to determine that the A/E meets those requirements?

Use the "Other (explain)" section of FORM D to enter the A/E qualifications

May offerors put the line item price described in question 17 (for patch repair and crack repair) on the SF1442 form or is there another place?

Response to question 293 RFI 1 stated: A unit price chart has been provided in section 2.1.1.18

A Separate Unit Price Sheet is now attached to this amendment

RFI ROUND 3 - FINAL Clarifications

FY24 NCR MATOC Construction IDIQ

Solicitation # 47PM0123R0023

Question 32 asks: Please confirm that a “Satisfactory” rating or no Evaluator rating entered for Small Business Subcontracting will be considered compliant/sufficient and/or not included in the requirement that all ratings for Small Business Subcontracting must be “Very Good” or better. (also question 31)

Based on the way question 32 is written, and based on the comments preceding the question, the offeror has two conditions they are asking about in their question, to which you provided one answer: The CPARS rating is required to be minimum "Very Good" for all categories.

They asked about “satisfactory” ratings in some categories, to which you replied that “very good” is necessary.

The offeror also included another part of the question that is causing confusion. It relates to categories that are BLANK. The offeror asked you to confirm if “a ‘Satisfactory’ rating or no

Evaluator rating entered,” was excluded from the “very good” evaluation.

The offeror appears to be asking if the “very good” rating requirement be waived if there is no evaluator rating in the small business subcontracting category, which does not apply to contracts set aside for small businesses. The response, The CPARS rating is required to be minimum "Very Good" for all categories,” indicates the CPARS must have very good in all categories, and by extension, if there is NO EVALUATOR RATING IN ANY CATEGORY, the

CPARS is not acceptable.

The reason categories are left blank is usually because the evaluator has determined it does not apply to the project, so the answer indicates you require a “Very good” rating on all categories, even those with “no evaluator rating entered,” that do not apply to the project seems like an error. Is it your intention that the requirement that “CPARS rating is required to be minimum ‘Very Good’ for all categories” apply to categories where there is “no Evaluator rating entered?”

Correction to RFI 2 Response to questions 31 & 32: The CPARS rating is required to be minimum "Very Good" for all RATED categories.

The PPQ is NOT disqualified if the evaluator includes NO RATING

(BLANK) for a specific category that is not applicable to the project being rated.

RFI Clarifications, RFI #8 " The answer to RFI#167 and your RFI question are undoubtedly connected. The (5) projects listed in the prior experience are the same (5) projects we are requiring past performance information for." Solicitation, page 31, Factor 1: Past Performance, "The Contractor is requested to choose two (2) of the projects that were submitted for the

Prior Experience evaluation factor (above)".

Please confirm that, according to the solicitation, of the five projects we list for Factor 2: Prior Experience, we are to include the CPARS or PPQs for two of those projects for Factor 1: Past Performance.

Yes, of the five projects submitted under prior experience, choose any two and submit a PPQ or CPARS demonstrating the past performance for those projects.