055213 Pipe and Tube Railings.pdf

PDF 32 KB Posted

Attached to
SOLICITATION NOTICE FY24 NCR Construction IDIQ
Solicitation number
NCRFY24SolicitationConstructionIDIQ
Issued by

About this file

This document contains specifications for pipe and tube railings required under a National Records Center construction contract. The specifications cover steel railings made from pipe or tube, with requirements for materials, fabrication, finishes, installation and execution. Key details include the use of ASTM A53 Grade A steel pipe or tube, with galvanized finish for exterior installations. Welded connections are to be used unless otherwise indicated. Railings must be installed level, plumb, square and true to line with a maximum variation of 1/4 inch in 12 feet. Anchorage devices and fasteners suitable for the intended substrate are specified.

View the file

Other files

File Type Posted
Solicitation Amendment 47PM0123R0023_0010-executed 24 01 09.pdf PDF
Solicitation Amendment 47PM0123R0023_0009-executed 24 01 05.pdf PDF
Bid Form_version 8_2024 01 05 .xlsx XLSX spreadsheet
RFI Round 3 Clarifications-FINAL 23 12 20.pdf PDF
GSA WNRC-Geotechnical Report-20210621.pdf PDF
UNIT PRICING SHEET for SEED WNRC RET WALL.xlsx XLSX spreadsheet
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual 2312 20.pdf PDF
Solicitation Amendment 47PM0123R0023_0008-executed 23 12 20.pdf PDF
RFI Clarifications - IDIQ 2024 - Round 2 RFI.pdf PDF
Site Visit Attendee List 23 10 17.pdf PDF
Solicitation Amendment 47PM0123R0023_0007-executed 23 12 19.pdf PDF
Solicitation Amendment 47PM0123R0023_0006-executed 23 12 11 .pdf PDF
MDE Stamped Plans - WNRC Ret Wall Replacement GSA-Site Plans-2022-02-23.pdf PDF
Solicitation Amendment 47PM0123R0023_0005-executed 23 12 01.pdf PDF
SOW 2023 12 1_rev.pdf PDF
Bid Form version 7_23 12 01.xlsx XLSX spreadsheet
22-SF-0088 - MDE Final Approval - WNRC Ret Wall Replacement GSA.pdf PDF
RFI Response 23 12 01.pdf PDF
Solicitation Amendment 47PM0123R0023_0004-executed 23 11 28.pdf PDF
Solicitation Amendment 47PM0123R0023_0003 .pdf PDF
Form D - Subcontractor Relationships Form v2 23 11 07.docx DOCX document
Form E-IDIQ Management Plan V1 23 11 07.docx DOCX document
Form B - Prior Experience Form v2 23 11 07.docx DOCX document
Form C - Key Personnel Form v2 23 11 07.docx DOCX document
The Solicitation v2 23 11 07.pdf PDF
Solicitation Amendment 47PM0123R0023_0002-executed 23 10 30.pdf PDF
NCR Pre-Proposal Conference Presentation 10 16 2023v1.pdf PDF
Solicitation Amendment 47PM0123R0023_0001-executed 23 10 16 .pdf PDF
Virtual Site Visit Attendees 23 10 16.pdf PDF
Form D - Subcontractor Relationships Form v1 23 10 12.docx DOCX document
47PM0123R0023 SF1442 v1 23 10 12.pdf PDF
Form B - Prior Experience Form v1 23 10 12.docx DOCX document
Form C - Key Personnel Form v1 23 10 12.docx DOCX document
Wage Determination MD20230054 23 09 01.pdf PDF
Offeror Representations and Certifications Form 23 10 05.pdf PDF
SEED SOW 23 02 16.pdf PDF
GSA Form 527.pdf PDF
Site Visit Authorization Request (VAR) Template.xlsx XLSX spreadsheet
Pre-Proposal Request for Information (RFI) Template.xlsx XLSX spreadsheet
The Solicitation 23 10 05.pdf PDF
SF1442 47PM0123R0023 .pdf PDF
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual.pdf PDF
Form F - Socio Economic Status Form.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Drawings .pdf PDF
Form E-IDIQ Management Plan.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Specifications.pdf PDF
Price Proposal Pricing Bid Form.xlsx XLSX spreadsheet
The Agreement 23 10 05.pdf PDF
Form A - Past Performance Form.docx DOCX document
Form C - Key Personnel Form.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RETAINING WALL DESIGN

WASHINGTON NATIONAL RECORDS CENTER CONTRACT #47PM0420R0023

PIPE AND TUBE RAILINGS 055213 - 1

SECTION 055213 - PIPE AND TUBE RAILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel railings.

1.2 COORDINATION

A. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

1.3 ACTION SUBMITTALS

A. Product Data:

1. Manufacturer's product lines of mechanically connected railings.

2. Handrail brackets.

3. Intermediate coats and topcoats.

4. Anchoring cement.

5. Metal finishes.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

1.4 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel in accordance with the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

1.5 DELIVERY, STORAGE, AND HANDLING

A. Protect mechanical finishes on exposed surfaces of railings from damage by applying a strippable, temporary protective covering before shipping.

1.6 FIELD CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with railings by field measurements before fabrication.

PIPE AND TUBE RAILINGS 055213 - 2

PART 2 - PRODUCTS

2.1 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.

2.2 STEEL RAILINGS

A. Source Limitations: Obtain each type of railing from single source from single manufacturer.

B. Pipe: ASTM A53/A53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.

1. Provide galvanized finish for exterior installations and where indicated.

C. Plates, Shapes, and Bars: ASTM A36/A36M.

2.3 FASTENERS

A. Fastener Materials:

1. Hot-Dip Galvanized Railing Components: Type 304 stainless steel or hot-dip zinc-coated steel fasteners complying with ASTM A153/A153M or ASTM F2329/F2329M for zinc coating.

2. Finish exposed fasteners to match appearance, including color and texture, of railings.

B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction.

C. Post-Installed Anchors: Galvanized fastener systems with working capacity greater than or equal to the design load, according to an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC193.

2.4 MISCELLANEOUS MATERIALS

A. Welding Rods and Bare Electrodes: Select in accordance with AWS specifications for metal alloy welded.

B. Etching Cleaner for Galvanized Metal: Complying with MPI#25.

C. Galvanizing Repair Paint: High-zinc-dust-content paint, complying with SSPC-Paint 20 and compatible with paints specified to be used over it.

2.5 FABRICATION

A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage.

PIPE AND TUBE RAILINGS 055213 - 3

B. Shop assemble railings to greatest extent possible to minimize field splicing and assembly.

Disassemble units only as necessary for shipping and handling limitations.

1. Clearly mark units for reassembly and coordinated installation.

2. Use connections that maintain structural value of joined pieces.

C. Cut, drill, and punch metals cleanly and accurately.

1. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated.

2. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

E. Fabricate connections that are exposed to weather in a manner that excludes water.

1. Provide weep holes where water may accumulate.

2. Locate weep holes in inconspicuous locations.

F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.

G. Connections: Fabricate railings with welded connections unless otherwise indicated.

H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove flux immediately.

4. At exposed connections, finish exposed welds to comply with NOMMA's "Voluntary Joint

Finish Standards" for Finish #3 welds; utilitarian appearance not subject to view, partially dressed weld with spatter removed.

I. Nonwelded Connections: Connect members with concealed mechanical fasteners and fittings.

Fabricate members and fittings to produce flush, smooth, rigid, hairline joints.

1. Fabricate splice joints for field connection, using an epoxy structural adhesive, if this is manufacturer's standard splicing method.

J. Bend members in jigs to produce uniform curvature for each configuration required. Maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.

K. Close exposed ends of hollow railing members with prefabricated cap and end fittings of same metal and finish as railings.

L. Provide wall returns at ends of wall-mounted handrails unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 1/4 inch or less.

M. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work unless otherwise indicated.

PIPE AND TUBE RAILINGS 055213 - 4

N. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work.

1. Fabricate anchorage devices capable of withstanding loads imposed by railings.

2. Coordinate anchorage devices with supporting structure.

O. For railing posts set in concrete, provide stainless steel sleeves not less than 6 inches long with inside dimensions not less than 1/2 inch greater than outside dimensions of post, with metal plate forming bottom closure.

2.6 STEEL AND IRON FINISHES

A. Galvanized Railings:

1. Hot-dip galvanize exterior steel railings, including hardware, after fabrication.

2. Comply with ASTM A123/A123M for hot-dip galvanized railings.

3. Comply with ASTM A153/A153M for hot-dip galvanized hardware.

4. Do not quench or apply post-galvanizing treatments that might interfere with paint adhesion.

5. Fill vent and drain holes that are exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.

B. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components.

C. Preparing Galvanized Railings for Shop Priming: After galvanizing, thoroughly clean railings of grease, dirt, oil, flux, and other foreign matter, and treat with etching cleaner and as follows.

1. Comply with SSPC-SP 16.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that locations of concealed reinforcements are clearly marked for Installer. Locate reinforcements and mark locations if not already done.

3.2 INSTALLATION, GENERAL

A. Perform cutting, drilling, and fitting required for installing railings.

1. Fit exposed connections together to form tight, hairline joints.

2. Install railings level, plumb, square, true to line; without distortion, warp, or rack.

3. Set railings accurately in location, alignment, and elevation; measured from established lines and levels.

4. Do not weld, cut, or abrade surfaces of railing components that are coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.

5. Set posts plumb within a tolerance of 1/16 inch in 3 feet.

PIPE AND TUBE RAILINGS 055213 - 5

6. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet.

B. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.

1. Coat concealed surfaces of aluminum that will be in contact with grout, concrete, masonry, wood, or dissimilar metals, with a heavy coat of bituminous paint.

C. Adjust railings before anchoring to ensure matching alignment at abutting joints.

D. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction.

3.3 ANCHORING POSTS

A. Form or core-drill holes not less than 5 inches deep and 3/4 inch larger than OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink grout, mixed and placed to comply with anchoring material manufacturer's written instructions.

B. Cover anchorage joint with flange of same metal as post, attached to post with setscrews.

C. Leave anchorage joint exposed with 1/8-inch buildup, sloped away from post.

3.4 CLEANING

A. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas, and repair galvanizing to comply with ASTM A780/A780M.

3.5 PROTECTION

A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.

B. Restore finishes damaged during installation and construction period, so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units.

END OF SECTION 055213